DRAFT 80ARC023R0003 - J.1(a) Att. 2 - CDRL.pdf
PDF 530 KB Posted
- Solicitation number
- DRAFT_80ARC023R0003
About this file
This is a draft request for proposal for the NASA Academic Mission Services 2 (NAMS-2) contract. The draft RFP solicits proposals to provide research and development services across multiple core technology areas, including air traffic management. Offerors must submit capability statements, technical and management approaches, and pricing by April 30th, with the contract to be awarded by September 30th. The single-award, indefinite-delivery/indefinite-quantity contract has a five-year base period of performance and includes both firm-fixed-price and cost-reimbursement task orders. Small businesses, woman-owned small businesses, HUBZone small businesses, service-disabled veteran-owned small businesses, and historically black colleges and universities are encouraged to compete. The incumbent contractor is invited to participate.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 1
CONTRACT DATA REQUIREMENTS LIST
NASA Academic Mission Services 2 (NAMS-2)
National Aeronautics and Space Administration
Ames Research Center
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 2
DOCUMENT CHANGE LOG
DRD
No.
DRD Title Revision Date
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 3
INTRODUCTION
This document defines the requirements for contractual data to be delivered by the contractor to the Government. The data requirements are set forth in each Data Requirements Description (DRD) and shall govern that data required by the contract. The contractor shall furnish data defined by the DRDs as listed on the Contract Data Requirements List (CDRL) by category of data, attached hereto, and made a part of this contract. Such data shall be prepared, maintained, and delivered to NASA in accordance with the requirements set forth within this document. In cases where data requirements are covered by a Federal Acquisition Regulation (FAR) or NASA FAR Supplement (NFS) clause or other term (e.g., requirements statement), that clause or term shall take precedence over the DRD.
Contract Data Requirements List (CDRL): Throughout the performance of the contract, the CDRL provides a listing by number, data type, title, and Office of Primary Responsibility (OPR).
Data Requirements Description (DRD): Each DRD included in this CDRL prescribes content, format, and submittal requirements. The DRDs included in this CDRL are ordered sequentially as listed in the CDRL page(s) that precede(s) the actual DRDs.
Data Type Description: Each DRD is classified by data type as defined below:
TYPE DESCRIPTION
1 - All submittals of and interim changes to Type 1 DRDs require written approval from the contracting officer before formal release for use or implementation.
2 - NASA reserves a time-limited right to disapprove in writing any submittal of and interim changes to Type 2 DRDs. The contractor shall submit the required data to NASA for review within the time period established in the DRD prior to its release for use or implementation. The contractor shall clearly identify the release target date. If the data is unacceptable, the contracting officer will notify the contractor within the time period established in the DRD from the date of submission, regardless of the intended release date. The contractor shall resubmit the information for reevaluation if disapproved. The submittal is considered approved if the contractor does not receive disapproval or an extension request from the contracting officer within the time period established in the DRD.
3 – Type 3 DRDs shall be delivered as required by the contract and do not require NASA approval.
4 - The Government will evaluate the Offeror’s initial submission of the Safety and Health (S&H) Plan for acceptability in accordance with the RFP. If a plan is determined to be acceptable and Code QH functionally approves it then it shall be incorporated into the contract as a Section J Attachment at time of contract award. For subsequent submissions of the S&H Plan during contract
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 4 performance, the submittal shall be considered to be functionally approved if the Contractor does not receive a notification that the plan is unacceptable or an extension request from NASA within 45 calendar days of the submission date of the plan.
5 – Code QH will review the Offeror’s initial submission of the Safety and Health (S&H) Plan for acceptability and provide functional approval of the S&H Plan. The plan shall not be incorporated into the contract. For subsequent submissions of the S&H Plan during contract performance, the submittal shall be considered to be functionally approved if the Contractor does not receive a notification that the plan is unacceptable or an extension request from NASA within 45 calendar days of the submission date of the plan.
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 1
STATEMENT OF GENERAL REQUIREMENTS
Subcontractor Data Requirement The prime contractor is responsible for flowing down any specific data requirements that apply to subcontracts and vendor agreements.
Reference to subcontractor data in the contractor’s responses is permissible and a copy of the referenced subcontractor data must be supplied with the response document at time of delivery to NASA.
Data Distribution, Format, and Transmittal Distribution: Distribution recipients and number of copies are identified within each DRD, provided within the contract, or as directed by the Contracting Officer
(CO).
Format Electronic Format: Electronic submission of data deliverables is required.
Electronic deliverables shall be printable. Data deliverables shall be delivered to NASA in the format specified below unless a specific format is required by a DRD. Data submittals shall consist of a single Adobe Acrobat PDF file and the native format electronic file(s). The preferred native formats include Microsoft Word, Excel, or PowerPoint, as appropriate.
Transmittal Data shall be transmitted to NASA by email or other mechanism agreed to by the Contracting Officer (CO), Contracting Officer’s Representative (COR), and project representatives who are responsible to receive, index, and store the data deliverables.
If email is used to transmit data deliverables, the email size shall be 10 megabytes or less to ensure receipt by the NASA email servers. Encrypted email format shall be used to transmit data.
Data Transmittal Package: Each data transmittal package shall include a transmittal memorandum that specifies the following:
Contract number Data Requirements Description (DRD) number DRD data type Submission date or milestone being satisfied Document number and revision Document title File names of all files being delivered; file naming convention shall clearly identify the document being delivered NASA Records Retention Schedule (NRRS) number, if applicable (See NRRS 1441.1, NASA Records Retention Schedules)
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 2
Document Identification: For all data types, the document number, change legend, date, and title constitute the minimum identification of the specific document and shall appear on the cover and title page. The contract number shall also appear on the cover and title page as separate markings. The originator and organization shall be included on the title page. The document number, change legend, and date shall appear on each page of the document. All Type 1 documentation shall be marked “PRELIMINARY PENDING NASA APPROVAL,” and once approved shall be reissued with “APPROVED BY NASA” and the date and approval authority annotated on the cover.
Data Restriction Determination and Marking Requirements: The contractor shall properly mark data in accordance with the data rights clause(s) included in the contract. The contractor must make a determination for each individual data deliverable, and shall not apply a default or blanket data restriction marking to all data deliverables (e.g., “data may be export restricted”). If NASA does not agree with the contractor applied data restriction, the CO shall return the data to the contractor, cancel the markings, or ignore the markings consistent with the procedures set forth in the “data rights” clause(s) contained in the contract.
Reference to Other Documents and Data Deliverables in Data Submittals: All referenced documents shall be made readily available to the cognizant NASA organization upon request.
Document Revisions
Revisions of documentation previously submitted may be accomplished either by individual page revision or by a complete reissue of the document.
A document shall be completely reissued when, in the opinion of the contractor and/or NASA, the document has been revised to the extent that it is unusable in its present state, or when directed by the CO. When complete reissues are made, the entire contents of the document shall be brought up to date and shall incorporate revised pages. All revisions shall be recorded. A revision log shall identify complete reissues except for periodic reports and documents which are complete within themselves as final.
Individual page revisions shall be made as deemed necessary by the contractor or as directed by the CO.
Changes of a minor nature to correct obvious typing errors, misspelled words, etc., shall only be made when a substantial change is made, unless the accuracy of the document is affected.
All revised pages shall be identified by a revision identifier and a new date.
Each document shall contain a log of revised pages that identify the revision status of each page with the revision symbol. This list shall follow the table of
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 3 contents in each document. The line or lines revised on a given page shall be designated using vertical line in the margin of the page, and the change authority shall be indicated adjacent to the change.
CDRL/DRD MAINTENANCE PROCEDURES
NASA-Initiated Change: New and/or revised data requirements shall be incorporated by contract modification to which the new or revised portion shall be appended. The contractor shall notify the CO in the event a deliverable data requirement is imposed and is not covered by a DRD, or when a DRD is changed by a contract modification and for which no revision is appended.
CDRL or DRD Change Procedures Revisions to the CDRL or DRDs will be identified by NASA in the Document Change Log. The date of the revision, DRD number, title, and revision description will be annotated in the Document Change Log. Revision descriptions will include the modification number, which implements the change, and a brief description of the portions of the CDRL and/or DRD affected within the “Revision” column of the Document Change Log.
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 4
Contract Data Requirements List
DRD
No.
DRD
Type
DRD Title OPR
1 3 Initial Financial Management Report (NF533I) Code C
2 3 Monthly Financial Management Report (NF 533M) Code C
3 3 Quarterly Financial Management Report (NF 533Q) Code C
4 3 Monthly Progress Report Code A
5 3 Quarterly Progress Report Code A
6 3 Final Report Code A
7 3 Subcontract Consent Package Code JA
8 5 Safety and Health Plan Code QH
9 3 Contractor Monthly Accident Report (CMAR) Code QH
10 3 Mishap Report Code QH
11 3 Information Technology (IT) Security Management Plan Code I
12 3 NASA Property in the Custody of Contractors (NF1018) Code JSL
13 3 Phase-in Plan Code A
14 3 Phase-Out Plan Code A
15 3 Subject Invention Reports or New Technology Reports Code DL
16 3 Employee Checkout Records Management Report (ARC 779) Code I
17 3 Source Code Code A
18 3 Analysis/White Paper Report Code A
19 3 Technical Concept of Operations (ConOps) Code A
20 3 Software Assurance and Software Safety Plan Code A
21 3 Functional Configuration Audit (FCA) and/or Physical Configuration Audit (PCA)
Code A
22 3 Software Development Management Plan Code A
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 5
23 3 Simulation Report Code A
24 3 Demonstration Report Code A
25 3 Weekly Task Order Report Code A
26 3 Diversity, Equity, Inclusion, and Accessibility (DEIA) Plan OP
27 3 Property Management Records Report Code JSL
28 3 Contractor Request for Government-Furnished Property Code JSL
29 3 Government Property management Information Plan Code JSL
30 3 Organizational Conflict of Interest (OCI) Plan OP
31 3 Representation of Limited Rights Data and Restricted Computer Software
Code DL
32 3 Patent Rights – Notice of Election Decision Code DL
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 6
1. DRD Title: Initial Financial Management Report (NF 533I)
2. DRD No.: 1 3. Data Type: 3 4. OPR: Code C
5. Solicitation No.: 80ARC023R0003
6. Contract No.: TBD
7. Date Issued: TBD
8. Date Revised: N/A 9. DRD Category:
Technical ☐
Administrative ☒
S&MA ☐
10. Description/Use: An initial financial management report shall be submitted by the Contractor and each major subcontractor on NASA Form 533Q (or computer-generated version) in accordance with the instructions on the reverse side of the forms and the NASA Procedural Requirements (NPR) 9501.2E, NASA Contractor Financial Management Reporting, at URL: http://nodis3.gsfc.nasa.gov/displayDir.cfm?t=NPR&c=9501&s=2E and as set forth in scope section below:
11. Distribution:
Contracting Officer's Representative (COR) AF Contracting Officer (CO) Code JAC Financial Management Division, Code CF Resources Management Office, Code CR
Initial Submission: 10 working days after the effective date of the contract
Submission Frequency: Once
Format: Electronic
Interrelationship: PWS Sections 3.1.1, 3.1.2 and 3.1.3
Applicable Documents: NPR 9501.2 & NFS 1852.242-73
Scope: For core requirements, cost categories shall be reported by CLIN (Core Management, and Core Technology Area: Air Traffic Management (ATM) Research). For IDIQ requirements, cost categories shall be reported for each task order by CLIN.
Contents: Reports shall be broken out by total direct labor hours (excluding subcontract);
direct labor hours (major subcontractors); direct labor costs; overhead and G&A (prime contractor); total direct labor, overhead, and G&A (major subcontractors); other direct costs (ODCs) include travel, material purchases, and subcontracts (other than major subcontractors), G&A/handling charge on ODCs; total other direct costs; fixed fee; total cost plus fixed fee.
Remarks: N/A
Maintenance: Changes shall be incorporated by complete reissue.
http://nodis3.gsfc.nasa.gov/displayDir.cfm?t=NPR&c=9501&s=2E
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 7
1. DRD Title: Monthly Financial Management Report (NF 533M)
2. DRD No.: 2 3. Data Type: 3 4. OPR: Code C
Administrative ☒
S&MA ☐
10. Description/Use: The Contractor shall deliver the NF 533M report in accordance with the instructions on the reverse side of the forms and the NASA Procedural Requirements (NPR) 9501.2E, NASA Contractor Financial Management Reporting, at URL:
http://nodis3.gsfc.nasa.gov/displayDir.cfm?t=NPR&c=9501&s=2E and as set forth below.
11. Distribution:
Contracting Officer's Representative (COR) AF Contracting Officer (CO) Code JAC Financial Management Division, Code CF Resources Management Office, Code CR
Initial Submission: No later than 10 working days following the close of the contractor’s accounting period after initial incurrence of cost.
Submission Frequency: Monthly, no later than 10 working days following the close of the contractor's monthly accounting period.
Format: Electronic
Interrelationship: PWS Sections 3.1.1, 3.1.2 and 3.1.3
Applicable Documents: NPR 9501.2 & NFS 1852.242-73
Scope: For core requirements, cost categories shall be reported by CLIN (Core Management, and Core Technology Area: Air Traffic Management (ATM) Research). For IDIQ requirements, cost categories shall be reported for each task order by CLIN.
Contents: Reports shall be broken out by total direct labor hours (excluding subcontract);
direct labor hours (major subcontractors); direct labor costs; overhead and G&A (prime contractor); total direct labor, overhead, and G&A (major subcontractors); other direct costs (ODCs) include travel, material purchases, and subcontracts (other than major subcontractors), G&A/handling charge on ODCs; total other direct costs; fixed fee; total cost plus fixed fee. Variances exceeding 5 percent between planned dollars and actual dollars for each reporting category (at the total contract level only) shall be explained.
Remarks: N/A
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 8
1. DRD Title: Quarterly Financial Management Report (NF 533Q)
2. DRD No.: 3 3. Data Type: 3 4. OPR: Code C
Administrative ☒
S&MA ☐
10. Description/Use: The Contractor shall deliver the NF 533Q report in accordance with the instructions on the reverse side of the forms and the NASA Procedural Requirements (NPR) 9501.2E, NASA Contractor Financial Management Reporting, at URL:
http://nodis3.gsfc.nasa.gov/displayDir.cfm?t=NPR&c=9501&s=2E and as set forth below.
11. Distribution:
Contracting Officer's Representative (COR) AF Contracting Officer (CO) Code JAC Financial Management Division, Code CF Resources Management Office, Code CR
11. Distribution: Contracting Officer (CO), Contracting Officer's Representative (COR), Financial Management Division
Initial Submission: No later than the 15th day of the month preceding the quarter being projected
Submission Frequency: Quarterly, no later than the 15th day of the month preceding the quarter being projected
Format: Electronic
Interrelationship: PWS Sections 3.1.1, 3.1.2 and 3.1.3
Applicable Documents: NPR 9501.2 & NFS 1852.242-73
Scope: For core requirements, cost categories shall be reported by CLIN (Core Management, and Core Technology Area: Air Traffic Management (ATM) Research). For IDIQ requirements, cost categories shall be reported for each task order by CLIN.
Contents: Reports shall be broken out by total direct labor hours (excluding subcontract);
direct labor hours (major subcontractors); direct labor costs; overhead and G&A (prime contractor); total direct labor, overhead, and G&A (major subcontractors); other direct costs (ODCs) include travel, material purchases, and subcontracts (other than major subcontractors), G&A/handling charge on ODCs; total other direct costs; fixed fee; total cost plus fixed fee. Variances exceeding 5 percent between planned dollars and actual dollars for each reporting category (at the total contract level only) shall be explained.
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 9
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 10
1. DRD Title: Monthly Progress Report
2. DRD No.: 4 3. Data Type: 3 4. OPR: Code A
Administrative ☒
S&MA ☐
10. Description/Use: The Contractor shall submit separate monthly reports of all work accomplished during each month of contract performance.
11. Distribution: Contracting Officer (CO), Contracting Officer's Representative (COR), Financial Management Division, Task Requestor (TR)
Initial Submission: 15th calendar day after the first month of performance.
Submission Frequency: Monthly, 15th day of the month following the month being reported.
Format: Electronic
Interrelationship: PWS Sections 3.1.1, 3.1.2 and 3.1.3
Applicable Documents: NFS 1852.235-74
Scope: The Contractor shall submit a monthly progress report of all work accomplished during each month of contract performance for core management, core technology area: ATM research, and each task order.
Contents: At a minimum, the report shall contain:
The activities for all work on the contract describing the progress to date A statement of any current and/or potential problem areas and proposed corrective action A discussion of work to be performed during the next report period Any other relevant issues and risks including potential subject invention/technology, security, staffing, budget, schedule, technical, and safety issues Risk management report detailing possible mitigation methods for risks and requests for additional guidance or information that impact the risks Number of hours by position for core and each task order Summary of monthly hiring and staffing data
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 11
1. DRD Title: Quarterly Progress Report
2. DRD No.: 5 3. Data Type: 3 4. OPR: Code A
Administrative ☒
S&MA ☐
10. Description/Use: The Contractor shall submit a quarterly progress report of all work accomplished during each month of contract performance
11. Distribution: Contracting Officer (CO), Contracting Officer's Representative (COR), Financial Management Division, Task Requestor (TR)
Initial Submission: 15th calendar day after the first quarter of performance
Submission Frequency: Quarterly, 15th day of the month following the quarter being reported
Format: Electronic
Interrelationship: PWS Sections 3.1.1, 3.1.2 and 3.1.3
Applicable Documents: NFS 1852.235-74
Scope: The Contractor shall submit a quarterly progress report of all work accomplished during each month of contract performance for core management, core technology area: ATM research, and each task order.
Contents: At a minimum, the report shall contain:
1. A statement (including progress in terms of percentages) of progress on subcontracting goals.
2. A discussion on the current status against the subcontracting limit, including any potential problems.
3. A discussion of any outside (non-NASA) work and any problems staying with the limitation included in the contract.
4. Status of current export control training and any non-compliance with export control laws and/or regulations.
5. Discussion of any significant intellectual property management issues, including any training provided to staff.
6. Employee Roster including employee name, position, employer, assigned organization, assigned task(s)/CLIN.
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 12
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 13
1. DRD Title: Final Report
2. DRD No.: 6 3. Data Type: 3 4. OPR: Code A
6. Contract No.: 80ARC02XDXXXX
Administrative ☒
S&MA ☐
10. Description/Use:
The Contractor to shall submit a final report, which documents and summarizes the results of the performance period, including recommendations and conclusions based on the experience and results obtained. The final report should include tables, graphs, diagrams, curves, sketches, photographs, and drawings in sufficient detail to explain comprehensively the results achieved under the contract.
11. Distribution: Contracting Officer (CO), Contracting Officer's Representative (COR), Task Requester (TR)
Initial Submission: 10 calendar days prior to the end of the Base Period, Option Periods, and Task Order performance periods.
Submission Frequency: Once, 10 calendar days prior to the end of the period of performance
Format: Electronic
Interrelationship: PWS Sections 3.2 and 4.0.
Applicable Documents: NPR2200.2 and 1852.235-73, Final Scientific and Technical Reports
Scope: The Contractor shall submit a final report for each core technology area: ATM research CLIN, and each task order.
Contents: The final report should comply with formatting and stylistic guidelines contained in NPR 2200.2, Requirements for Documentation, Approval, and Dissemination of NASA Scientific and Technical Information.
In addition, the final report shall include the motivation and background of the research, the goals of the work, the methods, the metrics, conclusions, and recommendations for next steps.
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 14
1. DRD Title: Subcontract Consent Package
2. DRD No.: 7 3. Data Type: 3 4. OPR: Code JA
Administrative ☒
S&MA ☐
10. Description/Use:
The Contractor shall submit subcontract consent package(s) a minimum of in accordance with FAR 52.244-2.
11. Distribution: Contracting Officer
Initial Submission: 10 calendar days prior to subcontract award
Submission Frequency: 10 calendar days prior to subcontract award or as specifically requested by the Contracting Officer
Format: Electronic
Interrelationship: PWS Sections 3.1.1, 3.1.2 and 3.1.3
Applicable Documents: FAR 52.224-2
Scope: The Subcontractor Consent package is applicable to core management, core technology area: ATM research, and each task order.
Contents: The Subcontractor Consent package shall include the following information:
• A description of the supplies or services to be subcontracted.
• Identification of the type of subcontract to be used.
• Identification of the proposed subcontractor.
• The proposed subcontract price.
• The subcontractor’s current, complete, and accurate certified cost or pricing data and Certificate of Current Cost or Pricing Data, if required by other contract provisions.
• The subcontractor’s Disclosure Statement or Certificate relating to Cost Accounting
Standards when such data are required by other provisions of this contract.
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 15
• A negotiation memorandum reflecting-o The principal elements of the subcontract price negotiations;
o The most significant considerations controlling establishment of initial or revised prices;
o The reason certified cost or pricing data were or were not required;
o The extent, if any, to which the Contractor did not rely on the subcontractor’s certified cost or pricing data in determining the price objective and in negotiating the final price;
o The extent to which it was recognized in the negotiation that the subcontractor’s certified cost or pricing data were not accurate, complete, or current; the action taken by the Contractor and the subcontractor; and the effect of any such defective data on the total price negotiated;
o The reasons for any significant difference between the Contractor’s price objective and the price negotiated; and o A complete explanation of the incentive fee or profit plan when incentives are used. The explanation shall identify each critical performance element, management decisions used to quantify each incentive element, reasons for the incentives, and a summary of all trade-off possibilities considered.
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 16
1. DRD Title: Safety and Health Plan
2. DRD No.: 8 3. Data Type: 5 4. OPR: Code QH
Administrative ☐
S&MA ☒
10. Description/Use:
The detailed Safety and Health (S&H) Plan shall state how the contractor intends to protect the life, health, and well-being of the public, and NASA and contractor employees as well as property and equipment. The contractor shall abide by the approved Safety and Health Plan in performance of contractual requirements conducted completely or partly on a Federally controlled facility. S&H Plan shall be consistent with the proposed technical approach, cost/price, and contractual requirements.
11. Distribution: The NASA Contracting Officer cognizant for this contract in accordance with the instructions in the Contract.
Initial Submission: The initial submission shall be 15 calendar days after the effective date of the contract.
Submission Frequency: Contractor shall review annually and revise as necessary if contractual requirements, processes used by the contractor, or conditions change that warrant a change to the S&H Plan.
Format: The document shall be in a formal report with table of contents, approval signature page, and record of revisions. The plan shall follow the format and content in stated in the Content Section of this DRD. If a particular section listed in the Content Section of the DRD is not applicable to the effort, state that it is Not Applicable (N/A) and provide an explanation as to why that is the case. Do not delete sections or renumber sections stated in the Content Section of this DRD.
Interrelationship: PWS Section 3.1.9
Applicable Documents: APR 8715.1 Ames Health and Safety Manual
Scope: The contractor will develop and subsequently implement a safety and health program based on the approved S&H Plan and applicable requirements in the PWS/SOW that will include policies and procedures for compliance with pertinent NASA policies and requirements, and Federal, State and local regulations for safety, health, environmental protection, and fire protection. The contractor's Safety and Health Program will be used to assure integration of the contractor as a full participant in the Center's Safety and Health Program.
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 17
Contents:
Title: Safety and Health Plan for the NASA Academic Mission Services (NAMS-2) Contract
1.0 INTRODUCTION
List the work activities to provide context for the essential elements of an effective safety program by checking all of the following that apply to the proposed work:
☐ Office work ☐ Hazardous chemical use ☐ Hazardous noise exposure ☐ Use of biohazardous materials
☐ Use of nanomaterials ☐ Use of explosives or propellants ☐ Use of radioactive materials ☐ Use of high energy lasers ☐ Field work in extreme environments ☐ Use of pressure systems ☐ Use of lifting devices ☐ Use of aircraft (including UAVs) ☐ Construction of buildings or research facilities
2.0 MANAGEMENT LEADERSHIP AND EMPLOYEE PARTICIPATION
2.1 Office Safety
2.1.1 Policy: Provide the contractor's corporate safety policy statement.
2.1.2 Management Leadership: Describe the process and procedures for implementing management commitments to safety and health through visible activities and initiatives.
2.1.3 Employee Involvement: Describe procedures to implement and promote employee (e.g., non-supervisory) involvement in safety and health program development, implementation, and decision making.
2.1.4 Assignment of Responsibility: Describe the line and staff responsibilities for safety and health program implementation.
2.1.4.1. Designated Safety Official: Identify, by title, the official(s) responsible for implementing the proposed Safety and Health Plan. This individual will be the official designated as the company representative for all formal contacts with regulatory agencies that concern the company’s employees.
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 18
2.1.5 Accountability: Describe the procedures for ensuring that management and employees will be held accountable for implementing their tasks in a safe and healthful manner. The use of traditional and/or innovative personnel management methods (including discipline, motivational techniques, or any other technique that ensures accountability) should be referenced, as a minimum, and described, as appropriate.
2.2 Labs, shops, and research facility support:
For contracts that include work with hazards beyond those found in an office setting, include the following information in addition to the topics covered in section 2.1. If this section does not apply to this section, insert N/A and an explanation of why it does not apply.
2.2.1 Program Evaluation: Describe the method to be used for internal program reviews and evaluations. Consider using OSHA guidance at OSHA CSP 03-01-005, Voluntary Protection Program (VPP): Policies and Procedures Manual.
2.2.2 Program Documentation. Describe the approach to be taken to document its safety and health program performance and maintain records required by OSHA.
2.2.3 Procurement: Describe how safety and health requirements will be stated in subcontracts. Describe methods that will be used to assure that specifications for purchases of equipment contain appropriate safety criteria and instructions. Describe procedures for purchases of hazardous materials. Identify procedures used to comply with the requirement in APR8715.1 Chapter 24, Hazard Communication, to assure that the contractor's hazardous material purchases are reviewed by a competent person for safety considerations.
2.2.4. Safety Data Sheets and Hazardous Chemical Inventory: Prepare a written program as required by OSHA 29 CFR 1910.1200 and include it as an appendix to this safety and health plan if any hazardous materials will be acquired under this contract. Describe the procedure to be used by the contractor to maintain a hazardous material inventory and make Safety Data Sheets available to employees for hazardous materials brought onto NASA Ames Research Center (ARC) or included in products delivered to the Government.
3.0 WORKPLACE ANALYSIS
3.1 Office Safety:
3.1.1 Inspections: This section should include the procedures and frequency for regular inspections and evaluations of work area hazards and who will be accountable for implementing corrective measures.
3.1.2 Employee Reports of Hazards: Identify the methods to be used to encourage employees to report hazardous conditions (e.g., close calls) and analyze/abate hazards. Describe steps to be taken to create reprisal-free employee reporting with emphasis on management support for employees.
3.2 Labs, Shops, and Research Facility Support:
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 19
For contracts that include work with hazards beyond those found in an office setting, include the following information in addition to the topics covered in section 3.1.
3.2.1 Hazard Identification: Describe the procedures and techniques to be used to identify hazards associated with the work to be performed on this contract. Consider the work specified in the contract as well as the hazards associated with operations and work environments in close proximity to contract operations. Describe the information collection process including a combination of surveys, analyses, inspections of the workplace, investigations of mishaps and close calls, and the collection and trend analysis of safety and health data such as records of occupational injuries and illnesses; findings and observations from preventive maintenance activities; reports of spills and inadvertent releases to the environment; facilities-related incidents related to partial or full loss of systems functions;
and employee reports of hazard.
3.2.2 Hazards addressed in the Ames Safety and Health Manual: Evaluate the applicability of chapters in the Ames Safety and Health Manual (APR 8715.1) to the anticipated work activities under the contract. Include the table below that has been completed for the Contractor’s proposed approach as an Appendix to the S&H Plan.
*Applicable, Yes or No?
APR 8715.1 Ames Safety and Health Manual Chapter
Purpose
Chapter 2: Safety and Health Responsibilities
Assigns safety and health responsibilities to ARC personnel, contractors, and Center-wide Safety and Health Committees.
Chapter 4, Mishap and Close Call Reporting and Investigating
Establishes requirements to report, investigate, and document mishaps, close calls, and previously unidentified serious workplace hazards to prevent recurrence of similar accidents.
Chapter 5: Smoking Policy Establishes that the ARC No Smoking policy encompasses all tobacco products (including electronic cigarettes), describes where smoking is not permitted, and provides guidance to supervisors on accommodating employees who wish to smoke.
Chapter 6: Work Alone Establishes specific safety requirements for working in certain hazardous conditions. (Note: For safety reasons, working alone is not permitted under specified hazardous conditions.)
Chapter 7: Ames Radiation Safety
Provides, along with supplements, a technical specification for the safe use of https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C6.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C7.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C7.pdf
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 20 radioactive materials and ionizing radiation producing equipment at ARC.
Specific procedures outlined in the Ionizing Radiation Safety Manual available from the Ames Radiation Safety Officer. (Note: Required to contact the Ames Radiation Safety Officer prior to bringing any radioactive source (e.g., soil density measurements, radiography, or other non-destructive testing) on to ARC.)
Chapter 8: Laser, Microwave, and other Nonionizing Safety
Provides requirements for the safe use of nonionizing radiation devices (i. e., lasers, microwaves, radio frequency energy, static magnetic fields, and ultraviolet radiation).
Chapter 10: Pressure Systems Safety
Provides requirements for the safe use of systems containing fluid under positive or negative pressure relative to atmosphere.
Chapter 11: Electrical Safety Assigns authority, responsibility, and requirements relative to electrical work.
Chapter 12: Explosives Safety
Provides policy and procedures for handling, storing, and accountability for explosives.
Chapter 13: Chemical Hygiene Program
Establishes minimum requirements to protect laboratory workers from chemical hazards through hazard assessment, hazard communication, training, safe work practices, and special controls for some specific hazardous chemicals.
(Note: Any active laboratory is required to have an acceptable lab safety plan. See Appendix H for an example of a lab safety plan template.)
Chapter 14: Shop Safety Provides general shop safety requirements not specifically covered in other chapters.
(Note: Job Hazard Analysis is required for hazardous work.)
Chapter 15: Cryogenic Safety Assigns authority, responsibility, and requirements for safe use of cryogens.
Chapter 17: Lifting Devices and Equipment
Provides safety requirements and procedures for the use of cranes, other lifting devices, and lifting equipment at ARC. (Note: Lift plan approval is required prior to conducting crane lifting activities on all critical lifts (i.e., lifts https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C8.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C8.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C10.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C10.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C11.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C12.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C12.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C13.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C13.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C14.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C15.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C17.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C17.pdf
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 21 using a forklift, manlift, or any other lifting device or equipment).)
Chapter 18: Emergency Eyewash and Shower Equipment
Provides requirements on the selection, installation, use, and maintenance of eyewash and shower equipment for emergency flushing treatment.
Chapter 20: Fire Protection Provides fire protection requirements for personnel and property. (Note: All programs, projects, contracts, facilities, designs, installations, infrastructure, maintenance, operations, firefighting, procedures, permitting, inspections, investigations, reviews, reporting, records retention, training and work shall conform to NASA-STD-8719.11.)
Chapter 22: Event Safety Provides event safety requirements and guidance to successfully support individuals who may host an event at ARC or NASA Research Park (NRP).
(Note: An Event Health and Safety Plan/Checklist is required for open houses, Ames Exchange events, educational events, outreach events, program or project events, training events and other events where individuals from the public are in attendance.)
Chapter 23: Control of Narcotics and other Controlled Substances
Establishes policy and procedures for procurement, storage, handling, and disposition of narcotics and other controlled substances used for research purposes.
Chapter 24: Chemical Hazard Communication Program
Establishes minimum requirements to communicate chemical hazards to workers.
Chapter 26: Confined Space Entry
Provides requirements for the management and control of entries into confined spaces. (Note: Confined space entry is allowed only through compliance with the contractor's approved confined space entry program or this Chapter. If a contractor’s program is used it must be submitted and approved by the Safety H&MS Division.)
Chapter 27: Construction Safety Management
Consolidates the applicable safety and health requirements for construction.
https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C18.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C18.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C18.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C20.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C22.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C23.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C23.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C23.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C24.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C24.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C26.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C26.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C27.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C27.pdf
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 22
Chapter 28: Respiratory Protection
Establishes the written respiratory protection program required by OSHA regulations.
Chapter 29: Hearing Conservation Program
Establishes minimum requirements to protect workers from hearing loss. (Note:
NASA’s exposure limits are more stringent than OSHA’s; criteria for the hearing conservation program enrollment are in paragraph 29.5.)
Chapter 30: Asbestos Management Plan
Integrates applicable Federal, State, and local regulatory agency requirements with NASA policy governing asbestos-related work.
Chapter 31: Logout/Tagout Specifies the control of hazardous energies via lockout/tagout requirements and work practices used in conjunction with Chapter 11 – Electrical Safety.
Chapter 32: Bloodborne Pathogens Protection Plan
Assigns authority, responsibility, and requirements to address the potential for exposure to blood or other potentially infectious materials that may result from the performance of an employee's duties.
Chapter 33: Personal Protective Equipment
Provides guidance on selection of appropriate Personal Protective Equipment (PPE) to prevent injury and illness from hazards not fully controlled by elimination, substitution, engineering, barriers, or procedural controls.
Chapter 35: Lead Management Plan
Establishes the ARC Lead Management Program.
Chapter 36: Ames Ergonomics Program
Provides guidance for training and workstation evaluations that use sound ergonomic principles to reduce the number and severity of Musculoskeletal Disorders (MSDs) caused by exposure to risk factors in the workplace.
Chapter 37: Indoor Air Quality
Provides guidance for the evaluation of indoor air quality (IAQ) concerns.
Chapter 38: Occupational Safety and Health Administration (OSHA) Regulated Chemicals
Establishes minimum requirements to minimize and control exposure to chemicals with OSHA expanded health standards.
Chapter 40: Fall Protection Program
Outlines ARC’s Fall Protection requirements for any walking or working surface where an individual may be exposed to a fall to a lower level.
https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C28.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C28.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C29.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C29.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C30.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C30.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C31.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C32.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C32.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C33.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C33.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C35.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C35.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C36.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C36.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C37.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C37.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C38.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C38.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C38.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C38.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C40.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C40.pdf
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 23
Chapter 41: Animals in the Workplace
Establishes the ARC policy regarding all domestic, feral, and wild animals.
Provides guidance on accommodating animals supporting airfield management, research activity, or assistive duties, as allowed by this policy.
Chapter 42: Ames Procedural Requirements for Safety Lanes, Barricades, Hazard Labeling and Posting
Provides policy and procedures for safety lanes, barricades, hazard labeling, and posting.
Chapter 44: Compressed Gas Cylinder Safety
Establishes responsibilities, transportation, storage, and use requirements associated with compressed gas cylinders.
Chapter 45: Food Safety Establishes minimum requirements to maintain a food safety program.
Chapter 46: Automatic External Defibrillation Program
Provides procedures for selection, siting, operation, maintenance, and inspection of Automatic External Defibrillators.
Chapter 49: Laboratory Decommissioning Procedure
Addresses environmental, occupational health, and safety requirements associated with vacating laboratory spaces and auxiliary spaces serving laboratories.
Chapter 50: Nanomaterials Safety and Health
Provides the safety and health requirements for working with manufactured nanomaterials in research laboratories.
Chapter 51: Field Research Safety Review Board
Establishes procedures for review and approval of field research in high risk environments.
Chapter 52: Biosafety Addresses the roles, responsibilities, and procedures required for the use of biohazardous materials in support of ARC research operations.
Chapter 53: Student Safety Procedures
Outlines procedures to provide educational opportunity to students while ensuring a safe work environment.
Chapter 54: Reproductive and Developmental Health Program
Establishes policy to keep potential exposures to reproductive or developmental hazards as low as reasonably practicable.
Chapter 55: Critical Incident Stress Management Plan
(CISM)
Establishes a program to address the immediate and subsequent impact of catastrophic events on individuals or groups.
https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C41.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C41.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C42.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C42.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C42.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C42.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C44.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C44.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C45.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C46.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C46.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C46.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C49.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C49.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C50.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C50.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C51.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C51.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C52.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C53.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C53.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C54.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C54.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C54.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C55.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C55.pdf https://cdms.nasa.gov/assets/docs/centers/ARC/Dirs/APR/APR8715.1C55.pdf
J.1(a), Attatchment 2 80ARC023R00003
J.1(a), Att. 2 – Page 24
Chapter 56: Legionella Control
Identifies risk reduction methods and techniques to help prevent Legionella disease propagation within the ARC water systems.
Chapter 58: Alarm Systems for Detection of Hazardous Atmospheres in Facilities
Establishes procedures and practices for determining the need for sensor and alarm systems to detect flammable gases and vapors, oxygen deficient and oxygen enriched atmosphere due to leakage from cryogen containers (e.g., dewars and DOT containers) or compressed gas cylinders.
Addresses issues related to installation and maintenance requirements of gas sensor and alarm systems.
*Note: Contractor/Offeror to state “yes” or “no” based on whether or not the relevant chapter of APR 8715.1 is applicable to the safety and health program, stated in the S&H Plan, it proposes to use in performance of the contractual requirements.
3.2.4 Systems Safety: Identify all safety engineering products, which address operations, equipment, and other aspects of safety engineering, on Federally-controlled facilities that will be developed/used under this contract. (Note: All safety engineering products, which address operations, equipment, and other aspects of safety engineering, on NASA property will be subject to the review and concurrence of the ARC Safety Office unless otherwise specified in the approved safety and health plan.)
4.0 MISHAP INVESTIGATION AND RECORD ANALYSIS
4.1 Mishap Investigation and Reporting: Identify the methods to assure that the investigations and reporting of mishaps including corrective actions to be implemented to prevent recurrence. Describe procedures for implementing the NASA mishap investigation and reporting requirements for electronic reporting in the Contractor Monthly Accident Reporting data system and the NASA Mishap Information System, in accordance with NFS Clause 1852.223-70.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .