DRAFT_140R4025R0016_Attachment_4_-_00_00_02_Dwgs-B_096-189_02-14-2025_2.pdf
PDF 20 MB Posted
- Attached to
- NGWSP PUMPING PLANT 1
- Solicitation number
- 140R4025R0016
About this file
I apologize, but I cannot provide a summary of the file because the actual file content is not included in the provided text. The information shared only contains metadata about a draft document related to the NGWSP Pumping Plant 1 solicitation by the Department of the Interior Bureau of Reclamation, with a solicitation number 140R4025R0016. Without the actual file contents, I cannot analyze or summarize its specific details. If you can provide the contents of the PDF file, I would be happy to review and summarize it comprehensively.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F
20' - 9"
Air compressors for discharge air compressors
FLOW
CL 24" Manhole Class 300, Type A, L=6, see Dwg. 40-D-6137
CL Discharge manifold air chambers, see Dwg. (61958)
8'-0"
CL Restrained split sleeve type coupling for dynamic joint deflection
22'-6"
FLOW
PI 10" Discharge manifold for filling pump unit, see Dwg. (61946)
CL Insulating flange joint, see detail, Dwg.
(61950)
Exterior of foundation, see Dwg. (61893)
42" Std.
steel pipe
Continuation on Dwg. (61946)
3'-3"
30'-1 1/2"
42" Std.
steel pipe
C401C301
TK-AC3 TK-AC4
13'-4 1/2"
2'-6"
42" Buried butterfly valve with 6" filling line, see Detail, Dwg. (61953)
150'-0" 106'-8 1/2"
3'-2 3/4"
100'-0" 49'-11 3/4"
3'-0" 3'-0" 5'-6"2'-6"
86'-0 1/4"
PI 42" Std. steel miter bend, =2.49°, R=8'-9"
PI 42" Std. steel miter bend, =3.09°, R=8'-9"
PI 42" Std. steel miter bend, =3.72°, R=8'-9"
PI 42" Std. steel miter bend, =3.60°, R=8'-9"
CL Blowoff, see Detail, Dwg. (61953)
607'-2 1/4"
PI Combined bend 2, see detail, Dwg. (61949)
Matchline C
Matchline D
3'-0"
CL Restrained split sleeve type coupling
Co nt in ua tio n on
D w g.
9)
CL Flanged connection
Thrust collar, see Dwg.
(61927)
2'-6"
8'-0"
CL Discharge air chamber, see detail, Dwg. (61958)
PI 10" x 42" Tee PI 12" x 42" Tee
42" Std.
steel pipe
13'-4 1/2" 3'-3"
W=2" x t=1/2" welding pad, see Detail, Dwg. (61950)
CL Restrained split sleeve type coupling
W=2 1/2" x t=1/2" welding pad, see Detail, Dwg. (61950)
FLOW
61952
61952
PI 42" Std. steel miter bend, =3.60°, R=8'-9", El. -8.00
CL 10" Discharge manifold for filling pump unit, see Dwg. (61946)
CL Insulating flanged connection, see detail, Dwg. (61950)
CL Restrained split sleeve type coupling for dynamic joint deflection
Building line, see structure outline Dwg. (61889)
CL 24" Manhole, Class 300, Type A, L=6, see Dwg.
40-D-6137
D is ch ar ge a ir c ha m be rs se e D w g.
8)
10" Sch. 20 steel pipe
FLOW
20'-9"22'-6"30'-1 1/2"
TOC, El. 0.00, typ.
12" Sch. 20 steel pipe
12" Sch. 20 steel pipe
TK-AC3
TK-AC4 PI 42" Std. steel miter bend, =3.72°, R=8'-9", El. -14.3
3'-2 3/4"
100'-0" 49'-11 3/4" 86'-0 1/4" 150'-0" 106'-8 1/2"
3'-0" 3'-0"
2'-6"
PI 42" Std. steel miter bend, =3.09°, R=8'-9", El. -14.0
PI 42" Std. steel miter bend, =2.49°, R=8'-9", El. -5.6
PI Combined bend 2, see detail, Dwg. (61949)CL Blowoff, see detail, Dwg. (61953)
1/
2"
El. -8.00
CL filling line, see detail, Dwg. (61953)
CL Buried butterfly valve and 6" filling line, see Detail, Dwg.
(61953)
2'-6" 3'-0"
CL. El. Varies
Thrust collar, see detail, Dwg. (61927)
42" Anchor ring, see detail, Dwg. (61952)
Scale: 1/8" = 1'-0"F SECTION
D
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C
T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
T. SHARP
J. HAMMOND
R. FRISZ
R. SCHLOSSER, P.E.
M. DIUBALDO, P.E.
Peer Reviewer - Manager - Mechanical Piping & Systems Group
DENVER, CO 2025-02-03
STEEL MANIFOLD
DISCHARGE
PLAN AND SECTION
1695-D-61948
Scale: 1/8" = 1'-0"
PUMPING PLANT NO. 1 DISCHARGE MANIFOLD PLAN
0 5' 10'
Scale: 3/16" = 1'-0"
0 5' 10'
Scale: 3/16" = 1'-0"
NOTES
1. For General Notes, see Dwg. (61942).
2. For Plan and Profile, see Dwg. (61865).
(61943)
CL Restrained split sleeve type coupling
CL 10" Sch.
20 steel pipe
3/4" Extra stong steel pipe, 4" long
3/4" Ball valve, S01A02-BV-U7-14
Provide bushings as needed
Pressure gauge, S01A02-PI-703
3/4" ASME B16.11 Class 3000 threaded steel coupling, see detail
3/4" ASME B16.11 Class 3000 threaded tee
3/4" Extra stong steel pipe, 2.5" long
3/4" ASME B16.11 Class 3000 90 threaded elbow
3/4" Extra stong steel pipe, 6" long
Provide bushings as needed
Block and bleed in-line manifold, similar to Rosemount 306
Pressure transmitter, S01A02-PIT-703
CL 10" Steel Pipe
2" Combination air valve, S01A02-ARV-U7-7
S01A02-ARV-U7-11
S01A02-ARV-U7-13
1' - 4"
2" Extra strong steel pipe
2" Extra strong steel nipple, 6" long
2" Ball valve, S01A02-BV-U7-6
S01A02-BV-U7-10
S01A02-BV-U7-12
2" Sch. 80 PVC pipe
PI 2" Steel street elbow, rotate so drain path is clear of pipe
PI 2" 90° PVC
threaded elbow
2" Sch. 80 PVC pipe, extend to 6" above floor
2" ASME B16.11
Class 3000 threaded coupling, see detail
1'-3"
CL 18" or 20" Steel Pipe
3" Combination air valve, S01A02-AVC-U1-6, -10, -12
S01A02-AVC-U2-6, -10, -12
S01A02-AVC-U3-6, -10, -12
S01A02-AVC-U4-6, -10, -12
S01A02-AVC-U5-6, -10, -12
S01A02-AVC-U6-6, -10, -12
1' - 4"
3" Extra strong steel pipe
3" Extra strong steel nipple, 6" long
3" Ball valve, S01A02-BV-U1-5, -9, -11
S01A02-BV-U2-5, -9, -11
S01A02-BV-U3-5, -9, -11
S01A02-BV-U4-5, -9, -11
S01A02-BV-U5-5, -9, -11
S01A02-BV-U6-5, -9, -11
3" Sch. 80 PVC pipe
PI 3" Steel street elbow, rotate so drain path is clear of pipe PI 3" 90° PVC threaded elbow
3" Sch. 80 PVC pipe, extend to 6" above floor
3" ASME B16.11 Class 3000 threaded coupling, see Detail
1'
Pressure switch, S01A02-PS-101, 102
S01A02-PS-201, 202
S01A02-PS-301, 302
S01A02-PS-401, 402
S01A02-PS-501, 502
S01A02-PS-601, 602
S01A02-PS-701, 702
Pressure gauge, S01A02-PI-101, 102
S01A02-PI-201, 202
S01A02-PI-301, 302
S01A02-PI-401, 402
S01A02-PI-501, 502
S01A02-PI-601, 602
S01A02-PI-701, 702
3/4" Ball valve, S01A02-BV-U1-7, 8
S01A02-BV-U2-7, 8
S01A02-BV-U3-7, 8
S01A02-BV-U4-7, 8
S01A02-BV-U5-7, 8
S01A02-BV-U6-7, 8
S01A02-BV-U7-8, 9
PI 3/4" ASME B16.11 Class 3000 90° threaded elbow
3/4" extra strong steel pipe, 2.5" long
3/4" ASME B16.11 Class 3000 threaded tee
3/4" Extra strong steel nipple, 4" long
Provide bushings as needed
3/4" Extra strong steel pipe, 4" long
3/4" ASME B16.11 Class 3000 threaded steel coupling, see detail
CL 20", 18", or 10" Steel pipe
3/4" Extra strong steel nipple, 4" long t t W" x t" Welding pad
W t
Inside of steel pipe
Encase steel flange in the wall, drill and tap flange for studs
CL AWWA F insulating flanged joint
Threaded stud with nut, see Note 2
Insulating bolt sleeve and washer
Buried PipeEncased Pipe
CL ASME B16.11
Class 3000 threaded steel coupling or half coupling
Inside of pipe or tank
Ø5/8"-18-UNF Thru for leveling screw, see Dwg.
40-D-6006, typ.
Coordinate location with pump manufacturer.
Pump Unit
20" Std. steel pipe
18" Std.
steel pipe
Epoxy grout Pump pedestal
Anchor bolt hole, coordinate size and location with pump manufacturer, typ.
FL
O
W
For pump precast concrete, see Dwg. (61930)
D
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C
T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
T. SHARP
J. HAMMOND
R. FRISZ
R. SCHLOSSER, P.E.
M. DIUBALDO, P.E.
Peer Reviewer - Manager - Mechanical Piping & Systems Group
DENVER, CO 2025-02-03
STEEL MANIFOLD AND
AIR CHAMBER DETAILS
DETAILS
1695-D-61950
Scale: 1" = 1'-0"
3" COMBINATION AIR VALVE
Scale: 1 1/2" = 1'-0"
PRESSURE GAUGE AND SWITCH ASSEMBLY
Scale: Not to Scale
THREADED STEEL COUPLING
Scale: Not to Scale
INSULATING FLANGED JOINT
Scale: Not to Scale
WELDING PAD
NOTES
1. For General Notes, see Dwg. (61942)
2. Use dielectric antiseize during installation of insulating flange kit. Do not use in excess.
Scale: 1 1/2" = 1'-0"
PRESSURE GAUGE AND TRANSMITTER ASSEMBLY
Scale: 1" = 1'-0"
2" COMBINATION AIR VALVE
(61946, 61947)
(61946, 61947)(61947)
(61947)
61946 Scale: 3/4" = 1'-0"
7 DETAIL
0 1' 2'
Scale: 1" = 1'-0"
0 1' 2'
Scale: 1" = 1'-0"
0 1/2' 1' 1 1/2'
Scale: 1 1/2" = 1'-0"
0 1/2' 1' 1 1/2'
Scale: 1 1/2" = 1'-0"
(61945, 61948)
(61945, 61947, 61948, 61951, 61952, 61953) (61952, 61954, 61955, 61957, 61958, 61959, 61960, 61961, 61962) 0 1' 2' 3'
Scale: 3/4" = 1'-0"
Provide stainless steel screen, see detail
8" x 6" Std.
steel reducer
Ground surface
PI 6" Short radius welding elbow
6" Std. steel pipe
6" Short radius Std. steel 180 degree return bend m in
2'
0" m in
H
6" Combination air valve, see detail
Precast concrete manhole, see Dwg. (61929)
Air vent pipe, see detail Two-way damper
PI 6" Std.
welding elbow
CL 6" Air vent pipe
CL 6" AWWA Class D flanged joint
1' - 11"2' - 0"
Contractor designed pipe support attached to wall
CL 42" Std.
steel pipe
PI 42" x 6" tee
W=1 1/2", t=1/2" welding pad, see detail Dwg. (61950)
CL 6" Combination air valvewith hood
Air valve insulation not shown, see detail
8"min.
1' -6
6" AWWA Class 250B manually operated butterfly valve
6" Std. steel pipe, typ.
CL AWWA Class F flanged joint
2'
Compacted backfill, see Dwg. (61929)
Operator for butterfly valve shall extend beyond insulation
Inside of steel pipe
Valve insulation jacket, see Note 2
CL Std. 8" x 6" steel reducer
Stainless steel wire cloth, 2x2 meshes per linear inch, 0.063" diameter wire
Tack weld every other strand
Valve operator
CL AWWA
class buried butterfly valve
Valve box centered on valve operating stem
Valve extension rod
Square nut
Concrete collar, see Dwg. (61928)
Valve box As Required
Compacted backfill
CL 42" Std.
steel pipe
3'-0" CL WWA Class F flanged joint
6" Std. steel pipe
W=1 1/2" x t=1/2" welding pad, see detail
6" Std. steel pipe
Coordinate with local municipality on valving, piping, and hydrant, requirements
S01A01-BFV-SCU-4
Concrete thrust block, see detail on Dwg. (61926)
Structural backfill around concrete thrust block, see Specification section 21 16 13 - Fire Hydrants
D
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C
T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
T. SHARP
J. HAMMOND
R. FRISZ
R. SCHLOSSER, P.E.
M. DIUBALDO, P.E.
Peer Reviewer - Manager - Mechanical Piping & Systems Group
DENVER, CO 2025-02-03
STEEL MANIFOLD
SECTIONS AND DETAILS
1695-D-61951
0 1' 2' 3'
Scale: 3/4" = 1'-0"
1. For General Notes, see Dwg. (61942).
2. Air valve insulation jacket shall not inhibit movement or operation of valve
NOTES
Scale: 1/2" = 1'-0"H SECTION
Scale: 1/2" = 1'-0"
6" COMBINATION AIR VALVE ASSEMBLY
Scale: 1/2" = 1'-0"
AIR VALVE INSULATION
Scale: 1 1/2" = 1'-0"
MESH SCREEN
Scale: 1/2" = 1'-0"
BURIED VALVE ACTUATOR (BUTTERFLY VALVE SHOWN)
61945 Scale: 3/4" = 1'-0"
C SECTION
(60144, 60149)
90'-0"
Provide steel bushing as needed
CL Insulating union 3/4" ASME B16.11 Class 3000 threaded steel coupling, see Detail, Dwg. (61950)
CL Automatic ball-drip drain valve, min 250 psi working pressure, bronze
Std. steel pipe, 1-2" longStd. bronze pipe, 1-2" long
Min. 3'-6' of cover, see Note 3
Automatic ball-drip drain valve, min 250 psi working pressure
Stainless steel plate, drilling and dimensions to match 6" AWWA Class F flange
Hole diameter, see Note 6 Orifice hole, see detail
1 1/2"
1 1/2"
Upstream edge of the holes to be rounded as shown
R 1/8"
FLOW
CL 6" Grooved coupling
CL Flanged connection to AWWA Class 250B buried butterfly valve
CL 42" Std.
steel pipe
W=2" x t=1/2", welding pad, see detail, Dwg. (61950), typ.
CL Flanged connection to 42" Manually operated buried butterfly valve
CL Flanged connection to 6" fill line orifice plate 1, see detail
CL AWWA Class F flanged joint
CL 6" Std. steel pipe CL 6" Std. steel pipe
5'-6"
6' -0
2'-6"
PI 6" Std. steel 90 ° welding elbow
PI 6" Std. steel 90 ° welding elbow
3' -0
PI 42" x 6" Tee PI 42" x 6" Tee K
Note:
Suction requires 2 orifice plates.
Discharge requires 3 orifice plates, as shown.
9" 9"
3'-0"
CL Flanged connection to 6" fill line orifice plate 3, only required on discharge, see detail
FLOW
CL Flanged connection to 6" fill line orifice plate 2, see detail
8' - 0"
1' - 10" 4' - 0"
3' - 0" 3' - 0" 8' - 0"
1' - 10" 4' - 0" 2' - 2"
3' - 0"9"9"
6"
Se e
No te
3' m in
CL 42" Std.
steel pipe
W=1 1/2" x t=1/2" welding pad see detail, Dwg. (61950)
CL 6"
Flanged joint
CL 1/2" Automatic ball-drip drain valve, see detail, provide bushing as needed
Top of backfill inside of vault
Spool, see detail
6" AWWA Class F blind flange Blowoff orifice plate, see detail
6" AWWA Class 300 ball valve for buried service.
Orient actuator for vertical actuation, valve box and actuator not shown.
L
Compacted backfill, see Dwg. (61929)
Precast concrete blowoff enclosure, see Dwg. (61929)
6" AWWA Class F blind flange, see Note 4
CL Flange connection
CL Spool
6" Std. steel pipe Orifice plate, see detail
8"
W=1 1/2" x t=1/2", welding pad see detail, Dwg. (61950)
CL 42" Std steel pipe
CL 6" Flanged joint
1/2" Automatic ball-drip valve, see detail
6" Std. steel pipe
Top of backfill inside of vault
Bottom of flange, see Note 2
Valve box, see detail, Dwg. (61951)
Precast concrete blowoff enclosure, see Dwg. (61929)
3" min.
S ee
N ot e
6" min.
Top of blind flange, see Note 4
Compacted backfill, see Dwg. (61929)
D
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C
T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
T. SHARP
J. HAMMOND
R. FRISZ
R. SCHLOSSER, P.E.
M. DIUBALDO, P.E.
Peer Reviewer - Manager - Mechanical Piping & Systems Group
DENVER, CO 2025-02-03
STEEL MANIFOLD
SECTION AND DETAILS
1695-D-61953
Scale: Not to Scale
AUTOMATIC BALL DRIP VALVE
Scale: 1" = 1'-0"
ORIFICE PLATE
Scale: 6" = 1'-0"
ORIFICE HOLE
Scale: 1/2" = 1'-0"L SECTION
Scale: 1/2" = 1'-0"
BLOWOFF
Scale: 1 1/2" = 1'-0"
SPOOL
1. For General Notes, see Dwg. (61942).
2. Minimum 3" of clearance between the bottom of flange and compacted backfill.
3. Minimum 3'-6" of cover from ground surface to centerline of automatic drip valve.
4. Minimum 6" of clearance between the top of the blind flange and the bottom of the enclosure lid.
5. Minimum of 5'-4" of cover from bottom of 6"
AWWA Class 300 ball valve and compacted backfill.
6. Suction Orifice Plate for filling line and blowoff:
7 holes in an array of equliateral triagles with 1 1/2" legs and hole diameter of 3/4".
Discharge Orifice Plate for filling line and blowoff:
8 holes in an array of equliateral triagles with 1 1/2" legs and hole diameter of 5/8".
NOTES
0 1' 2' 4'
Scale: 1/2" = 1'-0"
0 1' 2'
Scale: 1" = 1'-0"
0 1" 3" 4"2"
Scale: 6" = 1'-0"
Scale: 1/2" = 1'-0"
42" BURIED BUTTERFLY VALVE AND 6" FILLING LINE
0 1' 2' 4'
Scale: 1/2" = 1'-0"
(61944, 61948)
Scale: 1/2" = 1'-0"K SECTION
CL 6" Std.
steel pipe
CL 42" Std.
steel pipe
PI 42" x 6" tee
W=2" x t=1/2" Welding pad, see detail, Dwg. (61950)
6" AWWA Class 250B buried butterfly valve
PI Horizontal bend
6" Std. steel pipe
CL Grooved end coupling, flexible fit
CL 42" Std.
steel pipe
PI 42" x 6" tee
W=2" x t=1/2" Welding pad, see detail, Dwg. (61950)
Buried valve actuator, see detail, Dwg (61951)
PI Horizontal bend
CL AWWA Class F flanged joint
CL Flanged connection to 6" fill line orifice plate 1, see detail
CL Flanged connection to 6" AWWA Class 250B buried butterfly valve
(61944, 61948)0 1' 2' 4'
Scale: 1/2" = 1'-0"
0 1' 2' 4'
Scale: 1/2" = 1'-0"
0 1' 2' 4'
Scale: 1/2" = 1'-0"
CL Flanged connection to 6" fill line orifice plate 2, see detail
CL Flanged connection to 6" fill line orifice plate 3, only required on discharge, see detail
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U
R
EA
U O
F R
EC
LA
M
AT
IO
N U
.S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C
T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
K. NUNES
K. NUNES
D. O'DONNELL
C. WOODARD, P.E.
E. MENDLIN, P.E.
Peer Reviewer - Manager, Electrical Equipment Group
DENVER, CO 2024-12-31
ELETRICAL
INSTALLATION
PANELBOARD
SCHEDULES
1695-D-61978
Notes:
Total Est. Demand: 25 A Total Conn.: 25 A
Total Est. Demand: 20880 VA Total Conn. Load: 20880 VA
Motor 20880 VA 100.00% 20880 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 25 A 25 A 25 A Total Load: 6960 VA 6960 VA 6960 VA
59 60 57 58 55 56 53 54 51 52 49 50 47 48 45 46 43 44 41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26
23 6214 VA 24
21 6214 VA 22
Motor 20 A 3
6214 VA 20
17 124 VA 124 VA 18
15 124 VA 124 VA 16
S01A02-MBV-U5-2 20 A 3
124 VA 124 VA
3 20 A S01A02-MBV-U6-2
11 124 VA 124 VA 12
9 124 VA 124 VA 10
S01A02-MBV-U3-2 20 A 3
124 VA 124 VA
3 20 A S01A02-MBV-U4-2
5 124 VA 124 VA 6
3 124 VA 124 VA 4
S01A02-MBV-U1-2 20 A 3
124 VA 124 VA
3 20 A S01A02-MBV-U2-2
CKT Circuit Description Trip Poles A B C
Poles Trip Circuit Description CKT
Notes:
Bussing: Copper Additional Features: SPD Main Bus Rating: 600 A Enclosure: NEMA 12 Wires: 3 MCB Trip Rating: 150 A Mounting: Floor Phases: 3 Mains Type: Molded Case Circuit Breaker
Supply From: S01A05-SWBD-001 Volts: 480 A.I.C. Rating: 35 kA
Panelboard: S01A05-SWBD-101
Notes:
Total Est. Demand: 102 A Total Conn.: 102 A
Total Est. Demand: 84760 VA Other 29760 VA 100.00% 29760 VA Total Conn. Load: 84760 VA
HVAC 55000 VA 100.00% 55000 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 102 A 102 A 102 A Total Load: 28253 VA 28253 VA 28253 VA
59 60 57 58 55 56 53 54 51 52 49 50 47 48 45 46 43 44 41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26
23 3333 VA 24
21 3333 VA 22
EUH-09 20 A 3
3333 VA 20
17 3333 VA 3333 VA 18
15 3333 VA 3333 VA 16
EUH-06 20 A 3
3333 VA 3333 VA
3 20 A EUH-10
11 1667 VA 3333 VA 12
9 1667 VA 3333 VA 10
EUH-03 20 A 3
1667 VA 3333 VA
3 20 A EUH-05
5 9920 VA 3333 VA 6
3 9920 VA 3333 VA 4
AHU-2 20 A 3
9920 VA 3333 VA
3 20 A EUH-01
CKT Circuit Description Trip Poles A B C
Poles Trip Circuit Description CKT
Notes:
Bussing: Copper Additional Features: SPD Main Bus Rating: 600 A Enclosure: NEMA 12 Wires: 3 MCB Trip Rating: 300 A Mounting: Floor Phases: 3 Mains Type: Molded Case Circuit Breaker
Supply From: S01A05-SWBD-001 Volts: 480 A.I.C. Rating: 35 kA
Panelboard: S01A05-SWBD-201
1. Circuit breaker ratings are estimated. Actual ratings to be determined by contractor based on equipment finished.
NOTES
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U
R
EA
U O
F R
EC
LA
M
AT
IO
N U
.S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C
T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
K. NUNES
K. NUNES
D. O'DONNELL
C. WOODARD, P.E.
E. MENDLIN, P.E.
Peer Reviewer - Manager, Electrical Equipment Group
DENVER, CO 2024-12-31
ELECTRICAL
INSTALLATION
PANELBOARD
SCHEDULES
1695-D-61979
Notes:
Total Est. Demand: 111 A Lighting 6660 VA 100.00% 6660 VA Total Conn.: 111 A Receptacle 6660 VA 100.00% 6660 VA Total Est. Demand: 91924 VA Other 35820 VA 100.00% 35820 VA Total Conn. Load: 91924 VA
HVAC 42784 VA 100.00% 42784 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 113 A 114 A 106 A Total Load: 31149 VA 31417 VA 29357 VA
59 60 57 58 55 56 53 54 51 52 49 50 47 48 45 46 43 44 41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26
23 3333 VA 24
21 3333 VA 22
EUH-08 20 A 3
3333 VA 20
17 3333 VA 3333 VA 18
15 3333 VA 3333 VA 16
EUH-04 20 A 3
3333 VA 3333 VA
3 20 A EUH-07
11 9920 VA 3333 VA 12
9 9920 VA 3333 VA 10
AHU-1 20 A 3
9920 VA 3333 VA
3 20 A EUH-02
5 4832 VA 1272 VA 6
3 4472 VA 3692 VA 4
S01A05-XFMR-T-001 20 A 3
4092 VA 3804 VA
3 20 A S01A05-LCP-001
CKT Circuit Description Trip Poles A B C
Poles Trip Circuit Description CKT
Notes:
Bussing: Copper Additional Features: SPD Main Bus Rating: 600 A Enclosure: NEMA 12 Wires: 4 MCB Trip Rating: 350 A Mounting: Floor Phases: 3 Mains Type: Molded Case Circuit Breaker
Supply From: S01A05-SWBD-ATS-01 Volts: 480/277 Wye A.I.C. Rating: 35 kA
Panelboard: S01A05-SWBD-301
Notes:
Total Est. Demand: 21 A Total Conn.: 21 A
Total Est. Demand: 149140 VA Total Conn. Load: 149140 VA
Motor 149140 VA 100.00% 149140 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 21 A
Total Conn. Load: 14...
1 Motor 3 400 A 20 A 21 A 21 A 21 A
CKT Circuit Description # of Poles Frame Size Trip Rating A B C
Remarks
Notes:
Enclosure: NEMA 12 Equivalent Main Bus Rating: 1 A Mounting: Floor Wires: 4 MCB Trip Rating:
Supply From: Phases: 3 Mains Type:
Location: CONTROL ROOM 4 Volts: 4160 Wye A.I.C. Rating:
Switchboard: S01A52-MCE-701
1. Circuit breaker ratings are estimated. Actual ratings to be determined by contractor based on equipment
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U
R
EA
U O
F R
EC
LA
M
AT
IO
N U
.S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C
T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
K. NUNES
K. NUNES
D. O'DONNELL
C. WOODARD, P.E.
E. MENDLIN, P.E.
Peer Reviewer - Manager, Electrical Equipment Group
DENVER, CO 2024-12-31
ELECTRICAL
INSTALLATION
PANELBOARD
SCHEDULES
1695-D-61980
Notes:
Total Est. Demand: 37 A Total Conn.: 37 A
Receptacle 6660 VA 100.00% 6660 VA Total Est. Demand: 13396 VA Other 3952 VA 100.00% 3952 VA Total Conn. Load: 13396 VA
HVAC 2784 VA 100.00% 2784 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 34 A 38 A 41 A Total Load: 4092 VA 4472 VA 4832 VA
41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26 23 24 21 22 19 20 17 18 15 16
13 RECEPTACLES - EXTERIOR 20 A 1 1440... 14
11 RECEPTACLES - DISCHARGE AIR CHAMBER... 20 A 1 1080... 1080... 1 20 A RECEPTACLES - EXTERIOR 12
9 RECEPTACLES - PUMP ROOM 20 A 1 900 VA 900 VA 1 20 A RECEPTACLES - PUMP ROOM 10
7 RECEPTACLES - ELECTRICAL ROOM 20 A 1 540 VA 720 VA 1 20 A RECEPTACLES - SUCTION AIR CHAMBER RM 8
5 F-3 20 A 1 696 VA 1976... 6
3 F-4 20 A 1 696 VA 1976...
2 20 A Other
1 F-1 20 A 1 696 VA 696 VA 1 20 A F-2 2
CKT Circuit Description Trip Poles
A B C Poles Trip Circuit Description CKT
Notes:
Bussing: Copper Additional Features: Main Bus Rating: 150 A Enclosure: NEMA 1 Indoor Wires: 4 MCB Trip Rating: 100 A Mounting: Surface Phases: 3 Mains Type: Main Lugs Only
Supply From: Volts: 120/208 Wye A.I.C. Rating: 22000
Panelboard: S01A05-PNL-001
Notes:
Total Est. Demand: 11 A Total Conn.: 11 A
Total Est. Demand: 8768 VA Lighting 6660 VA 100.00% 6660 VA Total Conn. Load: 8768 VA Other 2108 VA 100.00% 2108 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 15 A 15 A 5 A Total Load: 3804 VA 3692 VA 1272 VA
59 60 57 58 55 56 53 54 51 52 49 50 47 48 45 46 43 44 41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26 23 24 21 22 19 20 17 18 15 Lighting 20 A 1 636 VA 16
13 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 14
11 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 12
9 LIGHTING - ELECTRICAL ROOM 20 A 1 556 VA 0 VA 1 20 A SPARE 10
7 LIGHTING - DISCHARGE AIR CHAMBER ROOM 20 A 1 848 VA 848 VA 1 20 A LIGHTING - DISCHARGE AIR CHAMBER ROOM 8
5 SPARE 20 A 1 0 VA 1272 VA 1 20 A LIGHTING - SUCTION AIR CHAMBER ROOM 6
3 LIGHTING - PUMP ROOM 20 A 1 1250 VA 1250 VA 1 20 A LIGHTING - PUMP ROOM 4
1 LIGHTING - EXTERIOR 20 A 1 1020 VA 1088 VA 1 20 A LIGHTING - EXTERIOR 2
CKT Circuit Description Trip Poles A B C
Poles Trip Circuit Description CKT
Notes:
Bussing: Copper Additional Features: Main Bus Rating: 150 A Enclosure: NEMA 1 Indoor Wires: 4 MCB Trip Rating: 100 A Mounting: Surface Phases: 3 Mains Type: Main Lugs Only
Supply From: S01A05-SWBD-301 Volts: 480/277 Wye A.I.C. Rating: UseShortCircuitCurrentRating & Refer t...
Panelboard: S01A05-LCP-001
1. Circuit breaker ratings are estimated. Actual ratings to be determined by contractor based on equipment
Engine Generator
S01A01-NTUA-XFMR-T-001
S01A01-XFMR-T-002
S01A01-SWGR-201
S01A01-SWGR-101
S01A05-SWBD-101
S01A05-MCE-101
S01A05-LCP-001
S01A05-PNL-001
S01A05-XFMR-T-001
SCADA
Cabinet
Communication Rack
NTUA VACUUM FAULT
INTERRUPTER
S01A05-SWBD-301
S01A05-SWBD-201
S01A05-SWBD-001
S01A05-SWBD-ATS-01
ELECTRICAL
EQUIPMENT
VAULT
S01A01-PB-001
FIBER
OPTIC
VAULT
S01A01-PB-002
S01A01-NTUA-XFMR-T-001 - Pad Mounted Transformer 12.47kV-4,160Y/2,400V S01A01-SWGR-101- Outdoor Metal-Clad Switchgear (15kV) S01A01-SWGR-201- Outdoor Metal-Clad Switchgear (15kV) S01A05-MCE-101 - Motor Control Equipment (5kV) S01A01-XFMR-T-002 - Pad Mounted Transformer 4.16kV-480Y/277V S01A05-SWBD-001- 480Y/277 Volt Switchgear
S01A05-SWBD-101- 480 Volt Panelboard S01A05-SWBD-201- 480 Volt Panelboard S01A05-SWBD-ATS-01 - Automatic Transfer Switch S01A05-SWBD-301- 480Y/277 Volt Panelboard
S01A05-XFMR-T-001 - 480V-208Y/120V Transformer S01A05-PNL-001 - 208Y/120 Volt Distribution Panelboard S01A05-LCP-001 - Lighting Control Panel
D
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U
R
EA
U O
F R
EC
LA
M
AT
IO
N U
.S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C
T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
K. NUNES
K. NUNES
D. O'DONNELL
C. WOODARD, P.E.
E. MENDLIN, P.E.
Peer Reviewer - Manager, Electrical Equipment Group
DENVER, CO 2024-12-31
ELECTRICAL
INSTALLATION
ELECTRICAL SITE PLAN
1695-D-61983
Scale: 1/16" = 1'-0"
ELECTRICAL SITE PLAN
Unit 1 Motor
Unit 2 Motor
Unit 3 Motor
Unit 4 Motor
Unit 5 Motor
Unit 6 Motor
Unit 7 Motor
ELECTRICAL - EQUIPMENT LIST
0 8' 16' 32'
61985
61986 1 61987
61985
1. Grounding system conductors are stranded bare copper.
2. The pumping plant building ground ring is to be attached to the footing reinforcement steel.
Grounding method is dependent on design and construction of the building foundation.
3. All embedded ground terminations to be performed using Cadweld, thermoweld, or an equivalent exothermic process.
4. Location of ground cable terminations to be determined by the contractor.
5. Grounding layout drawing shows typical locations of grounding plates.
6. Connect water storage tank steel structures to the tank ground ring.
7. Connect structural steel members to the embedded ground ring.
8. Connections to the lightning protection system are not shown.
Ground Cable Buried In Earth Ground Cable Embedded In Concrete Ground Cable Exposed Welded or Bolted Connection Riser or Grounding Electrode Conductor
Ground Rod
Grounding Plate
Welded or Bolted Connection with pigtail connection
4/0 AWG
4/0 AWG
Pumping Plant Embedded Ground Bus Chemical Building Foundation Embedded Ground Ring
4/0 AWG Water Storage Tank Ground Ring Steel Column Grounding Jumper Riser Wireways & Cable Trays
4/0 AWG
4/0 AWG
2 AWG
4/0 AWG
2 AWG
2 AWG
4.16 kV Switchgear S01A01-SWGR-001
480V, 208Y/120V, & 240/120V Panelboards PLC & SCADA Cabinets
4/0 AWG Transformer S01A01-XFMR-T-002
4.16 kV Motors
480V Switchboard S01A05-SWBD-001 480V Motors Evaporative Cooling Units
4/0 AWG
4/0 AWG
2 AWG
2 AWG
Engine Generator & Fuel Tank4/0 AWG
4.16 kV Motor Control Equipment S01A05-MCE-1014/0 AWG
D
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U
R
EA
U O
F R
EC
LA
M
AT
IO
N U
.S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C
T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
K. NUNES
K. NUNES
D. O'DONNELL
C. WOODARD, P.E.
E. MENDLIN, P.E.
Peer Reviewer - Manager, Electrical Equipment Group
DENVER, CO 2024-12-31
GROUNDING SYSTEMS
PLAN - SITE
1695-D-61984
Scale: 1/16" = 1'-0"
GROUNDING SITE PLAN
NOTES
GROUNDING - SYMBOLS
SYSTEM CONDUCTORS
EQUIPMENT JUMPERS
Continues to Detail 2
1. Grounding system conductors are stranded bare copper.
2. The pumping plant building ground ring is to be attached to the footing reinforcement steel.
Grounding method is dependent on design and construction of the building foundation.
3. All embedded ground terminations to be performed using Cadweld, thermoweld, or an equivalent exothermic process.
4. Location of ground cable terminations to be determined by the contractor.
5. Grounding layout drawing shows typical locations of grounding plates.
6. Connect water storage tank steel structures to the tank ground ring.
7. Connect structural steel members to the embedded ground ring.
8. Connections to the lightning protection system are not shown.
Continues to Detail 1
ELECTRICAL
EQUIPMENT
S01A01-PB-001
D
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U
R
EA
U O
F R
EC
LA
M
AT
IO
N U
.S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C
T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
K. NUNES
K. NUNES
D. O'DONNELL
C. WOODARD, P.E.
E. MENDLIN, P.E.
Peer Reviewer - Manager, Electrical Equipment Group
DENVER, CO 2024-12-31
GROUNDING SYSTEMS
PLAN - SUCTION AIR
CHAMBER ROOM AND
CONTROL ROOM SPACES
1695-D-61985
Scale: 3/16" = 1'-0"1 PLAN - SUCTION AIR CHAMBER ROOM AND CONTROL ROOM SPACES
NOTES
Scale: 3/16" = 1'-0"2 PLAN - PULL BOX AND NTUA EQUIPMENT
0 5' 10' copper.
2. The pumping plant building ground ring is to be attached to the footing reinforcement steel.
Grounding method is dependent on design and construction of the building foundation.
3. All embedded ground terminations to be performed using Cadweld, thermoweld, or an equivalent exothermic process.
4. Location of ground cable terminations to be determined by the contractor.
5. Grounding layout drawing shows typical locations of grounding plates.
6. Connect water storage tank steel structures to the tank ground ring.
7. Connect structural steel members to the embedded ground ring.
8. Connections to the lightning protection system are not shown.
D
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U
R
EA
U O
F R
EC
LA
M
AT
IO
N U
.S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C
T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
K. NUNES
K. NUNES
D. O'DONNELL
C. WOODARD, P.E.
E. MENDLIN, P.E.
Peer Reviewer - Manager, Electrical Equipment Group
DENVER, CO 2024-12-31
GROUNDING SYSTEMS
PLAN - PUMP ROOM
1695-D-61986
Scale: 3/16" = 1'-0"
PLAN - PUMP ROOM
copper.
2. The pumping plant building ground ring is to be attached to the footing reinforcement steel.
Grounding method is dependent on design and construction of the building foundation.
3. All embedded ground terminations to be performed using Cadweld, thermoweld, or an equivalent exothermic process.
4. Location of ground cable terminations to be determined by the contractor.
5. Grounding layout drawing shows typical locations of grounding plates.
6. Connect water storage tank steel structures to the tank ground ring.
7. Connect structural steel members to the embedded ground ring.
8. Connections to the lightning protection system are not shown.
D
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U
R
EA
U O
F R
EC
LA
M
AT
IO
N U
.S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C
T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
K. NUNES
K. NUNES
D. O'DONNELL
C. WOODARD, P.E.
E. MENDLIN, P.E.
Peer Reviewer - Manager, Electrical Equipment Group
DENVER, CO 2024-12-31
GROUNDING SYSTEMS
PLAN - DISCHARGE AIR
CHAMBER ROOM AND
HVAC EQUIPMENT
1695-D-61987
Scale: 3/16" = 1'-0"
PLAN - DISCHARGE AIR CHAMBER ROOM AND HVAC EQUIPMENT SPACE
S01A01-XFMR-T-002
S01A01-SWGR-201
S01A01-SWGR-101
S01A05-SWBD-101
S01A05-MCE-101
S01A05-LCP-001
S01A05-PNL-001
S01A05-XFMR-T-001 SCADA
Cabinet
S01A05-SWBD-301
S01A05-SWBD-201
S01A05-SWBD-001
S01A05-SWBD-ATS-01
1. Cable tray routings are typical.
2. Cable and conductors to be routed via conduit from equipment to the cable tray.
3. Cable tray sections MP-x and SS-x to be located approximately 10.5 feet AFF except where installed above the motor control center (S0302-MCE-001) and low voltage switchboard (S0302-SWBD-001).
4. Cable tray sections MI-x and SI-x to be located approximately 18 inches above the respective sections MP-x and SS-x except where installed above the motor control center (S0302-MCE-001) and low voltage switchboard (S0302-SWBD-001).
5. Cable tray sections MP-A, MI-A, SS-A, and SI-A to be spaced evenly between the top of the motor control center (S0302-MCE-001) and low voltage switchboard (S0302-SWBD-001) and the wall mounted ventilation fans. Ensure adequate space is provided for installation and removal of associated conduit, conductors, and cables.
6. Cable tray support trapeze to be suspended from available roof support beams and purlins using the appropriate hardware. Coordinate design and installation with the pre-engineered building manufacturer and cable tray manufacturers installation requirements.
MP-x - Motor Power Cable Tray SI-x - Station Instrumentation Cable Tray SS-x - Station Service Power Cable Tray
D
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U
R
EA
U O
F R
EC
LA
M
AT
IO
N U
.S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C
T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
K. NUNES
K. NUNES
D. O'DONNELL
C. WOODARD, P.E.
E. MENDLIN, P.E.
Peer Reviewer - Manager, Electrical Equipment Group
DENVER, CO 2024-12-31
ELECTRICAL
INSTALLATION
CABLE TRAY PLAN -
MEDIUM VOLTAGE
1695-D-61988
Scale: 1/8" = 1'-0"
MEDIUM VOLTAGE CABLE TRENCH PLAN
NOTESCABLE TRAY - DESIGNATIONS
0 4' 8' 16'
A 61991
SS-E
Ladder Cable Tray
12"x4"
61950
SS-D3
Ladder Cable Tray
12"x4"
SS-D1
Ladder Cable Tray
12"x4"
SS-D2
Ladder Cable Tray
12"x4"
SS-C3
Ladder Cable Tray
12"x4"
SS-C2
Ladder Cable Tray
12"x4"
SS-B1
Ladder Cable Tray
12"x4"
SS-B2
Ladder Cable Tray
12"x4"
SS-F1
Ladder Cable Tray
12"x4"
SS-F2
Ladder Cable Tray
12"x4"
SS-G
Ladder Cable Tray
12"x4"
SS-A1
Ladder Cable Tray
12"x4"
SS-A2
Ladder Cable Tray
12"x4"
SS-A3
Ladder Cable Tray
12"x4"
B 61991
SS-C1
Ladder Cable Tray
12"x4"
1. Cable tray routings are typical.
2. Cable and conductors to be routed via conduit from equipment to the cable tray.
3. Cable tray sections MP-x and SS-x to be located approximately 10.5 feet AFF except where installed above the motor control center (S0302-MCE-001) and low voltage switchboard (S0302-SWBD-001).
4. Cable tray sections MI-x and SI-x to be located approximately 18 inches above the respective sections MP-x and SS-x except where installed above the motor control center (S0302-MCE-001) and low voltage switchboard (S0302-SWBD-001).
5. Cable tray sections MP-A, MI-A, SS-A, and SI-A to be spaced evenly between the top of the motor control center (S0302-MCE-001) and low voltage switchboard (S0302-SWBD-001) and the wall mounted ventilation fans. Ensure adequate space is provided for installation and removal of associated conduit, conductors, and cables.
6. Cable tray support trapeze to be suspended from available roof support beams and purlins using the appropriate hardware. Coordinate design and installation with the pre-engineered building manufacturer and cable tray manufacturers installation requirements.
MP-x - Motor Power Cable Tray SI-x - Station Instrumentation Cable Tray SS-x - Station Service Power Cable Tray
D
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U
R
EA
U O
F R
EC
LA
M
AT
IO
N U
.S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C
T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
K. NUNES
K. NUNES
D. O'DONNELL
C. WOODARD, P.E.
E. MENDLIN, P.E.
Peer Reviewer - Manager, Electrical Equipment Group
DENVER, CO 2024-12-31
ELECTRICAL
INSTALLATION
STATION SERVICE CABLE
TRAY PLAN
1695-D-61989
Scale: 1/8" = 1'-0"
PLAN - STATION SERVICE CABLE TRAY
NOTESCABLE TRAY - DESIGNATIONS
A 61991
SI-E
Channel Cable Tray
8"x4"
61950
SI-A1
Channel Cable Tray
8"x4"
SI-B1
Channel Cable Tray
8"x4"
SI-C2
Channel Cable Tray
8"x4"
SI-A2
Channel Cable Tray
8"x4"
SI-D1
Channel Cable Tray
8"x4"
SI-G
Channel Cable Tray
8"x4"
SI-F2
Channel Cable Tray
8"x4"
SI-D2
Channel Cable Tray
8"x4"
B 61991
SI-C1
Channel Cable Tray
8"x4"
SI-D3
Channel Cable Tray
8"x4"
SI-F1
Channel Cable Tray
8"x4"
MP-x - Motor Power Cable Tray SI-x - Station Instrumentation Cable Tray SS-x - Station Service Power Cable Tray
1. Cable tray routings are typical.
2. Cable and conductors to be routed via conduit from equipment to the cable tray.
3. Cable tray sections MP-x and SS-x to be located approximately 10.5 feet AFF except where installed above the motor control center (S0302-MCE-001) and low voltage switchboard (S0302-SWBD-001).
4. Cable tray sections MI-x and SI-x to be located approximately 18 inches above the respective sections MP-x and SS-x except where installed above the motor control center (S0302-MCE-001) and low voltage switchboard (S0302-SWBD-001).
5. Cable tray sections MP-A, MI-A, SS-A, and SI-A to be spaced evenly between the top of the motor control center (S0302-MCE-001) and low voltage switchboard (S0302-SWBD-001) and the wall mounted ventilation fans. Ensure adequate space is provided for installation and removal of associated conduit, conductors, and cables.
6. Cable tray support trapeze to be suspended from available roof support beams and purlins using the appropriate hardware. Coordinate design and installation with the pre-engineered building manufacturer and cable tray manufacturers installation requirements.
D
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U
R
EA
U O
F R
EC
LA
M
AT
IO
N U
.S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C
T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
K. NUNES
K. NUNES
D. O'DONNELL
C. WOODARD, P.E.
E. MENDLIN, P.E.
Peer Reviewer - Manager, Electrical Equipment Group
DENVER, CO 2024-12-31
ELECTRICAL
INSTALLATION
INSTRUMENTATION
CABLE TRAY PLAN
1695-D-61990
Scale: 1/8" = 1'-0"
PLAN - INSTRUMENTATION CABLE TRAY
CABLE TRAY - DESIGNATIONS NOTES
SI-A1
Channel Cable Tray
8"x4"
SS-A2
Ladder Cable Tray
12"x4"
SI-C1
Channel Cable Tray
8"x4"
SS-C1
Ladder Cable Tray
12"x4"
SI-C2
Channel Cable Tray
8"x4"
SS-C3
Ladder Cable Tray
12"x4"
SS-C2
Ladder Cable Tray
12"x4"
D
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U
R
EA
U O
F R
EC
LA
M
AT
IO
N U
.S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C
T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
K. NUNES
K. NUNES
D. O'DONNELL
C. WOODARD, P.E.
E. MENDLIN, P.E.
Peer Reviewer - Manager, Electrical Equipment Group
DENVER, CO 2024-12-31
ELECTRICAL
INSTALLATION
CABLE TRAY SECTIONS
1695-D-61991
61989 Scale: 1/4" = 1'-0"
A SECTION - ELECTRICAL ROOM NORTH
2'0 4' 8'
61989 Scale: 1/4" = 1'-0"
B SECTION - ELECTRICAL ROOM SOUTH
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U
R
EA
U O
F R
EC
LA
M
AT
IO
N U
.S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C
T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
K. NUNES
K. NUNES
D. O'DONNELL
C. WOODARD, P.E.
E. MENDLIN, P.E.
Peer Reviewer - Manager, Electrical Equipment Group
DENVER, CO 2024-12-31
ELECTRICAL
INSTALLATION
CABLE TRAY SCHEDULE -
STATION
INSTRUMENTATION
1695-D-61992
CABLE TRAY SCHEDULE - STATION INSTRUMENTATION
CABLE
TRAY
SECTION CONDUCTOR FUNCTION
CONDUCTOR
SIZE CABLE ORIGINATING POINT CABLE TERMINATING POINT
SI-D3 S01A02-FIT-101 Modbus 2-RS-485 SCADA Cabinet S01A02-FIT-101 SI-D3 S01A02-FIT-101 Power 1-3/c 14 AWG SCADA Cabinet S01A02-FIT-101 SI-D3 S01A02-FIT-201 Modbus 2-RS-485 SCADA Cabinet S01A02-FIT-201 SI-D3 S01A02-FIT-201 Power 1-3/c 14 AWG SCADA Cabinet S01A02-FIT-201 SI-D3 S01A02-FIT-301 Modbus 2-RS-485 SCADA Cabinet S01A02-FIT-301 SI-D3 S01A02-FIT-301 Power 1-3/c 14 AWG SCADA Cabinet S01A02-FIT-301 SI-D3 S01A02-FIT-401 Modbus 2-RS-485 SCADA Cabinet S01A02-FIT-401 SI-D3 S01A02-FIT-401 Power 1-3/c 14 AWG SCADA Cabinet S01A02-FIT-401 SI-D3 S01A02-FIT-501 Modbus 2-RS-485 SCADA Cabinet S01A02-FIT-501 SI-D3 S01A02-FIT-501 Power 1-3/c 14 AWG SCADA Cabinet S01A02-FIT-501 SI-D3 S01A02-FIT-601 Modbus 2-RS-485 SCADA Cabinet S01A02-FIT-601 SI-D3 S01A02-FIT-601 Power 1-3/c 14 AWG SCADA Cabinet S01A02-FIT-601 SI-D3 S01A02-MBV-U1-2 Modbus 2-RS-485 SCADA Cabinet S01A02-MBV-U1-2 SI-D3 S01A02-MBV-U2-2 Modbus 2-RS-485 SCADA Cabinet S01A02-MBV-U2-2 SI-D3 S01A02-MBV-U3-2 Modbus 2-RS-485 SCADA Cabinet S01A02-MBV-U3-2 SI-D3 S01A02-MBV-U4-2 Modbus 2-RS-485 SCADA Cabinet S01A02-MBV-U4-2 SI-D3 S01A02-MBV-U5-2 Modbus 2-RS-485 SCADA Cabinet S01A02-MBV-U5-2 SI-D3 S01A02-MBV-U6-2 Modbus 2-RS-485 SCADA Cabinet S01A02-MBV-U6-2 SI-D3 S01A02-PIT-001 Signal 1-TSP 16 AWG SCADA Cabinet S01A02-PIT-001 SI-D3 S01A02-PS-101 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-101 SI-D3 S01A02-PS-102 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-102 SI-D3 S01A02-PS-201 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-201 SI-D3 S01A02-PS-202 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-202 SI-D3 S01A02-PS-301 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-301 SI-D3 S01A02-PS-302 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-302 SI-D3 S01A02-PS-401 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-401 SI-D3 S01A02-PS-402 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-402 SI-D3 S01A02-PS-501 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-501 SI-D3 S01A02-PS-502 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-502 SI-D3 S01A02-PS-601 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-601 SI-D3 S01A02-PS-602 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-602 SI-D3 Unit 1 RTD Signals 8-Triad 16 AWG S01A05-MCE-101 S01A02-P-U1 Motor SI-D3 Unit 2 RTD Signals 8-Triad 16 AWG S01A05-MCE-201 S01A02-P-U2 Motor SI-D3 Unit 3 RTD Signals 8-Triad 16 AWG S01A05-MCE-301 S01A02-P-U3 Motor SI-D3 Unit 4 RTD Signals 8-Triad 16 AWG S01A05-MCE-401 S01A02-P-U4 Motor SI-D3 Unit 5 RTD Signals 8-Triad 16 AWG S01A05-MCE-501 S01A02-P-U5 Motor SI-D3 Unit 6 RTD Signals 8-Triad 16 AWG S01A05-MCE-601 S01A02-P-U6 Motor SI-D3 Unit 7 RTD Signals 8-Triad 16 AWG S01A05-MCE-701 S01A02-P-U7 Motor
CABLE TRAY SCHEDULE - STATION INSTRUMENTATION
CABLE
TRAY
SECTION CONDUCTOR FUNCTION
CONDUCTOR
SIZE CABLE ORIGINATING POINT CABLE TERMINATING POINT
SI-E S01A02-FIT-101 Modbus 2-RS-485 SCADA Cabinet S01A02-FIT-101 SI-E S01A02-FIT-101 Power 1-3/c 14 AWG SCADA Cabinet S01A02-FIT-101 SI-E S01A02-FIT-201 Modbus 2-RS-485 SCADA Cabinet S01A02-FIT-201 SI-E S01A02-FIT-201 Power 1-3/c 14 AWG SCADA Cabinet S01A02-FIT-201 SI-E S01A02-FIT-301 Modbus 2-RS-485 SCADA Cabinet S01A02-FIT-301 SI-E S01A02-FIT-301 Power 1-3/c 14 AWG SCADA Cabinet S01A02-FIT-301 SI-E S01A02-FIT-401 Modbus 2-RS-485 SCADA Cabinet S01A02-FIT-401 SI-E S01A02-FIT-401 Power 1-3/c 14 AWG SCADA Cabinet S01A02-FIT-401 SI-E S01A02-FIT-501 Modbus 2-RS-485 SCADA Cabinet S01A02-FIT-501 SI-E S01A02-FIT-501 Power 1-3/c 14 AWG SCADA Cabinet S01A02-FIT-501 SI-E S01A02-FIT-601 Modbus 2-RS-485 SCADA Cabinet S01A02-FIT-601 SI-E S01A02-FIT-601 Power 1-3/c 14 AWG SCADA Cabinet S01A02-FIT-601 SI-E S01A02-MBV-U1-2 Modbus 2-RS-485 SCADA Cabinet S01A02-MBV-U1-2 SI-E S01A02-MBV-U2-2 Modbus 2-RS-485 SCADA Cabinet S01A02-MBV-U2-2 SI-E S01A02-MBV-U3-2 Modbus 2-RS-485 SCADA Cabinet S01A02-MBV-U3-2 SI-E S01A02-MBV-U4-2 Modbus 2-RS-485 SCADA Cabinet S01A02-MBV-U4-2 SI-E S01A02-MBV-U5-2 Modbus 2-RS-485 SCADA Cabinet S01A02-MBV-U5-2 SI-E S01A02-MBV-U6-2 Modbus 2-RS-485 SCADA Cabinet S01A02-MBV-U6-2 SI-E S01A02-PIT-001 Signal 1-TSP 16 AWG SCADA Cabinet S01A02-PIT-001 SI-E S01A02-PS-101 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-101 SI-E S01A02-PS-102 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-102 SI-E S01A02-PS-201 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-201 SI-E S01A02-PS-202 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-202 SI-E S01A02-PS-301 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-301 SI-E S01A02-PS-302 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-302 SI-E S01A02-PS-401 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-401 SI-E S01A02-PS-402 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-402 SI-E S01A02-PS-501 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-501 SI-E S01A02-PS-502 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-502 SI-E S01A02-PS-601 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-601 SI-E S01A02-PS-602 Signal 1-3/c 14 AWG SCADA Cabinet S01A02-PS-602 SI-E Unit 1 RTD Signals 8-Triad 16 AWG S01A01-MCE-101 S01A02-P-U1 Motor SI-E Unit 2 RTD Signals 8-Triad 16 AWG S01A05-MCE-201 S01A02-P-U2 Motor SI-E Unit 3 RTD Signals 8-Triad 16 AWG S01A05-MCE-301 S01A02-P-U3 Motor SI-E Unit 4 RTD Signals 8-Triad 16 AWG S01A05-MCE-401 S01A02-P-U4 Motor SI-E Unit 5 RTD Signals 8-Triad 16 AWG S01A05-MCE-501 S01A02-P-U5 Motor SI-E Unit 6 RTD Signals 8-Triad 16 AWG S01A04-MCE-601 S01A02-P-U6 Motor SI-E Unit 7 RTD Signals 8-Triad 16 AWG S01A04-MCE-701 S01A02-P-U7 Motor
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U
R
EA
U O
F R
EC
LA
M
AT
IO
N U
.S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C
T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
K. NUNES
K. NUNES
D. O'DONNELL
C. WOODARD, P.E.
E. MENDLIN, P.E.
Peer Reviewer - Manager, Electrical Equipment Group
DENVER, CO 2024-12-31
ELETRICAL
INSTALLATION
CABLE TRAY SCHEDULES
- STATION SERVICE
1695-D-61993
CABLE TRAY SCHEDULE - STATION SERVICE
CABLE
TRAY
SECTION CONDUCTOR FUNCTION
CONDUCTOR
SIZE CABLE ORIGINATING POINT CABLE TERMINATING POINT
SS-A1 EUH-02 Power 3-3/c 10 AWG S01A05-SWBD-301 EUH-02 SS-A1 EUH-04 Power 1-3/c-10 AWG S01A05-SWBD-301 EUH-04 SS-A1 EUH-07 Power 1-3/c 8 AWG S01A05-SWBD-301 EUH-07 SS-A1 EUH-08 Power 1-3/c 8 AWG S01A05-SWBD-301 EUH-08
SS-A2 EUH-05 Power 1-3/c 10 AWG S01A05-SWBD-201 EUH-05 SS-A2 EUH-06 Power 1-3/c 8 AWG S01A05-SWBD-201 EUH-06 SS-A2 EUH-07 Power 1-3/c 8 AWG S01A05-SWBD-301 EUH-07 SS-A2 EUH-08 Power 1-3/c 8 AWG S01A05-SWBD-301 EUH-08 SS-A2 EUH-09 Power 1-3/c 8 AWG S01A05-SWBD-201 EUH-09 SS-A2 EUH-10 Power 1-3/c 8 AWG S01A05-SWBD-201 EUH-10 SS-A2 S01A02-MBV-U2-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U2-2 SS-A2 S01A02-MBV-U3-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U3-2 SS-A2 S01A02-MBV-U4-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U4-2 SS-A2 S01A02-MBV-U5-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U5-2 SS-A2 S01A02-MBV-U6-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U6-2 SS-A2 S01A02-MBV-U7-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U7-2 SS-A2 Unit 3 Heater 1-3/c 12 AWG S01A04-MCE-301 A01A02-P-U3 Motor SS-A2 Unit 4 Heater 1-3/c 12 AWG S01A05-MCE-401 A01A02-P-U4 Motor SS-A2 Unit 5 Heater 1-3/c 12 AWG S01A05-MCE-501 A01A02-P-U5 Motor SS-A2 Unit 6 Heater 1-3/c 12 AWG S01A05-MCE-601 A01A02-P-U6 Motor SS-A2 Unit 7 Heater 1-3/c 12 AWG S01A05-MCE-701 A01A02-P-U7 Motor
SS-A3 EUH-05 Power 1-3/c 10 AWG S01A05-SWBD-201 EUH-05 SS-A3 EUH-06 Power 1-3/c 8 AWG S01A05-SWBD-201 EUH-06 SS-A3 EUH-07 Power 1-3/c 8 AWG S01A05-SWBD-301 EUH-06 SS-A3 EUH-09 Power 1-3/c 8 AWG S01A05-SWBD-201 EUH-09 SS-A3 EUH-10 Power 1-3/c 8 AWG S01A05-SWBD-201 EUH-10 SS-A3 S01A02-MBV-U2-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U2-2 SS-A3 S01A02-MBV-U3-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U3-2 SS-A3 S01A02-MBV-U4-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U4-2 SS-A3 S01A02-MBV-U5-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U5-2 SS-A3 S01A02-MBV-U6-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U6-2 SS-A3 S01A02-MBV-U7-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U7-2 SS-A3 Unit 1 Heater 1-3/c 12 AWG S01A05-MCE-101 A01A02-P-U1 Motor SS-A3 Unit 2 Heater 1-3/c 12 AWG S01A05-MCE-201 A01A02-P-U2 Motor SS-A3 Unit 3 Heater 1-3/c 12 AWG S01A05-MCE-301 A01A02-P-U3 Motor SS-A3 Unit 4 Heater 1-3/c 12 AWG S01A05-MCE-401 A01A02-P-U4 Motor SS-A3 Unit 5 Heater 1-3/c 12 AWG S01A05-MCE-501 A01A02-P-U5 Motor SS-A3 Unit 6 Heater 1-3/c 12 AWG S01A05-MCE-601 A01A02-P-U6 Motor SS-A3 Unit 7 Heater 1-3/c 12 AWG S01A05-MCE-701 A01A02-P-U7 Motor
SS-B1 EUH-04 Power 1-3/c-10 AWG S01A05-SWBD-301 EUH-04
SS-B3 EUH-01 Power 3-3/c 10 AWG S01A05-SWBD-201 EUH-01 SS-B3 EUH-02 Power 3-3/c 10 AWG S01A05-SWBD-301 EUH-02 SS-B3 EUH-03 Power 1-3/c-10 AWG S01A05-SWBD-201 EUH-03 SS-B3 EUH-03 Power 1-3/c-10 AWG S01A05-SWBD-201 EUH-03 SS-B3 EUH-03 Power 1-3/c-10 AWG S01A05-SWBD-201 EUH-03 SS-B3 F-4 Power 1-3/c 8 AWG S01A05-PNL-001 F-4
SS-C1 EUH-01 Power 3-3/c 10 AWG S01A05-SWBD-201 EUH-01 SS-C1 EUH-02 Power 3-3/c 10 AWG S01A05-SWBD-301 EUH-02 SS-C1 EUH-04 Power 1-3/c-10 AWG S01A05-SWBD-301 EUH-04
SS-C2 EUH-04 Power 1-3/c-10 AWG S01A05-SWBD-301 EUH-04 SS-C2 F-3 Power 1-3/c 8 AWG S01A05-PNL-001 F-3
CABLE TRAY SCHEDULE - STATION SERVICE
CABLE
TRAY
SECTION CONDUCTOR FUNCTION
CONDUCTOR
SIZE CABLE ORIGINATING POINT CABLE TERMINATING POINT
SS-C2 F-4 Power 1-3/c 8 AWG S01A05-PNL-001 F-4
SS-C3 EUH-04 Power 1-3/c-10 AWG S01A05-SWBD-301 EUH-04 SS-C3 F-3 Power 1-3/c 8 AWG S01A05-PNL-001 F-3 SS-C3 F-4 Power 1-3/c 8 AWG S01A05-PNL-001 F-4
SS-D S01A02-MBV-U2-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U2-2 SS-D S01A02-MBV-U3-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U3-2 SS-D S01A02-MBV-U4-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U4-2 SS-D S01A02-MBV-U5-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U5-2 SS-D S01A02-MBV-U6-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U6-2 SS-D S01A02-MBV-U7-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U7-2
SS-D1 F-3 Power 1-3/c 8 AWG S01A05-PNL-001 F-3 SS-D1 F-4 Power 1-3/c 8 AWG S01A05-PNL-001 F-4
SS-D3 EUH-06 Power 1-3/c 8 AWG S01A05-SWBD-201 EUH-06 SS-D3 EUH-07 Power 1-3/c 8 AWG S01A05-SWBD-301 EUH-06 SS-D3 EUH-08 Power 1-3/c 8 AWG S01A05-SWBD-301 EUH-08 SS-D3 EUH-08 Power 1-3/c 8 AWG S01A05-SWBD-301 EUH-08 SS-D3 EUH-09 Power 1-3/c 8 AWG S01A05-SWBD-201 EUH-09 SS-D3 EUH-10 Power 1-3/c 8 AWG S01A05-SWBD-201 EUH-10 SS-D3 F-3 Power 1-3/c 8 AWG S01A05-PNL-001 F-3 SS-D3 F-4 Power 1-3/c 8 AWG S01A05-PNL-001 F-4 SS-D3 S01A02-MBV-U2-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U2-2 SS-D3 S01A02-MBV-U3-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U3-2 SS-D3 S01A02-MBV-U4-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U4-2 SS-D3 S01A02-MBV-U5-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U5-2 SS-D3 S01A02-MBV-U6-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U6-2 SS-D3 S01A02-MBV-U7-2 Power 1-4/c 12 AWG S01A04-SWBD-101 S01A02-MBV-U7-2 SS-D3 Unit 2 Heater 1-3/c 12 AWG S01A04-MCE-201 A01A02-P-U2 Motor SS-D3 Unit 3 Heater 1-3/c 12 AWG S01A04-MCE-301 A01A02-P-U3 Motor SS-D3 Unit 4 Heater 1-3/c 12 AWG S01A04-MCE-401 A01A02-P-U4 Motor SS-D3 Unit 5 Heater 1-3/c 12 AWG S01A04-MCE-501 A01A02-P-U5 Motor SS-D3 Unit 6 Heater 1-3/c 12 AWG S01A04-MCE-601 A01A02-P-U6 Motor SS-D3 Unit 7 Heater 1-3/c 12 AWG S01A04-MCE-701 A01A02-P-U7 Motor
SS-E AHU-1 Power 1-4/c 4 AWG S01A05-SWBD-301 AHU-1 SS-E AHU-2 Power 1-4/c 4 AWG S01A05-SWBD-301 AHU-1 SS-E EUH-06 Power 1-3/c 8 AWG S01A05-SWBD-201 EUH-06 SS-E EUH-07 Power 1-3/c 8 AWG S01A05-SWBD-301 EUH-07 SS-E EUH-08 Power 1-3/c 8 AWG S01A05-SWBD-301 EUH-08 SS-E EUH-09 Power 1-3/c 8 AWG S01A05-SWBD-201 EUH-09 SS-E EUH-10 Power 1-3/c 8 AWG S01A05-SWBD-201 EUH-10 SS-E F-3 Power 1-3/c 8 AWG S01A05-PNL-001 F-3 SS-E F-4 Power 1-3/c 8 AWG S01A05-PNL-001 F-4 SS-E S01A02-MBV-U1-2 Power 1-4/c 12 AWG S01A05-SWBD-101 S01A02-MBV-U1-2 SS-E S01A02-MBV-U2-2 Power 1-4/c 12 AWG S01A05-SWBD-101 S01A02-MBV-U2-2 SS-E S01A02-MBV-U2-2 Power 1-4/c 12 AWG S01A05-SWBD-101 S01A02-MBV-U3-2 SS-E S01A02-MBV-U4-2 Power 1-4/c 12 AWG S01A05-SWBD-101 S01A02-MBV-U4-2 SS-E S01A02-MBV-U5-2 Power 1-4/c 12 AWG S01A05-SWBD-101 S01A02-MBV-U5-2 SS-E S01A02-MBV-U6-2 Power 1-4/c 12 AWG S01A05-SWBD-101 S01A02-MBV-U6-2 SS-E Unit 1 Heater 1-3/c 12 AWG S01A05-MCE-101 S01A02-P-U1 Motor SS-E Unit 2 Heater 1-3/c 12 AWG S01A05-MCE-201 A01A02-P-U2 Motor SS-E Unit 3 Heater 1-3/c 12 AWG S01A05-MCE-301 A01A02-P-U3 Motor SS-E Unit 4 Heater 1-3/c 12 AWG S01A05-MCE-401 S01A02-P-U4 Motor SS-E Unit 5 Heater 1-3/c 12 AWG S01A05-MCE-501 A01A02-P-U5 Motor SS-E Unit 6 Heater 1-3/c 12 AWG S01A05-MCE-601 A01A02-P-U6 Motor SS-E Unit 7 Heater 1-3/c 12 AWG S01A05-MCE-701 A01A02-P-U7 Motor
SS-F1 EUH-08 Power 1-3/c 8 AWG S01A05-SWBD-301 EUH-08 SS-F1 EUH-09 Power 1-3/c 8 AWG S01A05-SWBD-201 EUH-09 SS-F1 EUH-10 Power 1-3/c 8 AWG S01A05-SWBD-201 EUH-10 SS-F1 F-3 Power 1-3/c 8 AWG S01A05-PNL-001 F-3 SS-F1 F-4 Power 1-3/c 8 AWG S01A05-PNL-001 F-4
SS-F2 AHU-1 Power 1-4/c 4 AWG S01A05-SWBD-301 AHU-1 SS-F2 AHU-2 Power 1-4/c 4 AWG S01A05-SWBD-301 AHU-1
SS-G EUH-08 Power 1-3/c 8 AWG S01A05-SWBD-301 EUH-08 SS-G EUH-09 Power 1-3/c 8 AWG S01A05-SWBD-201 EUH-09 SS-G EUH-10 Power 1-3/c 8 AWG S01A05-SWBD-201 EUH-10 SS-G F-3 Power 1-3/c 8 AWG S01A05-PNL-001 F-3 SS-G F-4 Power 1-3/c 8 AWG S01A05-PNL-001 F-4
61995
1. All work to be in accordance with the latest version of NFPA 70, National Electric Code.
2. See Cable and Conduit Schedules for conduit size, type, and conductors. Contractor to verify conductor ampacity, conduit fill, and jam ratio based on actual equipment provided.
3. Conduit routings are typical. Determine actual location for conduit and stub-ups in the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .