Doc EE Bid Bond.pdf
PDF 186 KB Posted
- Attached to
- 26-10 Car833409A (Carroll) RFB
- Solicitation number
- 26-10 Car833409A (Carroll) Wetland
- Issued by
- Carroll County, Iowa
About this file
This is a Bid Bond (Proposal Guarantee) document issued by the State of Iowa, Iowa Department of Agriculture and Land Stewardship, Division of Soil Conservation and Water Quality for the Nutrient Reduction Wetland Project (Project ID: Car833409A, Bid No. 26-10) located in Section 09, Township 83 North, Range 34 West, Carroll County, Iowa. The project involves constructing a wetland treatment system powered by a solar panel pump to treat water from an existing ditch. Work includes selective clearing, excavation and grading, tile and outlet structure installation, pump installation, riprap placement, and seeding. The project encompasses approximately 19,861 cubic yards of earthwork, 835 linear feet of pipe installation, 29 tons of riprap, a Modified SW-513 concrete outlet structure, an SW-401 concrete lift station structure with a solar pump system, and 2.4 acres of seeding. Construction must be completed by September 1, 2027, with seeding completion required by December 15, 2027, following specifications stipulated in the contract documents. The estimated construction cost range is $150,000 to $250,000.
The bid bond requires bidders to submit a proposal guarantee with a penal sum to be specified by the Division. If the proposal is rejected or accepted but the principal fails to enter into the contract within fourteen (14) days of award approval or fails to furnish the required performance bond, the principal and surety agree to forfeit the penal sum to the Division. The bond obligates both the principal and surety jointly and severally to ensure contract performance in accordance with the proposal, schedule of prices (Document CC), and Division specifications. The surety's liability is limited to the penal sum stated in the bond.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specifications.pdf | ||
| Doc CC Proposal Acknowledgement - Affidavit.pdf | ||
| Plans.pdf | ||
| Notice to Bidders.pdf | ||
| Design Report.pdf | ||
| Bid Book.pdf | ||
| Wetland QA QC Plan.pdf | ||
| Pre-Bid Meeting Minutes & PLAN HOLDERS as of 10-22-26.pdf | ||
| Doc CC Schedule of prices.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Car833409A Nutrient Reduction Wetland Project DOCUMENT EE Bid No. 26-10 PROPOSAL GUARANTEE (BID BOND)
EE-1
State of Iowa Iowa Department of Agriculture and Land Stewardship
DIVISION OF SOIL CONSERVATION AND WATER QUALITY
KNOW ALL PERSONS BY THESE PRESENTS:
That we, of as PRINCIPAL, and of as SURETY(S), are hereby held and firmly bound unto the State of Iowa in the penal sum of
______ /100 Dollars ($ . ) for the payment, whereof, the said PRINCIPAL and SURETY(S) bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
The conditions of this obligation are such that whereas the PRINCIPAL is herewith submitting to the Iowa Department of Agriculture and Land Stewardship, Division of Soil Conservation and Water Quality, hereinafter called the DIVISION its sealed contract for the following:
Nutrient Reduction Wetland Project Section 09, Township 83 North, Range 34 West, Carroll County, Iowa Project ID: Car833409A Bid No. 26-10
NOW THEREFORE,
the conditions of this obligation are such that, if said proposal is rejected by the DIVISION, or if said proposal is accepted by the DIVISION and the PRINCIPAL shall enter into a contract in the form specified by the DIVISION in accordance with the terms of the Proposal and Schedule of Prices (Document CC) and shall furnish a bond for the faithful performance of said contract in the form specified by the DIVISION, this obligation shall be null and void. Otherwise, it shall remain in full force and effect.
In the event that the said proposal is accepted by the DIVISION and the PRINCIPAL fails to enter into the contract as defined herein or fails to furnish the performance bond as noted above, within fourteen (14) days of the approval of the award, the PRINCIPAL and SURETY(S) agree to forfeit to the DIVISION the penal sum herein mentioned, it being understood that the liability of the SURETY(S) shall in no event exceed the penal sum or this obligation.
IN WITNESS WHEREOF,
the above bounden parties have executed this instrument under their several seals this day of , 20_______, the name and corporate seal of each party being hereto affixed and these presents duly signed by its undersigned representative pursuant to authority of its governing body.
PRINCIPAL SURETY
By By
Print Name:
If a partnership, all partners must sign.
END OF DOCUMENT EE