OKC_Paint_Area_Computation_Rev.pdf

PDF 61 KB Posted

Attached to
PAINTING OF THE INTERIOR OFFICES AND INSTALLATION OF FLOORING
Solicitation number
DJM-17-A37-Q-0200
Issued by

About this file

Computation Area

View the file

Other files

File Type Posted
Sign_-_In_Sheet.pdf PDF
Meeting_Minutes.pdf PDF
Amendment_1.pdf PDF
Past_Performance_Data_Worksheet.pdf PDF
15-5315.txt TXT text file
OKC_Paint_Area_Computation.pdf PDF
Solicitation.pdf PDF
Statement_of_Work_(SOW).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Room Name Width Length Height Total

100 Entry 5 14 9 167

100a Entry Utility Closet 6 8.5 9 261

101 Waiting Area 11 22 9 462

102 Guard Room 11 11.5 9 294.5

103 Hallway 5.5 9.5 9 230

104 Secured Storage 10 15 9 410

105 Maint Shop & Closet 16 18 9 612

106 Maint Brkroom 10 20 9 540

101a, 201, 223, 301, 332 Stairwell Inlet 5.5 7.5 9 1080 180 (x6)

101b, 110, 201, 223, 301, 332 Stairwell 7.5 18.5 9 2538 423 (x6)

107a FAA Hallway a 8 24 9 432

107b FAA Hallway b 8 114 9 1594

110a Stairwell Hallway 22 4 9 468

202 Elev Lobby 11.5 13.5 9 369

203 Training 18 41.5 9 922.5

205 Womens Fit Rstrm 12.5 16 2 138

207 Men Fit Rstrm 12.5 19 2 150

208 Corridor 5.5 34 9 626

209 Reception Office 8 13.5 9 387

210 Corridor 5.5 13.5 9 292.5

210 Supvsry Brnch Ch 14 14.5 9 484

211 Corridor 5.5 34 9 450

211 Office Equip 13 14 9 486

108, 109, 212, 214 Men/Womens Rstrm 13 15 2 552 138 (x4)

213 Coat 3 7.5 9 189

215 Janitor 8 14 9 391.5

216 a/b Cabin Crew Office 7.5 13 9 692 346 (x2)

216 Cabin Crew Pit 13 18 9 355.5

217 Break Rm. 13.5 14 9 393.5

218, 219 DepinChrge 1,2 9.5 13 9 754 377 (x2)

220 Cabin Crew 2 19 32 9 729

220 Cabin Crew Corridor 14.5 15 9 309

221 Corridor 5.5 34 9 527

222 Cabin Crew 3 20.5 29.5 9 727.5

225 Coat 4 7.5 9 207

225 Storage 7 13 9 360

226 Conference 13 22 9 593

227 Storage 4 5.5 9 166.5

228 a/b DepinChrge 3a/b 9.5 14 9 760 380 (x2)

302 Elevator Lobby 15 18 9 556.5

303 Reception 5 9 9 252

303a ACI Office 10 18.5 9 462.5

304 Storage 6.5 9.5 9 288

305 Comm 6.5 9 9 274.5

305b Restroom 5.5 9 9 256.5

306 Asst. Chief 14.5 14.5 9 486

307 Branch Chief 14.5 18.5 9 511.5

310 Coffee 6 8 9 252

311 Storage 7 8 9 270

312 Conf Room 13.5 29.5 9 432

313 Reception Hallway 6.5 16 9 279

313a Reception Spare Off 9.5 11.5 9 354.5

313b Reception Office 9.5 9.5 9 318.5

314 Acft Mnt Spec 14.5 18.5 9 548

315 Library 10 12.5 9 400.5

316, 321 Women/Mens Rstrm 12.5 14.5 2 108

317, 318, 320, 322, 324, 326, 327, 330 ,331, 334, 337, 338

Prog Analyst, Pilot

Offices 9 14.5 9 4806

400.5

(x12)

319 Corridor 5 78.5 9 1413

319a Corridor (Flt Plning) 5 35 9 540

323 Janitor 8 12.5 9 369

325 Break Room 12.5 16 9 401

328 Flt Plan 14.5 26 9 639

328a Flt Plan Office 8.5 11.5 9 360

328b Flt Plan Lunch 9.5 13 9 405

329 a,b,c Flt Crew Office 11 14.5 9 1269 423 (x3)

333 Coat 4.5 8.5 9 234

335 Storage 4.5 5 9 171

336 Flt Crew 19 29.5 9 780.5

339 Corridor 5 18 9 324

38862Total Paintable Square Foot

File details come from the government source that posted it. Updated .