DRAFT_140R4025R0016_Attachment_3_-_00_00_02_Dwgs-B_001-095_02-14-2025_2.pdf
PDF 23 MB Posted
- Attached to
- NGWSP PUMPING PLANT 1
- Solicitation number
- 140R4025R0016
About this file
This document contains detailed engineering and architectural drawings for the Navajo-Gallup Water Supply Project's Pumping Plant No. 1, located in San Juan County, New Mexico. The comprehensive set of technical drawings covers multiple aspects of the pumping plant, including civil site details, structural excavation, masonry design, grading plans, and manifold piping layouts. The plant will include multiple pumping units (Units 1-7), air chambers, suction and discharge manifolds, and supporting infrastructure such as electrical and HVAC enclosures, with a primary datum elevation of 5076.50 feet.
The drawings specify intricate technical specifications for the facility, including 42-inch standard steel piping, butterfly valves, air release valves, blowoff valves, and complex piping configurations. The site includes detailed grading plans with specific elevation changes, riprap berms, concrete pans, and drainage considerations. The plant is designed with multiple mechanical and electrical components, including vertical turbine pumps, air compressors, and control systems, with provisions for instrumentation, level monitoring, and system controls. The project is being executed by the Bureau of Reclamation and is part of the larger Navajo-Gallup Water Supply Project, aimed at providing water infrastructure for the Navajo Nation in New Mexico.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAPI TO
Tsé Da’azkání Pumping Plant (2)
Tó Ałts’íísí Pumping Plant (3)
Tooh Haltsooi Pumping Plant (4)
Pumping Plant No. 7
Tohlakai Hill Pumping Plant (8,9,10)
Pumping Plant No. 1(c)
Pumping Plant No. 2(c)
14.3a Pumping Plant (284gpm)
14.1 Pumping Plant
14.2 Pumping Plant
14.6 Pumping Plant
14.7a Pumping Plant
Pumping Plant No. 3(c)
Reach 25 Booster Station
Phase 3 Booster Station
Phase 2 Booster Station
JICAAJIC RILLRIL AAAA
APACPAPA E INDIANN
RESERESERESES RVATRVRVV ION
Huerfano Turnout
Nageezi Turnout
Counselor Turnout
Ojo-Encino North Turnout
Pueblo Pintado Turnout
Torreon Turnout
Tohatchi/Buffalo Springs TO
Sheep Springs N Turnout
Sanostee/Burnham Turnout
Rock Springs Turnout
Newcomb Turnout
Naschitti Turnout
Window Rock Turnout
Jicarilla Apache Nation Turnout
Twin Lakes Turnout
Nav a j o I nd i an I r r i gat i on P r o j e c t
Ma i n Can a l
R io
A rr ib a
San Juan
S an do va l
McKinley
A pa ch e
Cibola
BECLAIBITO
SHIPROCK
RED VALLEY
NEZAHNEZAD
SANOSTEE
HUERFANO
LUKACHUKAI
COVE
ROUND ROCK
WEETWATER
TSAILE/WHEATFIELDS
NEWCOMB
TWO GREY HILLS
BURNHAM
SHEEP SPRINGS
CRYSTAL
SAWMILL
NASCHITTI
WHITEROCK LAKE VALLEY
NAGEEZI
RED LAKE MEXICAN SPRINGS
TOHATCHI
FORT DEFIANCE
TWIN LAKES
COYOTE CANYON
NAHODISHGISH
STANDING ROCK
ROCK SPRINGS
TSAYATCH
CHURCH ROCK
MARIANO LAKE
IYANBITO SMITH LAKE
CASAMERA LAKE
LITTLEWATER
CROWNPOINT
THOREAU
RED ROCK
MANUEITO
BREADSPRINGS
BACA/HAYSTACK
CHICHILTAH
LUPTON
HOUCK
OAKS SPRINGS
INLICHEE
CANONCITO
WHITE HORSE LAKE
PUEBLO PINTADO
BECENTI
TORREON
OJO ENCINO
COUNSELOR
SAINT MICHAELS
NAHATA DZIIL
RAMAH
CHINLE
NAZLINI
CUTTER
RESERVOIR
RIVEREVEEEVEVEEE
RIVER
IVER
RIVER
FRANK CHEE
WILLETTO
RESERVOIRR
NMORGANMORGANMORGANMORGANMORGANMORGANMORGAN
LAKELAKEAKELAKEAKEAKE
NAPI Turnout
Pumping Plant No.12 Standing Rock Pumping Plant
Crownpoint Turnout
Pumping Plant No.13
Pumping Plant No.14
Shiprock Turnout
FRUITLAND
UPPER
JUANUAN
SSSSSSANSASSSSSSSS
C H
U S
K A
M O
U N
T A
I N
S
TUN ITCHA
MOUNTA
IN
S
R E D
R O C K
V A L L E Y
Z U
N I
M O
U N
T A
I N
S
M
T
T
A
Y L
O R
C H A C O M E S A
S A N M A T E A M E S A
B I S T I
W I L D E R N E S S
C E R E Z
A C A
N Y O NL
A
R G
O
C A N Y O N
C A N Y O N
B L A N C O
S A N J U A N B A S I N F E I L D
C A N Y O N
G A
L L
E G
O S
Dona Ana
Los Alamos Harding Mora
Taos Rio Arriba
Quay
Guadalupe
San Juan
Sandoval
Sierra
Lincoln
Bernalillo
Union
Valencia
Hidalgo
Curry
Roosevelt
Chaves
De Baca
Santa Fe
Otero
San Miguel
Grant
Luna
Lea
Torrance
Catron
Cibola
Colfax
Socorro
McKinley
Eddy
COLORADO
A R
IZ
O N
A
O K
LA
H O
M A
TEX
A S
NEW MEXICO
MEXICO
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
-5
-6
-R D
-1 .D
W G
LA
S T
S A V
ED
D A
TE
-0 5-
LA
S T
S A V
ED
B Y
D
TH
O R N
B U
R G
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
GENERAL MAP
FARMINGTON, NM
1695-529-60431
2024-04-30
WASHINGTON
OREGON
MONTANA
WYOMING
IDAHO
CALIFORNIA
NEW MEXICO
ARIZONA
KEY MAP
COLORADO
NEVADA
UTAH
LEGEND
Miles 0 5 10
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
ADMIN APPROVAL -
D. Thornburg
D. Thornburg
MALCOLM BEGAY
Tihami, Moncef N P.E.
Gladden, Ryan L P.E.
Deputy Construction Engineer
LOCATION MAP
(NOT TO SCALE)
(NOT TO SCALE)
Found BLM Brass Cap Set 1999
Found BLM Brass Cap Set 1999
N20° 24' 15"E
783.86' (TIE)
S
' 3 9"
W
.1
2'
S88° 27' 03"W 2636.23'
7 8
18 17
South Quarter Corner
Section 7
SE Corner Section 7
PARCEL NO. RCH 2-PUMPING
PLANT NO. 1 (T-1)
3.82 ± acres
BIA N-362
BI
A
N-
Point of Beginning
N84° 12' 14"W 186.66'
N
' 4 7"
E
8.
S60° 30' 59"E 28.32'
S30° 15' 48"E 135.20'
S75° 13' 14"E
229.60'
S64° 28' 32"E
294.28'
S31° 43' 58"E 54.63'
East Quarter Corner Section 7 8
Found BLM Brass Cap Set 1999
S
' 4 4"
W
.4
6'
N89° 57' 02"E 5210.84'
Found BLM Brass Cap Set 1961 6 5
8NE Corner Section 7
N51° 07' 48"W
5222.45' (TIE)
1 6
12 NW Corner Section 7
Found BLM Brass Cap Set 1999
Township 29N Range 15W
Township 29N Range 16W
Section 07, Township 29 North, Range 15 West, N.M.P.M.
NAVAJO NATION
TRIBAL TRUST LAND
SAN JUAN COUNTY
NEW MEXICO
Pumping Plant 1 PARCEL NO.
RCH 2-PUMPING PLANT NO. 1 (P)
5.09 ± acres
PARCEL NO. RCH
2-PUMPING PLANT
NO. 1 (T-2)
0.69 ± acres
N83° 59' 52"W
134.09'
N
' 0 8"
E
7.
N78° 22' 54"W
106.13'
S1 9°
2'
7"
W
7.
S3 5°
1'
0"
W
6.
N84° 18' 03"W
426.99'
N31° 43' 58"W 121.18'
N84° 07' 11"W
304.34'
N
' 4 2"
E
8.
S84° 07' 11"E
52.92'
N
' 4 2"
E
.0 5'
S84° 12' 14"E 74.07' S52° 42' 15"E
40.67'
S84° 12' 14"E 174.24'
N06° 02' 08"E 44.75'
S83° 59' 46"E 200.04'
S06° 02' 08"W 44.03'
S84° 12' 14"E 357.30'
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
-5
-6
-R D
-1 .D
W G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
M B
EG
A Y
N av aj o- G al lu p W at er
S up pl y
Pr oj ec t, N M
N ew
M ex ic o
S an
J ua n La te ra l - R ea ch
R ig ht -o f- W ay
Navajo Nation - Tribal Trust Land
PARCEL NO. RCH 2 -
PUMPING PLANT NO. 1
Farmington, NM
1695-529-60430
2024-04-26
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
ADMIN APPROVAL
Malcolm Begay
Malcolm Begay
Tihami, Moncef N
Tihami, Moncef N
Gladden, Ryan L Deputy Construction Engineer
R
EV
N O
-1 0-
M od ifi ed p er m an en t R O
W p ar ce l ( to in cl ud e w es t en tr an ce an d ad de d an ot he r te m po ra ry
R O
W p ar ce l.
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
RR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
5066 5067
TPPP1-24 PERC
TPPP1-24-1
TPPP1-24-2
TPPP1-24-3
TPPP1-24-4
TPPP1-24-5
TPR2-22-13
TPR-22-12
TPR2-22-14
S.P. Coordinate N: 2089109.54 E: 2541466.63 Remove ~125LF of fence to the north
Service yard extents
Approximate grading extents, clear and screen area for vegetation, large rocks, etc. before backfilling and grading. See Specifications for additional information
Existing 24" PVC Navajo Nation Municipal Pipeline to remain
Existing Yellowman Siphon to remain
Existing 10" PVC irrigation line to remain
10" PVC
irrigation riser pipe
10" PVC irrigation riser pipe
10" PVC irrigation riser pipe
Construction ROW (1695-529-60430)
Construction ROW (1695-529-60430)
Permanent ROW (1695-529-60430)
Permanent ROW (1695-529-60430)
Navajo-Gallup Water Supply Project Reach 2 By Others
Access road extents
Access road extents
Existing manholes to remain
Yellowman Siphon
Existing culvert see Notes 1 & 5
Existing 36" HDPE Yellowman Siphon to remain
Permanent ROW (1695-529-60430)
Edge of existing road to remain
Existing fence to remain
Connection to West Haul road , see 61869 & 61870
Existing Yellowman Siphon transitions from buried to the west to above grade to the east
Edge of existing road, see note 5
Existing 30" CMP culvert to remain
Existing 20LF 30" CMP culvert to be removed, see note 1
Existing fence to remain
0 60'30'
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER
Brian Zook
Brian Zook
Andrew Marner
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
-D
-6
-R
D -1
.D W
G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
A M
A R N
ER
N av aj o- G al lu p W at er
S up pl y
Pr oj ec t, N M
N ew
M ex ic o
S an
J ua n La te ra l
Pu m pi ng
P la nt N o.
EXISTING CONDITIONS
& DEMOLITION PLAN
Denver, CO
1695-D-61859
NOTES:
1. Contractor to verify existing grades, utilities, and horizontal & vertical tie in to existing roads prior to construction in accordance with the specifications. Notify COR of any conflicts or discrepancies immediately.
2. All control points are shown in New Mexico State Plane Coordinate System, West Zone (NAD83) horizontal datum. A grid to ground scale factor of
1.000286319627 was used.
3. Contours shown are based off of lidar data provided by Atlantic and survey elevations provided by the Four Corners Construction Office.
4. All vertical elevations are based on the NAVD88 vertical datum.
5. Improvements to the main road and culvert are shown on 61869 and 61870.
Legend
Permanent ROW
Existing irrigation line/ Yellowman Siphon
Existing fence
Service yard/access road extents
IRR
Construction ROW
Approximate grading extents
Test pit
Navajo Nation Municipal Pipeline
RR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
ST
E
S T
S T
Edge of gravel (typ.)
Existing 36" HDPE Yellowman Siphon to remain
Existing 24" PVC Navajo Nation Municipal Pipeline to remain
Existing road to remain
9' Chain link fence w/ 1' of three-strand barbed wire on top
Permanent ROW (1695-529-60430)
Permanent ROW (1695-529-60430)
Connection point to Navajo-Gallup
Water Supply Project Reach 2
6" Gravel (61867)
2.00' Fence to edge of gravel (typ.)
.0
0'
Pumping Plant No. 1
S.P. Coordinate N: 2089130.00 E: 2542049.96
Navajo-Gallup Water Supply
Project Reach 2 (1695-D-60778)
L1
L2 L3
L4
L5
L6
62.00'
30' Slide gate
Enclosure wall (61921)
Enclosure wall (61922)
Concrete for Electrical & Mechanical equipment (61922)
Concrete for Electrical & Mechanical equipment (61921)
L7 L8
R30' R30'
Gravel to the edge of road, match existing road elevation
.8
1'
.0
0'
Electrical equipment
Culvert
Guard post (typ.) see note 7
62.00'
L9
L10
4' concrete chase w/ two curbs, see
Detail 3 on (61867)
C2
S.P. Coordinate N: 2089038.70 E: 2541564.77
Install Type L riprap berm 188'L x 5'W x 1.5'D
Install Type L riprap 1.5' depth
Install Type VL riprap 1'D
Transition from 4' concrete pan w/ one curb (Detail 2 on 61867) to 4' concrete chase with two curbs (Detail 3 on 61867). Transition curb height from 0" to 6" over 6LF to the north
S.P. Coordinate Install cutoff wall at edge of concrete pan N: 2089218.56 E: 2541483.51
Detention basin see (61864)
Concrete apron (typ.)
see (61862) for grading & (61893) for layout Concrete apron (typ.)
see (61862) for grading & (61893) for layout
Electrical equipment
Utility pole
4' Fiber reinforced concrete pan w/ one curb, see Detail 2 on (61867)
4' Fiber reinforced concrete pan see
Detail 3 on (61867)
4' Fiber reinforced concrete pan, see
Detail 1 on (61867)
4' Fiber reinforced concrete pan w/ one curb see Detail 2 on (61867)
Pipeline
4' Fiber reinforced concrete pan w/ one curb see Detail 2 on (61867)
Outlet structure concrete wall w/ riprap, see detailed plan view on this sheet and (61864)
Guard posts for transformer (By others)
Guard post (typ.)
see detail on this sheet for layout
Install Type VL riprap 1' D
14.00'
Pipeline
8.00'
Construction ROW (1695-529-60430)
Permanent ROW (1695-529-60430)
24' Slide gate Connection to main road By Others
4' Fiber reinforced concrete pan see Detail 1 on (61867)
Transition 4' Fiber reinforced concrete pan thickness from Detail 2 to Detail 3 on (61867) Taper curb from 6" to 0" over 6LF
95.00'
17.00'
Access road see (61866)
Culvert Culvert
L11
L12 C1
L13
L14
L15
L16
L17
L18
L19
L20
L21
L22 L23
S.P. Coordinate N: 2089107.43 E: 2541509.85
5.00' Type L riprap berm, 1.5'D
C3 7.00' 6.00'
7.00' 10.00'
33.67
S.P. Coordinate N: 2089110.14 E: 2541447.11
S.P. Coordinate N: 2089171.64 E: 2541452.42
Install Type L riprap 10'Lx5'Wx1.5'D
10.65'7.25'
15.00'
19.81'
Install Type VL riprap berm
48'L x 2.5'W x 1.0'D
Type L riprap, 1.5'D
S.P. Coordinate N: 2089121.16 E: 2541484.07
Existing 10" PVC irrigation line
Install Type L riprap 1.5' deep
20.00'8.00'
8.00'
S.P. Coordinate N: 2088995.14 E: 2541973.75
S5° 52' 57.61"W
Trench drain (61922)Trench drain (61921)
Fire hydrant (61951)
IRR
IRR
Concrete wall outlet structure (61864)
Install Type L riprap 1.5' deep
Install Type L riprap berm 1.5' deep
5.00'
4' Fiber reinforced concrete pan w/ one curb, see Detail 2 (61867)
4' Fiber reinforced concrete pan, see Detail 1 (61867)
3.5' Min.
5.00'
5.00'
Install Type L riprap 1.5' deep
Install Type L riprap 1.5' deep
.0
0'
23.00'
10°
4' Fiber reinforced concrete pan, see Detail 1 (61867)
30°
42.00'
13.00'
5.00' Type L riprap berm
2.50'
2.50'
1.50'
1.50'
2.50'
1.50'1.50'
E Confirm bollard and foundation do not conflict with electrical conduit or grounding (typ.)
Guard post (typ.)
4.00'
4.00 4.00'
4.00'
4.00'
4.00'
7.00'
9.00
7.00'
Approximate location of transformer grounding cable (61983)
0 60'30'
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER
Brian Zook
Brian Zook
Andrew Marner
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
-D
-6
-R
D -2
.D W
G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
A M
A R N
ER
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
SITE PLAN
DENVER, CO
1695-D-61860
NOTES:
1. Contractor to provide erosion and sediment control for the site until final stabilization is achieved. Erosion control activities shall include but are not limited to:
1.a. Installing a silt fence around perimeter of disturbed areas.
1.b. Seed and mulch disturbed areas outside the proposed chainlink fence and riprap areas for permanent soil stabilization.
1.c. Install erosion control blankets on disturbed soils with 4:1 slopes or greater.
2. Reference Structural drawings for concrete apron information
3. See 40-D-60002 for guard post details.
4. Line and curve table dimensions and bearings are labeled to the flowline of the concrete pans and the gravel yard extents.
5. All control points are shown in New Mexico State Plane Coordinate
System, West Zone (NAD83) horizontal datum. A grid to ground scale factor of 1.000286319627 was used.
6. See (61867) for concrete pan, concrete chase, cutoff wall, and gravel surfacing details.
7. Reference Specifications for fire hydrant information. Install (4) guard posts around the fire hydrant, provide 48" minimum clearance from fire hydrant to guard posts. Install guard posts to avoid conflict with the fire hydrant valve access and fire hydrant lateral.
8. Drawing numbers are 1695-D-XXXXX unless otherwise specified.
Legend
Concrete
Gravel
Chainlink fence
Riprap
0 10' 20'
0 5' 10'
0 5' 10'
0 20' 40'10'
6.00'
Riprap berms w/ soil & gravel filling riprap rock voids
ST
E
S T
S T
R
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
Pumping Plant No. 1
FFE=5076.50'
3.9%
3.
0%
2:
2.
0%
2.
0%
0.7%
2.
0%
6.
0%
4:1
.0
9.
3%
2.3
4.3%
4:1 1.0%
2.2%
3.
0%
2.
7%
0.7%
3:
3.
6% 3:
1.0%
0.
7%
4:
2.0%
3:
3:1
1.8%
1.0%
3.
2%4.5%
50735074
50785079
507550705067 5068 5069 5071
5073 5075
507050715072
Navajo-Gallup Water Supply
Project Reach 2 By Others
Permanent ROW (1695-529-60430)
Pipeline
Inv.=5069.80
5073.92
FGC
5071.26
5069.73
5074.16 GB
5075.40 GB
Inv.=5069.41
5071.84 GB
5073.30
5073.70
5074.25
5069.025069.11
5074.72
5074.56
5073.70
5076.00
Grade break
5075.40 GB
5076.50 TOC
Grade break
5073.78
5075.40 GB
5072.93
5074.50 GB
5073.72 GB
5072.52
5076.50 TOC
5073.52 GB
Inv.=5070.24
5066.43 ME
5066.68 ME
5072.63
See (61922) for grading & trench drain informationSee (61921) for grading information
5076.50 TOC
5076.40 TOC
5076.50 TOC
5076.50 TOC
5076.00
5076.005076.00
5076.50 TOC
5076.40 TOC
5072.37
5067.89 ME
Contractor to verify positive drainage to existing culvert, see notes 1 & 9
5069.42
Ridge line
5075.00 HP
4' Fiber reinforced concrete pan, see
Detail 3 on (61867) Riprap berm
4' Fiber reinforced concrete pan w/ once curb, see Detail 2 (61867)
44LF 18" RCP
class V culvert
@1.0% w/ (2) FES Permanent ROW (1695-529-60430)
5068.05
5068.33
Inv.=5068.41
5072.33
5075.92 FGC
5076.50
5073.52 GB
5076.40
5076.40 TOC
5076.50 TOC
5076.30 TOC
5076.30 TOC
5076.40 TOC
5076.50 TOC
5076.40 TOC
5074.31 FGC
5074.30
FGC
5073.90
FGC
5071.21 TOB
5071.21 TOB
5071.21 TOB
5071.21 TOB
Riprap berm
TOC=5074.75
Permanent ROW (1695-529-60430)
5075.40 GB
5073.93
Outlet structure wall (61864)
2.8%
5074.15
5074.29 FGP
5074.12 TOC=5074.75
5074.14 FGP
5072.75 HP
5072.45 HP
3.
0%
5067.25
5071.21 TOB
5071.21 TOB
48LF 36" RCP
class V culvert @ 2.1% w/ (2) FES
Inv.=5071.50
Inv.=5070.09
Riprap berm 1.0%
1.0%
Access road see (61866)
5075.50 FGC
5074.16 GB
6.
0%
14.2%
1.0
1.0
1.0%
3.2%
Top of curb=5071.21
TOB=5071.21
Riprap berm
2.
0%
5078.05 TOB
5077.05 TOB
5076.50 TOB
5075.75 TOB
5075.75 TOB
5076.50 TOB
4' Fiber reinforced concrete pan w/ once curb, see Detail 2 (61867)
TOF=5074.80
Detention basin see (61864)
5069.53
5074 50
5074.57
Connection to main road, see note 9
Main road improvements, see note 9
5078.55 TOB
62LF 36" RCP class V culvert @2.3% w/ (2) FES
See Partial View A for information
507150725073
Existing 36" CMP culvert, see notes 1 & 9
4' Fiber reinforced concrete pan w/ once curb, see Detail 2 (61867)
Existing CMP culvert to remain see note 1
5075.50 FGC
5.
0%
E
Pumping Plant No. 1
FFE=5076.50'
3.
6%
5076.50 TOC
5076.50 TOC GB
5076.40 TOC
5076.40 TOC GB
5075.74
5075.92 FGC
3.5%
2.
0%
5076.25 TOC
5075.75 FGC
(1) 6" Step, contractor to confirm trench drain daylights to gravel surface
5076.25 TOC
5075.75 FGC
Trench drain (61921) See Structural for enclosure grading information (61921)
5076.30
3.
2%
See note 10
0 60'30'
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
Brian Zook
Brian Zook
Andrew Marner
Marner, Andrew (Andy) J P.E.
Steen, Timothy M P.E.
Civil Engineer
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
-D
-6
-R
D -3
.D W
G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
A M
A R N
ER
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
GRADING PLAN
DENVER, CO
1695-D-61862
2025-02-04
Pumping plant
FFE (See plan for elevation)
A NOT TO SCALE
Compacted subgrade
Top of gravel
6" Slope per plan
NOTES:
1. Contractor to verify existing grades and utilities prior to construction in accordance with the Specifications.
Notify COR of any conflicts or discrepancies immediately.
2. Yard elevations are shown to top of gravel unless otherwise specified.
3. Provide 6% minimum grade away from the building in gravel areas for 10' minimum.
4. Slope concrete stoops and aprons away from the building at 2.0% slope. Re: Structural for grading information within enclosures.
5. Install erosion control blankets on disturbed slopes sloped at 4:1 or greater.
6. All vertical elevations are based on the NAVD88 vertical datum.
7. Contours shown are based off of lidar data provided by Atlantic and survey elevations provided by the Four
Corners Construction Office.
8. All control points are shown in New Mexico State Plane Coordinate System, West Zone (NAD83) horizontal datum. A grid to ground scale factor of 1.000286319627 was used.
9. Improvements to the main road and the existing CMP culvert beneath the main road are shown on drawings
61869 & 61870.
10. Taper the gravel surface from flush with the concrete walk to a 6" min. depth to provide an outfall for the trench drain. Paint the edge and top 4" of the concrete walk's edge where the vertical clearance from concrete to gravel is less than 6".
11. See (61860) for locations of riprap berms where soil and gravel shall be used to fill riprap rock voids.
12. See 40-D-6552 for details regarding bedding and embedment placement about RCP Culverts. Refer to
Specifications for CLSM bedding and embedment depth requirements.
ABBREVIATIONS
ME - Match existing HP - High point GB - Grade break FFE - Finished floor elevation FES - Flared end section FGC - Finished grade at concrete RCP - Reinforced concrete pipe TOB - Top of berm TOC - Top of concrete TOF- Top of fire hydrant flange
(~6" above gravel surface)
Compacted backfill per Specifications
Finished grade, see note 5
C NOT TO SCALE
6" Min.
Non-woven geotextile fabric
Compacted backfill per Specifications
Detention basin
D NOT TO SCALE
Width varies4' Fiber reinforced concrete pan w/ one 6" curb (61867)
Non-woven geotextile fabric, provide positive drainage toward concrete pan
18"
1.0' Top of riprap berm (See plan for elevations)
Erosion control blanket, see note 5
Gravel4' Fiber reinforced concrete pan w/ one 6" curb (61867)
3:1 Max
3:1 Max
0 10' 20'
Chainlink fence w/ barbed wire
2.0'
Compacted backfill per Specifications
B NOT TO SCALE
2.0'
Non-woven geotextile fabric
18"
1.0'
Riprap berm see plan for elevation, fill riprap voids with gravel and soil
Existing grade 2:1 Max
3:1 Max
Erosion control blanket, see note 5
2.0'
2:1 Max
Riprap berm, fill riprap voids with gravel and soil
Varies
3"
3"
Riprap per plan
Non-woven geotextile fabric, provide positive drainage toward concrete pan
Extend non-woven geotextile fabric to top of pan edge
Extend non-woven geotextile fabric to top of pan edge
12"
Extend non-woven geotextile fabric to top of gravel
2:1 max
S T
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
Pumping Plant No. 1
FFE=5076.50'
3:
5072507250735074
50785079
50705067 5068 5069 5071 5072
5073 5075
50705068 5069
2+
3+
4+
5+
6+
B P:
.0
EP: 6+52.09
7+00
8+00
9+00
BP: 7+00.00
EP: 9+65.66
+0
+0
+0
+0
+0
BP
: 1
5+
.0
EP
: 2
0+
.0
Connection to Navajo-Gallup Water
Supply Project Reach 2
Permanent ROW (1695-529-60430)
Pipeline
4' Fiber reinforced concrete pan (61867)
4' Fiber reinforced concrete pan w/ one curb (61867)
4' Fiber reinforced concrete pan w/ one curb (61867)
Culvert
Permanent ROW (1695-529-60430)
Riprap berm
Permanent ROW (1695-529-60430)Alignment A
Alignment B
Alignment C
Detention basin (61864)
4' Fiber reinforced concrete pan w/ one curb (61867) 4' Fiber reinforced concrete pan w/ curb (61867)
Concrete wall outlet structure
Culvert Culvert
Riprap berm
Riprap berm
Pipeline
Riprap berm
EL
EV
A
TI
O N
Alignment C
15+00 16+00 17+00 18+00 19+00 20+00 20+75
EL
EV
A
TI
O N
Alignment A
1+00 2+00 3+00 4+00 5+00 6+00 6+75
EL
EV
A
TI
O N
Alignment B
7+00 8+00 9+00 9+80
Finished grade
Existing grade
Finished grade
Existing grade
Finished grade
Existing grade
Pumping Plant (not to scale) See (61889)
See (61871) for structural excavation
See (61871) for structural excavation
Access road (61866)
Pumping Plant (not to scale) See (61889)
0 40' 80'20'
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER
Brian Zook
Brian Zook
Andrew Marner
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
-D
-6
-R
D -4
.D W
G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
A M
A R N
ER
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
GRADING SECTIONS
DENVER, CO
1695-D-61863
NOTES:
1. Contractor to verify existing grades and utilities prior to construction in accordance with the Specifications. Notify engineer of any conflicts or discrepancies immediately.
2. Elevations in the profile are shown to top of gravel and finished grade unless otherwise specified.
3. See (61862) for grading information, see (61864) for detention basin information, see (61869) for west haul road information.
4. All vertical elevations are based on the NAVD88 vertical datum.
5. Contours shown are based off of lidar data provided by Atlantic and survey elevations provided by the Four Corners Construction Office.
6. All control points are shown in New Mexico State Plane Coordinate System, West Zone (NAD83) horizontal datum. A grid to ground scale factor of
1.000286319627 was used.
7. Install erosion control blankets on disturbed slopes sloped at 4:1 or greater.
Gravel
Chainlink fence w/ barbed wire
Compacted backfill per Specifications
Non-woven geotextile fabric
Erosion control blanket, see note 7
E NOT TO SCALE
4' Fiber reinforced concrete pan w/ 6" curb (61867)
Non-woven geotextile fabric, provide positive drainge toward concrete pan (typ.)
Riprap per plan
3:1 Max
Top of riprap berm (See plan for elevations)
3"
2.5'
1.0' 2.0'Varies
3"
Riprap berm, fill riprap voids with gravel and soil
Non-woven geotextile fabric
12"
Extend non-woven geotextile fabric to top edge of concrete (typ.)
12"
T
S T
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
R
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
Pumping Plant No. 1
FFE=5076.50'
Permanent ROW (1695-529-60430)
Pipeline
1.0%
5068.05
71 50
72 50 73 50
50705068 5069 5071 5072 5073
See (61862) for grading information
5067.17
506550655065
TPR2-22-13
TPR-22-12
TPR2-22-14
Outlet structure wall see details on this sheet, see (61860) for riprap information
100-year water surface elevation=5070.21
Total required volume=6,316 CF
See (61862) for grading information
Existing 36" CMP culvert, see note 8
Ex. Inv.=63.27
Ex. Inv.=62.78
5071.21 TOB
5071.21 TOB 5071.21 TOBRiprap
berm
50705069 5071 5070
6950715072 50705069
5071.21 TOB
5071.21 TOB
Culvert (61862)
Culvert (61862)
Riprap berm
507050715072
Riprap berm
Pipeline
Culvert (61862)
Riprap berm
0 60'30'
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
Brian Zook
Brian Zook
Andrew Marner
Marner, Andrew (Andy) J P.E.
Steen, Timothy M P.E.
Civil Engineer
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
-D
-6
-R
D -5
.D W
G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
A M
A R N
ER
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
DETENTION BASIN PLAN
DENVER, CO
1695-D-61864
2025-02-04
Scale: 1"=30'
NOTES:
1. Contractor to verify existing grades and utilities prior to construction in accordance with the specifications. Notify engineer of any conflicts or discrepancies immediately.
2. Yard elevations are shown to the top of gravel and top of concrete/flowline unless otherwise specified.
3. Cover top of opening between bar grate and orifice plate w/ 24"x8.5"x0.25" solid stainless steel plate. Ensure anchor bolts for this cover plate are offset from the other anchor bolts to prevent conflicts.
4. Attach the stainless steel orifice plate, bar grate, and cover plate to the concrete wall with 1/2" stainless steel expansion anchor bolts with 3.5" embedment. Provide 3" clearance from center of bolt to edge of plate/concrete. See Specifications for information.
5. All vertical elevations are based on the NAVD88 vertical datum.
6. All control points are shown in New Mexico State Plane Coordinate System, West Zone
(NAD83) horizontal datum. A grid to ground scale factor of 1.000286319627 was used
7. Contours shown are based off of lidar data provided by Atlantic and survey elevations provided by the Four Corners Construction Office.
8. Improvements to the main road and the existing CMP culvert beneath the main road are based on assumed elevations and locations as the main road improvements and culvert may be designed and reconstructed By Others, see note 1.
9. See (61860) & (61862) for locations, type, depth, and elevations of riprap berms where soil and gravel shall be used to fill riprap rock voids.
DETAIL - DETENTION BASIN OUTLET STRUCTURE
NOT TO SCALE
SECTION -DETENTION BASIN OUTLET STRUCTURE
NOT TO SCALE
1.5'
8"
Flow
DETAIL - OUTLET STRUCTURE PLAN VIEW
NOT TO SCALE
12"
3" Clr.
(typ.)
Fl ow
Bottom of basin=5068.05'
AMICO KLMP SR Series aluminum bar grate or equal, 3/16" wide bearing bars on 1-3/16" centers 1/4" Thick stainless steel orifice plate, see note 4
Top of concrete wall (100-year WSEL)=5070.21' Steel plate cover w/
(2) anchor bolts, see notes 3 and 4
Concrete pan Concrete pan, see (61860) for riprap placement
Anchor bolt (typ), see note 4
Stainless steel orifice plate
Concrete wall
Bar grate, bearing bars to run horizontally
5-year WSEL=5069.68'
3:1 Slope
Top of detention basin=5071.21' (Min.)
Finished grade
3:1 Slope
Top of detention basin=5071.21' (Min.)
Concrete pan
16.0'
1.5'Bottom of basin=5068.05'
5-year WSEL=5069.68'
Top of 100-year weir=5070.21'
(4) 1/2" Stainless steel anchor bolts (typ.) see note 4
5-year weir=0.27' wide
3.73'
Finished grade
Top of 100-year weir=5070.21'
12" Opening in concrete
Finished grade
Compact per Specifications
Compact per Specifications
Finished grade
24" Stainless steel orifice plate
Geotextile fabric
Riprap berm w/ soil and gravel filling voids, see note 9
Geotextile fabric
Concrete wall w/ #4@1'-6" ef ew
Riprap berm w/ soil and gravel filling voids, see note 9 Extend geotextile fabric to top of concrete
IRR
IRR
IRR
IRR
IRR
IRR
I
IRR
IRR
IRR
IRR
IRRExisting road
Pumping Plant No. 1
FFE=5076.50'
ROW
Navajo-Gallup Water Supply
Project Reach 2 (By others)
50745076
See (61862) for grading information
2191+00
2192+00 21
2191+00
CONNECTION TO REACH 2
N=2089093.75 E=2542125.40
2206+00
CONNECTION TO REACH 2 HDD
N=2089046± E=2541201±
2205+06.71
COMBINED MITER BEND
Δ=70°53'08" HORIZ.
N=2089130.04 E=2541240.01
2192+13.61
COMBINED MITER BEND
Δ=62°22'47" HORIZ.
N=2088999.04 E=2542062.70
Navajo-Gallup Water Supply Project Reach 2 (By others)
Existing 10"Ø PVC Irrigation Pipe
West Haul Road (61869)
2190+00 2193+00
2199+872200+00 2205+00 2206+00
S=0.05600
S= 0.
S=-0.00429
S=-0.06300
S=0.00200
Δ
2°
'0 3"
V
ER
TI
C A L Δ
5°
'0 6"
C O
M B
IN
ED
Δ
°0 0'
Δ
3°
'1 8"
Δ
3°
'1 0"
Δ
3°
'2 6"
D
EF
LE
C
TI
O N
.7
C O
M B
IN
ED
M
IT
ER
B
EN
D
D
EF
LE
C
TI
O N
D
EF
LE
C
TI
O N
D
EF
LE
C
TI
O N
El. 5070.9
El. 5081.5
El. 5068.5
El. 5062.2
El. 5062.5
S= 0.
El. 5061.0
El. 5068.5
V
ER
TI
C A L Δ
7°
'4 0"
C O
M B
IN
ED
Δ
°3 7'
M
IT
ER
B
EN
D
Δ
8°
'4 9"
.6
C O
M B
IN
ED
M
IT
ER
B
EN
D
El. 5081.10
.6
6-
IN
C H
A
IR
V A
LV
E
-I N
C H
B U
TT
ER
FL
Y
V A
LV
E 6-
IN
C H
B
LO
W O
FF
H
G L
EL
.0
El. 5060.55
.1
N N
M P
-i nc h
PV
C To p El
.7
.1
-I nc h
PV
C I rr ig at io n To p El
.4
6-
IN
C H
B
LO
W O
FF
-I N
C H
B U
TT
ER
FL
Y
V A
LV
E 6-
IN
C H
B
LO
W O
FF
H
G L
EL
.7
El. 5062.30
42B475 42B575 42B550
Pipe Pipe
Existing ground surface
Proposed ground surface
Existing ground surface
Proposed ground surface
H G
L
EL
.7
H G
L
EL
.0
.7
6-
IN
C H
A
IR
V A
LV
E
El. 5081.47
Wash Crossing
West Haul Road (61869)
C O
N N
EC
T
TO
R
EA
C H
El. 5060.23
S=0.00674
Compacted backfill where specified or where directed
O.D
Trench Wall
CLSM
Pipe
Pipe spring line
CLSM
3" M in
0.25 O.D.
EMBEDMENT
BEDDING0.
O .D
3" M in.
Bottom of trench Alternate B shown
Minimum side clearance is the horizontal distance between the trench wall and the pipe measured at the spring line.
18"
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
Andrew Marner
Andrew Marner
Brian Zook
Marner, Andrew (Andy) J P.E.
Steen, Timothy M P.E.
Manager, Water Conveyance 2
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
-D
-6
-R
D -6
.D W
G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
A M
A R N
ER
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
MANIFOLD PIPING
PLAN AND PROFILE
DENVER, CO
1695-D-61865
1HOR. 1" = 50', VERT. 1" = 5'
1" = 50'
NOTES
1. At angle points that do not require miter bends, long radius curves
(vertical and horizontal) shall be constructed by pulling joints.
2. Stations are approximate and may be varied as directed.
3. Minimum earth cover over the top of the pipe shall be 3.5 feet unless the line pipe is at an existing wash, or at a roadway or traffic, and then the minimum cover is 5 feet, unless otherwise noted.
4. All joints are to be restrained under wash crossings between the stations identified on the plan and profile.
5. Where the line pipe crosses an existing pipe, a minimum clear distance of 2 feet outside to outside between line pipe and existing pipe shall be provided unless otherwise directed. The backfill between the crossing pipelines shall be controlled low strength material (CLSM) as stated in the specifications.
6. Hydraulic grade line elevations (H.G.L. El.) shown are for the maximum static HGL upstream of Pumping Plant 1 on Reach 2.
The HGL downstream of the Pumping Plant 1 on Reach 2 is design Q of 71 cfs at steady state.
7. Unknown elevations and diameters of existing utilities shall be determined by the contractor and reported to the COR in time to allow adjustment of grades and design if required before contractor submits pipe, fittings, and miter bends for approval.
8. Grid based on New Mexico State Coordinate System West Zone.
9. Reach 2 and 3 Ground to grid conversion factor is 0.999713762328.
10. CAUTION: Call New Mexico One Call 811 before you dig.
PIPE CLASSIFICATIONS
The line pipe is designated as 36B425, 36B325, 36D450, etc.
The 36 indicates the nominal pipe diameter in inches. The letters B, C, and D denote cover class of 10, 15, and 20 feet respectively, of design earth cover over the top of the pipe. The letter K denotes steep pipe sections. The letters HDD denotes Horizontal Directional Drill. The number 425, 325, etc. denotes the maximum allowable hydrostatic pressure head, in feet, measured at the centerline of the pipe.
T
S
TS
T
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
1.0%
80 50
85 50
5070 5070 5069 50695071 5071
50755069
5071 5072 5073 5074 5076 5077
Pipeline
Detention basin see (61864)
Outlet structure wall (61864)
See (61062) for grading information
Culvert (61862)
Culvert (61862)
1+
2+
3+
4+
4+
West access road alignment, see profile and detail on this sheet
West Haul Road improvements, see note 3
Permanent ROW (1695-529-60430)
Connection to West Haul Road, see note 3
Existing culvert to remain, see note 1
Culvert (61862)
Existing 10" PVC irrigation line
0+80 1+00 2+00 3+00 4+00 4+60
2.0%
4.7%
2.1%Centerline of west access road
Existing grade
See West Haul Road, see note 3.
GRADE BREAK STA = 1+00.00
ELEV = 5073.08
G R A D
E B R
EA
K S
TA
.0
EL
EV
.8
PVI STA: 2+85.77
PVI ELEV: 5074.76
K: 29.49
LVC: 75.00
B V C S
2+
.2
B V C E:
3.
EV
C S
3+
.2
EV
C E:
6.
PVI STA: 1+54.88
PVI ELEV: 5071.98
K: 26.19
LVC: 108.00
B V C S
1+
.8
B V C E:
3.
EV
C S
2+
.8
EV
C E:
3.
13LOW PT. STA: 1+53.25
LOW PT ELEV: 5072.54
0 20' 40'10'
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
Brian Zook
Brian Zook
Andrew Marner
Marner, Andrew (Andy) J P.E.
Steen, Timothy M P.E.
Manager, Water Conveyance 2
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
-D
-6
-R
D -7
.D W
G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
A M
A R N
ER
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
WEST ACCESS ROAD
PLAN AND PROFILE
DENVER, CO
1695-D-61866
2025-02-04
NOTES:
1. Contractor to verify existing grades and utilities prior to construction in accordance with the Specifications. Notify engineer of any conflicts or discrepancies immediately.
2. Profile view elevations are shown to top of gravel unless otherwise specified.
3. Improvements to the main road and the existing CMP culvert beneath the West Haul
Road, see (61869) & (61870).
4. Install erosion control blankets on disturbed slopes sloped at 4:1 or greater.
5. All vertical elevations are based on the NAVD88 vertical datum.
6. Contours shown are based off of lidar data provided by Atlantic and survey elevations provided by the Four Corners Construction Office.
7. All control points are shown in New Mexico State Plane Coordinate System, West
Zone (NAD83) horizontal datum. A grid to ground scale factor of 1.000286319627 was used.
0 20' 40'10'
Gravel
Non-woven geotextile fabric
Erosion control blanket, see note 4
24.0'
2.0% 2.0%
12.0' 6"
Compacted backfill per Specifications
NOT TO SCALE
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER
Brian Zook
Brian Zook
Andrew Marner
Marner, Andrew (Andy) J P.E.
Steen, Timothy M P.E.
Manager, Water Conveyance 2
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
-D
-6
-R
D -8
.D W
G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
A M
A R N
ER
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
CIVIL SITE DETAILS
DENVER, CO
1695-D-61867
2025-02-04
Section View
4@
1' -0
8"
6"
Elevation View
See Detail 1 on this sheet
3'-0" 3'-0"
2' -0
3" (Typ.)7 - #4 Eq. spc.
(M in
Riprap per plan
Concrete pan
Concrete cutoff wall Compact backfill per Specifications (Typ.)
Concrete cutoff wall
#4
Concrete pan connection
Geotextile fabric
1' -6
6" Min.
6" Gravel surface
Nonwoven geotextile
Compacted backfill2.0' Min.
Existing subgrade
2.0' 2.0'
6"
2"
Riprap, see (61860) for riprap type and location
Flow line
Fiber reinforced concrete, see Note 1 and Detail 5 on this sheet for cutoff wall at end of pan
Compacted subgrade per Specifications
1 NOT TO SCALE
Geotextile fabric, provide positive slope toward pan (typ.)
2.0' 2.0'
6"
2" Flow line
Fiber reinforced concrete, see Specifications and Note 1
Compacted subgrade per Specifications
2 NOT TO SCALE
6" 1.0'
4 NOT TO SCALE
5 NOT TO SCALE
NOTES:
1. For concrete pans and chases, provide control joint every 10' minimum.
2.0' 2.0'
6"
2"
Finished grade, elevations shown on (61862)
Flow line
Fiber reinforced concrete, see Note 1 and Detail 5 on this sheet for cutoff wall at end of pan
Compacted subgrade per Specifications
3 NOT TO SCALE
Seed and compact per Specifications
3"
Extend geotextile fabric, to top of pan (typ.)
3"
See (61860) for riprap depth
See (61860) for riprap depth
Extend geotextile fabric to top of concrete
T
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
IRR
Existing road
50785079
80 50
85 50
50755073
5073 5075
5070 50705069 50695071 5071
5070 5075
Connection to Navajo-Gallup Water Supply
Project Reach 2
Existing 36" CMP culvert to be removed and replaced, see note 3
Permanent ROW (1695-529-60430)
Detention basin see (61864)
Outlet structure wall (61864)
See (61062) for grading information
Culvert (61862)
Main road improvements, see note 3
Construction ROW (1695-529-60430)
Fl ow t o
S an
J ua n R iv er
Pumping Plant No. 1
Connection to main road, see note 3
Culvert (61862)
Main road improvements By Others, see note 3
Culvert (61862)
Pipeline
Navajo-Gallup Water Supply Project Reach 2 By Others
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER
Zook, Brian P
Zook, Brian P
Marner, Andrew (Andy) J
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
-D
-6
-R
D -9
.D W
G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
C W
A
LS
H
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
EXISTING DRAINAGE
DITCH CAPACITY
PLAN
DENVER, CO
1695-D-61868
NOTES:
1. Contractor to verify existing grades and utilities prior to construction in accordance with the Specifications. Notify COR of any conflicts or discrepancies immediately.
2. Profile view elevations are shown to top of gravel unless otherwise specified.
3. For improvements to the main road and the existing CMP culvert beneath the main road, see drawings (61869) and (61870).
4. All vertical elevations are based on the NAVD88 vertical datum.
5. Contours shown are based off of lidar data provided by Atlantic and survey elevations provided by the Four Corners Construction
Office. Cross sections of the existing drainage channel are based off of survey elevations provided by FCCO on 1/2/24.
6. All control points are shown in New Mexico State Plane Coordinate System, West Zone (NAD83) horizontal datum. A grid to ground scale factor of 1.000286319627 was used.
7. A 100-year flowrate of 24.8 cfs was calculated for the off-site basin tributary to the existing drainage ditch. The off-site basin flowrate was analyzed to determine the capacity and 100-year water surface elevation (WSEL) in the ditch. The peak flowrate discharged from the Pumping Plant 1 site is expected to occur before the peak flow from the off-site basin.
0 40' 80'20'
A NOT TO SCALE
Existing grade
Existing=5065.21 Longitudinal slope=0.8%
Existing=5068.47Existing=5068.35
18.7' 15.2'
B NOT TO SCALE
Existing grade
Existing=5063.86 Longitudinal slope=1.3%
Existing=5066.59Existing=5067.45
15.2' 13.6'
100-Year WSEL=5066.63
100-Year WSEL=5065.23
C NOT TO SCALE
Existing grade
Existing=5062.09 Longitudinal slope=0.8%
Existing=5066.33Existing=5066.18
16.4' 11.0'
100-Year WSEL=5063.77
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
A. Marner
M. Hekmati
B. Zook
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
-D
-6
-R
D -1
0.
D
W G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
B Z O
O K
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
WEST HAUL ROAD
PLAN AND PROFILE
DENVER, CO
1695-D-61869
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
-D
-6
-R
D -1
1.
D
W G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
S
IM
O N
S M
A R T
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O
WEST HAUL ROAD
SECTIONS AND DETAILS
DENVER, CO
1695-D-61870
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
ADMIN APPROVAL
X
X
X
2.5:1 (Typ.) Compacted backfill
6" Gravel surfacing (Typ.), See Note 5
Approximate elevation of existing grade
El. -11.0 (Typ.)
1.0' (Typ.)
TOC, El. 0.0
Payline (Typ.)
1.0' (Typ.)
2.5:1 (Typ.)
1.
0' In-situ material (Typ.)
Superstructure and mechanical equipment not shown
Scarify and recompact, see Note 6
2.5:1 (Typ.)
Approximate elevation of existing grade
6" Gravel surfacing (Typ.), see Note 5
Compacted backfill
Superstructure and mechanical equipment not shown
Payline (Typ.)El. -16.5 1.0' (Typ.)
El. -13.3
TOC, El. 0.00
El. -17.0
Scarify and recompact, see Note 6
El. -16.0
1.
0'
In-situ material (Typ.)
Approximate elevation of existing grade
6" Gravel surfacing (Typ.), see Note 5
Compacted backfill
Payline (Typ.)
2.5:1 (Typ.)
El. -16.5
TOC, El. 0.0
El. -3.5
El. -11.0
1'-0" (Typ.)
El. -1.3 (Typ.)
In-situ material (Typ.)
Superstructure and mechanical equipment not shown
NOTES
1. For Drawing Index, see (61853) and (61854).
2. For Structural Design Data and Loads, see (61855) and (61856).
3. For General Notes, and Abbreviations see (61885) and (61886).
4. Site Plan, see (61860).
5. For Grading Plan, see (61862).
6. Excavate down to a depth of -16.5' (El. 5060.0), as depcited on drawings. Where structure extends below an elevation of -15.5' (El. 5061), overexcavate by a minimum of 1.0', scarify, and recompact. See specification for details.
D
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U
R
EA
U O
F R
EC
LA
M
AT
IO
N
U .S
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
N A V A
JO
-G A
LL
U
P W
A
TE
R S
U
PP
LY
P
R O
JE
C
T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R
A L
PU
M
PI
N
G P
LA
N
T N
O
M. Shepherd
B. DeShazer
C. Gemperline
M. Shepherd, P.E.
L. Nguyen, Ph.D, P.E.
Peer Reviewer - Plant Structures Group
DENVER, CO 2025-02-04
STRUCTURAL
EXCAVATION AND
BACKFILL
TRANSVERSE SECTIONS
1695-D-61871
TRANSVERSE SECTION - PUMP ROOM
TRANSVERSE SECTION - SUCTION AIR CHAMBER ROOM
TRANSVERSE SECTION - DISCHARGE AIR CHAMBER ROOM
NTS
NTS
1.
0'
1.0' (Typ.) 1.0' (Typ.)
El. -16.5 (Typ.)
El. -1.3 (Typ.)
El. -3.5 (Typ.)
TOC, El. 0.0 (Typ.)
Superstructure and mechanical equipment not shown Approximate elevation of existing grade
El. -16.0
2.5:1 (Typ.)
6" Gravel surfacing (Typ.)
Payline (Typ.)
Compacted backfillScarify and recompact, see Note 6
2.5:1 (Typ.)
1.
0'
1.0' (Typ.)
In-situ material (Typ.)
El. -13.3
El. -17.0
Superstructure and mechanical equipment not shownTOC, El. 0.0 (Typ.)
2.5:1 (Typ.)
Approximate elevation of existing grade
Payline (Typ.)
6" Gravel surfacing (Typ.), see Note 5
1.
0'
1.0' (Typ.)
El. -13.3
Compacted backfill
Scarify and recompact, see Note 6
El. -16.5 (Typ.)1.0' (Typ.)
El. -16.0 El. -17.0
NOTES
1. For Drawing Index, see (61853) and (61854).
2. For Structural Design Data and Loads, see (61855) and (61856).
3. For General Notes, and Abbreviations see (61885) and (61886).
4. Site Plan, see (61860).
5. For Grading Plan, see (61862).
6. Excavate down to a depth of -16.5' (El. 5060.0), as depcited on drawings. Where structure extends below an elevation of -15.5' (El. 5061), overexcavate by a minimum of 1.0', scarify, and recompact. See specification for details.
D
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U
R
EA
U O
F R
EC
LA
M
AT
IO
N
U .S
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
N A V A
JO
-G A
LL
U
P W
A
TE
R S
U
PP
LY
P
R O
JE
C
T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R
A L
PU
M
PI
N
G P
LA
N
T N
O
M. Shepherd
B. DeShazer
C. Gemperline
M. Shepherd, P.E.
L. Nguyen, Ph.D, P.E.
Peer Reviewer - Plant Structures Group
DENVER, CO 2025-02-04
STRUCTURAL
EXCAVATION AND
BACKFILL
LONGITUDINAL
SECTIONS
1695-D-61872
LONGITUDINAL SECTION - PUMP PRECAST CONCRETE MANHOLES
LONGITUDINAL SECTION - ALONG DISCHARGE MANIFOLD
El. 0.00
T.O. FLOOR
1 - course precast, chamfered sill sp lit
-fa ce d C
M U ru nn in g bo nd
Precast sill and scored course color to match
Exterior insulated metal wall panels sp lit
-fa ce d C
M U ru nn in g bo nd
1 - course smooth-faced CMU, face scored to represent a pattern of eight (8)-4"x4" squares on exterior face of block, as shown
Split-faced CMU courses to match co ur se s
8" X8
"X
6'
8" co ur se s
8" X8
"X
2'
El. 0.00
T.O. FLOOR
1 - course precast coping, chamfered @ side sp lit
-fa ce d C in g bo nd
Precast coping and smooth-faced, scored CMU color to match sp lit
-fa ce d C in g bo nd
1 - course smooth-faced CMU scored to represent a pattern of eight (8)-4"x4" squares on exterior face of block, as shown
Split-faced CMU courses color to match
- c ou rs es
"X 8"
X1 6"
2'
8" 8"
- c ou rs es
"X 8"
X1 6"
6'
8"
D
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
B U
R
EA
U O
F R
EC
LA
M
AT
IO
N U
.S
D
EP
AR
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
N A V A
JO
-G A
LL
U P
W A
TE
R S
U
PP
LY
P
R O
JE
C T
N
EW
M
EX
IC
O
S A N
J U
A N
L A
TE
R A L
PU
M
PI
N
G P
LA
N
T N
O .1
B. Barkey
B. Barkey
H. Cooper
B. Barkey, R.A.
L. Nguyen, Ph.D, P.E.
Peer Reviewer - Peer Reviewer - Plant Structures Group
DENVER, CO 2025-02-31
ARCHITECTURAL
DETAILS
1695-D-61882
Scale: 1" = 1'-0"1 CMU COURSING DETAIL - BUILDING WAINSCOT/VENEER Scale: 1" = 1'-0"2 CMU COURSING DETAIL - ENCLOSURE WALL
0 1' 2'
Scale: 1" = 1'-0"
Digitally signed by BRUCE BARKEY Date: 2025.02.14 15:35:03 -07'00' y, Digitally signed by LAN NGUYEN Date: 2025.02.14 15:41:56 -07'00'
For notes to designers and detailers, and for additional reinforcement general notes, see 40-D-60003.
For minimum requirements for detailing reinforcement, see 40-D-60004.
Structural design for cast-in-place structural concrete is based on steel with a minimum yield strength of 60,000 pounds per square inch.
"L" denotes length of reinforcement.
All lap splices are assumed to be class B, for specific lengths, see 40- D-60004.
Class A lap splice lengths shall noted on drawing with the abbreviation "Ls"
For additional reinforcement around openings, see 40-D-60004.
Reinforcement not shown is similar to that shown elsewhere on the drawing for similar details.
Splices in reinforcement at construction joints may be shifted to agree with sequence of construction.
REINFORCEMENT DESIGN
Masonry work shall conform to all requirements of IBC, and TMS402 "Building Code Requirements for Masonry Structures."
Notes apply to masonry shown on structural drawings and shall be the minimum requirements for masonry shown on architectural drawings.
CMU denotes Concrete Masonry Unit, see specifications.
Concrete Masonry:
Compressive strength of masonry: f'm = 2,000 psi Grout strength at 28 days: f'g = 2,500 psi Mortar: Type N
Special Inspections and Testing of masonry construction shall be conducted in accordance with the 2021 International Building Code, Chapter 17.
Provide light weight load-bearing "hollow" concrete masonry units for general use. Provide normal weight and/or "solid" units where specifically indicated. Non-load bearing units unacceptable. Obtain each type of exposed material from one manufacturer for entire project.
Provide necessary concrete masonry units shapes and sizes, bond beam units, lintel units, and corner units as required to satisfy conditions indicated on the drawings. Include half-size units where required.
Not all penetrations through concrete masonry walls have been shown.
Details shown are typical unless noted otherwise.
Dimensions of concrete masonry units are nominal block dimensions.
Thoroughly roughen and clean concrete surfaces on which masonry units are to be place.
Coordinate block outs, reveals, holes, openings and built in items with all contract documents and trades.
Grout cells solid at: Reinforcing, bond beams and inserts. Additional cell grouting may be required, see drawings.
Provide bond beams at sill lines, bottom edge of openings (extend 2'-0" past opening), top of walls, roof lines, top of parapets and at 10'-0" o.c.
maximum between. Bond beam shall be continuous unless noted otherwise.
Control Joints: Unless noted otherwise, control joint spacing shall be provided at a length to height of wall ratio 1.5:1, and not to exceed 16ft.
Control Joints must be a minimum of 2'-0" outboard of opening.
Reinforcing bars splice length, development length, clear cover, standard hooks and minimum bend diameters shall be in accordance with TMS 602-16.
All reinforcement dowels to be fully developed into concrete foundation.
Splice bars using contact lap splices.
CONCRETE UNIT MASONRY
Provide standard hooks on bars terminating into a masonry face in walls at openings, heads, jambs, expansion joints, and ends.
Continue vertical reinforcing through construction joints.
Vertical reinforcing bars shall be centered in the concrete masonry unit and shall be held in position top and bottom and in intervals not exceeding 4'-0" using rebar positioners, see specifications.
Horizontal joint reinforcing shall be lapped no less than 6" o.c., see specifications.
Horizontal joint reinforcing shall be lapped no less than 6" for all splices, including corners and tees where no control joint is used.
Continue reinforcing through control joints and around corners unless noted otherwise.
Number and location of splices to be determined by contractor.
Dowels from concrete to be furnished and placed by concrete contractor.
Provide vertical wall reinforcing at all wall corners; end walls; each side of openings and at each side of control and expansion joints. Match Vertical bars in wall.
CONCRETE UNIT MASONRY CONT'D
Minimum Lap Splice Length
Bar Size: Length:
1'-0"
1'-1"
1'-8"
3'-2"
4'-4"
5'-9" Notes:
1. Assumes nominal 8-in. x 8-in. x 16-in.
CMU block with a minimum compressive strength, f'm, of 2,000-psi.
2. Assumes a single layer of unconfined longitudinal reinforcement centered in the CMU cell.
All material is steel unless noted otherwise.
Galvanize all ferrous metalwork after fabrication U.N.O. Provide vent holes in pipe as required for galvanizing.
Details, welds, and other connections shown are typical for all similar conditions.
Dimensions are typical for similar details.
Contractor field verifies locations and dimensions of new or existing structures prior to fabrication of miscellaneous metalwork.
Grind all handrail, guardrail, and ladder welds smooth.
Guardrail dimensions are to the centerline of rail.
Ensure grating panels bear fully on support beams and angles.
All structural bolts to include heavy hex nut and hardened washer.
All bolted connections bolt holes are standard oversize per AISC 360 U.N.O.
All post-installed anchors to include heavy hex nut and hardened washer.
Arc-Welding Electrodes: Filler metal and required shielding gases or fluxes shall be per AWS D1.1 with filler metal for steel having a minimum tensile strength of 70,000 psi.
Structural Steel ASTM Specifications shall be as noted:
Wide Flanges----------------------------------------------------A992 Angles and Channels------------------------------------------- A36 All other shapes, plates, or bars-------------------------------A36
Fastner ASTM Specifications shall be as noted:
Structural Bolts--------------------------------- Group A (A325-N)
MISCELLANEOUS METALWORK
For abbreviations, concrete symbols, and additional concrete outline general notes, see 40-D-60003.
Structural design for cast-in-place structural concrete is based on concrete with a minimum compressive strength of 4,500 pounds per square inch at 28 days.
Dimensions not shown are the same dimensions for identical details and sections shown elsewhere on the drawings.
Where concrete with varying thickness is shown on the drawings, vary thickness of concrete uniformly between dimensions and elevations shown.
Pipe sleeves and embedded piping 12 inches in diameter and larger are shown on the outline drawings. Smaller diameter pipe sleeves or piping may or may not be shown.
Not all embedded items are shown on the outline drawings.
Before placing concrete on grade, make sure that all buried material below the concrete is in place.
For details of method of building forms for successive lifts, see 40-D-5246.
For details of construction and contraction joints, see 40-D-5247.
All horizontal construction joints shall be thoroughly cleaned and roughened to a full amplitude of approximately 1/4 inch.
Backfill shall not be placed against the walls until concrete has attained a compressive strength of 4,500 pounds per square inch.
Conduit shall not be larger in the outside…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .