About this file
This file is an application form and checklist for the Massachusetts Department of Energy Resources (DOER) Leading by Example Clean Energy Grants for State Entities - Fleet EVSE Deployment 4.0 program (PON-ENE-2027-XXX). The program provides grant funding to eligible state entities for the installation of electric vehicle supply equipment (EVSE) at state-owned facilities and domicile locations to support fleet electrification efforts. Applicants must submit a completed Application Checklist (Tab 1) and Application Form (Tab 2) along with required supporting documentation, including EVSE installation proposals from vendors or internal planning documents detailing equipment type, costs, and design specifications. State entities must demonstrate current or planned electric or plug-in hybrid vehicle ownership and commit to ordering at least one battery electric vehicle (BEV) within eighteen months of a signed agreement with DOER, or demonstrate that they have already deployed or ordered EVs for the project site. Non-domicile EVSE installations must be completed within six months of contract execution.
The application requires detailed project information including proposed locations, total grant funding requested, total estimated project costs, fleet electrification strategies, and specific equipment quantities by type (hardwired and portable Level 1 and Level 2 charging ports, DC fast charging ports, and standard electrical outlets). Applicants must itemize all project costs including equipment, installation, commissioning, labor, network software, maintenance packages, and extended warranties, with costs typically averaging $15,000 per port. Eligible procurement methods include VEH122, TRD01, Chapter 25A Section 14, and Chapter 149 procurements. State entities must commit to operating and maintaining the EVSE for a minimum of five years following final installation. The application includes an optional Environmental Justice (EJ) adder for non-domicile fleet EVSE projects, and applicants must describe pre-wiring plans for future charging infrastructure, data collection and sharing procedures for network-capable stations, and project justification for site suitability. Applications must be submitted to LBE-Grants@mass.gov with additional program details and the full Program Opportunity Notice available at https://www.mass.gov/info-details/leading-by-example-grants.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PON-ENE-001LBE Fleet EV Charging Deploy. Grant 4~1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Introduction
| INSTRUCTIONS |
| Read the full Program Opportunity Notice on COMMBUYS (Bid BD-XXX) to ensure your project and application meets all program requirements. |
| Complete tabs 1 (Application Checklist) and 2 (Application Form) of this spreadsheet and submit to DOER via email to LBE-Grants@mass.gov alongside any required attachments or supplemental information. |
| Please find program requirements, application deadline, eligiblity information, and link to the full Program Opportunity Notice at https://www.mass.gov/info-details/leading-by-example-grants. |
| FOR ADDITIONAL ASSISTANCE |
| For assistance with filling out this form, questions about this program, or to discuss availability and eligibility for funding, please contact the Leading by Example Program at LBE-Grants@mass.gov |
The Commonwealth of Massachusetts Department of Energy Resources 100 Cambridge Street, 9th Floor Boston, MA 02114 http://www.mass.gov/doer Leading by Example Clean Energy Grants for State Entities:
Fleet EVSE Deployment Grant 4.0 Application Checklist
PON-ENE-2027-XXX
Issued XXX, 2026 Please find program requirements, application deadline, eligiblity information, and link to the full Program Opportunity Notice at https://www.mass.gov/info-details/leading-by-example-grants.
1. Application Checklist
| Application Submission | |
| Tab 2: Application Form complete. | |
| EVSE installation proposal from vendor or internal planning documents, including equipment type, costs, design, etc. For mobile or other types of charging, provide quote detailing all costs being covered by LBE grant funds. | |
| (Domicile sites only) Confirmed eligibility for domicile program participation through domicile survey | |
| Agency Commitment After Grant Award | |
| Agree to submit a current FY Leading by Example Tracking and Reporting Form prior to any funding award if applicable and not previosly submitted by applying entity. | |
| Agree to provide periodic grant project reports as requested. | |
| Agree to submit digital photos (where appropriate) of the project at different stages of work. | |
| Agree to submit final grant report detailing final project costs and lessons learned from the project. | |
| Agree to work with DOER on any events/announcements regarding project. |
The Commonwealth of Massachusetts Department of Energy Resources 100 Cambridge Street, 9th Floor Boston, MA 02114 http://www.mass.gov/doer Leading by Example Clean Energy Grants for State Entities:
Fleet EVSE Deployment Grant 4.0 Application Checklists
PON-ENE-2027-XXX
Issued XXX, 2026
2. Application Form
| To ensure a timely review, please provide as much information as possible throughout this application form. | ||
| If insufficient information is provided, the DOER will follow-up with clarification questions. | ||
| Where possible, please note where information is not yet available due to the current stage of the project. | ||
| 1) | Applicant Contact Information: | Notes Column for Additional Information |
| State Entity |
(e.g., agency or campus):
| Primary Contact Submitting Application: | |
| Primary Contact Title: | |
| Primary Contact E-mail: | |
| Primary Contact Phone: | |
| New Application or Update to Existing Application | Please select from dropdown |
| Date of Submission |
(whether new or update):
| 2) | Grant Application Scope |
| Proposed Project Location(s): |
(Include specific lot or building, where applicable. If locations not yet known, please describe how locations will be selected.)
(If domicile, please provide specific address.)
| EVSE Project Category | Please select from dropdown |
| Total LBE grant funding requested ($) | |
| Total estimated project cost ($) | |
| In as much detail as possible, please describe your agency/facility's fleet electrification plan or strategy. This may include number of electric vehicles currently in the fleet, the number expected to be ordered on an annual basis, target dates for total or partial electrification, and other details on how the agency/facility intends to grow its fleet of EVs.* | |
| Provide a brief description of the fleet EVSE project, including the installation process and approximate timeline. Please include an explanation of how this project will serve to assist the state entity's fleet electrification efforts described above, and how the EVSE funded through this grant will be utilized. If EVSE is already in place at the project location, describe why additional stations are needed.* | |
| *DOER reserves the right to review any information submitted about fleet electrification efforts, request additional information, and/or make a determination on full or partial award based on the information provided and the extent to which agencies have demonstrated a clear commitment to electrify their fleet and the benefits associated with acquiring additional EVSE. | |
| 3) | Project Justification and Site Suitability |
| Does the applying state entity currently own or lease electric or plug-in hybrid vehicles in its fleet, or will the entity order at least one EV within 18 months of a signed agreement with DOER? | Please select from dropdown |
| Is the site committed to installing EVSE within 6 months of a signed contract with DOER (if non-domicile EVSE)? | Please select from dropdown |
| Agencies will need to provide a commitment that one or more EVs will be ordered for purchase or lease within eighteen (18) months of a signed agreement with DOER. For EV leases, the minimum term of the lease must be thirty-six (36) months. Agencies can meet this commitment by demonstrating that they have already deployed or ordered one or more EVs for the project site and that charging infrastructure is necessary to support these vehicles. On a case by case basis, DOER may allow plug-in hybrid vehicles to fulfill this requirement if the applicant can demonstrate that a battery electric vehicle is not suitable for their operations. | |
| 4) | Eligible Procurement Methods |
| Please indicate which procurement method you are using for the project. | Please select from dropdown |
| If "Other," please describe your procurement method. | |
| 5) | State-Owned Facilities & Domicile Sites: EVSE Stations |
| Number of hardwired Level 1 EV charging ports to be procured and installed: | |
| Number of portable or 'plug-in' Level 1 EV charging ports to be procured and installed: | |
| Number of hardwired Level 2 EV charging ports to be procured and installed: | |
| Number of portable or 'plug-in' Level 2 EV charging ports to be procured and installed: | |
| Number of hardwired DC Fast Charging Ports to be procured and installed: | |
| 110/120V Outlets |
(not connected to other EV charging equipment):
220/240v Outlets (not connected to other EV charging equipment):
6) State-Owned Facilities & Domicile Sites: EVSE Costs (Cost categories in vendor proposal and listed here may not match exactly. Please feel free to list costs in most appropriate cell or add to "Other" section and input cost description.)
| EV charging equipment $ |
| Additional equipment $ |
| Site assessment $ |
| Installation $ |
| Commissioning $ |
| Pre-wiring for additional EV-ready/EV-capable parking spaces $ |
| Labor $ |
| *Network software and data reporting packages $ |
| *Maintenance packages $ |
| *Extended warranties $ |
| MoveEV activation fee $ |
(if domicile EVSE)
| Other (input description) | |
| If this project includes fewer than two EV charging ports per proposed project location (if non-domicile), please provide an explanation. | |
| 7) | Other Charging |
| If the eligible state entity's EV charging project does not fit into any other category, please describe the project, technology, services, and other details of the project here. Please include an explanation as to why this product or service was selected. | |
| 8) | Pre-Wiring for Future EVSE |
| Number of spaces that will be pre-wired as part of this project to facilitate easier/more cost-effective EVSE installation in the future. |
Agencies are encouraged to include pre-wiring to support future fleet EV charging needs, if applicable.
| If applicable and known, please describe your facility/agency's plans to install EV Charging Stations at these pre-wired spots in the future. | |
| Agencies are highly encouraged to pre-wire to reduce costs of installing EV charging stations in the future. If pre-wiring is not included in this project, please provide an explanation as to why. | |
| 10) | Data Collection and Sharing |
| Will this project include network-capable stations? | Please select from dropdown |
| If yes, please confirm that the agency/facility has reviewed any contracts or agreements and has determined it may sign such contracts. | |
| If yes, please describe how the agency/facility intends to use this data, and how data will be collected and shared with LBE. | |
| 11) | Station Maintenance Commitment |
| Will the applying state entity operate and maintain the fleet EVSE, including any associated costs beyond what is covered through this grant program, for a minimmum of five years following final installation and commissioning? | Please select from dropdown |
| If no, please provide justification. | |
| 12) | Environmental Justice (EJ) Adder (for non-domicile fleet EVSE) |
| How many of the EVSE ports funded through this grant program will be located in neighborhoods that meet the EJ population criteria as defined by the EEA Environmental Justice Policy? | |
| See EJ Policy and interactive map of EJ census blocks here: https://www.mass.gov/environmental-justice | |
| OPTIONAL: |
Please describe any potential benefits this project may have for Environmental Justice Populations. (e.g., electrification of fleets that operate primarily in EJ census blocks, providing learning opportunities for schools or community organizations, reducing fleet operations costs to better serve EJ populations, etc.)
See EJ Policy and interactive map of EJ census blocks here: https://www.mass.gov/environmental-justice pick lists
| Please select from dropdown |
| Yes |
| No |
| Don't Know |
| New or Updated App |
| Please select from dropdown |
| New Application |
| Update to Existing Application |
| Cost Justification |
| EVSE deployment averages about $15,000 per port. If costs are beyond this average, please provide an explanation for the higher cost. |
| If this project includes fewer than two EV charging ports per proposed project location (if non-domicile), please provide an explanation. |
| Please select |
| 0 |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| Select from drop-down |
| Equipment |
| Installation |
| Both |
| Other (describe in Section 2) |
| Please select from dropdown |
| EVSE installation at state-owned facility |
| EVSE installation at domicile location |
| Please select from dropdown |
| Currently at least one BEV or PHEV in fleet |
| Intend to order at least one BEV or PHEV in next 18 months |
| No BEV or PHEV in fleet and no plans to order one |
| Don't know |
| Please select from dropdown |
| VEH122 |
| TRD01 |
| c. 25A, Section 14 |
| c. 149 |
| Other |
| Please select from dropdown |
| Yes |
| No |
| Don't Know |
| Will adhere to the domicile maintenance responsibilities outlined in the signed domicile user agreement |
File details come from the government source that posted it. Updated .