AMENDMENT NUMBER 0001 TO Solicitation Number DOL110RP20889 Pine Ridge Job Corps Civilian Conservation Center Dated 3-8-10.pdf
PDF 54 KB Posted
- Solicitation number
- DOL110RP20889
About this file
AMENDMENT NUMBER 0001
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Labor OASAM Office of Procurement Services Suite N-4308 200 Constitution Avenue Washington, DC 20210
X
PINE RIDGE JOB CORPS CIVILIAN CONSERVATION CENTER – WIND TURBINES
Solicitation Number DOL110RP20889 for a contractor to design and build wind turbine(s) at the Pine Ridge Job Corps Civilian Conservation Center is amended as follows:
a. DOL will conduct ONE (1) Pre-Bid walk-thru for Thursday, March 11, 2010 at 1:00 PM CST. The walk thru will take place at the Pine Ridge Job Corps Civilian Conservation Center 15710 Highway 385 Chadron, NE 69337. THE WALK THRU IS NOT
MANDATORY.
b. The last day to submit questions to Johnny A. Arnold, II is March 18, 2010 at 4:00 PM CDT. Questions will only be accepted via e-mail at the following address: arnold.johnny@dol.gov
c. Incorporate additional requirements under Section C; and
d. Incorporate clarifications under Section L.
EXCEPT AS STATED ABOVE ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED
5. PROJECT NO.
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NO.
CODE
6. ISSUED BY 1605
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED
1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended, X
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment of each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC- KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 10-83)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30STANDARD FORM 30
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(No., street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(If applicable)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
(X)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 11
3-8-10
TO ALL OFFERORS/BIDDERS DOL110RP20889
X
2-26-10
Solicitation Number DOL110RPB20889 Page 2 of 11 Amendment Number 0001
WIND TURBINES
PINE RIDGE JOB CORPS CIVILIAN CONSERVATION CENTER
CHADRON, OREGON
A. REVISE SECTION C., DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK to add:
Submittal Requirements
The design-build contractor shall provide “Construction Ready” documents based on the schedule. The “Construction Ready” documents submission shall, at a minimum, contain the following:
Final Geotechnical Report, Final structural calculations, All electrical calculations, Lightning Protection Calculations, Manufacturer’s product data and descriptive literature, All final calculations associated with the design and selection of the wind turbine electric generating system(s), Final calculations of estimated energy generated by the system. The estimate shall be based on publicly available wind data for the Project Location and shall be adjusted for local elevation. Estimated energy production shall be provided for each month of the year and total for the year in kWh. Estimate energy production on a twenty year basis. Provide a power curve for wind speed for the turbine.
Drawings, Specifications as applicable, Copies of all approvals and permits including those from the local utility provider, Federal Aviation Administration (FAA), and local, state and Federal Government agencies as applicable.
The design build contractor shall provide “For Construction” documents no later than two (2) weeks after receipt of DOL’s acceptance letter for the “Construction Ready”
Solicitation Number DOL110RPB20889 Page 3 of 11
WIND TURBINES
PINE RIDGE JOB CORPS CIVILIAN CONSERVATION CENTER
CHADRON, OREGON
design submission. The “For Construction” documents shall incorporate all corrections from the “Construction Ready” submittal review comments.
Submittals for Review
For the submissions identified above the design-build contractor shall submit to the Department of Labor for review four (4) sets of drawings and project documents (drawings shall consist of two full-size sets and two half-size sets), as well as three (3) sets of design calculations at the “Construction Ready” stage . One (1) set of drawings at the interim progress and “Construction Ready” design stage shall be submitted to the Job Corps Data Center.
Each submittal of drawings shall be incorporated into an AutoCAD (version 14 or later) compatible electronic format on compact disc and be delivered to DOL by the design-build contractor in addition to the project documents/specification sets required.
Complete project documents shall also be furnished on a compact disc in electronic format that is Microsoft Word compatible.
The design-build contractor is required to maintain the design-build schedule per the contract, and must indicate to the Department of Labor ways and means to recover lost time due to delays. No additional time will be given to the design-build contractor unless it is determined by DOL that the delay is legitimate and unavoidable and that the design-build contractor has prudently exercised all options within its authority and ability to avert such delays.
The design-build contractor will be responsible for the professional quality, technical accuracy, and adherence to the requirements of the scope of work, for all plan submittals, and for all required permit applications and acquisitions required under this contract.
DOL will perform review of the required submissions. The review will be limited to project constructability (e.g. site problems, existing obstructions or proposed utilities, proposed contract time for construction, omissions, discrepancies, known issues that have occurred at the site or with projects of similar scopes, phasing, and coordination problems that could lead to construction difficulties), design (conformance to the negotiated scope of work) and construction quality control procedures.
Unless otherwise stated, review comments and concurrence with the required submissions do not revise the scope or intent of the project and do not constitute a request for change beyond the negotiated scope of work. In the event DOL determines that any required submission is incomplete which precludes a meaningful review, or does not adhere to the scope of work, DOL will advise the design-build contractor of the shortcomings and direct the design-build contractor to revise and resubmit the plan. No time extension or price increase will be granted as a result of such action. In the event the design-build contractor
Solicitation Number DOL110RPB20889 Page 4 of 11
WIND TURBINES
PINE RIDGE JOB CORPS CIVILIAN CONSERVATION CENTER
CHADRON, OREGON
believes that any review comment requires a change to the scope of agreed work, the design-build contractor shall first consult the DOL for clarification, and shall, within 10 days of receipt of the comments provide written notice to the Contracting Officer concerning the reasons why the design-build contractor believes the scope has been changed.
Following concurrence of the design documentation at the “Construction Ready” stage(s), the design-build contractor shall prepare plan sets for use during construction. All review comments shall be resolved in writing by the design-build contractor to the satisfaction of the DOL before the design-build contractor delivers the “For Construction” submittal.
Each drawing sheet shall have its last revised date noted on the sheet and clearly marked “Approved for Construction”
B. REVISE SECTION C., DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK , Metering to read:
Provide an anemometer and electric meter with remote monitoring capability for power produced by the turbine. The meters shall be pulse emitting type, 20 hertz maximum with dry contact, KYZ pulse output. The design-build contractor shall provide for category 5 or better Ethernet wiring and Ethernet RJ45 male connector at each metering point, for remote data collection and analysis, and a 120 volt dedicated outlet as a power source.
The Department of Labor, through a separate contract, will provide and install telephone and data connections to the meter and anemometer. The design-build contractor shall coordinate the construction and operations of, and will provide access to the Work with the Department of Labor contractor.
The design-build contractor shall consult with the Engineering Support Contractor relative to the use of the utility company meters for data collection versus using sub-meters. The following equipment has been determined to meet the requirements specified above.
Equipment provided shall meet or exceed the capabilities of the following equipment:
EnergyICT RTU + V6 with EI Meter, EnergyICT RTU+ Server with EI Meter Eaton Power Xpert® 4000/6000/8000 Meter Series E-Mon Class 5000 Meter, or equal
C. REVISE SECTION C., DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK , to add:
Temporary Facilities and Controls
Temporary Utility Installation
Solicitation Number DOL110RPB20889 Page 5 of 11
WIND TURBINES
PINE RIDGE JOB CORPS CIVILIAN CONSERVATION CENTER
CHADRON, OREGON
General
The design-build contractor shall pay all costs associated with the installation and removal of temporary utility service, maintenance of temporary utility installations, and usage costs. It shall be the design-build contractor’s responsibility to obtain and pay for all necessary approvals and permits that may be required for the installation of the temporary utilities.
The design-build contractor shall engage the appropriate utility company to install temporary service or connect to existing service. Where utility companies provide only part of the service, the design-build contractor shall provide the remainder with matching, compatible materials, and equipment.
The design-build contractor shall arrange with the utility company and existing users for the time when service can be interrupted to make connections for service. The design-build contractor shall obtain, and pay for, all easements required to bring temporary utilities to the project site where the Department of Labor’s easements cannot be used for that purpose.
The design-build contractor shall remove each temporary service or facility when the need for its service has ended, when it has been replaced by authorized use of a permanent service or facility, or no later than the date of Substantial Completion. The design-build contractor shall complete or, if necessary, restore permanent construction that may have been delayed because of interference with temporary services or facilities. The Design-Builder shall repair all damaged work, clean all exposed surfaces, and replace construction that cannot be satisfactorily repaired.
D. REVISE SECTION C., DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK , to add:
Design-Build Contractor Responsibilities
The design-build contractor must be familiar with Yachats, Oregon (local) construction methods and building materials, and shall provide a design that exemplifies the optimum balance of economy, aesthetics, safety, ease of maintenance and speed of construction. An acceptable quality design must provide appropriate functional facilities at the lowest practical construction cost, with due consideration for economy in maintenance and operation.
The specified construction materials must be of quality that is consistent with the intended use of the facility, the center, and reflect local availability and construction skills. Innovative
Solicitation Number DOL110RPB20889 Page 6 of 11
WIND TURBINES
PINE RIDGE JOB CORPS CIVILIAN CONSERVATION CENTER
CHADRON, OREGON
materials and methods should be considered, but only if they provide an economic or functional advantage.
Although this scope of work may identify specific elements of construction, it is the design-build contractor's responsibility to provide any and all elements which are incidental to provide a fully functional facility.
DELETE THE CURRENT SECTION L.10 IN ITS ENTIRETY AND SUBSTITUTE THE
FOLLOWING:
L.10 PROPOSAL SUBMISSION REQUIREMENTS
(a) GENERAL. The Government may evaluate proposals and make award without discussions.
(1) Delivery Location. Proposals shall be received via overnight mail or private courier at the following location:
Five sets – Technical Proposal, and Certificates and Representations and
Three sets originally-signed Cost/Price Proposals (In Separate, Sealed envelope):
US DEPARTMENT OF LABOR /BOC/OPS/
Division of Job Corps A/E & Construction Services 2200 Wilson Boulevard, Suite 102 Box 314 Arlington, VA 22201-3324 ATTN: Lawrence Glover, Documents Control (Marked) SEALED Proposal – DO NOT OPEN Solicitation Number: DOL110RP20889
PINE RIDGE JOB CORPS CIVILIAN CONSERVATION
CENTER WIND TURBINES
Proposal Due Date: 3/26/2010 Time: 2:00 pm (EDT)
(b) PROPOSAL SUBMISSION REQUIREMENTS
(1) MANAGEMENT
Solicitation Number DOL110RPB20889 Page 7 of 11
WIND TURBINES
PINE RIDGE JOB CORPS CIVILIAN CONSERVATION CENTER
CHADRON, OREGON
Describe the proposed design-build organization and how it will be managed by the Offeror.
Include a simple organizational chart, illustrating the organization, including the proposed quality control group(s). Present a matrix of responsibilities for each firm in executing the key work breakdown structure activities of the project, including design and construction activities for each major feature (i.e., site work, utilities). Identify the design firm(s) chosen for the project, if not to be self-performed. Describe the proposed management structure for the team, describing the how the design and construction process will be managed and the authorities and the delegations of authority within the team. Include a key personnel organization chart that clearly depicts the key positions and the names of the personnel, their firm affiliations and their job locations, their job/position title within the organization. The key personnel organization chart shall be consistent with the corporate organization chart, with the matrix of responsibilities assigned to the D-B team firms, and with the list of key personnel provided under “KEY
PERSONNEL CAPABILITIES AND EXPERIENCE.
Provide a consolidated list of key personnel with name, position title, and description of project responsibility for each. Indicate whether each individual has had a significant role in any of the cited project examples. If re-assignment of personnel is considered possible, provide alternate professionals in each assignment. Include key designers, whether employed by the prime or by a design subcontractor. For each person provide a brief resume. Include the prime contractor's project manager responsible for design and construction, the design manager, the designers of record for architecture, interior design, structural, civil, geotechnical, fire protection, electrical, mechanical/plumbing, and permit preparers. Permit preparers must be professionally registered in the state the project is located. Where projects are located in states that require a separate registration for design of structures, the structural designer of record must be registered in that state. All other designers of record must be registered in accordance with contract clause 52.236- 25, Requirements for Registration of Designers. For construction, include the on-site manager and the general superintendent (in charge of self-performed work). Offeror shall provide unequivocal letters of commitment from all proposed key personnel not currently employed by the team members.
(A). Key personnel shall include:
Design-Build Contractor
(i) Principal;
(ii) Construction Project Manager;
(iii) Construction Superintendent;
Sub-Contract Architect-Engineer
(i) Principal;
(ii) Project Architect;
(iii) Structural Engineer;
(iv) Electrical Engineer;
Solicitation Number DOL110RPB20889 Page 8 of 11
WIND TURBINES
PINE RIDGE JOB CORPS CIVILIAN CONSERVATION CENTER
CHADRON, OREGON
(2) PAST PERFORMANCE and EXPERIENCE
Past performance refers to the quality of recent project experience from the owner's perspective. The Offeror and its design firm(s) (or prime contractor if design is to be self performed) shall provide customer reference name(s), company affiliation and current phone numbers on the specific project experience. Projects cited shall be currently well underway (fully designed and at least 50% construction progress completed) or construction substantially completed within 5 years preceding the date of this solicitation. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer. The Government may contact and interview the points of contact and reserves the right to interview other individuals acting for the listed reference, if the listed reference is not available. The team members may also briefly provide information on problems encountered on identified contracts and the team member’s corrective actions.
(A) The Offeror shall demonstrate prior corporate experience listing only those projects completed within the past five (5) years with any of the following criteria:
(i) Projects performed of similar size and scope in the State of Oregon; and/or
(ii) Projects performed of similar size and scope as this project within the United States; and/or
(iii) Projects of similar size and scope performed under a Federal Government contract.
(B) Scoring will be more favorable for projects meeting multiple criteria. Include the following information for each project listed. (Items are of equal importance.)
(i) The Offeror’s design experience in the Design-Build process;
(ii) The Offeror’s construction experience in the Design-Build process;
(iii) The Offeror’s recent experience in meeting the completion schedule for similar projects; and
(iv) The Offeror’s awards that have been won for similar projects;
(3) PRELIMINARY DESIGN
Solicitation Number DOL110RPB20889 Page 9 of 11
WIND TURBINES
PINE RIDGE JOB CORPS CIVILIAN CONSERVATION CENTER
CHADRON, OREGON
As part of its Technical Proposal, the Offeror shall submit sketches for the design and the construction of the project. The proposal shall be based on the requirements set forth under Section C of this RFP entitled “Statement of Work For Program Year 2009 For Wind Turbine Installation At The Angell Job Corps Civilian Conservation Center” .
The design effort shall be sufficiently complete in all parts to ensure the work represented can be accomplished within the construction budget and is sufficient for the Offeror to develop a firm price proposal.
This project will require the following submittals with the bid.
1. Contact information and description (scope and cost) of at least three (3) similar wind energy systems installed within the past three years.
2. Preliminary site plan sketch showing proposed location of wind turbine system(s).
Proposed location shall be referenced by approximate distance from nearest building(s) or structure(s).
3. Recommended tower height for site roughness, obstructions.
4. Estimates of energy generated by the system. The estimate shall be based on publicly available wind data for the Project Location and shall be adjusted for local elevation.
Estimated energy production shall be provided for each month of the year and total for the year in kWh. Estimate energy production on a twenty year basis. Provide a power curve for wind speed for the turbine.
5. Description of warranties and available maintenance agreements.
6. Description of remote monitoring and control system.
7. Provide technical literature for the proposed wind turbine system(s).
(4) PROJECT SCHEDULE
The Offeror shall provide a preliminary CPM schedule with narrative covering at a minimum, the following milestones:
(A). The Design Period:
(i) Construction Ready design document preparation period;
Solicitation Number DOL110RPB20889 Page 10 of 11
WIND TURBINES
PINE RIDGE JOB CORPS CIVILIAN CONSERVATION CENTER
CHADRON, OREGON
(ii) Utility Company and agency review, coordination and design acceptance;
(iii) DOL review of Construction Ready design documents (allow 15 work days); and
(iv) Permit application(s) to local authorities.
(B) Construction Period:
(i) Mobilization;
(ii) Permits collection from local permitting agencies, INCLUDING AGENCIES STATUTORY PERMITTING TURN
AROUND PERIODS.
(iii) Site Utilities and civil site improvements
(iv) Excavation;
(v) Foundation Construction;
(vi) Procurement, fabrication and delivery of proposed wind turbine electric generating system(s) equipment;
(vii) Installation of equipment
(viii) Provisions for overtime or shift work;
(viii) Commissioning and Testing;
(iv) Substantial Completion; and
(x) Project Completion
The offeror may also provide, at its option, an alternate CPM schedule showing an earlier completion date than the contract period of performance and shall include a narrative describing the means and methods proposed to achieve an earlier project completion. The offeror may submit a schedule that would permit fast tracking. The Government will evaluate proposed alternate CPM schedules showing an earlier completion date for reasonableness and may consider an unreasonable schedule as a weakness or deficiency when evaluating competing proposals.
(c) COST PROPOSAL REQUIREMENTS:
Carefully follow “Instructions, Conditions, and Notices to Offerors.” Standard Form 1442 (Solicitation, Offer, and Award) shall be used for submitting offers.
(d) PROPOSAL FORMAT:
The following documents make up the requirements to be delivered in accordance with paragraph L.10 (a)(1), above:
Solicitation Number DOL110RPB20889 Page 11 of 11
WIND TURBINES
PINE RIDGE JOB CORPS CIVILIAN CONSERVATION CENTER
CHADRON, OREGON
(1) TECHNICAL PROPOSAL –
(A) Management
(B) Past Performance and Experience
(C) Preliminary Design
(D) Schedule
(2) COST/PRICE PROPOSAL – Separately packaged and sealed:
(A) Standard Form (SF) 1442 (Originally-signed [blue ink] by an individual authorized to bind the Offeror in BLOCK 30 (a),(b) & (c)
(B) Complete breakdown of costs in the latest CSI Master Format by division and subdivision of work, including direct labor, materials, overhead, and profit (includes breakdowns from all subcontractors), as shown within the following website:
http://www.constructionnotebook.com/ipin2/CSIDivisions.asp
(3) REPRESENTATIONS and CERTIFICATIONS (Section “K”) – Please ensure that you have updated your on-line Representations and Certifications at https://orca.bpn.gov/
END OF AMENDMENT
File details come from the government source that posted it. Updated .