This document is an Industry Day presentation for the National Park Service (NPS) Fort Caroline Memorial Relocation project, scheduled for bid solicitation in Summer 2027. The project aims to relocate the Fort Caroline Memorial exhibit approximately 300 feet southeast to a higher elevation outside the floodplain, reducing chronic storm and tidal damage while improving visitor and employee safety.
The project scope includes demolishing the existing fort exhibit, filling in the moat, regrading the area, and reinstalling irrigation and seeding. Construction of the new exhibit will incorporate rammed earth-style/formed concrete walls with striated appearance, Corten steel railings and beams, composite decking for overlooks, and either a salvaged or reconstructed archway. New accessible stabilized compacted paths will be installed throughout, with ABA compliance requirements noted. The site plan identifies specific trees for removal (nine live oaks by diameter breast height), selective underbrush clearing, and reestablishment of native scrub vegetation. Staging and working areas include the Maintenance Yard, areas adjacent to the existing exhibit for demolition, Timucuan Village, and potentially part of the Visitor Center Parking Lot, with the requirement that public access remain open with minimal trail closures throughout construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Industry_Day_-_Special_Notice_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Park Service (NPS) Fort Caroline Memorial Relocation
Industry Day Project Design
September 11, 2026
Project Updates
Purpose of Project
• Move the fort exhibit out of the floodplain and reduce damage from chronic storm and tidal events to be more resilient and sustainable
• Improve visitor and employee safety by creating safer and more stable location for the exhibit
Summary of Project
• Demolish the current Fort Caroline Memorial exhibit, fill in moat, regrade area, reinstall irrigation, seed area
• Construct new Fort Caroline Memorial exhibit ~300' southeast to higher elevation
• Remove specifically identified trees, selective underbrush, and regrading
• Reconstruct new fort exhibit and trails
• Install irrigation and seed area
Schedule
• Anticipated bid solicitation: Summer 2027
Project Overview – Site Map
Existing Conditions
Moat Timucuan Village
Trail Fort Wall
Arch Gate
Aerial View
Architectural Overview
Proposed Materials
• Rammed earth style/formed concrete walls with striated/poured lift appearance
• Corten steel for railings and beams
• Composite decking for overlooks
• Salvaged arch from existing fort or reconstructed arch
• Stabilized compacted accessible paths (materials TBD)
Archway View
South Monument View - Inside
South Monument View - Outside
Tiered Gathering Area
Corner Overlook – View South
Corner Overlook – View North
Site Plan
Trails and Access Plan
Hardscape Details
South Monument Detail
Entry Detail
Staging & Working Areas
• Maintenance Yard and certain trails
• Adjacent to existing Fort Caroline exhibit for demolition
• Timucuan Village
• Potential for part of the Visitor Center Parking Lot
• Public access will need to remain open for the duration of the project with minimal closures to trails, as possible.
| Slide Number 1 |
| Slide Number 2 |
| Project Overview – Site Map |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
File details come from the government source that posted it. Updated .