Draft_ANAD_FORGE2_Project 3_24 Apr 2026_PaintFacility.pdf

PDF 97 MB Posted

Attached to
DRAFT Anniston Army Depot FORGE 2 Other Transaction Authority (OTA) Request for Proposal (RPP)
Solicitation number
W91QEY-26-R-A002
Issued by

About this file

This is a Project 3 specification document for the Paint Facility component of the Anniston Army Depot (ANAD) FORGE 2 Military Construction initiative. The document outlines design and construction requirements for a paint facility at ANAD, one of four buildings being developed under an Other Transaction Authority (OTA) agreement operating under Title 10 U.S.C. Section 2808a. The Paint Facility is intended to support the Army's repair and construction operations at the depot and will be designed and constructed through this OTA mechanism, which allows the Department of the Army to conduct facility projects outside traditional contracting methods.

The procurement involves the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Sam Houston as the contracting agency. An on-site visit is scheduled for May 14, 2026, with details to be published separately. Prospective contractors and interested parties must submit questions using the designated "QA_ANAD_FORGE II" spreadsheet no later than May 6, 2026 by 4:00 PM Central Time. The Paint Facility represents one component of the broader FORGE 2 project, which encompasses four distinct facilities: the Component Remanufacture Facility, Missile Maintenance Facility, Paint Facility, and Storage Facility, all designed to enhance the Army's capacity for facility repair and construction operations at ANAD.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .