Offeror Questions 20 Mar 2012.docx
DOCX document 89 KB Posted
- Attached to
- Web and Mobile Application Development
- Solicitation number
- DOL121RP21395
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Semi-Agile Procedure Document.doc | DOC document | |
| SDLCM-v2-2 Manual.pdf | ||
| Question 272 Update 26 Mar 2012.doc | DOC document | |
| Section B Updated 23 Mar 2012.doc | DOC document | |
| Section B Updated 21 Mar 2012.doc | DOC document | |
| Updated Vendor Q and A 21 Mar 2012.doc | DOC document | |
| Section B Final 15 Mar 2012.doc | DOC document | |
| 15 Feb 2012 Updated SOW page 25.doc | DOC document | |
| SOW 21 Jan 2011 Final.docx | DOCX document | |
| OPA WEB SERVICES RFP 14 Feb 2012.rtf | RTF text file | |
| Key Personnel and Supporting Document.doc | DOC document | |
| Past Performance Questionnaire.doc | DOC document | |
| Attachment D Contract Administration Data.doc | DOC document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. DOL121RP21395 Web and Mobile Application Development Offeror Questions: 12 Mar 2012 Government Responses: 20 Mar 2012
1. Page E-4, Section E, Volume II Past Performance: The RFP states: “The Government will evaluate past performance of three (3) current or previous contracts for relevancy (within 3 years) based on how well the contractor performed on projects of similar dollar value, scope, and complexity.”
Page E-4, Section E, Volume II Past Performance: The RFP states: “Subcontractors performing 20% or more of direct labor must submit past performance of at least three (3) contracts for current relevance (3 years), based upon how well the contractor performed on projects of similar dollar value, scope, and complexity of work in the SOW.”
Question: Based upon the two RFP extractions above, is the Offeror to provide a total of (3) contract references which are inclusive of a minimum of one (1) of the three (3) being from a subcontractor that is proposed to perform 20% of the work?
Response: Each subcontractor performing 20% or more of direct labor must submit past performance of at least three (3) contracts.
Question: Additionally, based upon the above, if the Offeror is required to submit three (3) contract references in addition to three (3) contract references from the Subcontractor proposed to do 20% or more of the work, it would be difficult to provide the required information requested in the RFP for each reference and remain within the 8 page limit. Please allow additional pages for Past Performance volume if the latter is correct (i.e., three (3) from Offeror and three (3) from 20% Subcontractor, which totals six (6) contract references).
Response: The page limit has been increased to 16 pages.
2. Page E-12, Section E, Volume II Past Performance: The RFP states: “The Government will evaluate past performance of 3 current or previous contracts for relevancy (within 3 years) based on how well the contractor performed on projects of similar dollar value, scope, and complexity.”
Question: Is the Offeror to submit only three (3) past performance questionnaires in total? If the Offeror provides more than three (3) contract references in their proposal should the Offeror send out PPQs for each?
Response: Each subcontractor performing 20% or more of direct labor must submit past performance of at least three (3) contracts.
3. The SOW reads “the successful awardee will support DOL.gov, LaborNet and ‘several agencies hosted on DOL.gov’”.
Question: Are the agencies listed on the main page the complete list of the several agencies supported? If not, will DOL provide a list of what the other agencies are so that we can get a better understanding of the magnitude of support needed?
Response: All of the agencies listed at http://www.dol.gov/dol/organization.htm are hosted on DOL.gov EXCEPT: Occupational Safety and Health Administration (OSHA), Bureau of Labor Statistics (BLS), Employment and Training Administration (ETA), Mine Safety and Health Administration (MSHA), Office of Administrative Law Judges (OALJ), Office of Inspector General (OIG), and Pension Benefit Guaranty Corporation (PBGC).
4. Question: In the “Manage Service Desk” task can you tell us what is the average Daily or Yearly number of service desk tickets? Or What is the expected volume of tickets?
Response:
The internal OPA Help Desk handled 1,355 requests in FY 2011 covering a range of tasks. Examples for each task category are included, but are not the only types of tasks completed within those categories.
| API Support (add new data, answer public questions) |
| 34 |
| Content Updates (change content within a production application, update search engine entries) |
| 12 |
| ECN Issues (surplus equipment, assist with routine computer questions) |
| 8 |
| Hardware (setup printer, setup workstation, add memory, resolve issues) |
| 149 |
| Miscellaneous (add DNS entry, purchase quote request) |
| 27 |
| Production Applications (error encountered, add capability, resolve issues) |
| 134 |
| Security (conduct application scan, check patch status, install certificates) |
| 18 |
| Software (install software, update software, resolve software issues) |
| 138 |
| User Account (create new account, reset password, close account) |
| 153 |
| WCMS Development (tasks specifically for the Web Content Management System) |
| 33 |
| Uncategorized (includes items from all other categories that weren’t tagged) |
| 649 |
| Total |
| 1,355 |
5. Question: What is the monthly average number of viewers?
Response: In Fiscal Year 2011, LaborNet had 2,206,163 Visits with 5,775,354 Page Views (monthly averages of 183,847 and 481,280, respectively). DOL.gov, during the same period, had 26,046,742 Visits and 117,498,634 Page Views (monthly averages of 2,170,562 and 9,791,553, respectively).
6. The SOW states “OPA DEC supplies desktop support, including hardware purchasing, installation, and inventory, for all OPA staff.”
Question: Is the purchasing of hardware and maintaining inventory ODC items? or does OPA have a purchasing vehicle that is used?
Response: All equipment referenced in this requirement is government furnished.
7. The PPI states “Subcontractors performing 20% or more of direct labor must submit past performance of a least three (3) contracts for current relevancy (3 years), based upon how well the contractor performed on projects of similar dollar value, scope, and complexity of work in the SOW.”
Question: Does the submission of the Past Performance for subs count against the 8 page count limit as stated in the page count table?
Response: The page count limit was amended via amendment one (1) which allows for a page count increase to “16” pages versus the original “8” pages.
8. Under SOW 3.2.8 Cloud Hosting Support, it states that we will be managing cloud service level management processes and managing cloud hosting solutions.
Question: Is there an existing cloud hosting location that contractor will be managing or is the contractor expected to host it?
Response: There is no existing cloud solution. The Offeror is not expected to host a cloud solution. If the Government implements a cloud solution for hosting websites, the Offeror is expected to assist in managing that implementation.
9. The sow states “Work Stoppages Due to Government Shutdown or Other Unavailability During situations where only exempt Government employees are permitted to work, no Contractor services will be authorized.”
Question: Will the DOL consider, were plausible, allowing work to take place in alternate work locations (i.e. Contractor site or telework scenarios) during these unexpected Government shutdowns?
Response: When the government is shut down, only Government Mission-Essential personnel will be allowed to work, be it onsite or remotely.
10. On RFP page E-5, the RFP states, “The offeror shall complete Section B, Schedule of Supplies/Services of the Standard Form (SF) 1449, Solicitation, Contract, Order for Commercial Items, with pricing for each contract line item number for the base and the option periods. The offeror’s price proposal should include a breakout of the proposed labor categories and the rates for each category (to include overtime rates), Firm Fixed Pricing, estimated travel etc.. However, the Section B only has a single line for the Grand Total price. Similarly page E-13 talks about the “total of all CLIN prices” but nowhere is there a list of required CLINs. Please clarify the intent of the government including formats, templates and/or any limitations or guidelines regarding pricing.
Response: A revised Schedule B model will be uploaded to FBO.gov.
11. The Technical Evaluation factors on page E-11 do not map to the Volume 1 (Technical Approach) items A-F list on page E-3. Could the government please clarify what information/requirements the Tech Volume is required to contain and how same will be evaluated?
Response: The submissions will be evaluated in accordance with the Technical Evaluation Factors on Page E-11.
12. The instructions for Volume II, Past Performance indicates the Government will evaluate 3 citations from the offeror (Page E-4). But the following paragraph states any subcontractor performing >=20% of the direct labor must provide 3 past performances. In this scenario, does the government want 3 from the prime contractor and 3 from each major sub or 3 in total? Please also clarify what the total page count for this volume is, if different than the previously stated 8-page limit.
Response: Page count has been increased to 16 pages.
13. In the RFP page E-6, it states that answers to questions are due back to the offerors Mar. 20 by COB and the RFP submission is to be received by DOL no later than Mar. 27 by noon. It also states that it is prudent to mail the proposal to be received 1 or 2 business days prior to the due date to account for possible processing lags and procedures. This means that offerors would likely want to mail the RFP on Mar. 22 or 23. Since this is only 2 to 3 full business days after the receipt of answers to questions, would the government please consider shifting the Q&A process forward (earlier) by a week to 10 days (meant to include Question submission deadline and Answer response deadline)?
Response: There are currently no additional extensions for this solicitation.
14. Question: Similar to the Question above, Past Performance questionnaires are due before the answers are due back from the Government. Would the government please consider pushing back (later) the submission of past performance questionnaires to be commensurate with submission of the RFP itself?
Response: Past Performance Questionnaires have been extended to 20 Mar 2012 via previous amendment.
15. Question: Is there an incumbent currently performing the SOW covered under this solicitation?
Response: There is an incumbent performing duties similar to these, but not under this identical Statement of Work (SOW).
16. Question: Could you please let us know who the incumbent is, the contract number, and value of the current contract?
Response: Cascades Technology. Please submit FOIA request, in accordance to FOIA guidelines that can be found on the DOL website.
17. Is the incumbent an eligible offer for this solicitation DOL121RP21395?
Response: No.
18. Page B-1, paragraph B.1; Pages E-5 through E-6, Volume III Price; Atch B
What should offerors price? Pages E-5 through E-6 of the RFP state, “The offeror shall complete Section B, Schedule of Supplies/Services of the Standard Form (SF) 1449, Solicitation, Contract, Order for Commercial Items, with pricing for each contract line item number for the base and the option periods. The offeror’s price proposal should include a breakout of the proposed labor categories and the rates for each category (to include overtime rates), Firm Fixed Pricing, estimated travel etc.” However, there is only one CLIN in Section B that appears to ask for one price for five years. RFP Atch B provides labor category descriptions and estimated annual labor hours; however directions in this attachment state, “The contractor is responsible for proposing the appropriate hours and labor mix to perform the requirements of this SOW. This data is provided for informational purposes only.” Given all of the above, what should offerors price?
Response: A revised Schedule B model will be uploaded to FBO.gov. Please NOTE: Overtime will not be authorized.
19. Page E-13, Volume III – Price; Atch B
How will Price be evaluated? Page E-13 states, “The Government will evaluate offers for award purposes by adding the total of all CLIN prices, including all options to ensure that pricing is not unbalanced. Price will be evaluated for completeness and reasonableness using the techniques in FAR 15.404-1(b).” However there is only one CLIN in Section B. Ach B gives a list of labor categories and qualifications, but also indicates that offerors should propose the hours and labor mix. Further, in our experience when the Government anticipates awarding an IDIQ contract, the Government generally provides a pricing model for evaluation due to the fact that there is no way for offerors to anticipate what the Government will order. Does the Government intend to provide a list of CLINs and labor categories to be evaluated?
20. Response: Response: A revised Schedule B model will be uploaded to FBO.gov. Please NOTE: Overtime will not be authorized.
21. Pages E-5 through E-6, Volume III -- Price
What overtime should be priced and how will the overtime be evaluated? The RFP states, “The offeror’s price proposal should include a breakout of the proposed labor categories and the rates for each category (to include overtime rates),…” Is it the Government’s intent that the offeror propose all labor categories it deems necessary as well as an overtime rate for each labor category? How will the overtime rates be evaluated?
22. Response: A revised Schedule B model will be uploaded to FBO.gov. Please NOTE: Overtime will not be authorized.
23. Page E-8, paragraph E.2
Please clarify the contract type. The RFP states, “The Government contemplates award of a Hybrid Firm Fixed Price, Labor-Hour, Indefinite Delivery/Indefinite Quantity (IDIQ) contract resulting from this solicitation.” Does the Government intend to award an IDIQ contract and award labor-hour orders against the IDIQ using the offeror’s firm-fixed-price labor rates?
Response: Yes.
24. Atch C, SOW, Pages 15-16, paragraph 14; Atch C, SOW, Page 16, paragraph 15
What ODCs does the Government anticipate and how should offerors price them? The SOW states, “For other direct costs such as equipment, travel, per diem, subcontractor labor, etc., invoices shall reflect the contractor's actual expense for the item, plus General and Administrative costs (G&A).” However, the SOW further states that no travel is anticipated.
Response: The Government anticipates no ODCs at the start of the contract and limited ODCs throughout the life of the contract.
25. Page E-13, Volume III – Price
How will ODCs be evaluated in regard to Volume III – Price?
Response: The Government does not currently anticipate any ODCs at the start of the contract. However, since there is the potential for limited ODCs throughout the life of the contract, a subsequent CLIN will be added, with an associated Not to Exceed (NTE) contract line item.
26. Sections C and E
Will this be considered a commercial contract? Section C includes commercial clauses. However, Section E also includes clauses that are generally not included in commercial RFPs/contracts.
Response: Commercial solicitation used in conjunction with FAR part 15.
27. Section B, Page B-1, paragraph B.2
What is the proposed start date? Paragraph B.2 shows the date of delivery as 23 May 2012. Does this mean that the Government expects performance to begin on this date? Is the period of performance the award date through five years from the award date?
Response: The Government expects transition to the new contract to begin on or around 23 May 2012. The Period of Performance is 23 May 2012 + 5 years.
28. Atch C, SOW, Page 18, paragraph 29
Is there a planned transition time period for this requirement? The SOW states, “The offeror shall submit a plan which includes Transition-In Plan which contains a reasonable, realistic approach for assuming full contractual responsibility without disruption or degradation of performance during the start-up period. The plan shall identify risk, propose appropriate mitigation strategies, proposes a realistic, achievable and affordable start-up schedule and staffing plan. The plan shall ensure sufficient resources are on hand and available to begin work under this requirement. It shall include a statement that the personnel proposed are available, trained, and qualified to perform the work under this effort.”
Response: The Government expects transition to the new contract to begin on or around 23 May 2012, which will be the official contract start date. The Period of Performance is 23 May 2012 + 5 years (will include the 30-day transition period).
29. Atch C, SOW, Page 18, paragraph 29
Will transition costs be reimbursed via a task order?
Response: The transition plan will be incorporated into the initial Task Order.
30. Atch C, SOW, Page 18, paragraph 29; Page E-13, Volume III – Price
How will the price of the transition be evaluated?
Response: Since the transition will be incorporated into the new Task Order, it will not be considered a separate Task Order.
31. Atch C, SOW, Page 12, paragraph 5
The SOW states, “All work under this contract will be performed at the Government worksite unless specifically authorized by mutual agreement of the CO, COTR and the Contractor.” In order to provide efficiencies in contract performance, can an offeror submit a proposal that includes methodologies allowing their company to do work from a non-government location?
Response: All regular work assignments shall take place at the Government worksite.
32. What kinds of technologies and development tools are being used to develop and support the mobile and web applications?
Response:
.Net – C# - Visual Studio iOS – Objective C – Xcode Android – Java/Dalvic – Eclipse PHP (as necessary) – Dreamweaver Windows Phone 7 (as necessary) – C# - Visual Studio Blackberry (as necessary) – Java – Eclipse
33. On page E-4 of the OPA_WEB_SERVICES_RFP_14_FEB_2012 document, it says that “Subcontractors performing 20% or more of direct labor must submit past performance of a least three (3) contracts for current relevancy (3 years), based upon how well the contractor performed on projects of similar dollar value, scope, and complexity of work in the SOW”. Can the subcontractor provide a Past Performance even if they are performing less than 20% of the work and will DOL consider that as 1 of the 3 submissions.
Response: Each subcontractor performing 20% or more of direct labor must submit past performance of at least three (3) contracts. Subcontractors should refrain from submitting Past Performance for less than 20% of the work, unless requested by the government at a later date.
34. We respectfully request clarification on Section L and Section M for Technical volume. Looking at the SOW requirements (3.1 and 3.2 sections from SOW) and looking at page E-3 & E-11 of _WEB_SERVICES_RFP_14_FEB_2012 document, we think that Section L and M are not matching to each other and not correlating the Requirements defined in Section 3.1 and 3.2 of SOW document. If you can clarify what the expectations for Technical approach (whether to write to SOW or to write to Section M or to Section L) that will be greatly appreciated.
Response: Write to Section E-9, page E-11 of the solicitation.
35. Volume II – Past Performance: NTE 8 pages, however, RFP mentions Prime can submit three past performances and subcontractors who perform 20% must submit at least 3 past performances. Will you increase the page count to meet this requirement? Is it a must that subcontractors submit 3 PP if they perform 20% or more of directed labor?
Response: The page count has been increased to 16 pages.
36. For section 4: Are past performance questionnaires due NLT 8 March at 1200PM EST? Questions are all due on 9 March?
Response: Past Performance Questionnaires are due 20 Mar 2012.
37. RFP, Page E-3: “(i) VOLUME I –TECHNICAL APPROACH” The content requested in items A-F do not provide instructions for addressing factors identified in RFP Page E-11 and E-12 “VOLUME I: TECHNICAL”. Where should we describe our approach to meeting Factors 1-11?
Response: The Technical Approach should be presented according to the factors listed on page E-11.
38. RFP, Page E-3: “Volume II – Past Performance.. NTE 8 pages…” Does this page limitation apply to the three (3) additional past performance references for subcontractors that will perform 20% or more of the contract? If so, will the government consider a 14 page limit for proposals with 6 past performance submissions (i.e. 3 for prime and 3 for subcontractor)?
Response: Each group of past performance documentation should be no longer than eight (8) pages. Therefore, the total amount of past performance documentation could exceed eight (8) pages, depending on how many subcontractors there are.
39. RFP, Page E-5: (4) Section 4 Past Performance Questionnaire states the questionnaire is “due no later than 08 Mar 2012”, which is before the proposal due date (27 Mar 2012) and responses to questions date (20 Mar 2012). Would the government consider changing the Past Performance Questionnaire Due date to match the proposal Due date or at least after the responses to questions date?
Response: Past Performance Questionnaires are due 20 Mar 2012.
40. RFP, Page E-5: VOLUME III – PRICE “The offeror shall complete Section B, Schedule of Supplies/Services…” However Section B does not have any CLINs listed. Will the government update the RFP to include a CLIN for each Labor Category from Attachment B, estimated workload data?
Response: A revised Section B will be uploaded to the FBO.gov website.
41. RFP Attachment B, Program Manager and Team Leads are designated as Key Personnel. Please confirm that the government requires resumes only for these two personnel.
Response: Resumes are required for the Program Manager and for any proposed Team Leads. The number of Team Leads designated is up to you, according to your staffing proposal. Also, note that the government would like to review all resumes prior to hiring.
42. RFP Attachment B, since the anticipated award is an IDIQ contract, the workload will be determined on Task Orders. Therefore, for pricing purposes of the IDIQ, should we assume the estimated quantities provided in Attachment B?
Response: Yes.
43. Attachment B – 2 Senior Systems Developer has a requirement of “PMP certified with a minimum of two years served as project manager”. This requirement is for managers (i.e. Project Manger/Business Analyst Labor category), not for developers. Is this a typo?
Response: Senior Systems Developer also has a requirement for “PMP certification with a minimum of two years served as project manager”
44. Question: Will the Government amend this page count requirement to specify a page limit per past performance or grant an overall extension of the page count limit for this section?
Response: The total number of pages for Past Performance has been increased to 16 pages.
45. Question: For past performance reference, what is the difference between “procuring” and “administrative” contracting officers (see (b) and (d) below)? For example, our contract is funded by DoD but the contract is issued by DoI. Who should be the “procuring” CO and who should be the “administrative” CO?
Response: For this requirement, the PCO and ACO are one in the same:
Contracting Officer: Tova L. Stein Email: Stein.Tova@dol.gov
(b) Government contracting activity, and current address, Procuring Contracting Officer's name, e-mail address, telephone and fax numbers.
(d) Government contract administration activity and the Administrative Contracting Officer's name, and current e-mail address, telephone and fax numbers.In the Delivery instructions DOL stated:
NOTE: If the offeror intends to use express mail service, it is recommended to have delivery scheduled for one to two days BEFORE the RFP due date.
U. S. POSTAL SERVICE CHANNELS: Offers submitted through US Postal Service shall be mailed to the following address:
OASAM/BOC/OPS
ATTN: Antoinette H. Ingram 200 Constitution Ave, NW Room S-4307 Washington, DC 20210 NOTE: Because of tightened security measures. Packages arriving through postal service are screened and are opened prior to receipt at OPS. These actions and other uncertain delays are probable and outside the control of OPS. Any package received by OPS through postal channels after the due date will be returned to the offeror in the same condition in which it was received. The contents will not be evaluated and therefore, be ineligible for award. HANDCARRIED PROPOSALS WILL NOT BE ACCEPTED.
46. Question: Because of security concerns….Will the DOL consider a package delivered 2 days prior to due date acceptable? If not, what will DOL commit to?
Response: Yes
47. Lines/page: The Government specified 45 lines per page. However, with the Times New Roman 12, single spaced, one empty space between paragraphs requirements, there are 47 lines per page. Question: Will the Government reword its requirement to allow 47 lines per page?
Response: Yes. The requirement is relaxed to state that the proposals include 45-47 lines per page.
48. Cloud Computing: in Paragraph 3.2.8, the government requests Cloud Hosting Support:
In the area of cloud hosting support, the Contractor shall manage the following activities:
a. Managing cloud hosting solutions;
b. Managing cloud computing security and reliability;
c. Implementing a cloud service delivery model that will be developed and designed from another program within DOL; and
d. Managing cloud service level management processes.
Question: Should the contractor be expected to host the Cloud Solution on a government-designated and controlled site, or should the contractor use/locate a site for the government?
Response: There is no existing cloud solution. The Offeror is not expected to host a cloud solution. If the Government implements a cloud solution for hosting websites, the Offeror is expected to assist in managing that implementation.
49. Are resumes required just for the Program Manager and the Team Leads, or are resumes required for the program manager, project manager, and senior and junior staff?
Response: Resumes are required for the Program Manager and for any proposed Team Leads. The number of Team Leads designated is up to you, according to your staffing proposal.
50. Is there a requirement to provide Team Leads? Attachment B denotes the Program Manager and Team Leads as key personnel. However, Attachment B also goes on to state, “The contractor is responsible for proposing the appropriate hours and labor mix to perform the requirements of this SOW.” Does this mean that offerors have the leeway to provide no Team Leads, if so desired?
Response: The number of Team Leads designated is up to you, according to your staffing proposal.
51. Should the reference to Attachment 1 be Attachment B?
Response: Yes.
52. How many applications need ATO – Authority to Operate?
Response: Currently, there are 33 applications contained within the DOL.gov and LaborNet inventory. The number of applications supported by OPA DEC is expected to increase.
53. When was the last ATO performed and when is the next ATO due?
Response: OPA DEC received an ATO on September 27, 2011 that is valid for three years. The next ATO must be completed by September 27, 2014.
54. Are the any open or outstanding Plan of Actions and Milestones (POA&M) and how many are there?
Response: Yes, there are currently five(5) open POA&Ms. The number of POA&Ms may change and is dependent on the outcomes of continuous monitoring activities and ongoing security control assessments.
55. What is the required System Security Rating: FISMA Low, Moderate or High?
Response: The system’s FIPS 199 security categorization is Moderate.
56. What is the number of servers and their respective role and specs? For example (2 web servers, 2 app, 1 database server)
Response: We operate 24 servers in our development environment:
1 file server 10 web servers 4 database servers 9 infrastructure servers (AD, backup, remote access, etc.)
57. Per server, what is the number of processors, RAM and disks configuration OS and DB?
Response: Windows 2003, migrating to Windows 2008. Most are virtual machines running on VMWare, 4 GB RAM, HD in RAID 5
58. Storage - is it on server or separate storage device and how much storage is needed?
Response: All but the file server currently store their data on a SAN
59. Bandwidth - What is the sustained rate per Mbps per month?
Response: We currently lack metrics that could answer this question.
60. Back-ups- Willl daily incremental and weekly fulls work?
Response: Daily incremental and weekly full backups are our standard.
61. Is there a COOP requirement? If so, what is the recovery time objective and recovery point objective
Response: There is no COOP requirement as the OPA servers are not mission essential.
62. Network - HA or non-HA?
Response: Non-HA
63. Is there an Anti-virus requirement?
Response: Yes, but the Government supplies the software.
64. Who will provide the hardware- Governemnt or contractor?
Response: All equipment referenced in this requirement is government furnished.
65. If government is providing the HW…will they provide the software (OS and DB)?
Response: Yes.
66. What is the current operating system and database software?
Response: Windows 2003, migrating to Windows 2008 and Ubuntu LTE. SQL Server 2005, migrating to SQL Server 2008 by end of the fiscal year and MySQL.
67. Are offerors required to redact past performance agency, department and office names to be compliant with the technical volume redaction requirements?
Response: No. The Past Performance information will not be revealed to the Technical Evaluation team until the technical evaluations are completed.
68. Page E-4 of the solicitation instructs offerors to describe their "Ability to implement Secretary’s Order 2-2005." It is our understanding that only the Government can implement the Secretary's order. Is this requirement intended to state "Ability to support the Government in implementing Secretary’s Order 2-2005"?
Response: Yes.
69. Attachment B Estimated Workload Data indicates that the Program Manager and Team Leads are the only key personnel positions. However, page E-4 of the solicitation states that key staff "includes the program manager, project manager, senior and junior staff." Please clarify which positions are key.
Response: Resumes are required for the Program Manager and for any proposed Team Leads. The number of Team Leads designated is up to you, according to your staffing proposal.
70. The pricing volume instructions appear to conflict with Section B of the solicitation. Please clarify exactly what is required from offerors for the pricing volume. As firm fixed price is required, why does the Government require offerors to submit overtime rates?
Response: A revised Schedule B pricing model will be added to the solicitation. Note: Overtime will not be authorized.
71. When completing the pricing proposal, how much should offerors allocate for travel?
Response: Travel will not be authorized under this contract.
72. Please clarify how the Government would like the price broken out. What format is required? Is a fixed price per month required? Per labor category? Per contract year?
Response: A revised Schedule B pricing model will be added to the solicitation. Note: Overtime will not be authorized.
73. Page 4 of the SOW states, "DEC has an overarching policy role within the Department, developing policies that affect all DOL websites. DEC has direct responsibility for the content and applications hosted on DOL.gov and performs content management operations for several smaller agencies hosted on DOL.gov. DEC is responsible for building Web and mobile applications to support OPA requirements and also builds Web and mobile applications for agencies on a reimbursable basis." Please provide the number of Web sites, the number of Web applications and the number of mobile applications built by the incumbent contractor and DEC during FY2010, FY2011, FY2012 and anticipated for FY2013. Also, please provide the number of Web sites, the number of Web applications, the number of mobile applications and the number of smaller agencies hosted on DOL.gov that were supported by the incumbent contractor and DEC during FY2010, FY2011, FY2012 and anticipated for FY2013.
Response: Currently, there are 33 applications contained within the DOL.gov and LaborNet inventory. The number of applications supported by OPA DEC is expected to increase. All of the agencies listed at http://www.dol.gov/dol/organization.htm are hosted on DOL.gov EXCEPT: Occupational Safety and Health Administration (OSHA), Bureau of Labor Statistics (BLS), Employment and Training Administration (ETA), Mine Safety and Health Administration (MSHA), Office of Administrative Law Judges (OALJ), Office of Inspector General (OIG), and Pension Benefit Guaranty Corporation (PBGC).
74. Please provide the number of personnel provided by the incumbent contractor by labor category (as indicated in Attachment B Estimated Workload Data) for FY 2008, FY2009, FY2010, FY2011 and FY2012.
Response: Please submit a formal FOIA request for this request.
75. Please identify the positions that require resumes in the proposal.
Response: Resumes are required for the Program Manager and for any proposed Team Leads. The number of Team Leads designated is up to you, according to your staffing proposal.
76. Page E-4 of the solicitation states, "F. Qualifications, capabilities and experience of the key staff, which includes the program manager, project manager, senior and junior staff. (See attachment No. 1)" There is no "Attachment No. 1" in the solicitation. Please define the attachment that offerors are expected to refer to regarding this instruction.
Response: Attachment B.
77. Page 5, the 2nd paragraph states that “All staff with project management responsibilities shall be Project Management Professional (PMP) certified or near certification” and “Information Technology Infrastructure Library (ITIL) certification for staff is desirable”. Yet, in the “Key_Personnel_and_Supporting_Document.doc”: It states that the Program Manager “be a certified PMP and ITIL”.
Q (a): Could the government clarify the certification requirements for the Program Manager?
Response: The Program Manager will be PMP and ITIL certified with a minimum of five (5) years served as project manager on a project with at least 10 or more members.
(b): Are Project Managers/Business Analysts considered “staff with project management responsibilities” and therefore required to have PMP certification?
Response: Yes.
78. Page 6, Onsite services will include project management, web content management, quality assurance, desktop support to OPA personnel.”
Q: Is desktop support limited to OPA staff located at DOL headquarters?
Response: No. Although the Division does buy hardware for regional staff, much of their desktop support is performed locally.
79. Page 7, “Assist in developing and monitoring Memoranda of Understanding (MOU) and Service Level Agreements (SLA).”
Q: How many MOUs and SLAs are currently in place?
Response: Currently, OPA DEC has implemented one MOU/ISA with OASAM ITC and one SLA for Agency Application Owners.
80. Page 7, under “Applying configuration, change and release management practices.”
Q (a): In addition to applying this practice, does the government currently utilize software to facilitate this practice?
Q (b): If so, what is the name and version of the software?
Response: (a) & (b) OPA DEC uses OTRS 3.0.11 for change and release management.
81. Page 8, under “Manage Multi-platform Database Management Systems (DMBS).
Q (a): Can the government specifically provide the various database software platforms and versions currently being used by DOL DEC?
Q (b): What technology(s) are the current systems running on? (.Net, Drupal, LAMP, SharePoint, other CMS, etc.)
Response: (a) SQL Server 2005, migrating to SQL Server 2008 by end of the fiscal year and MySQL.(b) Windows 2003, migrating to Windows 2008 and Ubuntu LTE.
82. Page 8, under “Provide content management services.”
Q (a): Does the government currently use enterprise content management system software to manage web site content?
Response: No.
Q (b): Does the government currently use a software system or database system to capture and track requests and changes to web site content?
Response: A very simple database is used to track content change requests, but it isn’t a comprehensive log of all changes made to the websites.
83. Page 8, under “Manage WebTrends Web Analytics and Web statistics – or equivalent.“
Q: Are the statistics and analytical tools accessible in one central location or are there decentralized systems that the vendor is required to manage and maintain?
Response: The Government currently has one Web metrics system that tracks the agencies’ public websites as well as our intranet (LaborNet). The Offeror is only asked to manage the statistics package provided by the Government, not to supply a Web metrics solution.
84. Page 8, under “Management of cloud service.”
Q (a): Can the government provide who currently provides cloud hosting services?
Q (b): What is the government expectation with regard to cloud services?
Response: There is no existing cloud solution. The Offeror is not expected to host a cloud solution. If the Government implements a cloud solution for hosting websites, the Offeror is expected to assist in managing that implementation.
85. Page 8, under “Develop and support native mobile applications on multiple platforms.”
Q (a): Are there existing mobile applications that will be maintained under this contract
Response: Yes, there are existing mobile applications that will be maintained with the assistance of the vendor.
Q (b): And/Or are there new mobile applications that will be developed under the contract?
Response: Although none have been defined, we anticipate that there will be mobile applications developed under this contract.
86. Page 9, under “Manage a Service Desk.”
Q (a): What is the name of the current helpdesk software?
Response: Open-source Ticket Request System (OTRS)
Q (b): What is the average number of help desk tickets generated per month?
Response: See the answer for Question 4.
87. Page 9, under “Publish Newsletters and e-Magazines.”
Q (a): Does the government intend for the vendor to produce and make available publications in Adobe PDF format?
Response: Yes, but only in the sense that materials we produce in other formats (Word, HTML) that are then turned into a PDF. See the DOL Newsletter at http://www.dol.gov/_sec/newsletter/ and at http://www.dol.gov/_sec/newsletter/2012/20120308.pdf for an example.
Q (b): Would DOL provide stock photos and images for use in newsletters and e-Magazines?
Response: Yes.
88. Page 9, under “Prepare Videos for the Website.”
Q: Would contractor be responsible for video production?
Response: No; completed videos are supplied by outside contractors, by the agencies, or from the Office of Public Affairs’ Division of Audio Visual Communication Services.
89. Page 10, Section 3.2.3
Q (a): How many Windows and OS X desktops would the vendor be responsible for managing and supporting?
Q (b): Does OPA DEC manage the Development and TEST environments for applications development?
Response: (a) 80+ Windows desktops and 10 OS X desktops. (b) Yes.
90. Page 10, Section 3.2.4
Q: Does the government intend for the vendor to provide in-person (face-to-face) training and training documentation for review and management of Section 508?
Response: Occasional in-person or videoconference-enabled Section 508/accessibility training may be required, but not on a regular basis. Written documentation would need to be developed and maintained, as needed.
91. Page 11, Section 3.2.8 mentions cloud hosting support that is currently in place from within DOL.
Q: What program is this referencing?
Response: We’re referencing the potential for cloud hosting rather than an actual cloud hosting solution that is in place.
92. Page 11, Section 3.2.9
Q (a): What social media tools is DOL DEC currently using?
Response: Facebook (2 pages); Twitter (4 accounts); YouTube; Flickr, RSS feeds, and internal and external blogs.
Q (b): What other DOL agencies are using social media services supported by DOL DEC?
Response: Except for a few exceptions that aren’t managed by DEC, all agency social media outlets listed in the above response are managed by DEC in coordination with the agencies who supply much of the content.
93. Page 12, Section 3.3.2
Q (a): What is the format that should be compatible to the Department of Labor’s productivity software?
Response: The Department of Labor uses the Microsoft Office suite of products. Any version of these packages should be accessible to us.
Q (b): How many applications are currently supported by OPA DEC? Could a descriptive list be provided? (ie COTS, GOTS, CMS tools)
Response: b) OPA DEC supports about three dozen desktop applications, with varying degrees of deployment; some widely, some have but a few installations.
94. May contractors submit additional past performance references from other team members that have less than 20% work share?
Response: No.
95. May the prime offeror submit more than 3 past performance references?
Response: No.
96. Discussion: Pages E- 3 and 4 of the RFP states that the proposal will be evaluated on our method and approach to meeting the RFP requirements. The outline includes: "C. Ability to conduct technological feasibility analysis." "Technological feasibility analysis" is not in the scope as identified as Requirements and Tasks in the SOW, or as one of the factors to be evaluated in the outline on page E-11.
Question: Please clarify the relationship between the "technological feasibility analysis" on E-4 with the more detailed tasking to be evaluated as described in E-11 and the SOW.
Response: Please use the factors on page E-11.
97. Discussion: Similar to question 1 above. There seems to be a relationship between the Technical Evaluation Factors/SubFactors on pages E-11, 12, but there is no exact matching with the six components for the RFP Technical Proposal format paragraphs A through F.
Question: Should we assume that the Technical Evaluation factors are used throughout all sections or just as applicable?
Response: Please use the factors on page E-11.
98. Discussion: The RFP Instructions Pages E-3 and E-4 lay out the format and content of the technical proposal and Pages E-11 and E-12 list the Technical Evaluation Factors and Sub-Factors. The technical instructions as to the format and content do not seem to lend themselves to highlighting the evaluation criteria factors in a meaningful way.
Question: Does the Government want technical proposals structured around the instructions or the evaluation factors?
Response: Please use the factors on page E-11.
99. Discussion: From the SOW section 3.3.1 Performance Requirement Summary Table, the SOW states that The Contractor will propose and submit a Performance Requirement Summary Table. The table should reflect objective performance measures to evaluate Contractor’s performance of contract provisions. Incentives may be both positive and negative.
Question: Will the government build this table with the requirements and performance measures for the contractor to follow?
Response: The Government would like the Offeror’s to propose an evaluation structure.
100. Please let us know the list of Key personnel requirements. Please provide details on ‘senior’ and ‘junior’ staff.
Response: Unless otherwise stated, the Key Qualifications document lists requirements for the “Senior” level of that position. The “Junior” level would have a similar type of experience, but with less longevity.
101. We understand that we need to submit the resumes of key personnel alone. Please confirm our understanding.
Response: The government would like to review all resumes prior to the contractor hiring potential candidates..
102. Price Proposal – Provide the list of pricing components expected in our pricing proposal.
Response: An updated Schedule B will be added to the solicitation.
103. As the SOW talk about wide variety of services (broader scope), can we provide the labor category pricing alone against fixed bid pricing?
Response: Government requests further clarification from the offeror as this question is unclear?
104. Do we need to include our standard hosting pricing details?
Response: If this is in reference to website hosting, there is no requirement for that.
105. Please let us know the COTS products used at DOL
Response: OPA uses industry standard productivity and design & development software for Windows and OS X.
106. Please let us know the Content management system used at DOL
Response: There is no Web content management system currently in use.
107. Please provide a copy of the DOL SDLC methodology document
Response: This will be provided. Please note that, in addition to the required documentation and process, we also use a User Story -> Design -> Low Leve Requirements approach to development.
108. Please provide a copy of the DOL Agile methodology document
Response: This will be provided.
109. Let us know the mobile platforms / devices for development at DOL
Response: Primary: iOS (iPhone and iPad) & Android phones; As needed: Blackberry & Windows Phone 7
110. Please provide the number of FTEs currently supporting the development and maintenance at DOL (specific to the current SOW). Please provide the labor category split-up details Response: Refer to Attachment B, Sample Labor Categories.
111. Let us know the current enterprise search engine being used at DOL
Response: FAST Data Search supports the intranet website (LaborNet). DOL.gov uses USASearch.
112. Let us know the number of FTEs currently managing the ‘Service Desk’ Response: Please submit formal FOIA request.
113. Let us know the expected contract award date Response: On or around 23 May 2012.
114. Let us know the expected transition period – take over from the incumbent.
Response: We anticipate a one month transition period, which will be inclusive in the initial Task Order.
115. When was the system accredited?
Response: OPA DEC received an ATO on September 27, 2011 that is valid for three years. The next ATO must be completed by September 27, 2014.
116. Is the current C & A package complaint with NIST and Federal Guidance
Response: Yes, the current C&A package was completed in accordance with the DOL Computer Security Handbook and NIST guidance.
117. Has DOL resolved all existing POAM items?
Response: No, there are currently five (5) open POA&Ms. The number of POA&Ms may change and is dependent on the outcomes of continuous monitoring activities and ongoing security control assessments.
118. We assume the PRS and quality-control plan are outside of page count in the technical volume. Please confirm.
Response: Yes.
119. Would the government provide a format for pricing?
Response: An updated Schedule B will be provided.
120. RFP, Page E-2: “… offeror is required to provide a redacted and an unredacted copy of each volume on CD-Rom…” Since only Volume I requires redaction, please confirm that only volume I redacted electronic copies should submitted. (i.e. not Volume II, III and IV) Response: Vol I, CD Rom should be redacted. Vol II through IV of the CD-ROM should not be redacted.
121. Question: According to the RFP, the Offeror is only required to submit redacted hard copies of Volume 1, Technical. Is the Offeror required to submit CD-Roms of redacted copies of Volumes 2-4?
Response: No
122. Reference: RFP Section E, “Page Count,” pg. E-3: “NTE 25 pages, excluding the QCP.”
Question: Since it is not counted towards the page count, is the QCP to be included in the Appendix? Or should it be included as the last section of the Technical Volume, and those pages will not be counted?
Response: Include it as an Appendix.
123. Reference: RFP Section E, “Page Count, Volume II,” pg. E-3: “NTE 20 pages.”
Question: Will the page count be increased in Volume II for the additional past performances required of subcontractors who perform more than 20% of the work?
Response: The page count for Past Performance has been increased to 16 pages.
124. Reference: RFP Section E, “Volume 1: Technical Approach,” pg. E-4: “Qualifications, capabilities, and experience of the key staff, which includes the program manager, project manager, senior and junior staff. (see attachment No. 1)”
Question: Does Attachment No. 1 Refer to “Attachment B: Technical Exhibit Estimated Workload Data”?
Response: Yes.
125. Reference: RFP Section E, “Volume 1: Technical Approach,” pg. E-4: “Proposed management of work performance by consultants and subcontractors.”
Question: Because there is not a management section listed in the Factors, does the government intend for the offeror to address this requirement in Factor 10: Start Up/Phase-Out/Staffing Plan”?
Response: Yes.
126. Reference: RFP Section E, Section1—Contract Description, pg. E-4.
Question: Is it necessary to provide the contact information for the Procuring Contracting Officer, the Administrative Contracting Officer, and the Pre-Award Monitor? In many cases, the same Contracting Office performs all three functions listed above. Would the government consider changing the requirement to include only the contact information for the Contracting Officer and the COTR?
Response: The PCO, ACO, and Pre-Award Monitor are one in the same.
127. Reference: RFP Section E, “NOTE,” pg. E-6: “Evaluation Factors for Award in Section M of this RFP.”
Question: Because there is not a Section M of this RFP, should we follow the evaluation factors in Section E.9?
Response: Yes.
128. Reference: Attachment B: Technical Exhibit Estimated Workload Data: “The Senior Systems Developer (SSD) will hold a Bachelor’s Degree or higher within the areas of IT practice or equivalent experience and be PMP certified with a minimum of two years served as project manager on a project with at least 5 or more members. The SSD will have had at least 3 years experience as a technical lead, in areas of Web application systems, Web software design, model-view-controller (MVC) software architecture, native mobile application software design, customer management, strategic business analysis, configuration management, database server management and design, Web services and topology, test design and performance, technology performance monitoring and measurement, and software instrumentation and measurement techniques.”
Question: There are not many developers who possess a PMP certification and are able to provide hands-on development support. Given that the focus of this contract is to provide DOL OPA with exemplary web and mobile application development support, would the Government consider making the PMP qualification optional?
Response: This…