J-9_Whitney_Young_Facility_Survey_Final_Vol_2.pdf
PDF 8 MB Posted
- Attached to
- Operation of Whitney Young Job Corps Center
- Solicitation number
- DOL-ETA-15-R-00056
About this file
J-9 Volume 2
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Whitney M YoungWhitney M. Young Job Corps Center
Simpsonville, KY
Facility Planning ReportFacility Planning Report Volume II
Supporting Data
Fi lFinal January 2013
Department of Labor/ Office of Job Corps
22Whitney M. Young Job Corps Center
Whitney M YoungWhitney M. Young Job Corps Center
Simpsonville, KY
Facility Planning ReportFacility Planning Report Volume II
Supporting Data
Fi lFinal January 2013
Entrance to Whitney M. Young JCC
33 Whitney M. Young Job Corps Center
CONTENTS
WHITNEY M. YOUNG JOB CORPS CENTER
FACILITY PLANNING REPORT
VOLUME I - Planning Strategy
• Existing Site Plan
• Center Statistics
INTRODUCTION
• Purpose
• Report Contents
EXECUTIVE SUMMARY
A. EXISTING CONDITIONS
• Background
• General Site Conditions
• General Building Conditions
• Preventive Maintenance
• Ownership
• Facility Assessment by Function
• Energy
• Environmental Issues
• Sustainability
• Accessibility Standards
• Health and Life Safety Issues
• Summary of Defi ciencies
B. RECOMMENDATIONS
• Status of the Previous (PY09) Plan
• Signifi cant Issues
• PY 12 Plan Overview
• Summary of Proposed Projects
• National Projects
• Regional Projects
• Proposed Site Plan
• Implementation Plan
• Summary of National Projects
• Project Data Sheets
C. PLANNING ANALYSIS
• Purpose
• Planning Objectives and Assumptions
• Space Utilization Analysis
• Federal Real Property Asset Management
• Mission Dependency Site Plan
• Defi ciency Analysis
• Facility Condition Summary Report
• Building Condition by Function
• Building Condition Site Plan
VOLUME II - Supporting Data
• Vicinity Map
• Location Map
• Existing Site Plan
D. DESCRIPTIONS
• Buildings and Structures
• Space Utilization By Function
• NSF by Building
• Energy Management Report
• Environmental Management
Asbestos Report Radon Report
• Site Descriptions
• Building Descriptions
E. DEFICIENCIES
F. CORRESPONDENCE AND REPORTS
• Center Review Brief Meeting Minutes
• Survey Brief
• RA and Student Facility Feedback Questionnaire
• Life Safety Defi ciencies Transmittal and List
• O & M Defi ciency List
• Active Warranty Report
• FRPC Performance Measures Matrix
44Whitney M. Young Job Corps Center
55 Whitney M. Young Job Corps Center
66Whitney M. Young Job Corps Center
77 Whitney M. Young Job Corps Center
D Descriptions
BUILDINGS AND STRUCTURES
00316 WHITNEY M. YOUNG 01/30/2013
1Page: of Date:
0001 - BEREA HALL (ADMIN)
0002 - ECKSTEIN-NORTON DORMITORY
0003 - BELKNAP HALL (WAREHOUSE/
VACANT)
0004 - TYDING HALL COUNSELING
0005 - LEE THOMAS DORM
0006 - MAE STREET KIDD DORM
0007 - WHITNEY YOUNG
(GYM/RECREATION)
0008 - CAREER PREPARATION PERIOD
BUILDING
0009 - CAFETERIA/CULINARY ARTS
0010 - FACILITY
MAINT/WAREHOUSE/ADMIN
0012 - WELDING SHOP
0017 - TESTING
0020 - FACILITY MAINT/CARPENTRY
0022 - WELCOME STATION
0025 - STORAGE
0029 - WELLNESS CENTER
0033 - SAFETY/TRANSPORTATION
OFFICE
0034 - ROBINSON HALL DORM
0035 - ELEANOR YOUNG-LOVE
(ED/VOC)
0036 - JOSEPH H WIMSATT (VOC TDS)
0041 - MAINTENANCE FLAMMABLE
STORAGE
0011 - VOCATIONAL STORAGE
0027 - STORAGE SHED
0037 - BALLFLD CONCESSION STAND
0042 - MISC. STORAGE
0043 - WELDING STORAGE
0044 - LIFT STATION
A - GAZEBO
B - GAZEBO
C - GAZEBO
D - GAZEBO
E - GAZEBO
F - GAZEBO
G - PAVILION
H - PAVILION
J - GAZEBO
K - GAZEBO
Name GSF
12,228 14,785 16,470
5,000 10,365 10,365 30,664
8,400
12,212 8,297
5,680 1,060 6,747 1,115
4,440
36,830 21,808
10,477
1,456
Active Active Active
Active Active Active Active
Active
Active Active
Active Active Active Active
Demolition Requested
Active Active
Active Active
Active Active
Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active Active
StatusType
Building Building Building
Building Building Building Building
Building
Building Building
Building Building Building Building Building
Building Building
Building Building
Building Building
Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure
Use Group Built Flrs Const
Business Residential Storage
Business Residential Residential Mixed Use
Business
Assembly Factory/Ind.
Factory/Ind.
Business Factory/Ind.
Business Storage
Business Business
Residential Business
Business Storage
Business Storage Utility/Misc.
Storage Storage Utility/Misc.
Utility/Misc.
Assembly Assembly Utility/Misc.
Utility/Misc.
Utility/Misc.
Utility/Misc.
Utility/Misc.
Utility/Misc.
Utility/Misc.
Fair Good Fair
Good Good Good Good
Good
Good Good
Good Good Good Good Good
Good Poor
Good Good
Good Good
Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good
ConditionAsset Number
0031600002 0031600003 0031600004
0031600005 0031600006 0031600007 0031600008
0031600009
0031600010 0031600011
0031600013 0031600024 0031600019 0031600041 0031600026
0031600028 0031600033
0031600034 0031600035
0031600036 0031608121
0031600042 0031608128 0031600037 0031600044 0031600043 0031608129 0031600038 0031608124 0031608125 0031600045 0031608122 0031608123 0031608126 0031608127 0031608133 0031608134
BUILDINGS AND STRUCTURES
00316 WHITNEY M. YOUNG 01/30/2013
2Page: of Date:
21 217,958
16 4,380
37 222,338
Buildings
Structures
Total
GSF
GSF
GSF
Summary
01/22/2013
Space Utilization By Function 00316 Whitney M. Young Page: 1 of Date:
HOUSING
EDUCATION
FOOD SERVICE
SUGGESTED
NSF/
ENROLLEE
SUGGESTED
TOTAL
NSF
ACTUAL
TOTAL
NSF
TYPE OF SPACE
SUB TOTAL
SUB TOTAL
SUB TOTAL
Resident Men Resident Women Total Residents
Residents 380 Non Residents 20
400Total Students
(380)
(400)
(400)
DIFFERENCE
38,000
28,710
7,200
44,254
47,484
7,400
Lounge Other Shower/Toilet Sleeping Storage
Academic (400) Non-Academic
10 -- ACT (Off-Ctr) 20 -- Brick Masonry + 24 -- Carpentry + 20 -- Cement Masonry + 90 -- Cert. Nursing Asst.
30 -- Culinary Arts + 24 -- Facilities Maint. and Const. + 30 -- Medical Assistant 30 -- Medical Office Support 30 -- Pharmacy Tech + 48 -- Welding +
Vocational Theory (196)
Dining (2 Servings) Food Preparation Food Storage
5,490 4,072 4,023
27,215 3,454
8,390 10,220
4,613 2,181 3,731 4,158 1,830 2,903
3,982
3,153
4,550 1,115 1,735
3,800
4,560 27,360
2,280
4,000 4,000
1,500 1,800 1,500 3,600 1,800 1,800
1,350 3,600
1,960
3,200 2,400 1,600
1,690
-537 -145
1,174
4,390 6,220
3,113
2,231
1,103
-20 -380 -427
1,193
1,350 -1,285
Vocations
6,254
18,774
01/22/2013
Space Utilization By Function 00316 Whitney M. Young Page: 2 of Date:
RECREATION
MEDICAL/DENTAL
ADMINISTRATION
STORAGE/SUPPORT
VACANT
SUGGESTED
NSF/
ENROLLEE
SUGGESTED
TOTAL
NSF
ACTUAL
TOTAL
NSF
TYPE OF SPACE
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
TOTAL 279.73 111,890 152,788
(400)
(400)
(400)
(400)
(0)
DIFFERENCE
217,958
0.70
TOTAL GSF
NET TO GROSS RATIO
19,300
2,680
8,000
24,075
2,917
7,606
8,859
10,193
Gymnasium Miscellaneous Recreation Multipurpose Room Recreation Room Weight Room
Medical/Dental
Administration
Operations & Maintenance Warehouse
Under Renovation - Administration Vacant
6.7
11,814 6,861 2,662 1,695 1,043
2,917
7,606
4,955 3,904
9,799
2,680
3,200 4,800
-394
1,755 -896
RESIDENT
NON-RESIDENT
(380)
(20) 15
50 19,000
4,775
-394
10,193
40,898
Net Square Footage By Building Date: 01/22/2013 Page: 1
Center: WHITNEY M. YOUNG (00316) of 4
HOUSING
Sleeping
Lounge
Storage
Shower/Toilet
Other
Function Suggested
NSF
4,354 4,691 4,354
13,816
3,436
1,502
1,740
0006 - MAE STREET KIDD DORM
0002 - ECKSTEIN-NORTON DORMITORY
0005 - LEE THOMAS DORM
0034 - ROBINSON HALL DORM
0002 - ECKSTEIN-NORTON DORMITORY
0005 - LEE THOMAS DORM
0006 - MAE STREET KIDD DORM
0034 - ROBINSON HALL DORM
0004 - TYDING HALL COUNSELING
0006 - MAE STREET KIDD DORM
0034 - ROBINSON HALL DORM
0005 - LEE THOMAS DORM
0003 - BELKNAP HALL (WAREHOUSE/ VACANT)
0002 - ECKSTEIN-NORTON DORMITORY
0034 - ROBINSON HALL DORM
0006 - MAE STREET KIDD DORM
0005 - LEE THOMAS DORM
0002 - ECKSTEIN-NORTON DORMITORY
0005 - LEE THOMAS DORM
0002 - ECKSTEIN-NORTON DORMITORY
0006 - MAE STREET KIDD DORM
0034 - ROBINSON HALL DORM
Bldg Name Actual NSF Difference
27,215
5,490
3,454
4,023
4,072
Sub Total: 44,254
27,360
3,800
2,280
4,560
38,000
-145
1,690
1,174
-537
4,072
( 380
6,254
Page: 2
Center: WHITNEY M. YOUNG (00316) of 4
EDUCATION
Academic
Vocational Theory (196)
Carpentry
Cement Masonry
Culinary Arts
Welding
Facilities Maint. and Const.
Medical Assistant
Non-Academic
Brick Masonry
Pharmacy Tech
Medical Office Support
Cert. Nursing Asst.
Function Suggested
NSF
1,835 1,516 1,956 1,240 1,843
1,239
1,018
2,181
3,731
1,830
3,982
2,903
5,211
1,136 1,391 1,005
4,613
4,158
0035 - ELEANOR YOUNG-LOVE (ED/VOC)
0035 - ELEANOR YOUNG-LOVE (ED/VOC)
0035 - ELEANOR YOUNG-LOVE (ED/VOC)
0035 - ELEANOR YOUNG-LOVE (ED/VOC)
0035 - ELEANOR YOUNG-LOVE (ED/VOC)
0020 - FACILITY MAINT/CARPENTRY
0036 - JOSEPH H WIMSATT (VOC TDS)
0012 - WELDING SHOP
0020 - FACILITY MAINT/CARPENTRY
0036 - JOSEPH H WIMSATT (VOC TDS)
0009 - CAFETERIA/CULINARY ARTS
0012 - WELDING SHOP
0020 - FACILITY MAINT/CARPENTRY
0035 - ELEANOR YOUNG-LOVE (ED/VOC)
0008 - CAREER PREPARATION PERIOD BUILDING
0004 - TYDING HALL COUNSELING
0008 - CAREER PREPARATION PERIOD BUILDING
0010 - FACILITY MAINT/WAREHOUSE/ADMIN
0004 - TYDING HALL COUNSELING
0004 - TYDING HALL COUNSELING
0004 - TYDING HALL COUNSELING
0017 - TESTING
0036 - JOSEPH H WIMSATT (VOC TDS)
0035 - ELEANOR YOUNG-LOVE (ED/VOC)
0035 - ELEANOR YOUNG-LOVE (ED/VOC)
0035 - ELEANOR YOUNG-LOVE (ED/VOC)
Bldg Name Actual NSF Difference
8,390
3,153
2,181
3,731
1,830
3,982
2,903
10,220
4,613
4,158
Sub Total: 47,484
4,000
1,960
1,800
1,500
1,800
3,600
1,800
4,000
1,500
1,350
3,600
28,710
4,390
1,193
2,231
1,103
-20
6,220
3,113
-427
-380
( 400
18,774
Page: 3
Center: WHITNEY M. YOUNG (00316) of 4
FOOD SERVICE
RECREATION
MEDICAL/DENTAL
ADMINISTRATION
Dining (2 Servings)
Food Preparation
Food Storage
Multipurpose Room
Gymnasium
Weight Room
Miscellaneous Recreation
Recreation Room
Medical/Dental
Administration
Function Suggested
NSF
4,550
1,115
1,735
2,662
11,814
1,043
6,861
1,695
2,917
6,013
0009 - CAFETERIA/CULINARY ARTS
0009 - CAFETERIA/CULINARY ARTS
0009 - CAFETERIA/CULINARY ARTS
0007 - WHITNEY YOUNG (GYM/RECREATION)
0007 - WHITNEY YOUNG (GYM/RECREATION)
0007 - WHITNEY YOUNG (GYM/RECREATION)
0007 - WHITNEY YOUNG (GYM/RECREATION)
0007 - WHITNEY YOUNG (GYM/RECREATION)
0029 - WELLNESS CENTER
0001 - BEREA HALL (ADMIN)
0033 - SAFETY/TRANSPORTATION OFFICE
0010 - FACILITY MAINT/WAREHOUSE/ADMIN
0022 - WELCOME STATION
Bldg Name Actual NSF Difference
4,550
1,115
1,735
2,662
11,814
1,043
6,861
1,695
2,917
7,606
Sub Total:
Sub Total:
Sub Total:
Sub Total:
7,400
24,075
2,917
7,606
3,200
2,400
1,600
2,680
8,000
7,200
19,300
2,680
8,000
1,350
-1,285
-394
4,775
-394
Page: 4
Center: WHITNEY M. YOUNG (00316) of 4
STORAGE/SUPPORT
VACANT
Warehouse
Operations & Maintenance
Vacant
Under Renovation - Administration
Function Suggested
NSF
1,417 2,487
4,363
2,662
6,366
0010 - FACILITY MAINT/WAREHOUSE/ADMIN
0003 - BELKNAP HALL (WAREHOUSE/ VACANT)
0041 - MAINTENANCE FLAMMABLE STORAGE
0025 - STORAGE
0010 - FACILITY MAINT/WAREHOUSE/ADMIN
0001 - BEREA HALL (ADMIN)
0035 - ELEANOR YOUNG-LOVE (ED/VOC)
0003 - BELKNAP HALL (WAREHOUSE/ VACANT)
0004 - TYDING HALL COUNSELING
0002 - ECKSTEIN-NORTON DORMITORY
Bldg Name Actual NSF Difference
3,904
4,955
9,799
Sub Total:
Sub Total:
8,859
10,193
4,800
3,200
8,000
-896
1,755
9,799
10,193
Energy Management Report Center: WHITNEY M. YOUNG (00316)
Page: 1 Date: 01/22/2013 of 3
CENTER ENERGY DATA
Yes
ENERGY CONSUMPTION ASSESSMENT
67% 36,398
85,824 108,637
ENERGY USE BY FUEL TYPE
Energy Audit :
Date of Audit :
Status of Energy Conservation Measure Recommendations :
Electric Company :
Percent Change since Baseline Year :
Natural Gas Company :
Property Status :
12/1/1999 Not Implemented Kentucky Utilities Louisville Gas & Electric
Leased
2,451,248 8,364=
Total 15,437
MBtu
MBtu
Total $276,595 MBtu/ $17.918
BTU/GSF
BTU/GSF
BTU/GSF
Electricity
Natural Gas kWh
6,861 MCF = 7,073 MBtu
$224,354 $0.092= kWhElectricity
Natural Gas $52,241 = $7.614 MCF
ENERGY COST BY FUEL TYPE
COMMENTS
Construction scope of work for implementation of audit recommendations is at the center. (4/20/04)
WATER CONSUMPTION ASSESSMENT
Percent Reduction Since Baseline Year:
1,000 Gallons
1,000 Gallons
FY 2012 Energy Goal:
Energy Goals are being met. Keep up the Good Work to further Reduce Energy Usage.
FY 2012 Energy Consumption:
Note: The Federal Government has set a goal of 3% Energy Consumption Reduction per year in EO 13423.
9,837 8,853 4,474,000
Further Reduction in Water Usage is needed to meet Water Reduction Goals.
Note: The Federal Government has set a goal of 2% Water Consumption Reduction per year in EO 13423.
FY 2012 Goal:
FY 2012 Water Consumption:
1,000 Gallons
FY 2003 Energy Baseline:
FY 2007 Baseline:
Page: 2 of 3
Implementing some of the below recommendations can save you 10% to 25% off your annual energy bill without negatively impacting comfort or productivity.
1. Your staff and students are the key to savings. Educate the students and staff on the why of energy saving - costs and environmental impacts. Encouraging them to actively participate in energy reduction is also important. Post reminders at exit doors and bulletin boards about energy conservation. Simple tips include:
a. Turn it down (lights, heating & cooling),
b. Turn it off (lights, computers, other equipment),
c. Keep it tight (close doors and windows, use window blinds)
2. Operations and Maintenance: Educate the O&M staff on the why of energy saving -costs and environmental impacts. Simple tips include:
a. Make sure that the Operations and Maintenance staff is properly trained for the equipment they operate.
b. Tune and clean HVAC: Perform seasonal cleanups on air conditioners, boilers and furnaces, and regularly clean cooling coils and drain pans. Get rooftop or outdoor condenser coils cleaned and maintain an appropriate filter changing schedule.
c. Check (or ask your HVAC contractor to check) your outside air dampers or economizers to verify proper ventilation. Make sure economizer controls function properly. Make sure automatic dampers close during unoccupied periods.
d. Restore automatic control: When troubleshooting a system, take time to figure out and repair the automatic controls. Today's quick fix is tomorrow's bad idea.
e. Reasonable set points: Try 68°F in the heating season and 75°F in the cooling season.
f. Schedule HVAC equipment and lighting: (weekdays, weekends, holidays, off-season). Make sure equipment runs only when it is needed and the buildings are occupied. When buildings are vacant (i.e. dormitories during the day with students in class), make sure all the lights in the building are off.
g. Seasonal (resets, schedules, and shutoffs): As the seasons change, adjust set points and schedules to match the system's response to the weather.
h. Lighting: Invest in an inexpensive light level meter to measure the foot-candles in spaces to determine whether or not they are over lit and lamps can be safely removed. Where four-lamp fixtures are in use, two lamps can usually be removed from every fixture or every other fixture. After lamps are removed, disconnect ballasts. Contact the Energy team at PBDewberry for suggested light levels for individual space types. Cleaning fixtures regularly increases light levels.
i. Utilize power management features for all computers and monitors to shut them off when idle for more than 15 minutes.
Page: 3 of 3
j. Have your vending machine suppliers turn off or remove light tubes from the advertising lighting in the machine. This will save about $50 per year per vending machine.
k. Save water with low flow sink aerators (0.5gpm) and low flow shower heads (1.5gpm - 2.0gpm). This will also reduce water heating energy consumption.
l. Set your water heater to 120°F. Verify by measuring at the tap. Never go below 115°F.
m. For water heaters installed in unconditioned spaces, add insulation blankets making sure that access covers, electric connection areas, and pressure relief valves are left uncovered.
n. Caulk and fill cracks around doors and windows to reduce costly air leaks.
o. When replacing broken glass, use high transmittance, low heat gain windows.
p. Make sure automatic door closers are functioning properly to avoid drafts.
3. Buy energy efficient, buy EnergyStar (www.energystar.gov).
a. Buy EnergyStar appliances and equipment.
b. Replace burned out lightbulbs with EnergyStar labeled compact fluorescent lightbulbs (CFLs).
c. Replace broken thermostats with EnergyStar labeled programmable products.
d. Replace broken exit signs with EnergyStar LED exit signs.
Asbestos-Containing Materials Inventory
Date: 01/22/2013Center : Whitney M. Young (00316) Page: 1 of 2
Floor Finishes Floor Finishes Ceiling Finishes Plumbing (Bldg) Heating
Plumbing (Bldg) Floor Finishes Floor Finishes
Roof Repair/Replacement Floor Finishes Floor Finishes
Floor Finishes Ceiling Finishes
Floor Finishes
Floor Finishes
Bldg System
Bldg System
Bldg System
Bldg System
Bldg System
Bldg System
9x9 Floor tile & mastic 9x9 Floor tile & mastic, Asbestos cement board Pipe fitting insulation Boiler exhaust insulation
Pipe fitting insulation Floor tile & mastic Floor tile & mastic
Roof flashing Floor tile, gray Mastic beneath brown fl. tile
12x12 Floor tile & mastic Acoustical ceiling panels
Mastic beneath floor tile
Floor tile
Category Description
Category Description
Category Description
Category Description
Category Description
Category Description
Sq. Ft.
Sq. Ft.
Sq. Ft.
Ea.
Sq. Ft.
Lin. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Location
Location
Location
Location
Location
Location
Unit
Unit
Unit
Unit
Unit
Unit
Quantity
Quantity
Quantity
Quantity
Quantity
Quantity
Second floor office Basement Ceiling of Mech. rm.
Basement Basement
Mechanical room Basement Private bath, 3rd fl
Roof Second fl., 2 rooms Corridors
Orientation Orientation
Rec. rm & Laundry rm
Rec. rm & Laundry rm
Building :
Building :
Building :
Building :
Building :
Building :
0001 - BEREA HALL (ADMIN)
0002 - ECKSTEIN-NORTON DORMITORY
0003 - BELKNAP HALL (WAREHOUSE/ VACANT)
0004 - TYDING HALL COUNSELING
0005 - LEE THOMAS DORM
0006 - MAE STREET KIDD DORM
Asbestos-Containing Materials Inventory
Page: 2 of 2
Plumbing (Bldg) Floor Finishes Plumbing (Bldg)
Floor Finishes
Bldg System
Bldg System
Hot water insulation Mastic beneath linoleum Pipe fitting insulation
Floor tile
Category Description
Category Description
Sq. Ft.
Sq. Ft.
Ea.
Sq. Ft.
Location
Location
Unit
Unit
Quantity
Quantity
Boiler room Rec. room & storage Throughout
Storage & 2 classrms
Building :
Building :
0007 - WHITNEY YOUNG (GYM/RECREATION)
0008 - CAREER PREPARATION PERIOD BUILDING
Environmental Management Report
Page: 1 Date: 01/22/2013 of 1
SOLID & HAZARDOUS WASTE MANAGEMENT (RCRA)
Commercial Waste Service
HAZARDOUS MATERIALS STORAGE (EPCRA)
Yes Flammable Storage, Structure 41
Yes
PETROLEUM UNDERGROUND STORAGE TANKS (RCRA)
N/A0
PETROLEUM ABOVEGROUND STORAGE TANKS (CWA)
ASBESTOS AND PCB MANAGEMENT (TSCA)
AIR POLLUTION CONTROL (CAA)
N/A None
Attainment
Solid Waste Disposal :
Hazardous Waste Generator :
Hazardous Waste ID :
Generator Classification :
Hazadous Materials Storage :
Hazardous Materials ID :
HazMat Storage Area :
HazMat Spill Response Plan :
Number of Regulated USTs :
Number of Un-regulated USTs :
Local Hazardous Use Permit :
LEPC Notification :
EPA Generator ID Number :
Hazardous Waste Disposal :
RCRA Compliance
ID LocationFuel Type Capacity
Number of ASTs :
Asbestos Survey Date :
Asbestos Type :
Asbestos Coordinator :
Coordinator Training Date:
Custodial/Maintenance Training :
AHERA Regulated :
Management Plan Approval :
PCB Transformer Testing :
PCB Transformers :
PCB-Contaminated Transformers :
Transformers Labelled :
Regional Air Quality :
Permitted Air Pollution Source :
Source Description :
Industrial Disposal Company Yes Organic solvent (55 gals/month)
Conditionally Exempt Small Quantity Generator N/A Commercial Hazardous Waste Disposal Service
Safety Kleen
No Yes
Overfill Leak Corrosion
SPCC Plan Required : SPCC Plan Completed :
No N/A
10/27/1990 Friable/Non-Friable No Trained Coordinator
No No
No No
ID Fuel Type Capacity Location Overfill
Prevention Secondary Containment
1 Petroleum - Diesel Fuel 250 Near Building 12 No Yes
Tank Status Active
Tank Status Prevention/Detection
Radon
Page: 1 of 2
0001 - BEREA HALL (ADMIN)
0002 - ECKSTEIN-NORTON DORMITORY
0003 - BELKNAP HALL (WAREHOUSE/ VACANT)
0004 - TYDING HALL COUNSELING
0005 - LEE THOMAS DORM
0006 - MAE STREET KIDD DORM
0007 - WHITNEY YOUNG (GYM/RECREATION)
0008 - CAREER PREPARATION PERIOD BUILDING
0009 - CAFETERIA/CULINARY ARTS
0010 - FACILITY MAINT/WAREHOUSE/ADMIN
0012 - WELDING SHOP
0017 - TESTING
0020 - FACILITY MAINT/CARPENTRY
0022 - WELCOME STATION
0025 - STORAGE
0029 - WELLNESS CENTER
0033 - SAFETY/TRANSPORTATION OFFICE
0034 - ROBINSON HALL DORM
0035 - ELEANOR YOUNG-LOVE (ED/VOC)
0036 - JOSEPH H WIMSATT (VOC TDS)
0041 - MAINTENANCE FLAMMABLE STORAGE
Bldg Name
05/23/1990
08/18/1992
08/18/1992
05/23/1990
05/23/1990
05/23/1990
08/18/1992
05/23/1990
05/23/1990
05/23/1990
05/23/1990
05/23/1990
05/23/1990
05/23/1990
Test Date
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
Yes
Yes
No
No
No
No
N/A
Radon Testing
< 4 pCi
4 - 20 pCi
> 20 pCi
< 4 pCi
< 4 pCi
< 4 pCi
4 - 20 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
Test Result
N/A
No
No
N/A
N/A
N/A
No
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Mitigation Mitigation Date
Radon
Page: 2 of 2
RADON EXPLANATORY NOTES
The US Environmental Protection Agency (EPA) has established a radon action level of 4.0 picoCuries per liter (pCi/L). Occupied buildings with radon concentrations less than 4.0 pCi/L do not require radon mitigation; un-occupied buildings, or those buildings which are occupied only infrequently for brief periods of time, also do not require radon mitigation. Occupied buildings with radon concentrations greater than
4.0 pCi/L require radon mitigation and verification of radon reductions as soon as possible, with priority given to dormitories and student recreation buildings. Occupied buildings with radon concentrations greater than 20.0 pCi/L should be considered significant radon exposure hazards, and priority for mitigation should be given to buildings with these highly elevated radon concentrations.
Radon mitigation techniques include: (1) adjustment of the building HVAC system to create a positive pressure within the building; (2) sealing of foundation wall cracks, penetrations, or other openings;
(3) sealing crawlspace openings and sump pits; (4) installing an active subslab depressurization (ASD) system.
Site Description
WHITNEY M YOUNG
Satellite view of Whitney M Young JCCSatellite view of Whitney M Young JCC
Page: 1 Date: 01/22/2013 of 4
Comments:
Paving Type for Roads & Parking
Roadways are deteriorated near Building 35 and Building 7.
Paving Type for Sidewalks
Asphalt Concrete
Comments:
Topography Buildings and Structures
Center is not fully enclosed by fencing. There is a chain link fence around the HVAC equipment of Building 2 and around the sewage treatment plant.
ROADS, PARKING & SIDEWALKS
Water Source Water Authority Service Meter On-Site Treatment Plant
1. Water System
Treatment Type Storage Type Storage Capacity(Gallons)
NoMasterWest Shelby Water DistrictPublic Water Authority
None 0None
Fire Hydrants On-Site Water Supply Storage Capacity
(Gallons) Pressure Source FD Response Time (Minutes)
Yes 0 10None Municipal
Number of Deficiencies = 1
Number of Deficiencies = 1
SITE FEATURES
UTILITIES
2. Fire Protection System
Buildings Structures21 19Gently Sloping
Surrounding
Outdoor Recreation
Rural
Basketball, Football, Soft/Baseball RR Tracks
Outdoor HVAC Equipment
Sewage Treatment Plant
Chain Link
Chain Link
Location Type
Maintenance Responsibility System Capacity Adequate System Condition
Lessor Center Yes Good
Separate Loop
No
Ownership Maintenance Responsibility System Capacity Adequate System Condition
Lessor Center Yes Unknown
Ownership
Roads & Parking Adequate Roads & Parking Condition Sidewalks Adequate Sidewalk Condition Yes Fair Yes Good
Fencing
Other Features
Page: 2 Date: 01/22/2013 of 4
Comments:
Sewage Treatment Flow
The plant is an extended aeration package plant operated by the lessor. The center is responsible for operating and maintaining lift stations near Buildings 2 and 9.
Lessor
On-site Sewage Treatment Plant
Lessor
Gravity and Lift Stations
Maintenance ResponsibilityOwnership
Comments: Natural gas is metered at one central point, with no meters at the buildings. Plans for gas main replacement were underway during the April 2012 Facility Survey.
Louisville Gas & Electric
Comments:
Electric Company PCB Trans.
Transformer Mounting Transformer Ownership
Systems Ownership Maintenance Responsibility
Kentucky Utilities
Primary overhead electrical power service enters the center at one location from utility-owned primary power overhead distribution located along Shelbyville Road. This service feeds pad-mounted or pole-mounted step-down transformers with corresponding wall-mounted secondary utility meters for each individual building. 120/208V, 1-phase, 3 wire secondary service is additionally utilized.
Pole and Pad Utility
Utility Utility
No
12.47/7.2kV, 3-Phase, 4 Wire
208/120V , 3-Ph, 4 W and 277/480V, 3-Phase, 4 WOverhead & Underground
OverheadPrimary Service
Secondary Service
Distribution Characteristics
Number of Deficiencies = 13. Sanitary Sewer System/ Sewage Treatment Plant
5. Fuel Distribution System
Number of Deficiencies = 2
System Capacity Adequate System Condition
Yes Good
4. Storm Water System Number of Deficiencies = 3
Drain Type On-Site Storm Water Management
Surface Run-off N/A
Ownership Maintenance Responsibility System Capacity Adequate System Condition
Lessor Yes FairCenter
Comments: Several buildings have standing water after normal rainfall. Refer to Site Deficiency 42726.
Gas Company Metering
Master
Ownership Maintenance Responsibility System Capacity Adequate System Condition
Lessor Lessor Yes Poor
7. Electrical (Service)
Transformer Maint Resp
Utility
System Capacity Adequate System Condition
Yes Good
Generator
None
ATS MTS
No No
6. Central Plant: None
Metering Individual
Page: 3 Date: 01/22/2013 of 4
ACCESSIBILITY
Yes
Comments:
Telephone Company
On-site Line Owner
The Berea Hall (administration building) is utilized as the main communication service entrance for the center telephone and data systems, and is where the main DMARC is located. The internet and long distance communication system is a VoIP system implemented and managed by the JCDC. The local calls are managed by AT&T. The system hardware is manufactured by Cisco including the call manager (server), voicemail, IVR, and telephones. The system is served by three T1 lines provided by AT&T. These lines are set up for redundancy and load balancing for optimum performance. The center maintains approximately 100 phone extensions and 28 analog lines. This equipment is served by a UPS backup system for interruptions of up to 20 minutes. Fiber and CAT 5E cables are used for both Data and Voice and they run overhead to the buildings. The center does have data center approved wireless access points in Career Preparation Period Building 8 and Eckstein-Norton Dormitory Building 2. Cable TV is provided by Insight Communications Company at the security, dormitories, and recreation buildings. A computer based fire alarm central annunciator panel is located in the lobby of Welcome Station Building 22. It monitors the fire alarm system status of each major building via a radio frequency (RF) transceiver communication link and antennae mounted on the exteriors of the buildings. The system was installed by the center's fire alarm maintenance contractor Simplex Grinnell. The dormitories have magnetic door alarm contacts monitored at RA offices. Motion detection systems are provided in the student store and the Belknap Hall (Warehouse/Vacant) Building 3.
AT&T
Maint. Responsibility
Center Center
None
03/01/2000
Unknown
Unknown
Unknown
Center
Center
Center
Center
Active
Abandoned
Abandoned
Abandoned
Aboveground
Underground, Non-regulated
Underground, Non-regulated
Underground, Non-regulated
Near Building 12
Behind Building 2
Behind Building 3
Behind Building 7
No
No
No
Yes
Petroleum - Diesel Fuel
N/A
N/A
N/A
STORAGE TANKS
TypeStatus Location Owner Fuel Type Capacity (Gallons) Install DateID
Reg.
Number of Deficiencies = 7
Accessible Parking: Accessible Slope:
Yes
Curb Cuts:
Yes
Ramps:
YesYes
Site Accessible Route:
9. Electrical (Communication/Alarm/Security)
Equip/Veh Fueling
N/A
N/A
N/A
Purpose
Yes
Stand-Alone
VOIP
System Capacity Adequate System Condition
GoodYes
8. Electrical (Site Lighting)
Roadways Parking Walkways Building Outdoor Sports
Mounting
Control
Pole Pole Pole Building Pole
Photocell Photocell Photocell Photocell Switch
System Ownership Maintenance Responsibility System Capacity Adequate System Condition
Center Center Yes Good
Number of Deficiencies = 2
Number of Deficiencies = 5
Fire Alarm Security
Page: 4 Date: 01/22/2013 of 4
Comments:
UnknownYesYes
Buildings associated with the old Lincoln Institute are listed on the National Register of Historic Places: Berea Hall, Belknap Hall, Eckstein-Norton Dormitory.
Yes
Nationally Registered Site
Site Eligible for National Register
Located in Historic District
Archaeological Significance
Earthquake Risk
Low Low LowMedium HighIBC Low
LightningEarthquake Def. Authority Flooding Tornado Hurricane Forest
Fire
GENERAL SITE CONDITION
Rating X Good Fair Poor
HISTORIC PRESERVATION
NATURAL HAZARDS
The site condition is not impacting the functional use of the facilities.
The site condition IS impacting the functional use of the facilities.
The site condition IS SIGNIFICANTLY impacting the functional use of the facilities.
Building Descriptions and Utilities
BUILDING 1 BEREA HALL (ADMIN)BUILDING 1 - BEREA HALL (ADMIN)
Building Descriptions
Page: 1 of 101
Building: 0001 - BEREA HALL (ADMIN)
BUILDING ENVELOPE
Foundation RoofBuilding
Concrete Loadbearing Masonry Wood
Brick Masonry Stone Masonry
Wall Roof None Batt
Metal Unit - Metal Frame Wood Unit - Wood Frame
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership#Floors
Business 12,228 8,675 4 Leased 1910 Listed
Comments: Women's restrooms are handicapped accessible, but men's restrooms are not.
REAL ESTATE
Access to Building
Ramps
Entrance
2nd Egress
Visual Alarm
Corridor/Aisle
Rooms
Stairs
Elevator
Restrooms
Drinking Fountain
Telephone
No
No
Yes
No
Yes
Yes
Yes
Yes
No
No
Yes
N/A
ACCESSIBILITY
Structural Systems1.
Exterior Walls2. Number of Deficiencies = 1
Insulation4.
Exterior Doors5.
Material
The remaining life of roof is estimated based on visual inspection during the April 2012 Facility Survey.
Drainage Year Life
Remaining Type Area Served
Metal
EPDM
Scuppers and Downspouts
Scuppers and Downspouts
Gable
Flat
Offices
Offices
Comments:
3. Roof
Entire Building
Area Served
Page: 2 of 101
Building: 0001 - BEREA HALL (ADMIN)
Comments: Basement windows are fixed.
INTERIOR FINISH
Carpet Concrete Rubber VCT Wood
Brick Drywall Plaster
Metal Unit - Metal Frame Wood Unit - Wood Frame
Mechanical Restroom
Ventilation Area Served
VERTICAL CIRCULATION
Granite Stairs Metal Stairs Wood Stairs
Comments: There is one metal fire escape stair on west side of building.
Double Hung - Wood Frame; Double Glazing; Fixed - Wood Frame; Double Glazing;
Acoustical Tile Gypsum Board
Exhaust Ventilation
Number of Deficiencies = 3
Windows6. Number of Deficiencies = 1
Floors1. Asbestos: Yes Number of Deficiencies = 1
Interior Walls2.
3. Asbestos: Yes
Interior Doors4.
Heat Source
Heat Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
The boiler (Bryan #CLM150WGL, 1200 MBH output, built 2006) is located in the basement mechanical room. Three air handling units (Trane #BCHA036ARD022B2F1M, 1/3 HP) in the basement and another in the attic provide heat to the corridors and some offices.
Most of the offices are heated by fan coil units.
Comments:
Comments:
HVAC
Heat1. Asbestos: Yes
Gas-Fired Hot Water Boiler
Gas-Fired Hot Water Boiler
Single Duct
Fan Coil
Two-Pipe
Two-Pipe
None
Electric
Mechanical
Natural
None
None
Common Area
Offices
Ventilation2.
Ceilings
Page: 3 of 101
Building: 0001 - BEREA HALL (ADMIN)
The water heater (Rheem #6EO15A, 80 gallon, 4.5 kW) is located in the basement mechanical room.Comments:
Cast Iron None None
Electric Water Cooler Lavatory Urinal Water Closet (Flush Valve) Water Closet (Tank)
Gas (Natural)
None None ABC Type Fire Extinguisher
Copper Copper Electric None No
Hot Water Cold Water Water Heater Water Treatment HW Storage Tank
Grease InterceptorWaste / Vent Interior Storm
Chiller
Chiller
Single Duct
Fan Coil
Two-Pipe
Two-Pipe
None
Electric
Mechanical
Natural
None
None
Common Area
Offices
Sprinkler System Stand Pipe System Fire Suppression
PLUMBING
An air-cooled chiller (Carrier # 30RAN030) provides chilled water to three air handling units (Trane #BCHA036ARD022B2F1M, 1/3 HP) in the basement mechanical room and another in the attic to cool the corridors and some offices.
Most of the offices are cooled by fan coil units.
Comments:
Comments:
System Type
Air Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Water Distribution1.
Sanitary Distribution2.
Fixtures3.
Fuel Distribution4.
FIRE PROTECTION
3. Air Conditioning
Page: 4 of 101
Building: 0001 - BEREA HALL (ADMIN)
Comments: Electrical service to the building is provided from a pole-mounted utility-owned transformer bank, located at the southwest corner side of the building via overhead cable. Building service entrance equipment consists of one 600A, 120/208V, 3-phase fusible-switch type distribution panelboard, 600A main lug only (MLO). The panel has two 200A and two 100A fused switches that serve the chiller (200A), one two-sectional panelboard "C" (200A), panelboard "A" (100A MCB) and panelboard "B" (225 A MLO). The utility meter for this building is mounted at the utility pole.
FIRE ALARM
Comments: The addressable fire alarm control/annunciator panel is a Simplex 4004. The system is connected via an RF transceiver (Monaco BT2-7), located in the basement, to a computer based central annunciator located in the lobby (duty station) of Welcome Station Building 22.
Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices
Audible Alarm Control/Annunciator Panel Duct Smoke Detector Heat Detector Manual Pull Station Smoke Detector Visual Alarm
Comments: Recorded footcandle levels include natural light contribution. The main lobby has decorative pendant light fixtures (candelabra type) with incandescent lamps.
High Intensity Discharge (HID)
Comments: The building-mounted exterior light fixtures are controlled by individual photocells.
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
Incandescent
Offices
Corridors & Stairs
Conference Rooms
Reception
Storage Rooms
Vacant
Equipment Rooms (Elec/Mech)
Toilets
Reception
N/A
Area Recommended Level
Recorded Level Light Type
Battery Backup Battery Backup
Main Distribution Panel 120/208V, 3-Phase, 4 Wire Panelboard Receptacles, GFCI, Switches
Emergency Exit
ELECTRICAL SERVICES Number of Deficiencies = 3
Exterior Lighting1. Number of Deficiencies = 3
Interior Lighting2.
Emergency /Exit Lighting3. Number of Deficiencies = 3
LIGHTING
Page: 5 of 101
Building: 0001 - BEREA HALL (ADMIN)
Comments: The center main phone demarcation point is in the main electrical room and the center main data demarcation point is in the data closet, both located at the basement level. The data system is manufactured by Cisco. Fiber and CAT 5E cables are used for both data and voice, and are run overhead to the buildings. The phone system is PBX based type, with phone equipment provided by BellSouth and land lines provided by AT&T.
Connected to Main System None None TV with VCR
Telephone Security Public Address Television
GENERAL BUILDING CONDITION
Rating
Comments:
X Good Fair Poor
Water is infiltrating the basement. Floor tiles and baseboard are heavily stained. Frame seals at exterior windows on upper floors are failing and contribute to deterioration of windows.
COMMUNICATION
The facility condition is not impacting the functional use of the facility.
The facility condition IS impacting the functional use of the facility.
The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.
Electric Water Gas No NoYes
BUILDING UTILITY METERING
Structure: Good Exterior: Good Interior: Fair Mechanical: Good Electrical: Good
Type Location N/A N/A
Comments: It is not required since there are no sleeping rooms.
CARBON MONOXIDE DETECTION
BUILDING 2 ECKSTEIN NORTON DORMITORYBUILDING 2 - ECKSTEIN-NORTON DORMITORY
Page: 6 of 101
Building: 0002 - ECKSTEIN-NORTON DORMITORY
BUILDING ENVELOPE
Foundation RoofBuilding
Concrete Loadbearing Masonry Wood
Brick Masonry Stone Masonry
Wall Roof None None
Metal Unit - Metal Frame Wood Unit - Wood Frame
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership#Floors
Residential 14,785 8,289 4 Leased 1910 Listed
REAL ESTATE
Access to Building
Ramps
Entrance
2nd Egress
Visual Alarm
Corridor/Aisle
Rooms
Stairs
Elevator
Restrooms
Drinking Fountain
Telephone
No
No
No
No
Yes
Yes
Yes
No
No
No
Yes
N/A
ACCESSIBILITY
Structural Systems1.
Exterior Walls2. Number of Deficiencies = 1
Insulation4.
Exterior Doors5. Number of Deficiencies = 1
Material Drainage Year Life
Remaining Type Area Served
Built-up Roofing Interior Roof Drains 1999 7 Flat Entire Building
3. Roof
Page: 7 of 101
Building: 0002 - ECKSTEIN-NORTON DORMITORY
Comments: Basement windows are sliding.
INTERIOR FINISH
Carpet Concrete Rubber flooring Terrazzo Vinyl Tile
CMU Drywall Glazed Masonry Wood Paneling
Metal Unit - Metal Frame
VERTICAL CIRCULATION
Concrete Stairs Granite Stairs Metal Pan w/Concrete Stairs Metal Stairs
Comments: Roof is accessed by a portable ladder in the second floor janitor's closet. There are concrete stairs in the basement.
Double Hung - Aluminum Frame; Double Glazing; Sliding - Wood Frame; Double Glazing;
Acoustical Tile Exposed Structure Gypsum Board
Number of Deficiencies = 3
Windows6. Number of Deficiencies = 1
Floors1. Asbestos: Yes
Interior Walls2.
3.
Interior Doors4. Number of Deficiencies = 4
Heat Source
Heat Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
The fan coil units provide heating for the dormitory rooms. Hot water for heating is provided by a boiler (Burnham #V909A, 1167 MBH output, built 03/2000) located in the basement boiler room and is circulated by two pumps.
Two 100% outdoor air units (Trane #MCCA003GAV0BAB, 2HP, built 11/98) provide conditioned outdoor air to the fancoils. The hot water is provided by the boiler (above).
The unit heater in the boiler room is provided hot water by the boiler (above).
Comments:
Comments:
Comments:
HVAC
Heat1.
Gas-Fired Hot Water Boiler
Gas-Fired Hot Water Boiler
Gas-Fired Hot Water Boiler
Fan Coil
Single Duct
Unit Heater
Two-Pipe
Two-Pipe
Two-Pipe
Direct Digital Control (DDC)
Direct Digital Control (DDC)
Electric
Natural
Mechanical
Natural
None
None
None
Dorm Rooms
Common Area
Equipment Room
Page: 8 of 101
Building: 0002 - ECKSTEIN-NORTON DORMITORY
Mechanical
Mechanical
Mechanical
Toilet/Shower
Laundry
Janitor's Closet
Domestic hot water is provided by a Lochinvar #CWN0645PM water heater(522 MBH output). The hot water storage tank is a Lochinvar #RJA200 (200 gallon). Both are located in the basement boiler room.
Comments:
Cast Iron None None
Electric Water Cooler Lavatory Service Sink Shower Sink Urinal Water Closet (Flush Valve) Water Closet (Tank)
Gas (Natural)
Ventilation Area Served
Copper Copper Gas-Fired None Yes
Hot Water Cold Water Water Heater Water Treatment HW Storage Tank
Grease InterceptorWaste / Vent Interior Storm
Air-cooled Chiller
Air-cooled Chiller
Fan Coil
Single Duct
Two-Pipe
Two-Pipe
Direct Digital Control (DDC)
Direct Digital Control (DDC)
Natural
Mechanical
None
None
Dorm Rooms
Common Area
PLUMBING
Exhaust Ventilation
The fan coil units provide cooling for the dormitory rooms. Chilled water for cooling is provided by an air-cooled chiller (Trane #CGAFC30EABA1, built 03/2000) located outdoors on grade and is circulated by two pumps.
Two 100% outdoor air units (Trane #MCCA003GAV0BAB, 2HP, built 11/98) provide conditioned outdoor air to the fancoils. The chilled water is provided by the chiller (above).
Comments:
Comments:
Number of Deficiencies = 1
Ventilation2.
System Type
Number of Deficiencies = 1
Air Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Water Distribution1.
Sanitary Distribution2.
Fixtures3.
Fuel Distribution4.
Page: 9 of 101
Building: 0002 - ECKSTEIN-NORTON DORMITORY
None Wet ABC Type Fire Extinguisher
Comments: The building is equipped with a wet standpipe system with one 1 1/2" hose connection on each floor. The standpipe has a water flow switch and a fire department connection.
Comments: Electrical service of 120/240 V, 1-phase to the building is provided from a 75 kVA pole-mounted transformer located east of the building's northeast corner via overhead cable and terminated in the trough from which it is distributed to a 100A MCB panelboard, 200A enclosed circuit breaker and five disconnect switches of various sizes. All distribution equipment is located in the basement mechanical/electrical room. This service is provided with pole mounted utility meter. The second electrical service of 120/208V, 3-phase to the building is provided from a pole-mounted 3x25 kVA transformer bank located east of the building's northeast corner via overhead cable to a 600A main distribution panel with a 600A main circuit breaker (MCB). The panel serves a chiller (200A), a laundry panel (200A), and a trough that serves three 200A fused disconnect switches. This service is provided with a building-mounted utility meter.
Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices
Comments: Recorded footcandle levels include natural light contribution.
High Intensity Discharge (HID)
Comments: The building-mounted exterior light fixtures are controlled by one building-mounted photocell.
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
Offices
Sleeping Rooms
Recreation
Storage Rooms
Toilets
Shower
Shaving, Make-Up, Grooming
Lounges
Laundry Room
Corridors & Stairs
Equipment Rooms (Elec/Mech)
Area Recommended Level
Recorded Level Light Type
Battery Backup Battery Backup
Main Distribution Panel 120/240V, 1-Phase, 3 Wire Panelboard Receptacles, GFCI, Switches
Sprinkler System Stand Pipe System Fire Suppression
Emergency Exit
Number of Deficiencies = 2FIRE PROTECTION
ELECTRICAL SERVICES Number of Deficiencies = 3
Exterior Lighting1. Number of Deficiencies = 1
Interior Lighting2. Number of Deficiencies = 2
Emergency /Exit Lighting3. Number of Deficiencies = 1
Page: 10 of 101
Building: 0002 - ECKSTEIN-NORTON DORMITORY
FIRE ALARM
Comments: The addressable fire alarm control/annunciator panel is a Siemens FS-250 located at the first floor. The system is connected via an RF transceiver (Monaco BT2-7) to a computer based central annunciator panel located in the lobby (duty station) of Welcome Station Building 22.
Comments: The building is connected to the LAN. Magnetic door alarm contacts are installed on the corridor exit end doors. The alarm is local and doors are monitored by the RA personnel.
Audible Alarm Control/Annunciator Panel Duct Smoke Detector Flow Switch Heat Detector Manual Pull Station Smoke Detector Visual Alarm
Connected to Main System Magnetic Door/Alarm None Local Cable Company
Telephone Security Public Address Television
GENERAL BUILDING CONDITION
Rating
Comments:
X Good Fair Poor
The rooftop outdoor air unit is inoperable. The shower room exhausts are inoperable. Only one of the two HVAC circulating pumps is operable. Exterior walls need to be repaired and repointed.
COMMUNICATION
The facility condition is not impacting the functional use of the facility.
The facility condition IS impacting the functional use of the facility.
The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.
Electric Water Gas No NoYes
BUILDING UTILITY METERING
Structure: Good Exterior: Fair Interior: Good Mechanical: Fair Electrical: Good
This building has been recommended for renovation in the Long Range Development Plan.
RENOVATION RECOMMENDATION
Type Location N/A N/A
Comments: There is no plausible means by which harmful levels of CO could enter sleeping rooms. A carbon monoxide detector is provided in the mechanical room.
BUILDING 3 BELKNAP HALL (WAREHOUSE/ VACANT)BUILDING 3 - BELKNAP HALL (WAREHOUSE/ VACANT)
Page: 11 of 101
Building: 0003 - BELKNAP HALL (WAREHOUSE/ VACANT)
BUILDING ENVELOPE
Foundation RoofBuilding
Concrete Loadbearing Masonry Concrete
Brick Masonry Stone Masonry
Wall Roof None Rigid
Metal Units - Metal Frame
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership#Floors
Storage 16,470 9,629 3 Leased 1910 Listed
Comments: One audio/visual device is provided in the warehouse area. Audio/visual devices throughout vacant areas of the building are disconnected from the fire alarm panel.
REAL ESTATE
Access to Building
Ramps
Entrance
2nd Egress
Visual Alarm
Corridor/Aisle
Rooms
Stairs
Elevator
Restrooms
Drinking Fountain
Telephone
No
No
Yes
No
N/A
Yes
Yes
No
N/A
No
N/A
N/A
ACCESSIBILITY
Structural Systems1.
Exterior Walls2. Number of Deficiencies = 1
Insulation4.
Exterior Doors5.
Material
Asbestos: Yes
The remaining life of roof is estimated based on visual inspection during the April 2012 Facility Survey.
Drainage Year Life
Remaining Type Area Served
Built-up Roofing Surface Run-off 1960 4 Flat Entire Building
Comments:
3. Roof
Page: 12 of 101
Building: 0003 - BELKNAP HALL (WAREHOUSE/ VACANT)
INTERIOR FINISH
Ceramic Tile Concrete Vinyl Tile
CMU Ceramic Tile
Metal Units - Metal Frame Wood Unit - Metal Frame
Natural Entire Building
Ventilation Area Served
VERTICAL CIRCULATION
Metal Stairs
Comments: The building has 3 interior and 1 exterior staircases.
Double Hung - Aluminum Frame; Double Glazing;
Exposed Structure Plaster
Exhaust Ventilation
Windows6.
Floors1. Asbestos: Yes
Interior Walls2.
3.
Interior Doors4.
Heat Source
Heat Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
A small portion of the building is used as a warehouse; the rest is vacant. Most of the building has metal-clad fire doors. These doors were welded shut, so access to most of the building was not possible.
Comments:
HVAC
Heat1.
Packaged Heat Pump (Air
Source)
Window Unit None Electric Natural None Offices
Page: 13 of 101
Building: 0003 - BELKNAP HALL (WAREHOUSE/ VACANT)
Cast Iron None None
Lavatory Sink Water Closet (Flush Valve)
Gas (Natural)
None None ABC Type Fire Extinguisher
Comments: Two lateral, 120/240V, 1-phase overhead services are provided from a 75 kVA pole-mounted transformer to two disconnect switches, one fused at 400A and the other fused at 800A, both located in the basement electrical room. The 800A switch through the trough feeds five 200A disconnect switches; three of which are still operational and provide for the panels in the warehouse, first floor and basement areas. Most panels throughout the vacant areas are still connected to the power. Both services are provided with utility meters.
Copper Copper None None No
Hot Water Cold Water Water Heater Water Treatment HW Storage Tank
Grease InterceptorWaste / Vent Interior Storm
Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices
Packaged Heat Pump (Air
Source)
Window Unit None Electric Natural None Offices
High Intensity Discharge (HID) Incandescent
Comments: The building-mounted exterior HID light fixtures are controlled by individual photocells, and the incandescent light fixtures are controlled by toggle switch.
Main Disconnect Switch 120/240V, 1-Phase, 3 Wire Panelboard Receptacles, Switches
Sprinkler System Stand Pipe System Fire Suppression
PLUMBING
System Type
Air Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Water Distribution1.
Sanitary Distribution2.
Fixtures3.
Fuel Distribution4.
Number of Deficiencies = 1FIRE PROTECTION
ELECTRICAL SERVICES Number of Deficiencies = 1
Exterior Lighting1.
Page: 14 of 101
Building: 0003 - BELKNAP HALL (WAREHOUSE/ VACANT)
FIRE ALARM
Comments: The fire alarm control/annunciator panel is a Simplex 4001 located at the first floor. The system is conventional and is connected via an RF transceiver (Monaco BT2-7) to a computer based central annunciator located in the lobby (duty station) of Welcome Station Building 22. Most fire alarm devices in the vacant areas are bypassed. Only fire alarm devices on the first floor are still connected to the fire alarm panel.
Comments: Hallway motion detectors are not connected to the front lobby alarm.
Audible Alarm Control/Annunciator Panel Heat Detector Manual Pull Station Smoke Detector Visual Alarm
Connected to Main System None None TV with VCR
Telephone Security Public Address Television
Comments: Recorded footcandle levels include natural light contribution. Both T8 and T12-fluorescent light fixtures are utilized at the first floor. Most light fixtures at the basement level and second floor are not operational.
Comments: Exit signs and emergency light fixtures are operational only in the warehouse area.
T12 - Fluorescent
T8 - Fluorescent
T12 - Fluorescent
T12 and T8 - Fluorescent
T12 - Fluorescent
Incandescent
Storage/Warehouse-Active
Offices
Storage Rooms
Corridors & Stairs
Vacant
Equipment Rooms (Elec/Mech)
N/A
Area Recommended Level
Recorded Level Light Type
Battery Backup Battery Backup
Emergency Exit
Interior Lighting2. Number of Deficiencies = 1
Emergency /Exit Lighting3. Number of Deficiencies = 2
COMMUNICATION
Electric Water Gas No NoYes
BUILDING UTILITY METERING
Type Location N/A N/A
Page: 15 of 101
Building: 0003 - BELKNAP HALL (WAREHOUSE/ VACANT)
GENERAL BUILDING CONDITION
Rating
Comments:
X Good Fair Poor
At the time of the 2012 Facility Survey the first floor north wing was used as a warehouse and the rest of the building was vacant. The exterior brick wall, the windows and exterior doors are deteriorated.
The vacant areas are inhabited by rodents and other pests and the interior finishes have deteriorated.
The mechanical systems are "conditionally fair" in that they function for the present warehouse occupancy of the building, with steady occupancy by only two or three persons. The mechanical systems would be rated poor for any occupancy other than warehouse. The main electrical equipment and secondary panels throughout the building are antiquated. Most of the lighting throughout the vacant areas is non-operational. Lighting in the warehouse area is antiquated.
The facility condition is not impacting the functional use of the facility.
The facility condition IS impacting the functional use of the facility.
The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.
Structure: Good Exterior: Fair Interior: Poor Mechanical: Fair Electrical: Fair
BUILDING 4 TYDING HALL COUNSELINGBUILDING 4 - TYDING HALL COUNSELING
Page: 16 of 101
Building: 0004 - TYDING HALL COUNSELING
BUILDING ENVELOPE
Foundation RoofBuilding
Concrete Loadbearing Masonry Wood
Brick Masonry
Wall Roof None Rigid
Metal Unit - Metal Frame
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership#Floors
Business 5,000 3,221 1 Leased…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .