This document is a Request for Information (RFI) Industry Briefing presentation for the Landsat 10 (L10) Mission Operations Center (MOC) and Operations, conducted on May 13, 2026, by USGS in partnership with NASA.
The RFI seeks information to define the MOC acquisition strategy for a single-observatory architecture, replacing the previously planned triplet constellation. Key objectives include evaluating technical approaches (existing government or commercial MOC capabilities versus new development), assessing whether vendor heritage or matured technologies would benefit the L10 MOC, understanding cost-efficient approaches for the single-satellite architecture, and identifying solutions that support accelerated development timelines with early basic Telemetry & Command (T&C) capability for spacecraft and instrument development. The RFI addresses MOC hosting alternatives including USGS cloud solutions, AWS or Azure, EROS Enterprise VMware/Kubernetes hosting, NASA GSFC facilities, or vendor facilities, with corresponding Flight Operations Team staff location options. Responses are due June 4, 2026, following a 30-day response window from RFI release. Questions for clarity are due May 28, 2026, and optional one-on-one virtual discussions (45 minutes each) may be scheduled following the May 13 industry day. The USGS Contracting Officer is Tricia Rampersad, with Grant Mah as the Contracting Officer's Representative. Notional procurement dates indicate a targeted MOC/Flight Operations Team DRFP in November 2026, RFP in February 2027, and award in September 2027, supporting a Launch Readiness Date of December 11, 2031. Respondents must provide cost estimates using a standardized spreadsheet covering development, integration, testing, operations readiness through Mission Threshold Review (MTHR) plus five years of post-launch operations, broken into quarterly labor hours and Other Direct Costs.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L10 Landsat 10
Landsat 10 (L10) Mission Operations Center (MOC)
& Operations
Request for Information (RFI) Industry Briefing
May 13, 2026
1:00-3:00 CDST
Brian Sauer, USGS L10 Project Manager
Agenda
Introduction
Request for Information (RFI) Objectives
RFI Timeline and Logistics
Additional References
L10 Schedule & RFI Cost Estimate Overview
L10 Notional Ground System & MOC Target Dates
Mission/MOC Overview
Mission Synopsis – What’s changed (external slide deck)
MOC functions and notional block diagram
I&T/Mission readiness approach
Questions
NOTE: The project was previously named Landsat Next (LNext). For the purposes of these materials, any references to “LNext” and “L10” are completely interchangeable.
Introduction
Key USGS POCs:
CO Introduction – Tricia Rampersad
COR – Grant Mah
Landsat Next architecture and scope has been changed from triplet observatories to a single observatory with the project renamed to Landsat 10 (L10) with a NLT launch readiness date in December 2031
USGS has Conducted Many RFIs and Studies, Why Another ?
Prior RFIs and study RFP were conducted under a triplet observatory architecture
•The same objectives exist but now for the new architecture
The information from this last RFI will be used to define the acquisition strategy
USGS Challenge: Achieve technical and schedule objectives in a cost constrained environment for a single, one-off satellite expected to operate through the 2030s
RFI Objectives
Technical Approach – RFI Intended to Help USGS Define MOC Acquisition Strategy
Consideration of different approaches – Use of existing government or commercial MOC capability or facility
(with modifications), or development of new MOC capability hosted in a government (NASA GSFC or USGS
EROS) or vendor facility
Has vendor heritage changed (missions in planning for earlier studies are now operational) that would benefit
L10 MOC ?
Have any new technologies matured such that they would benefit the L10 MOC ?
Cost – Revised Focus for Single Observatory and Cost Efficiency
Conducted MOC studies in 2024 under a triplet observatory architecture
USGS wants to better understand best MOC architecture approach from a cost efficiency perspective given the new single satellite architecture
Schedule – Seeking MOC Systems that Support Accelerated L10 Development Timeline
USGS is in need of a solution that can be deployed quickly to support I&T schedule
Also interested in an early basic T&C capability that can be used for initial S/C and instrument product development activities
RFI Timeline and Logistics
One-on-One Discussion May be Held Following Industry Day 45 min virtual meetings - USGS CO will contact vendors to schedule, as needed
Please ensure contact information was provided in registration and indicate interest in one-on-one meetings
RFI Questions Questions for clarity about the RFI are encouraged and due by May 28, 2026
Use provided spreadsheet (Attachment A) to Submit Questions (Available on SAM.gov MOC RFI page)
Send questions to the CO at: trampersad@usgs.gov
USGS will make a best effort attempt to respond within 5 business days
Brief one-on-one discussions may be scheduled by the USGS to address questions, as needed
Through the Q&A responses, the Government may post information deemed generally useful for all participants to the SAM.gov MOC RFI Page
RFI Responses Due in 30 Days, 6/4/2026
Follow-on Discussions The USGS may request follow-on discussions (in-person or virtual) after responses are provided, to interactively discuss the material, as needed
NASA Draft RFP Documents Posted for Review (TBD)
MOC RFI
Industry Day
One-on-
Ones
30-Day Response Time
Optional Q&A
Follow-on
Discussions
(As needed)
RFI Release Responses Due mailto:trampersad@usgs.gov
Additional References
RFI Attachments:
Attachment A – RFI Questions spreadsheet
Attachment B – RFI Cost Template spreadsheet
Attachment C – L10 MOC Functions Summary
Attachment D – L10 MOC IT Security Guidance
Attachment E – LMOC Requirements Document
Attachment F – LMOC Operations Concept
Attachment G – LMOC Scalability Study
Attachment H – Landsat Ops Configuration Management Policy (Process)
Attachment I – USGS CHS Cloud Responsibilities
Attachment J – USGS EROS Enterprise Hosting Statement of Capabilities
Attachment K – Landsat 10 Mission Synopsis
Attachment L-1 – L10 Design Reference Case – 18 Day (DRC-18) Definition
Attachment L-2 – L10 DRC-18 Spreadsheet
NOTE: Any references in attached materials to “triplets” or “constellation” are outdated and have not yet been updated to reflect the latest single satellite architecture
Specific L10 MOC Information and Security Guidance for development & implementation
Historical background information on the L8/9 LMOC requirements & Ops Con from the L9 development, current as of L9 launch. Meant as a reference only for prior
MOC development.
Current L8/L9 Operations Policy for CM of LMOC and S/C systems, expect something similar for L10
Background on USGS/EROS Cloud and Enterprise Hosting capabilities (space for H/W, bare-metal infrastructure, VM and Kubernetes hosting)
Latest L10 mission documents
RFI Logistics
Study performed early in L10 formulation phase, used some assumptions and direction that has since been changed (especially L10 is now a single S/C mission)
Additional References, cont.
LMOC Design Document – Available Upon Request (CUI, Limited Distribution) Request via E-mail to CO at: trampersad@usgs.gov
Prior Industry Engagement References:
MOC RFI (2023):
https://sam.gov/workspace/contract/opp/59b2c686c7ab4651a0d8c091586861b5/view
MOC Funded studies (2024):
https://sam.gov/workspace/contract/opp/869873dc9ced4449a1d3e9ce43202864/view
Additional MOC info (2025):
https://sam.gov/workspace/contract/opp/f68d513fa4d84d818cf5f43359657a55/view https://sam.gov/workspace/contract/opp/59b2c686c7ab4651a0d8c091586861b5/view https://sam.gov/workspace/contract/opp/869873dc9ced4449a1d3e9ce43202864/view https://sam.gov/workspace/contract/opp/f68d513fa4d84d818cf5f43359657a55/view
Cost & Schedule Overview
Kari Wulf – USGS L10 Project Integration Lead (Aerospace)
USGS Ground System and Project Target Dates
Notional MOC Procurement Dates:
Targeted MOC/FOT DRFP – Nov 2026
Targeted MOC/FOT RFP – Feb 2027
Targeted MOC/FOT Award – Sept 2027
All dates shown below are notional:
Notional Project Dates:
Targeted S/C Award – NLT 12/31/2026
GRTs Start Nov 2029
MRTs Start July 2030
Launch Readiness Date (LRD) – NLT 12/11/2031
MTHR – Launch + 100 days
Cost Estimate Spreadsheet Background/Instructions
Estimate broken into:
Development/Test, Operations Readiness (Pre-MTHR)
Operations & Sustainment (Post-MTHR – 5 years)
• Steady State assumed at MTHR + 2 years
Please Use Provided Format per Instructions on
Spreadsheet Hours for each task
ODC in $K
Total costs for each quarter in $K
Spreadsheet formulas perform calculations
Provide Facility/Infrastructure/Cloud Hosting Needs Clearly document assumptions for GFE capabilities requested
Applies whether proposing on-prem, or a cloud-based solution
WBS Dictionary Provided on Second Tab Task descriptions based on MOC functions
If your organization uses different categories, please attempt to split hours into categories on spreadsheet based on your estimate of how the work is divided
Additional information:
Add any notes in Column AR on far right as needed
Feel free to add tabs if you want to provide additional data
Common format is requested to aid in cost analysis of RFI responses
CY2037
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
Notional Mission and Ground System Milestones
S/C Award January 2027 ▲
MOC Target Award Date October 2027 ▲
GS SRR August 2027 ▲
Mission PDR May 2028 ▲
GS PDR June 2028 ▲
Mission CDR May 2029 ▲
GS CDR May 2029 ▲
S/C I&T Start October 2029 (Notional) ▲
GRTs Start November 2029 ▲
SORTs (S/C mission readiness testing) Start Feb 2030 ▲
Observatory I&T Start May 2030 ▲
MRTs (Observatory mission readiness testing) Start July 2030 ▲
Mission Sims Start September 2030 ▲
LRD December 2031 ▲
MTHR - LEOC Ends/Transition to Ops March 2032 (Notionally Launch + 100 days) ▲
Achieve Steady State MOC and Operations ▲
DEVELOPMENT, INTEGRATION & TEST (Pre-MTHR)
Labor
Project Management/Admin for pre-MTHR (MOC Dev/I&T, Mission Ops Readiness, & LEOC) 0 hrs
MOC Systems Engineering 0 hrs
MOC Subsystems/Functions Development and I&T: 0 hrs
Telemetry & Command (T&C) 0 hrs
Flight Dynamics/Orbit Operations 0 hrs
Planning & Scheduling 0 hrs
Contact & Activity Orchestration 0 hrs
Configuration Management & State Management 0 hrs
Trending & Analysis 0 hrs
Alerts & Notification 0 hrs
Load Builder/Generator and Validation 0 hrs
Analytical Modeling & Simulators 0 hrs
Network and Infrastructure 0 hrs
Mission Operations Situational Awareness 0 hrs
Other Tools/Capabilities 0 hrs
Total Labor Hours for MOC Dev/I&T 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs
Total Labor Cost per Quarter, including overhead/fees ($K) $ 0.0K
ODCs (For the entire pre-MTHR period)
ODC/Equipment and Hardware $ 0.0K
ODC/Software Licenses $ 0.0K
ODC/Cloud Services (if applicable) $ 0.0K
ODC/Networks $ 0.0K
OCD/Other (make a note what this is for in column AR) $ 0.0K
Total ODC Cost per Quarter, including overhead/fees ($K) $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K
Total Dev/I&T Cost per Quarter, including overhead/fees ($K) $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K
MISSION OPERATIONS READINESS and LEOC (Pre-MTHR)
Mission Ops Readiness
FOT Training/Development 0 hrs
Ground Ops Proc Development/ Flight Proc Integration 0 hrs
Ground Systems Engineering 0 hrs
GRT Support/Execution 0 hrs
MRT Support/Execution 0 hrs
Mission Sims/Rehearsals 0 hrs
Simulator Engineering 0 hrs
Network/Infrastructure Support 0 hrs
LEO/Commissioning
Observatory Systems Engineering 0 hrs
Ground Systems Engineering 0 hrs
Realtime Operations 0 hrs
Planning & Scheduling 0 hrs
Flight Dynamics/ Orbit Operations 0 hrs
Anomaly Investigations 0 hrs
Network/Infrastructure Support 0 hrs
Total Labor Hours for MR and LEOC 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs
Total Mission Readiness/LEOC Cost per Quarter, including overhead/fees ($K) $ 0.0K
Total DEV/I&T/MR Cost per Quarter, including overhead/fees ($K) $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K
OPERATIONS & SUSTAINMENT (Post-MTHR)
Project Management/Admin 0 hrs
Observatory Systems Engineering 0 hrs
Ground Systems Engineering 0 hrs
Realtime Operations 0 hrs
Planning & Scheduling 0 hrs
Flight Dynamics/ Orbit Operations 0 hrs
Simulator Engineering 0 hrs
Anomaly Investigations 0 hrs
MOC Sustaining Engineering 0 hrs
Network/Infrastructure Support 0 hrs
Total Labor Hours for Ops 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs
Total Ops Labor Cost per Quarter, including overhead/fees ($K) $ 0.0K
ODC/Equipment and Hardware (ops refresh) $ 0.0K
ODC/Software Licenses (renewals) $ 0.0K
ODC/Cloud Services (if required) $ 0.0K
ODC/Networks $ 0.0K
ODC/Other (make a note what this is for in column AR) $ 0.0K
Total Ops ODC Cost per Quarter, including overhead/fees ($K) $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K
Total Ops Cost per Quarter, including overhead/fees ($K) $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K $ 0.0K
CY2032 CY2033 CY2034 CY2035 CY2036CY2027 CY2028 CY2029 CY2030
Instructions and Background information to fill out this spreadsheet provided below:
CY2031
Enter Labor Hours Below per Quarter and Burdened ODC and Total Labor Cost in Thousands of Dollars, including contractor overhead/fees (Excludes award fee)
Task/Activity
Mission Synopsis and Updates (external slide deck)
Chris Kilzer – NASA L10 Mission Systems Engineering (Aerospace)
Chris Engebretson – USGS L10 Chief Engineer
MOC Functions & Interfaces
Mission Operations Center (MOC) Functions/Capabilities
Alerts & Notification
Planning & Scheduling
(P&S)
Telemetry & Command
(T&C)
Load Builder/ Generator &
Validation
Mission Operations Situational Awareness
Trending & Analysis
Flight Dynamics/
Orbit Operations
(FD/OO)
Network and Infrastructure
Configuration Management
& State Management
Contact & Activity
Orchestration
(CAO)
Other Tools/ Capabilities
External Interfaces
• Ground Network (GN)
• Data Processing & Archive (DPAS)
• Cal/Val
• S/C Vendor
• Instrument Vendor
• Launch Services Segment
• NASA GSFC Services:
• Flight Dynamics Facility (FDF)
• Conjunction Analysis (CARA)
• Near Space Network (NSN)
• US Space Command
• Status Dashboard
• Conjunction Analysis Services
• US Naval Observatory
• DoC/TraCSS
Analytical Modeling & Simulators
See Attachment C – L10 MOC
Functions Summary for detailed descriptions
Overview of Networking and Interfaces
Connectivity to NASA Resources
IOnet – GFE dedicated lines to WSC for SN/TDRSS, NSN stations, and Listen-Line connection to S/C vendor
CARA/FDF – Internet data transfers with secure connections (SSL, https, etc.)
Connectivity to (USGS) LGN Stations
Internet with secure connections (SSL, https, etc.)
T&C data transfers
Scheduling coordination
Station status during passes for MOC automation
Connectivity to (USGS) DPAS and Cal/Val
Internet with secure connections (SSL, https, etc.)
Planning & Scheduling product transfers and handshake
Retransmit requests
TLM data access (for Cal/Val, anomaly investigations, etc.)
Other Interfaces
Connectivity to S/C and instrument vendors
Internet with secure connections (SSL, https, etc.)
Space Force, USNO, conjunction analysis service provider(s), etc.
MOC Hosting and Location Alternatives
With cloud based, on prem, and hybrid options, numerous combinations for MOC system hosting & FOT staff location, given remote access possibilities. Looking for cost efficiency, reliability, low risk.
MOC Systems Hosting
Cloud
USGS CHS III Gov/Cloud
AWS or Azure
EROS Enterprise VMware/Kubernetes
Hosting Service
USGS/EROS currently hosts bLMOC (dedicated server
H/W)
Ample space available for MOC
Vendor Facility
If recommending, please clearly identify benefits and cost efficiency of this approach over other options
NASA/GSFC (Building 32)
Current LMOC location (VMware servers in CR, Ops center and offices on second floor)
FOT Staff Location
USGS/EROS
Ample office and CR space availability
Location close to Ops project offices and staff
NASA/GSFC
Current LMOC location (VMware servers in CR, Ops center and offices on second floor)
Limited office space availability beyond L8/L9
Other Government or Leased Facility If recommending, please clearly identify benefits and cost efficiency over other options
Vendor-Managed Facility If recommending, please clearly identify benefits and cost efficiency over other options
Some Combination of above Ops/Flight Controllers in one location, shared resource S/C system engineers and SMEs in another, Infrastructure Team location depends on architecture
L10 Ground I&T/Mission Readiness (1 of 3)
Also Documented on the Cost Estimate Spreadsheet…
Verification (Test) Approach
Roll-up verification – Need to verify requirements children first
Test-as-You-Fly (TAFY) scenario-based testing based on ops cons
Ground System (Level 3) Verification/Testing
Ground Readiness Tests (GRTs) used to integrate MOC into the rest of the ground system (GS) – Ground Network (GN) and Data Processing and Archive System (DPAS)
GRTs consist of a 2-3 month “test window” where requirements assigned to a release are tested as they are ready, followed by a capstone for any remaining requirements and demonstration of requirements previously verified/tested
Executed on ops systems (or candidates for release into ops) by FOT using a combination of ops procs and other test scripts as needed
Multiple GRTs for phased release of GS capabilities (as needed to support mission-level testing)
L4/L5 MOC Testing
GRTs (L3)
NRTs
SORTs MRTs
Mission Simulations LRD
L10 Ground I&T/Mission Readiness (2 of 3)
Mission Readiness Mission Readiness tests include Network Readiness Tests (NRTs), Spacecraft Operations Readiness Tests (SORTs), Mission Readiness Tests (MRTs), and Mission Simulations
Key S/C and Observatory tests are divided between S/C-led operational readiness tests (SORTs) and “traditional” end-to-end mission readiness tests (MRTs)
SORTs SORTs verify/test requirements specific to (only) the S/C (e.g. S/C activation & checkout, etc.)
SORTs led and scheduled by S/C vendor (coordinated with project) and supported by the Ground System; could be many tests interleaved with S/C I&T activities or series of specific SORT test events
MOC full T&C capability is needed to enable SORTs (connectivity tests conducted prior to SORTs to verify S/C-MOC interface)
MOC commands S/C for SORTs using operational procs and systems – S/C vendor (S/C procs) and FOT (ground procs)
MRTs MRTs are end-to-end tests using observatory, MOC, and other parts of the GS, with support from S/C vendor & Inst vendor
MRTs are developed and led by NASA mission readiness team with support from the S/C & inst vendor and the GS
MRTs verify/test requirements for the observatory (integrated S/C bus & LANDIS instrument), e.g. Instrument activation, routine imaging ops, etc.
MOC may also need to support RF Compatibility tests to send CMDs for S/C RX threshold tests
L10 Ground I&T/Mission Readiness (3 of 3)
Mission Simulations (SIMs)
Conducted at MOC using operational procs and systems, and S/C simulator
S/C & Inst vendor provides onsite and remote support
Simulates various mission events, e.g. – launch/early orbit, instrument activation, routine ops, decommissioning, etc.
Some SIMs will simulate 24×7 ops
Initially nominal activities with anomalies in later SIMs
Flight Ops Team (FOT) Training and Certification
Needed before testing with S/C and participating in SIMs
Other Resources
Listen-Line: A wide-area two-way network connection (WAN) between the MOC and the S/C for T&C services, to execute
SORTs and MRTs, and provide periodic live TLM back to the MOC for testing or training
Ops Products: NASA will provide the MOC/FOT with tested/validated S/C procs, but MOC/FOT will need to develop all ground ops products including procs, MPS products, load tools, limit overlays, pages, trend templates, etc.
Simulator Key Highlights and Capability Summary
The information provided in this presentation is preliminary.
Simulator Key Highlights Description and functional details
Command and Telemetry Simulation System (CTSS)
• Simple C&T functions
• Deployable internationally
• Simple, low fidelity system for simulating realistic spacecraft command and telemetry (C&T) responses with basic scripting capability
• Primarily used for ground station and ground system checkout activities
• Deployable to international partner ground stations with limitable command and telemetry database functions (i.e. – remove all but a no-op CMD and acknowledgement handshake for ITAR/CUI protection)
SoftSim • 100% software
• Runs S/C FSW only
• Has full environmental truth model
• Software based (emulated hardware) simulator of the Observatory
• High fidelity Spacecraft (executable/patchable flight software (FSW), modeled subsystems, and environmental truth model, etc.)
• Low fidelity LandIS (basic C&T only) capability
• Primarily used for spacecraft and ground procedure development, ground software development, and ground readiness tests
Observatory Operational Simulator (OOpS)
• Runs S/C and LandIS
FSW
• Has full environmental truth model
• Workhorse simulator for ground, mission readiness, and operations teams
• High fidelity observatory simulators (integrated LandIS Operational Sim (LOpS) with S/C Operational Sim (SOpS)) with flight like timing for all mission data elements
• Flight-like command and telemetry response, redundancy, subsystem models, timing, compression, and science data generation/flow
• Executes S/C and LandIS FSW, with ability to use and update as in flight
• Primary resource for operational process and procedure development, Mission Conops validation, operations testing, and
Mission Readiness tests and simulations
• Long term operational use: special activity testing, product updates, anomaly investigation, team training and proficiency, etc.
• The L10 simulators are intended to provide incrementally more capability as the flight and ground segment needs increase during the mission development, launch preparation, and operations phases
• L10 will also utilize interface simulators for interface verification:
• LandIS Interface Simulator (LIS) – Early Instrument to S/C interface checkout
• Launch Vehicle Interface Simulator (LVIS) – Observatory to Launch Vehicle interface checkout
• RF Suitcase – Realistic Ka-Band RF signal to Ground Station hardware (free-space and/or coax)
Questions ?
Q&A Session
If There are Further Questions, Sign Up for a One-on-One Session
| Slide 1: Landsat 10 (L10) Mission Operations Center (MOC) & Operations Request for Information (RFI) Industry Briefing |
| Slide 2: Agenda |
| Slide 3: Introduction |
| Slide 4: RFI Objectives |
| Slide 5: RFI Timeline and Logistics |
| Slide 6: Additional References |
| Slide 7: Additional References, cont. |
| Slide 8: Cost & Schedule Overview Kari Wulf – USGS L10 Project Integration Lead (Aerospace) |
| Slide 9: USGS Ground System and Project Target Dates |
| Slide 10: Cost Estimate Spreadsheet Background/Instructions |
| Slide 11: Mission Synopsis and Updates (external slide deck) Chris Kilzer – NASA L10 Mission Systems Engineering (Aerospace) Chris Engebretson – USGS L10 Chief Engineer |
| Slide 12: MOC Functions & Interfaces |
| Slide 13: Overview of Networking and Interfaces |
| Slide 14: MOC Hosting and Location Alternatives |
| Slide 15: L10 Ground I&T/Mission Readiness (1 of 3) |
| Slide 16: L10 Ground I&T/Mission Readiness (2 of 3) |
| Slide 17: L10 Ground I&T/Mission Readiness (3 of 3) |
| Slide 18: Simulator Key Highlights and Capability Summary |
| Slide 19: Questions ? |