DQ1 2026-0322 - Specification Verification and Delivery Sheet.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- DQ1 PMAA 2026000322 2
- Issued by
- Colorado
About this file
This is a Specification Verification and Delivery Sheet for a Colorado Parks and Wildlife boat procurement (Project #S26WAQ-11592) in Fort Collins, Colorado. The state agency is seeking one aluminum deep V-hull work boat meeting detailed specifications. The vessel must be 20 to 21 feet in length, constructed of aluminum, and equipped with a Yamaha 150 horsepower (or larger) outboard engine to maintain consistency with previous departmental operations and standardized survey protocols. The boat requires a tandem axle trailer with surge brakes and 15-inch or larger wheels, a center console configuration with hard roof covering, and a beam width of eight feet or greater to accommodate netting and sampling work activities. Delivery is required on or before May 1, 2027, to the Colorado Parks and Wildlife Fort Collins Office at 317 W Prospect Road, Fort Collins, Colorado 80526.
The specification sheet establishes mandatory equipment and system requirements including a 50-gallon or larger fuel tank, a 12-circuit minimum fuse panel, at least one 12-volt receptacle, bilge pump, external battery charging port, battery system, complete electrical wiring and steering, standard console gauges (RPMs, MPH, engine trim position, and battery status), navigation lights, and an operator seat behind the console. Non-required features to control costs include motor bracket, waterline paint, trolling motor, tow bit, and trim tabs. The vessel manufacturer must demonstrate a minimum of 20 years of experience producing USCG-certified vessels. Vendors must confirm their ability to meet all specifications and delivery requirements through the provided verification form.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DQ1 2026-0322 - Pricing Sheet.xlsx | XLSX spreadsheet | |
| Bid Solicitation DQ1 2026-0322.docx | DOCX document | |
| DQ1 2026-0322 Boat Q&A.pdf | ||
| POTermsConditions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Spec Verification & Delivery DQ 2026-0322 Bid - Specification Verification and Delivery Sheet
Commodity Aluminum deep V-hull Work Boat, including delivery Required Vendor Specifications Does your bid item meet these specifications?
| (Y/N) | If no, describe your item: | |
| V-hull Work Boat | ||
| It is required for the boat size to be 20 - 21 and ½ feet |
It is required for the boat material to be aluminum
It is required to be equipped with a Yamaha (to match previous work with standardized surveys and speeds) 150 horsepower outboard engine (or larger)
It is required to be equipped with a trailer (tandem axle with surge brakes and 15" or larger wheels)
It is required to be designed with a center console (with a hard roof over the console), and relatively wide beam (8 feet or greater) to ensure effective work-space during netting and other sampling efforts.
It is required to have a 5O-gallon gas tank or larger
It is required to have a 12 or more circuit fuse panel
It is required to have 1 or more 12V receptacles
To maximize workspace and reduce cost, features including a motor bracket, waterline paint, trolling motor and trolling mount, a tow bit, and trim tabs are not required
It is required to include boat hull (Deep v-hull) and decking
It is required to include a bilge pump
It is required to include an external plug for battery charging
It is required to include a battery or set of batteries to run all electronics and start/run the engine
It is required to include an electrical system and complete wiring
It is required to include steering
It is required to include a fuel system
It is required to have a standard suite of console gauges including RPMs, MPH, engine trim position, and battery/electrical status
It is required to include navigation lights
It is required to include a seat behind the console
| It is required for the manufacturer to have at least 20 years of experience producing USCG-certified vessels. | ||
| Delivery | Delivery Information | Vendor Response (Y/N) |
| Delivery Address | Are you able to deliver to - |
Colorado Parks and Wildlife - Fort Collins Office 317 W Prospect Rd Fort Collins, CO 80526 Delivery Date Delivery is required on or before May 1st 2027 or earlier. Are you able to deliver by then?
File details come from the government source that posted it. Updated .