NAVY_SBIR_27BZ_PH I_R2.pdf
PDF 615 KB Posted
- Solicitation number
- DON27BZ02-NV015
About this file
This is the Department of the Navy (DON) DoW 2027 Small Business Innovation Research (SBIR) Broad Agency Announcement (BAA) Release 2 for Phase I proposals, containing instructions and 20 research topic areas (DON27BZ02-NV006 through DON27BZ02-NV025).
The BAA solicits Phase I proposals from small business concerns for innovative research and development addressing Navy priorities. Phase I work must be completed within exactly six months, with a base funding cap of $200,000; a Phase I Option for an additional six months may not exceed $115,000. A minimum of two-thirds of work must be performed by the proposing small business in both the base and option periods, calculated by direct and indirect costs. Cost sharing is not accepted. Proposals must be submitted electronically through the DoW SBIR/STTR Innovation Portal (DSIP) by the BAA close date; submissions through other means will be disregarded. The Technical Volume (Volume 2) is limited to 10 pages single-spaced with one-inch margins and minimum 10-point font. Seven proposal volumes are required: Proposal Cover Sheet, Technical Proposal, Cost Volume, Company Commercialization Report, Supporting Documents, Fraud/Waste/Abuse Training Certificate, and Foreign Affiliations Disclosures. Evaluation emphasizes technical merit as most important, followed equally by qualifications of key personnel and commercialization potential; cost is not an evaluation criterion. Phase I awardees may submit Phase II proposals for continued development; Phase II may be conducted under Cost Plus Fixed Fee, Firm Fixed Price, Basic Ordering Agreement, or Prototype Other Transaction contract types. The topics span advanced materials, sensing systems, software, autonomy, and sustainment technologies relevant to naval operations. DON templates are available at navysbir.com; questions should be directed to the Navy SBIR/STTR Program Management Office or the participating command point of contact listed for each topic.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DON27BZ02-NV015.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVY-1
DEPARTMENT OF THE NAVY (DON)
DoW 2027 Small Business Innovation Research (SBIR) BAA
Release 2 Phase I
Proposal Submission Instructions
IMPORTANT
• Effective October 1, 2026, the Department of the Navy transformed from a Systems Command-centric model to a centralized development pipeline, directly integrated with the Portfolio Acquisition Executive (PAE) framework to ensure alignment to naval priorities.
• The following instructions apply to topics:
o DON27BZ02-NV006 through DON27BZ02-NV025
• Submitting small business concerns (SBCs) are encouraged to thoroughly review the DoW SBIR/STTR Program Broad Agency Announcement (BAA) and register for the DSIP Listserv to remain apprised of important programmatic changes.
o The DoW Program BAA is located at: https://www.dodsbirsttr.mil/submissions/login.
o Register for the DSIP Listserv at: https://www.dodsbirsttr.mil/submissions/login.
• The information provided in the DON Proposal Submission Instructions takes precedence over the DoW Instructions posted for this BAA.
• DoW has established proposal limitations on a per-topic basis. SBCs may submit only one
(1) proposal in response to a single topic. Please review the DoW SBIR/STTR Program BAA for further information.
• DON Phase I Technical Volume (Volume 2) page limit is not to exceed 10 pages.
• Proposing SBCs that are more than 50% owned by multiple venture capital operating companies (VCOC), hedge funds (HF), private equity firms (PEF) or any combination of these are eligible to submit proposals in response to DON topics advertised in this BAA. Information on Majority Ownership in Part and certification requirements at time of submission for these proposing SBCs are detailed in the section titled ADDITIONAL SUBMISSION
CONSIDERATIONS.
• DON templates are available at https://www.navysbir.com/links_forms.htm.
• The DON may consider the following FAR and Non-FAR contract strategies when issuing
Phase I awards: Firm Fixed Price (FFP), Basic Ordering Agreement (BOA), or Prototype Other Transaction (OT). The DON may consider the following FAR and Non-FAR contracting strategies when issuing Phase II awards: Cost Plus Fixed Fee (CPFF), FFP, BOA, or Prototype
OT.
• This BAA is issued under regulations set forth in Federal Acquisition Regulation (FAR) 35.016 and awards will be made under “other competitive procedures”. The policies and procedures of https://www.dodsbirsttr.mil/submissions/login https://www.dodsbirsttr.mil/submissions/login https://www.navysbir.com/links_forms.htm
NAVY-2
FAR Subpart 15.3 shall not apply to this BAA, except as specifically referenced in it. All procedures are at the sole discretion of the Government as set forth in this BAA. Submission of a proposal in response to this BAA constitutes the express acknowledgement to that effect by the proposing SBC.
INTRODUCTION
The DON SBIR/STTR Programs are mission-oriented programs that integrate the needs and requirements of the DON’s Fleet through research and development (R&D) topics that have dual-use potential, but primarily address the needs of the DON. More information on the programs can be found on the DON SBIR/STTR website at www.navysbir.com. Additional information on DON’s mission can be found on the DON website at www.navy.mil.
For questions regarding this BAA, use the information in Table 1 to determine who to contact for what types of questions.
TABLE 1: POINTS OF CONTACT FOR QUESTIONS REGARDING THIS BAA
Type of Question When Contact Information Program and administrative Always Navy SBIR/STTR Program Management Office
DON_SBIR_STTR@us.navy.mil or appropriate participating Command listed in Table 2 (below)
Topic-specific technical questions
BAA Pre-release Technical Point of Contact (TPOC) listed in each topic on the DoW SBIR/STTR Innovation Portal (DSIP). Refer to the Proposal Submission section of the DoW SBIR/STTR Program BAA for details.
BAA Open DoW SBIR/STTR Topic Q&A platform (https://www.dodsbirsttr.mil/submissions) Refer to the Proposal Submission section of the DoW SBIR/STTR Program BAA for details.
Electronic submission to the DoW SBIR/STTR Innovation Portal (DSIP)
Always DSIP Support via email at dodsbirsupport@reisystems.com
Navy-specific BAA instructions and forms
Always DON SBIR/STTR Program Management Office DON_SBIR_STTR @us.navy.mil
TABLE 2: DON SBIR PARTICIPATING COMMANDS
Topic Numbers
Point of Contact Participating Command
DON27BZ02-
NV006 to
DON27BZ02-
NV008
Tatiana Sears Marine Corps PAE_Marine_Corps_SBIR_STTR @us.navy.mil
DON27BZ02-
NV009 Shadi Azoum Mission Systems PAE_MS_SBIR_STTR@us.navy.
mil http://www.navysbir.com/ http://www.navy.mil/ mailto:usn.pentagon.cnr-arlington-va.mbx.navy-sbir-sttr@us.navy.mil https://www.dodsbirsttr.mil/submissions mailto:dodsbirsupport@reisystems.com mailto:usn.pentagon.cnr-arlington-va.mbx.navy-sbir-sttr@us.navy.mil mailto:usn.pentagon.cnr-arlington-va.mbx.navy-sbir-sttr@us.navy.mil mailto:PAE_MS_SBIR_STTR@us.navy.mil mailto:PAE_MS_SBIR_STTR@us.navy.mil
NAVY-3
Topic Numbers
Point of Contact Participating Command
DON27BZ02-
NV010 to
DON27BZ02-
NV025
Lore-Anne Ponirakis Office of Naval
Research
(ONR)
ONR_SBIR_STTR@us.navy.mil
PHASE I SUBMISSION INSTRUCTIONS
The following section details requirements for submitting a compliant Phase I proposal to the DoW SBIR/STTR Programs.
(NOTE: Proposing SBCs are advised that support contract personnel will be used to carry out administrative functions and may have access to proposals, contract award documents, contract deliverables, and reports. All support contract personnel are bound by appropriate non-disclosure agreements.)
DoW SBIR/STTR Innovation Portal (DSIP). Proposing SBCs are required to submit proposals via the DoW SBIR/STTR Innovation Portal (DSIP); and follow proposal submission instructions in the DoW SBIR/STTR Program BAA on the DSIP at https://www.dodsbirsttr.mil/submissions. Proposals submitted by any other means will be disregarded. Proposing SBCs submitting through DSIP for the first time will be asked to register. It is recommended that SBCs register as soon as possible upon identification of a proposal opportunity to avoid delays in the proposal submission process. Proposals that are not successfully certified electronically in DSIP by the Corporate Official prior to BAA Close will NOT be considered submitted and will not be evaluated by DON. Proposals that are encrypted, password protected, or otherwise locked in any portion of the submission will be REJECTED unless specifically directed within the text of the topic to which you are submitting. Please refer to the DoW SBIR/STTR Program BAA for further information.
Proposal Volumes. The following seven volumes are required.
• Proposal Cover Sheet (Volume 1). As specified in DoW SBIR/STTR Program BAA.
• Technical Proposal (Volume 2) o Technical Proposal (Volume 2) must meet the following requirements or the proposal will be
REJECTED:
Not to exceed ten (10) pages, regardless of page content Single column format, single-spaced typed lines Standard 8 ½” x 11” paper Page margins one inch on all sides. A header and footer may be included in the one-inch margin.
No font size smaller than 10-point Include, within the ten-page limit of Volume 2, an Option that furthers the effort in preparation for Phase II and will bridge the funding gap between the end of Phase I and the start of Phase II. Tasks for both the Phase I Base and the Phase I Option must be clearly identified. Phase I Options are exercised upon selection for Phase II.
Work proposed for the Phase I Base must be exactly six (6) months.
Work proposed for the Phase I Option must be exactly six (6) months.
https://www.dodsbirsttr.mil/submissions
NAVY-4
o Additional information:
A Phase I proposal template specific to DON to meet Phase I requirements is available at https://navysbir.com/links_forms.htm A font size smaller than 10-point is allowable for headers, footers, imbedded tables, figures, images, or graphics that include text. However, proposing SBCs are cautioned that if the text is too small to be legible it will not be evaluated.
• Cost Volume (Volume 3).
o Cost Volume (Volume 3) must meet the following requirements or the proposal will be
REJECTED:
The Phase I Base amount must not exceed $200,000.
Phase I Option amount must not exceed $115,000.
Costs for the Base and Option must be separated and clearly identified in Volume 3.
For Phase I, a minimum of two-thirds of the work is performed by the proposing SBC. The two-thirds percentage of work requirement must be met in the Base costs as well as in the Option costs. DON will not accept deviations from the minimum percentage of work requirements for Phase I. The percentage of work is measured by both direct and indirect costs. To calculate the minimum percentage of work for the proposing SBC the sum of all direct and indirect costs attributable to the proposing SBC represent the numerator and the total cost of the proposal (i.e., Total Cost before Profit Rate is applied) is the denominator.
The subcontractor percentage is calculated by taking the sum of all costs attributable to the subcontractor (Total Subcontractor Costs (TSC)) as the numerator and the total cost of the proposal (i.e., Total Cost before Profit Rate is applied) as the denominator.
⧠ Proposing SBC Costs (included in numerator for calculation of the SBC):
Total Direct Labor (TDL) Total Direct Material Costs (TDM) Total Direct Supplies Costs (TDS) Total Direct Equipment Costs (TDE) Total Direct Travel Costs (TDT) Total Other Direct Costs (TODC) General & Administrative Cost (G&A)
NOTE: G&A, if proposed, will only be attributed to the proposing SBC.
⧠ Subcontractor Costs (numerator for subcontractor calculation):
Total Subcontractor Costs (TSC) ⧠ Total Cost (i.e., Total Cost before Profit Rate is applied, denominator for either calculation) Cost Sharing: Cost sharing is not accepted on DON Phase I proposals. A value above or below $0.00 entered in the Cost Sharing field will not be considered in the Phase I contract award.
Provide sufficient detail for subcontractor, material, and travel costs. Subcontractor costs must be detailed to the same level as the prime contractor. Material costs must include a listing of items and cost per item. Travel costs must include the purpose of the trip, number of trips, location, length of trip, and number of personnel.
Inclusion of cost estimates for travel to the participating Command’s facility for one day of meetings is recommended for all proposals.
The “Additional Cost Information” of Supporting Documents (Volume 5) may be used to provide supporting cost details for Volume 3. When a proposal is selected for award, be prepared to submit further documentation to the Contracting Officer to substantiate costs https://navysbir.com/links_forms.htm
NAVY-5
(e.g., an explanation of cost estimates for equipment, materials, and consultants or subcontractors).
• Company Commercialization Report (Volume 4). DoW collects and uses Volume 4 and DSIP requires Volume 4 for proposal submission. Please refer to the Proposal Preparation Instructions and Requirements section of the DoW SBIR/STTR Program BAA for details to ensure compliance with DSIP Volume 4 requirements.
• Supporting Documents (Volume 5). Volume 5 is for the submission of administrative material that
DON may or will require to process a proposal, if selected, for contract award.
o Proposing SBCs must review and submit the following items, as applicable:
Majority Ownership in Part. Proposing SBCs that are more than 50% owned by multiple venture capital operating companies (VCOC), hedge funds (HF), private equity firms (PEF), or any combination of these as set forth in 13 C.F.R. § 121.702, are eligible to submit proposals in response to DON topics advertised within this BAA. Complete the certification as detailed under ADDITIONAL SUBMISSION CONSIDERATIONS.
Proposing SBCs may include the following administrative materials in Supporting Documents (Volume 5); a template is available at https://navysbir.com/links_forms.htm to provide guidance on optional material the proposing SBC may want to include in Volume 5:
o Additional Cost Information to support the Cost Volume (Volume 3) o SBIR/STTR Funding Agreement Certification o Data Rights Assertion o Disclosure of Information (DFARS 252.204-7000) o Prior, Current, or Pending Support of Similar Proposals or Awards o Foreign Citizens
Details of Request for Discretionary Technical and Business Assistance (TABA), if proposed, is to be included under the Additional Cost Information section if using the DON Supporting Documents template.
Do not include documents or information to substantiate the Technical Volume (Volume 2) in Volume 5 (e.g., resumes, test data, technical reports, or publications). Such documents or information will not be considered.
A font size smaller than 10-point is allowable for documents in Volume 5; however, proposing SBCs are cautioned that the text may be unreadable.
• Fraud, Waste and Abuse Training (Volume 6). DoW requires Volume 6 for submission.
Please refer to the Proposal Preparation Instructions and Requirements section of the DoW SBIR/STTR Program BAA for details.
• Disclosures of Foreign Affiliations or Relationships to Foreign Countries (Volume 7). In accordance with 15 U.S.C. §638(vv) and the SBA SBIR/STTR Policy Directive, the DoW will review all proposals submitted in response to this BAA to assess security risks presented by SBCs seeking a Federally funded award. SBCs must complete the Disclosures of Foreign Affiliations or Relationships to Foreign Countries webform in Volume 7 of the DSIP proposal submission. Please refer to the Proposal Preparation Instructions and Requirements section of the DoW SBIR/STTR Program BAA for details.
NAVY-6
PHASE I EVALUATION AND SELECTION
The following section details how the DON SBIR/STTR Programs will evaluate Phase I proposals.
Proposals meeting DSIP submission requirements will be forwarded to the DON SBIR/STTR Programs.
Prior to evaluation, all proposals will undergo a compliance review to verify compliance with DoW and DON SBIR/STTR proposal eligibility requirements. Proposals not meeting submission requirements will be REJECTED and not evaluated.
• Proposal Cover Sheet (Volume 1). The Proposal Cover Sheet (Volume 1) will undergo a compliance review to verify the proposing SBC has met eligibility requirements and followed the instructions for the Proposal Cover Sheet as specified in the DoW SBIR/STTR Program BAA.
• Technical Volume (Volume 2). The DON will evaluate and select Phase I proposals using the evaluation criteria specified in the Method of Selection and Evaluation Criteria section of the DoW SBIR/STTR Program BAA, with technical merit being most important, followed by qualifications of key personnel and commercialization potential of equal importance. The information considered for this decision will come from Volume 2. This is not a FAR Part 15 evaluation and proposals will not be compared to one another. Cost is not an evaluation criterion and will not be considered during the evaluation process; the DON will only do a compliance review of Volume 3. Due to limited funding, the DON reserves the right to limit the number of awards under any topic.
The Technical Volume (Volume 2) will undergo a compliance review (prior to evaluation) to verify the proposing SBC has met the following requirements or the proposal will be REJECTED:
Not to exceed ten (10) pages, regardless of page content Single column format, single-spaced typed lines Standard 8 ½” x 11” paper Page margins one inch on all sides. A header and footer may be included in the one-inch margin.
No font size smaller than 10-point, except as permitted in the instructions above.
Include, within the 10-page limit of Volume 2, an Option that furthers the effort in preparation for Phase II and will bridge the funding gap between the end of Phase I and the start of Phase II. Tasks for both the Phase I Base and the Phase I Option must be clearly identified.
Work proposed for the Phase I Base must be exactly six (6) months.
Work proposed for the Phase I Option must be exactly six (6) months.
• Cost Volume (Volume 3). The Cost Volume (Volume 3) will not be considered in the selection process and will only undergo a compliance review to verify the proposing SBC has met the following requirements or the proposal will be REJECTED:
Must not exceed values for the Base ($200,000) and Option ($115,000).
Must meet minimum percentage of work; a minimum of two-thirds of the work is performed by the proposing SBC. The two-thirds percentage of work requirement must be met in the Base costs as well as in the Option costs. DON will not accept deviations from the minimum percentage of work requirements for Phase I.
Cost Sharing: Cost sharing is not accepted on DON Phase I proposals. A value above or below $0.00 entered in the Cost Sharing field will not be considered in the Phase I contract award.
• Company Commercialization Report (CCR) (Volume 4). The CCR (Volume 4) will not be evaluated by the DON nor will it be considered in the award decision. However, all proposing SBCs
NAVY-7
must refer to the DoW SBIR/STTR Program BAA to ensure compliance with DSIP Volume 4 requirements.
• Supporting Documents (Volume 5). Supporting Documents (Volume 5) will not be considered in the selection process and will only undergo a compliance review to ensure the proposing SBC has included items in accordance with the PHASE I SUBMISSION INSTRUCTIONS section above.
• Fraud, Waste, and Abuse Training Certificate (Volume 6). Not evaluated.
• Disclosures of Foreign Affiliations or Relationships to Foreign Countries (Volume 7).
Disclosures of Foreign Affiliations or Relationships to Foreign Countries (Volume 7) will be assessed as part of the Foreign Risk Evaluation Program to Assess Security Risks. Refer to the DoW SBIR/STTR Program BAA to ensure compliance with Volume 7 requirements.
ADDITIONAL SUBMISSION CONSIDERATIONS
This section details additional items for proposing SBCs to consider during proposal preparation and submission process.
Foreign Risk Evaluation (FRE) Program to Assess Security Risks. 15 U.S.C. §638(vv) requires the Department of War, in coordination with the Small Business Administration, to establish and implement a due diligence program, known as Foreign Risk Evaluation (FRE) Program, to assess and, when possible, mitigate security risks presented by SBCs seeking a Federally-funded award. Please review the Certifications and Registrations section of the DoW SBIR/STTR Program BAA for details on how DoW will assess security risks presented by SBCs. The FRE Program to Assess Security Risks will be implemented for all Phases.
Discretionary Technical and Business Assistance (TABA). The Small Business Innovation and Economic Security Act Section 7 mandates agencies offer TABA. The purpose of TABA is to assist awardees in making better technical decisions on SBIR/STTR projects; solving technical problems that arise during SBIR/STTR projects; minimizing technical risks associated with SBIR/STTR projects;
commercializing the SBIR/STTR product or process, including intellectual property protections and cybersecurity assistance; and screening for potential foreign involvement in technology development or commercialization activities. TABA services can be provided through vendor(s) selected by the SBC or the SBC may propose use of TABA funding to hire new staff, augment staff, or direct staff to conduct or participate in training activities consistent with the purpose of TABA as detailed above. The Phase I TABA amount, if proposed, cannot include any profit/fee by the proposing SBC and must be inclusive of all applicable indirect costs. TABA cannot be used in the calculation of general and administrative expenses (G&A) for the SBIR proposing SBC. An SBC receiving TABA will be required to submit a report detailing the results and benefits of the service received. This TABA report will be due at the time of submission of the final report.
Request for TABA funding will be reviewed by the DON SBIR/STTR Program Management Office.
If proposing a TABA Provider, the following MUST be included in the request or be subject to denial.
• Provider(s)
• Provider(s) point of contact, email address, and phone number
• An explanation of the provider’s unique qualifications to provide the TABA service
• Tasks that will be performed by the provider (to include the purpose and objective of the assistance)
• Total provider(s) cost, number of hours, and labor rates (average/blended rate is acceptable)
NAVY-8
If proposing TABA funding to hire new staff, augment staff, or direct staff to conduct or participate in training activities consistent with the purpose of TABA, the following MUST be included or be subject to denial.
• Name(s), position(s), business need to be filled, and/or training to be provided
• Number of employees to be hired, augmented, or directed to participate in training activities
• Qualifications of employees hired or augmented, or detailed need for training
• Tasks that will be performed (to include the purpose and objective of the assistance)
• Total staff/training cost, number of hours, and labor rates (average/blended rate is acceptable)
TABA requests must be included in the proposal as follows:
• Phase I:
Online DoW Cost Volume (Volume 3) – the value of the TABA request.
Supporting Documents (Volume 5) – a detailed request for TABA (as specified above) specifically identified as “TABA” in the section titled Additional Cost Information when using the DON Supporting Documents template.
• Phase II:
DON Phase II Cost Volume (provided by the DON) - the value of the TABA request.
Supporting Documents (Volume 5) – a detailed request for TABA (as specified above) specifically identified as “TABA” in the section titled Additional Cost Information when using the DON Supporting Documents template.
Proposed values for TABA must NOT exceed:
• Phase I: A total of $6,500, in addition to the Phase I award amount.
• Phase II: A total of $25,000 per award, not to exceed $50,000 per Phase II project, included in the
Phase II award amount.
Disclosure of Information (DFARS 252.204-7000). In order to eliminate the requirements for prior approval of public disclosure of information (in accordance with DFARS 252.204-7000) under this award, the proposing SBC shall identify and describe all fundamental research to be performed under its proposal, including subcontracted work, with sufficient specificity to demonstrate that the work qualifies as fundamental research. Fundamental research means basic and applied research in science and engineering, the results of which ordinarily are published and shared broadly within the scientific community, as distinguished from proprietary research and from industrial development, design, production, and product utilization, the results of which ordinarily are restricted for proprietary or national security reasons (defined by National Security Decision Directive 189). An SBC whose proposed work will include fundamental research and requests to eliminate the requirement for prior approval of public disclosure of information must complete the DON Fundamental Research Disclosure and upload as a separate PDF file to the Supporting Documents (Volume 5) in DSIP as part of their proposal submission.
The DON Fundamental Research Disclosure is available on https://navysbir.com/links_forms.htm and includes instructions on how to complete and upload the completed Disclosure. Simply identifying fundamental research in the Disclosure does NOT constitute acceptance of the exclusion. All exclusions will be reviewed and, if approved by the Government Contracting Officer, noted in the contract.
Majority Ownership in Part. Proposing SBCs that are more than 50% owned by multiple venture capital operating companies (VCOC), hedge funds (HF), private equity firms (PEF), or any combination of these as set forth in 13 C.F.R. § 121.702, are eligible to submit proposals in response to DON topics advertised within this BAA.
For proposing SBCs that are a member of this ownership class the following must be satisfied for proposals to be accepted and evaluated:
a. Prior to submitting a proposal, SBCs must register with the SBA Company Registry Database.
NAVY-9
b. The proposing SBC within its submission must submit the Majority-Owned VCOC, HF, and PEF Certification. A copy of the SBIR VC Certification can be found on https://navysbir.com/links_forms.htm. Include the SBIR VC Certification in the Supporting Documents (Volume 5).
c. Should a proposing SBC become a member of this ownership class after submitting its proposal and prior to any receipt of a funding agreement, the proposing SBC must immediately notify the Contracting Officer, register in the appropriate SBA database, and submit the required certification, which can be found on https://navysbir.com/links_forms.htm.
System for Award Management (SAM). It is strongly encouraged that proposing SBCs register in SAM, https://sam.gov, by the Close date of this BAA, or verify their registrations are still active and will not expire within 60 days of BAA Close. Additionally, proposing SBCs should confirm that they are registered to receive contracts (not just grants) and the address in SAM matches the address on the proposal. An SBC selected for an award MUST have an active SAM registration at the time of award or they will be considered ineligible.
Cybersecurity Maturity Model Certification (CMMC) Program. DoW has established the CMMC Program to verify that awardees have implemented required security measures necessary to safeguard Federal Contract Information (FCI) and Controlled Unclassified Information (CUI). CMMC Level requirements are identified within each topic and must be met prior to award. Proposing SBCs should anticipate that a Projected CMMC Level for Phase II award may be higher than the Projected CMMC Level advertised in the Phase I topic. Proposing SBCs should carefully review and consider the CMMC requirements as compliance may impact proposed costs and technical approach. Please review the DoW SBIR/STTR Program BAA for additional information on the CMMC Program.
Notice of NIST SP 800-171 Assessment Database Requirement. The purpose of the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 is to protect Controlled Unclassified Information (CUI) in Nonfederal Systems and Organizations. As prescribed by DFARS 252.240-7997, in order to be considered for award, an SBC is required to implement NIST SP 800-171 and shall have a current assessment uploaded to the Supplier Performance Risk System (SPRS) which provides storage and retrieval capabilities for this assessment. The platform Procurement Integrated Enterprise Environment (PIEE) will be used for secure login and verification to access SPRS. For brief instructions on NIST SP 800-171 assessment, SPRS, and PIEE, please visit https://www.sprs.csd.disa.mil/nistsp.htm. For in-depth tutorials on these items, please visit https://www.sprs.csd.disa.mil/webtrain.htm.
Human Subjects, Animal Testing, and Recombinant DNA. Due to the short timeframe associated with Phase I of the SBIR/STTR process, the DON does not recommend the submission of Phase I proposals that require the use of Human Subjects, Animal Testing, or Recombinant DNA. For example, the ability to obtain Institutional Review Board (IRB) approval for proposals that involve human subjects can take 6-12 months, and that lengthy process can be at odds with the Phase I goal for time-to-award.
Before the DON makes any award that involves an IRB or similar approval requirement, the proposing SBC must demonstrate compliance with relevant regulatory approval requirements that pertain to proposals involving human, animal, or recombinant DNA protocols. It will not impact the DON’s evaluation, but requiring IRB approval may delay the start time of the Phase I award and if approvals are not obtained within two months of notification of selection, the decision to award may be terminated. If the use of human, animal, and recombinant DNA is included under a Phase I or Phase II proposal, please carefully review the requirements at: https://www.nre.navy.mil/work-with-us/how-to-apply/compliance-and-protections/research-protections. This webpage provides guidance and lists approvals that may be required before contract/work can begin.
https://sam.gov/ https://www.sprs.csd.disa.mil/nistsp.htm https://www.sprs.csd.disa.mil/webtrain.htm https://www.nre.navy.mil/work-with-us/how-to-apply/compliance-and-protections/research-protections https://www.nre.navy.mil/work-with-us/how-to-apply/compliance-and-protections/research-protections
NAVY-10
Government Furnished Equipment (GFE). Due to the typical lengthy time for approval to obtain GFE, it is recommended that GFE is not proposed as part of the Phase I proposal. If GFE is proposed, and it is determined during the proposal evaluation process to be unavailable, proposed GFE may be considered a weakness in the technical merit of the proposal.
International Traffic in Arms Regulation (ITAR). For topics indicating ITAR restrictions or the potential for classified work, limitations are generally placed on disclosure of information involving topics of a classified nature or those involving export control restrictions, which may curtail or preclude the involvement of universities and certain non-profit institutions beyond the basic research level. Small businesses must structure their proposals to clearly identify the work that will be performed that is of a basic research nature and how it can be segregated from work that falls under the classification and export control restrictions. As a result, information must also be provided on how efforts can be performed in later phases if the university/research institution is the source of critical knowledge, effort, or infrastructure (facilities and equipment).
SELECTION, AWARD, AND POST-AWARD INFORMATION
Notifications. Email notifications for proposal receipt (approximately one week after the Phase I BAA Close) and selection are sent based on the information received on the proposal Cover Sheet (Volume 1).
Consequently, the e-mail address on the proposal Cover Sheet must be correct.
Debriefs. Requests for a debrief must be made within 15 calendar days of select/non-select notification via email as specified in the select/non-select notification. Please note debriefs are typically provided in writing via email to the Corporate Official identified in the proposal of the proposing SBC within 60 days of receipt of the request. Requests for oral debriefs may not be accommodated. If contact information for the Corporate Official has changed since proposal submission, a notice of the change on company letterhead signed by the Corporate Official must accompany the debrief request.
Protests. Interested parties have the right to protest in accordance with the procedures in FAR Subpart 33.1.
Pre-award agency protests related to the terms of the BAA must be served to: osd.ncr.ousd-r-e.mbx.SBIR- STTR-Protest@mail.mil. A copy of a pre-award Government Accountability Office (GAO) protest must also be filed with the aforementioned email address within one day of filing with the GAO.
Protests related to a selection or award decision should be filed with the appropriate Contracting Officer for an Agency Level Protest or with the GAO. Contracting Officer contact information for specific DON Topics may be obtained from the Point of Contact for the participating Command listed in Table 2 above.
For protests filed with the GAO, a copy of the protest must be submitted to the appropriate Point of Contact for the participating Command and the appropriate Contracting Officer within one day of filing with the GAO.
Awards. Due to limited funding, the DON reserves the right to limit the number of awards under any topic. Any notification received from the DON that indicates the proposal has been selected does not ultimately guarantee an award will be made. This notification indicates that the proposal has been selected in accordance with the evaluation criteria and has been sent to the Contracting Officer to conduct compliance review of Volume 3 to confirm eligibility of the proposing SBC, and to take other relevant steps necessary prior to making an award.
Contract Types. A Firm Fixed Price (FFP), Basic Ordering Agreement (BOA), or Prototype Other Transaction (OT) may be used for Phase I awards.
NAVY-11
Funding Limitations. In accordance with the SBIR and STTR Policy Directive section 4(b)(5), there is a limit of one sequential Phase II award per SBC per topic. The maximum Phase I proposal/award amount including all options (less TABA) is $315,000. The Phase I Base amount must not exceed $200,000 and the Phase I Option amount must not exceed $115,000. The maximum Phase II proposal/award amount including all options (including TABA) is $2,000,000 (unless non-SBIR/STTR funding is being added).
Individual Commands may award amounts, including Base and all Options, of less than $2,000,000 based on available funding. The structure of the Phase II proposal/award, including maximum amounts as well as breakdown between Base and Option amounts will be provided to all Phase I awardees either in their Phase I award or a minimum of 30 days prior to the due date for submission of their Initial Phase II proposal.
Contract Deliverables. Contract deliverables for Phase I are typically a kick-off brief, progress reports, and a final report. Required contract deliverables (as stated in the contract) must be uploaded to https://www.navysbirprogram.com/navydeliverables/.
Payments. The DON makes three payments from the start of the Phase I Base period, and from the start of the Phase I Option period, if exercised. Payment amounts represent a set percentage of the Base or Option value as follows:
Days from Start of Base Award or Option Payment Amount 15 Days 50% of Total Base or Option 90 Days 35% of Total Base or Option 180 Days 15% of Total Base or Option
Transfer Between SBIR and STTR Programs. Section 4(b)(1)(i) of the SBIR and STTR Policy Directive provides that, at the agency’s discretion, projects awarded a Phase I under a BAA for SBIR may transition in Phase II to STTR and vice versa.
PHASE II GUIDELINES
Evaluation and Selection. All Phase I awardees may submit an Initial Phase II proposal for evaluation and selection. The evaluation criteria for Phase II is the same as Phase I (as stated in this BAA). The Phase I Final Report and Initial Phase II Proposal will be used to evaluate the SBC’s potential to progress to a workable prototype in Phase II and transition the technology to Phase III. Details on the due date, content, and submission requirements of the Initial Phase II Proposal will be provided by the awarding Command either in the Phase I contract or by subsequent notification.
Awards. The DON will consider the following for Phase II award: Cost Plus Fixed Fee (CPFF), Firm Fixed Price (FFP), Basic Ordering Agreement (BOA), or Prototype Other Transaction (OT). Phase II awards can be structured in a way that allows for increased funding levels based on the project’s transition potential. To accelerate the transition of SBIR/STTR-funded technologies to Phase III, especially those that lead to Programs of Record and fielded systems, the Commercialization Readiness Program was authorized and created as part of section 5122 of the National Defense Authorization Act of Fiscal Year 2012. The statute set-aside is 1% of the available SBIR/STTR funding to be used for administrative support to accelerate transition of SBIR/STTR-developed technologies and provide non-financial resources for the SBCs (e.g., the Navy SBIR Transition Program, STP).
Navy SBIR Transition Program (STP). Phase II awardees have the opportunity to participate in the virtual Navy STP Kickoff during the first or second year of the Phase II contract. While there are no travel costs associated with this virtual event, Phase II awardees should budget time of up to a full day to
NAVY-12
participate. STP information can be obtained at: https://navystp.com. Phase II awardees will be contacted separately regarding this program.
PHASE III GUIDELINES
A Phase III SBIR/STTR award is any work that derives from, extends, or completes effort(s) performed under prior SBIR/STTR funding agreements, but is funded by sources other than the SBIR/STTR programs. This covers any contract, grant, or agreement issued as a follow-on Phase III award or any contract, grant, or agreement award issued as a result of a competitive process where the awardee was an SBIR/STTR firm that developed the technology as a result of a Phase I or Phase II award. The DON will give Phase III status to any award that falls within the above-mentioned description. Consequently, DON will assign SBIR/STTR Data Rights to any noncommercial technical data and noncommercial computer software delivered in Phase III that were developed under SBIR/STTR Phase I/II effort(s). Government prime contractors and their subcontractors must follow the same guidelines as above and ensure that companies operating on behalf of the DON protect the rights of the SBIR/STTR firm.
https://navystp.com/
NAVY-13
NAVY SBIR DOW 2027 BAA
Phase I
Topic Index Release 2
DON27BZ02-NV006 Mobile Vehicle Forensics
DON27BZ02-NV007 Lightweight, Energy-Efficient Portable Nitrogen Generator for Expeditionary Operations
DON27BZ02-NV008 Integrated Multi-Spectral Periscope for the Amphibious Combat Vehicle (ACV)
DON27BZ02-NV009 Distributed Multispectral Event-Driven Integrated Sensing and Communications
DON27BZ02-NV010 Automated Hardening for Cyber Secure Operating Systems
DON27BZ02-NV011 Low-cost Mid-wave Infrared Focal-Plane Array (FPA) Fabrication through Direct-bond Interconnection
DON27BZ02-NV012 “Self-Replicating Evolutionary Agentic SI Swarming Force” with Autonomous Embedded SI Guardrail Enforcers
DON27BZ02-NV013 Electro-Optical/Infrared Tactical Decision Aid
DON27BZ02-NV014 Autonomous Multi-Intelligence Acoustic Reasoning Agent for Anti-Submarine Warfare
DON27BZ02-NV015 High Sensitivity Tunneling Magnetoresistive Magnetometers
DON27BZ02-NV016 Improved Ionosphere D-region Specification for High Frequency Propagation
DON27BZ02-NV017 Expeditionary Water Quality Sensors
DON27BZ02-NV018 Rapid Thermoplastic Patching Capability for Legacy Thermoset Airframe Sustainment
DON27BZ02-NV019 Navy Shipboard Gas Turbine Rotating Detonation Combustor Operation with Diesel Fuel
DON27BZ02-NV020 Rapid Imagery Creation for Navy Training
DON27BZ02-NV021 SI-Enabled “Just-in-time” Knowledge Delivery for Naval Maintainers
DON27BZ02-NV022 Collapsible Fixed-Wing Low-Cost Unmanned Aerial System for Intelligence, Surveillance, and Reconnaissance Missions
DON27BZ02-NV023 Attritable Turbine for Low-Cost Attack Systems (ATLAS)
DON27BZ02-NV024 Zero-Retrofit Robotic Ammunition Handling for the MK 45 Mod 4, 5-Inch Gun Magazine
DON27BZ02-NV025 Innovative Shortwave Infrared High Energy Laser Source and Coupled Imager
NAVY-14
DON27BZ02-NV006 TITLE: Mobile Vehicle Forensics
COMPONENT TECHNOLOGY PRIORITY AREA(S): Human-Machine Interfaces;Integrated Sensing and Cyber;Trusted AI and Autonomy
PROJECTED CMMC LEVEL REQUIREMENT: Level 2 (Self)
OBJECTIVE: Design, develop, and demonstrate a ruggedized, field-deployable vehicle forensics device capable of non-destructive, rapid data triage and extraction.
DESCRIPTION: Operational Need & Gap: During tactical site exploitation (TSE), Marine Corps and Joint operators require immediate, field-deployable hardware and software to recognize, preserve, and collect materials of forensic value. While multi-purpose forensic kits exist to process traditional materials, a critical intelligence gap remains regarding vehicle-derived data. Modern vehicles function as mobile data hubs featuring advanced navigation, localized track logs, and cached external device connections.
Exploiting this telematics and informatics data is vital for generating actionable intelligence, mapping networks, and establishing identity dominance.
The Problem (Technological Fragmentation): The primary barrier to tactical vehicle exploitation is severe technological fragmentation. Current vehicle forensic solutions are often designed for controlled laboratory environments. Because In-Vehicle Infotainment (IVI) systems and Electronic Control Units (ECUs) rely on proprietary software architectures and inconsistent file structures, existing tools are often restricted to narrow manufacturer subsets. Consequently, field operators may be forced to perform invasive, time-consuming physical disassembly of the vehicle dashboard—a method that is untenable in many field environments.
Scope of Effort: This SBIR topic seeks innovative proposals to develop a low-SWaP (Size, Weight, and Power), ruggedized, all-in-one device that automates the forensic exploitation of vehicle data systems.
The system must interface via standard external access points (e.g., On-Board Diagnostic [OBD-II] ports or Universal Serial Bus [USB]); automatically profile the vehicle’s make, model, year, and digital architecture; and execute an automated script to extract and structure data. Crucially, these features must be achieved through a non-invasive approach requiring no component disassembly, while maintaining strict forensic data integrity and verifiable accuracy.
The system must seamlessly interface with a broad registry of modern commercial and civilian vehicles across diverse model years, makes, and international manufacturers. Specifically, the device must extract and normalize data from disparate telematics systems (e.g., embedded GPS, localized track logs) and informatics modules (e.g., infotainment systems, paired Bluetooth logs, Wi-Fi cache, and cellular device pairings) without requiring laboratory-grade component disassembly.
Performance Goals:
• Threshold (Minimum): Demonstrate compatibility with representative samples of common vehicles;
extract high-priority telematics (i.e., GPS, route history) and informatics (paired device logs) in under 15 minutes with verifiable accuracy (i.e., comparison with test data collected separately);
packaged in a portable, field-ruggedized kit.
• Objective (Ideal): A pocket-sized, plug-and-play device that requires minimal operator training;
demonstrates a modular path to broad vehicle compatibility; and extracts a comprehensive forensic data set in under 5 minutes via an intuitive, automated interface.
PHASE I: Develop a technical approach and assess the feasibility of a mobile, software-intelligent vehicle forensics capability that enables rapid data extraction from vehicle telematics (e.g., GPS, navigation logs)
NAVY-15
and infotainment systems (e.g., paired Bluetooth devices, call histories) and prioritizes universal applicability across diverse vehicle head units, makes, and models, avoiding dependencies on specific hardware teardowns.
Required Phase I deliverables include:
• A comprehensive feasibility study and initial system design architecture.
• An assessment of projected data extraction speeds, performance metrics, and technical limitations.
• A detailed Phase II development plan mapping out performance goals, key technical milestones, and risk mitigation strategies.
PHASE II: Develop, demonstrate, and validate a functional, field-ready prototype based on the feasibility concepts established in Phase I. Focus on expanding compatibility across a broader registry of vehicle makes, models, and head unit architectures, while increasing the depth and fidelity of extracted telematics and informatics data. Ensure that the prototype is ruggedized or packaged appropriately for expeditionary testing.
Required Phase II deliverables include:
• A fully functional prototype vehicle forensics tool (software, hardware, or hybrid) ready for
Government evaluation.
• Demonstrations of the tool’s capability in an operationally relevant environment against representative vehicle targets.
• Complete technical documentation, including system architecture, user operating manuals, and finalized performance data metrics.
• A commercialization and transition plan detailing manufacturing viability and scaling strategies for military integration.
PHASE III DUAL USE APPLICATIONS: Upon successful completion of Phase II, support technology transition into a Phase III acquisition pathway for integration into the Forensics Dominance System – Marine Corps (FDS-MC) tactical site exploitation kits. Given the Joint requirement, position this rapid field-extraction capability for immediate transition to U.S. Special Operations Command (USSOCOM) exploitation programs and other Department of War service forensic intelligence elements.
In the commercial sector, this software-intelligent tool has direct dual-use applicability for federal, state, and local civilian law enforcement agencies by significantly modernizing digital forensics units through enabling roadside or scene-of-crime vehicle data extraction, thus bypassing extensive laboratory backlogs. Additionally, the capability will serve private sector markets, including automotive insurance fraud investigators, crash reconstruction experts, and corporate cybersecurity firms analyzing fleet vehicle telematics breaches.
REFERENCES:
1. “iVe Vehicle and System Support.” Berla Corp., 2024. https://berla.co
1. “CAN Bus Explained - A Simple Intro.” CSS Electroinics, 2024.
https://www.csselectronics.com/pages/can-bus-simple-intro-tutorial
2. “NIST Special Publication 800-101 Revision 1, Guidelines on Mobile Device Forensics.”
National Institute of Standards and Technology, 2014.
https://csrc.nist.gov/publications/detail/sp/800-101/rev-1/final
3. “Rusolut Vehicle Data Reconstructor.” Rusolut, 2024. https://rusolut.com/vehicle-data-recovery/ https://rusolut.com/vehicle-data-reconstructor/
4. “United States Special Operations Command (USSOCOM) Tactical Forensics Event (TFE) 21.1, 2025”.
https://www.vulcan-sof.com/login/ng2/collection/a1e8fd06-ac2a-4fc6-bfb8-b1fcbe101b1c
KEYWORDS: Vehicle; forensics; information; collection; telematics; informatics
NAVY-16
DON27BZ02-NV007 TITLE: Lightweight, Energy-Efficient Portable Nitrogen Generator for Expeditionary Operations
OUSW (R&E) CRITICAL TECHNOLOGY AREA(S): Contested Logistics Technologies (LOG)
COMPONENT TECHNOLOGY PRIORITY AREA(S): Advanced Materials;Sustainment
PROJECTED CMMC LEVEL REQUIREMENT: Level 2 (Self)
The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), 22 CFR Parts 120-130, which controls the export and import of defense-related material and services, including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR Parts 730-774, which controls dual use items. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with the Announcement.
Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws.
OBJECTIVE: Develop and demonstrate a man-portable, self-contained nitrogen generator capable of producing high-purity (equal to or less than 99.5%) nitrogen at 1,800 to 3,500 pounds per square inch (PSI), operating strictly within a 120-volt, 25-Amp single-phase electrical limit to support United States Marine Corps (USMC) expeditionary maintenance operations. While utilizing common enabling gas-separation technologies similar to topic N244-P02, this effort is strictly distinguished by its unique requirement for a highly modular, lightweight, two-man portable form factor engineered specifically for point-of-need operations in austere, forward-deployed environments.
DESCRIPTION: The United States Marine Corps (USMC) requires high-pressure nitrogen gas at forward operating locations to perform essential maintenance tasks, including aircraft and ground vehicle tire servicing, recoil mechanism servicing, recharging of gas suspension and accumulator components, and filling gas cylinders. Historically, the military relies on pre-filled, heavy steel gas cylinders resupplied through a vulnerable logistics chain. This process creates a severe logistical burden and hazardous material handling risk. Generating nitrogen at the point of need is essential to sustaining mission readiness in distributed, austere, and expeditionary environments consistent with USMC Force Design 2030 and Expeditionary Advanced Base Operations (EABO) concepts. The final product will be employed by USMC maintainers operating from forward tactical enclosures, specifically integrating with the JLTV Electronic Maintenance Shelter (JEMS). The system will provide point-of-need, high-purity nitrogen to service tactical vehicle and aircraft tires, hydraulic accumulators, recoil mechanisms, and suspension struts in support of distributed expeditionary operations.
While the USMC currently utilizes a legacy portable nitrogen generation system, it presents severe technical limitations that hinder expeditionary operations. First, the legacy system weighs 450 pounds, severely limiting mobility and requiring a four-person lift. Second, it requires 240-volt single-phase electrical power drawing 25 Amps. This exceeds the standard 120-volt, 25-Amp electrical limits of forward tactical enclosures, such as the Joint Expeditionary Maintenance Shelter (JEMS). Third, the current system only achieves 99.0% nitrogen purity (falling short of the required 99.5% for sensitive aviation and vehicle struts) and suffers from extremely slow flow rates, taking up to 6 hours to fill a standard 244-cubic-foot cylinder.
Commercial industry has introduced 120-volt single-phase configurations that achieve high purity.
However, these state-of-the-art commercial units fall short of expeditionary physical requirements: they weigh in excess of 650 pounds, require separate external air compressors to operate, and maximize output
NAVY-17
at only 3,000 pounds per square…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .