Scope of Work Summary
This is a Scope of Work document for the Department of Military Affairs/Florida Army National Guard detailing invasive species management and chipping services at the Snake Creek Weekend Training Site (SCWTS) in Miramar, Florida. The project encompasses invasive species control across 250 acres of training site property, including both the North Parcel (approximately 100 acres) and South Parcel (approximately 150 acres) divided by the C-9 canal. The contractor will be responsible for spraying and removal/chipping of invasive species including trees, bushes, vines, and dense reed grass (Johnson grass, Guinea grass, and cane grass) within vegetation parallel to fence lines and throughout open areas. The contract term runs from approximately October 1, 2026, through September 30, 2027. Key deliverables include a kick-off meeting with FLARNG project managers within ten days of the Notice to Proceed, a detailed schedule/timeline of tasks, status reports with photographs and DoD 1532-1 forms following each spraying phase, and quarterly site inspections with accompanying documentation. The project manager is Ms. Jacqueline Kelly, Conservation Program Manager, contactable at 904-823-0343 or jacqueline.d.kelly6.nfg@army.mil.
The contractor must supply all personnel, State-approved chemicals, chipping equipment, transportation, and utilities including water, power, and sanitary facilities. No equipment or chemicals may be stored on-site. The contractor is responsible for management and planning, internal quality control, and project management to ensure delivery within budget and on schedule while protecting identified native and specimen trees. A firm deliverables schedule will be established during the kick-off meeting between the FLARNG Project Manager and the contractor. All submissions should be directed to the Construction & Facility Management Office, CFMO Environmental Section at the address provided in St. Augustine, Florida.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DMA-ITB-360 Tall grass polygons.pdf | ||
| DMA-ITB-360 Snake Creek Invasive Species Mgmt.pdf | ||
| DMA-ITB-360 Area map.pdf | ||
| DMA-ITB-360 Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Buyer: Department of Military Affairs/Florida Army National Guard Contact: Ms. Jacqueline Kelly, Conservation Program Manager Address: CFMO Environmental Section - RFE Armory
2305 State Road 207 St. Augustine, Florida 32086
Phone: 904-823-0343
I. BACKGROUND
The Florida Army National Guard (FLARNG), as an agent of the National Guard Bureau (NGB), is currently responsible for the prudent management and use of the approximately 250 acre Snake Creek Weekend Training Site (WETS) near Miramar, Florida. The C-9 canal bisects the Snake Creek WETS property, with approximately 100 acres of the property located to the north of the canal (North Parcel) and 150 acres to the south (South Parcel) of the canal. Please refer to the attached aerial map.
Considering these management responsibilities outlined in the FLARNG Integrated Natural Resource Management Plan (INRMP) for Snake Creek, the FLARNG requires a contract to perform Invasive Species Management & Chipping, at Snake Creek WETS.
The address of the adjacent Robert O. Harrison Readiness Center is 5001 Flamingo, Miramar, FL 33015.
II. GENERAL DESCRIPTION OF WORK
The Florida Army National Guard (FLARNG), seeks Contractor support for a One- Year Contract for Invasive Species Management on 250 acres of the entire Training Site Area to include both North & South Posts of Florida Army National Guard Property at the Snake Creek Weekend Training Site, adjacent to the Robert O.
Harrison Readiness Center in the Southeast Florida region.
The invasive species management will consist of spraying and removal/chipping of the invasive species (trees/bushes/vines) within the dense vegetation that is parallel to the fence lines of the entire 250 acres. In addition, spray & mulch the dense reed grass clumps (Johnson grass/Guinea Grass/Cane Grass) throughout the entire site (see attached maps).
ATTACHMENT I
Professional Scope of Work Florida Army National Guard Snake Creek Invasive Species Management/Conservation Program
Date: 17 June 2026
III. DETAILED DESCRIPTION OF TASKS
Task 1: Kick-off Meeting
The Contractor will be required to attend a kick-off meeting via telephone conference call with the CFMO-Environmental Office in St. Augustine. The meeting will be scheduled within ten (10) days of the Contractor receipt of the Notice to Proceed. At this meeting, the FLARNG project managers and the Contractor will agree on expectations, deliverable formats, and project deadlines. This meeting will serve as an opportunity for the Contractor to obtain FLARNG specific information necessary to the project. Following the kickoff meeting, the Contractor will submit a schedule/timeline of the tasks to be performed within the project.
Task 2:
The Contractor will be expected to spray the invasive species within all the tree rows adjacent to (parallel) and inside the fence lines taking care not to spray the native species.
The Contractor will be expected to maintain the tree rows along the fence lines free of over-hanging vegetation within six feet of all fences.
The Contractor will be expected to spot spray all the invasive woody species and tall grasses in the open areas of both North & South Posts, to include the wooded hammock area west of the burrow pit of the South Post.
The Contractor will be expected to chip all the vegetative debris and keep the mulch on site using it at the base of specimen trees.
The Contractor will be expected to prevent any damage to the native trees identified by the FLARNG project manager as protected trees.
Task 3: Status Report
The Contractor will submit a status report on the project with attached pictures and submit to the FLARNG POC. In addition, fill out and submit a DoD 1532-1 form to the
FLARNG POC.
Task 4: Quarterly Inspections
The Contractor will follow-up with quarterly inspections of the entire site (North & South Posts) and maintain the spraying as stated in the above project description. In addition, submit a status report/DoD 1532-1 form on spraying that was done.
IV. PROJECT DELIVERABLES AND SCHEDULE
The Contractor will supply all personnel, materials (State approved chemicals for spraying, chipping equipment), transportation, and provide utilities such as water, power, and sanitary facilities required to perform the tasks described in this Scope of Work. In addition, no equipment or chemicals will be stored on site. The Contractor will conduct management and planning functions, perform internal quality control, and conduct all necessary project management duties to ensure that the project is delivered within budget, on schedule, and satisfies all FLARNG expectations.
Deliverables:
Kick-off Meeting and Minutes Schedule/Timeline of tasks within the Project Status Reports with pictures, DoD1532-1 forms after spraying Quarterly Inspections with status report
Note: During the kick-off meeting, a firm deliverables schedule will be agreed upon by the FLARNG Project Manager and the Contractor.
V. PROJECT MANAGER
The FLARNG Point of Contact and Project Manager for this project is Ms. Jacqueline Kelly at 904-823-0343. All material submissions are to be sent to the following email address: jacqueline.d.kelly6.nfg@army.mil and mailing address;
Construction & Facility Management Office CFMO Environmental Section-RFE Armory Attn: Jacqueline Kelly 2305 State Road 207 St. Augustine, FL 32086 mailto:jacqueline.d.kelly6.nfg@army.mil
| Buyer: Department of Military Affairs/Florida Army National Guard |
| II. GENERAL DESCRIPTION OF WORK |