RFP_DJF-14-1200-R-0000034_Price_Template.xlsx
XLSX spreadsheet 63 KB Posted
- Attached to
- FBI CODIS ACQUISITION SME AND ADMIN RFP
- Solicitation number
- DJF-14-1200-R-0000034
About this file
Price Template
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CODIS_Acq_SME_Security_Requirements.pdf | ||
| CLIENT_AUTHORIZATION_LETTER_EXAMPLE.pdf | ||
| CODIS_SME_RFP_Amendment_2_7.9.14.pdf | ||
| Phase_1_Validation_Checklist_Amendment_1.doc | DOC document | |
| CODIS_SME_RFP_Amendment_1_7.1.14.pdf | ||
| CODIS_Q A_Final.pdf | ||
| Schedule_Attachment.pdf | ||
| FBI_Security_Requirements_Attachment.docx | DOCX document | |
| Attachment_J-3_OCI_Compliance.doc | DOC document | |
| Phase_2_Validation_Checklist.docx | DOCX document | |
| FBI_CODIS_Acquisition_SME_and_ADMIN_RFP_6.20.14.pdf | ||
| Phase_1_Validation_Checklist.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Instructions: | |
| 1) Do not change any of the data within the green tabbed spreadsheets or the green fields within the gray tabbed spreadsheets. | |
| 2) Only complete the gray fields within the gray tabbed spreadsheets. | |
| 3) A description of the colums associated with the Labor (CLIN 1 and 5) tabs that will require completion by the vendors is provided in gray below. Those listed in green below are calculated automatically via formulas: | |
| Company: | Name of the Prime or Sub-Contractor providing the labor |
| Labor Category: | Provide the Labor Cateogory being Proposed for this effort. |
| Alliant Hourly Rate: | List the Alliant approved Hourly Rate for the Labor Category proposed. |
| Proposed Hourly Rate: | List the Hourly Rate actually being proposed for this effort. |
| Discount Rate: | This field automatically calculates the discount rate provided to the Government by the offeror for each labor category and the average discount rate for all labor categories. |
| Hours: | Provide the number of hours per labor category proposed. |
| Base Labor: | This field automatically calculates the Discounted Hourly Rate multiplied by the Hours per labor category to provide an unburdened labor cost. |
| Overhead: | Provide the amount of overhead for each labor category (if necessary) within this field. |
| Facilities: | Provide the amount of facilities costs for each labor category (if necessary) within this field. |
| General and Administrative (G&A): | Provide the amount of G&A costs for each labor category (if necessary) within this field. |
| Sub-Total Cost: | This field automatically adds the Base Labor, Overhead, Facilities and G&A to provide a burdened labor cost. |
| Fee: | Provide the amount of Fee for each labor category (if necessary) within this field. |
| Total Cost: | This field automatically adds the Sub-Total Cost and Fee to provide a Total Cost of Labor. |
| Labor Discount: | This field automatically calculates the Labor Discount to the Government based on the Discount Rate provided by the offeror. |
| 4) A description of the colums associated with the Hardware and Software (CLINS 2 and 3) tabs that will require completion by the vendors is provided in gray below. Those listed in green below are calculated automatically via formulas: | |
| Item Price: | This is the price for a each (Qty = 1) item on the list. |
| Proposed Price: | This is the price being proposed for each (Qty = 1) item on the list. |
| Extended Item Price: | This field automatically calculates the Quantity multiplied by the Item Price. |
| Material Handling Charge (MHX): | Provide the amount of MHX costs for each item (if necessary) within this field. |
| General & Adminstrative (G&A) Expenses: | Provide the amount of G&A costs for each item (if necessary) within this field. |
| Sub-Total Item Cost: | This field automatically adds the Extended Cost + MHX + G&A. |
| Fee: | Provide the amount of Fee for each item (if necessary) within this field. |
| Total Item Cost: | This field automatically adds the Sub-Total Item Cost + Fee. |
| Quote Reference: | This field should provide the Basis of Estimate for the Item Price, such as a Website, Vendor Quote, etc. The offerors should also provide the Proposal page number in which the Quote is provided within this field. |
| Comment: | This field can be used to inform the government of any information needed, such as if an item is Not Separately Priced (NSP), if a price quote is good for three years, versus one, etc. If the item is NSP, the offeror should utilize this field to indicated which item # the price is included in. |
| 5) All formulas should be included in the spreadsheets, such as the calculation of the MHX, G&A, and Fee. | |
| 6) If additional fields (columns or rows) are needed for other categories, such as additional overhead categories, additional labor categories, etc., feel fee to add them. | |
| 7) No changes should be made to the list of HW and SW within the CLIN 2 and CLIN 3 tabs, i.e., no rows should be added and no changes should be made to the order of the items. | |
| 8) For those proposing a Firm-Fixed Price Contract Type, please disregard fields related to a cost type contract, such as Overhead, G&A, Facilities, etc., within all the tabs. |
Format 1
| FORMAT 1: Total Price Proposal Summary | ||||||||
| Total | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | TOTAL | ||
| CLIN | CLIN Description | Contract Type | Total | Total | Total | Total | Total | Total |
| 0001 | Services | FFP | * | * | * | * | * | * |
| 0002 | Travel | T&M | ** | ** | ** | ** | ** | ** |
| Total | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||
| * From Format 2 | ||||||||
| ** From Format 3 |
Format 2 FORMAT 2: CLIN (0001) Summary
| FBI Site Labor (Prime) | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | ||||||||||
| Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | |
| Labor Category | |||||||||||||||
| Acquisition Subject Matter Expert | 1980 | 1980 | 1980 | 1980 | 1980 | ||||||||||
| Administrative Assistant | 1980 | 1980 | 1980 | 1980 | 1980 | ||||||||||
| ….(insert rows as needed) | 1980 | 1980 | 1980 | 1980 | 1980 | ||||||||||
| Total Direct Labor | |||||||||||||||
| FBI Site Labor (Prime) Total Costs |
Summary Base Period Option Period 1 Option Period 2 Option Period 3 Option Period 4
Total: Price
Format 3
| FORMAT 3: CLIN (0002) Summary | ||||||||
| Destination | Period of Performance | |||||||
| (POP) | Trips per POP | Employees per trip | Days per trip | Mileage* | Rental Car* | Hotel | M&IE | Total** |
| Miles | Rate |
| Clarksburg, WV | Base Year | 4 | 1 | 4 |
| Clarksburg, WV | Option Year 1 | 4 | 1 | 4 |
| Clarksburg, WV | Option Year 2 | 4 | 1 | 4 |
| Clarksburg, WV | Option Year 3 | 4 | 1 | 4 |
| Clarksburg, WV | Option Year 4 | 4 | 1 | 4 |
| *Offerors are expected to use either the Mileage columns or the Rental Car column, but not both. | ||||
| **Not To Exceed (NTE) $10,000 per POP. |
Format 5 WBS Item # Manufacturer Description HW Model Name HW Model Number Support Level Qty List Price Proposed Price Discount Rate Extended Price MHX G&A Sub-Total Item Cost Fee Total Item Cost Quote Reference Comments HW Discount
Format 6 Item # Manufacturer Description SW Version Number SW Serial/License Number SW Part Number Support Level Qty List Price Proposed Price Discount Rate Extended Price MHX G&A Sub-Total Item Cost Fee Total Item Cost Quote Reference Comments SW Discount
Format 7 Item # Manufacturer Description SW Version Number SW Serial/License Number SW Part Number Support Level Qty List Price Proposed Price Discount Rate Extended Price MHX G&A Sub-Total Item Cost Fee Total Item Cost Quote Reference Comments SW Discount
Template
| FORMAT 2: CLIN (x0002, x0004, x0005) Summary | |||||||||||||||
| Contractor Site Labor (Prime) | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | ||||||||||
| Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | |
| Labor Category | |||||||||||||||
| ….(insert rows as needed) | |||||||||||||||
| Total Direct Labor | |||||||||||||||
| Fringe Rate: | |||||||||||||||
| Fringe Cost | |||||||||||||||
| Total Labor and Fringe | |||||||||||||||
| Overhead Rate: | |||||||||||||||
| Overhead Cost | |||||||||||||||
| Total Labor, Fringe, Overhead | |||||||||||||||
| Indirect Charge* (enter indirect charge name here) | |||||||||||||||
| Indirect Rate: | |||||||||||||||
| Indirect Cost | |||||||||||||||
| ….(insert other charges as needed) | |||||||||||||||
| Total Indirect Costs | |||||||||||||||
| Contractor Site Labor (Prime) Total Costs |
| FBI Site Labor (Prime) | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | ||||||||||
| Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | |
| Labor Category | |||||||||||||||
| ….(insert rows as needed) | |||||||||||||||
| Total Direct Labor | |||||||||||||||
| Fringe Rate: | |||||||||||||||
| Fringe Cost | |||||||||||||||
| Total Labor and Fringe | |||||||||||||||
| Overhead Rate: | |||||||||||||||
| Overhead Cost | |||||||||||||||
| Total Labor, Fringe, Overhead | |||||||||||||||
| Indirect Charge* (enter indirect charge name here) | |||||||||||||||
| Indirect Rate: | |||||||||||||||
| Indirect Cost | |||||||||||||||
| ….(insert other charges as needed) | |||||||||||||||
| Total Indirect Costs | |||||||||||||||
| FBI Site Labor (Prime) Total Costs |
| Contractor Site Labor (Subcontractor) | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | ||||||||||
| Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | |
| Subcontractor A (enter company name here) | |||||||||||||||
| Labor Category | |||||||||||||||
| ….(insert rows as needed) | |||||||||||||||
| Total Subcontractor A | |||||||||||||||
| Subcontractor B (enter company name here) | |||||||||||||||
| Labor Category | |||||||||||||||
| ….(insert rows as needed) | |||||||||||||||
| Total Subcontractor B | |||||||||||||||
| ….(insert other subcontractors as needed) | |||||||||||||||
| Total Direct Labor | |||||||||||||||
| Indirect Charge* (enter indirect charge name here) | |||||||||||||||
| Indirect Rate: | |||||||||||||||
| Indirect Cost | |||||||||||||||
| ….(insert other charges as needed) | |||||||||||||||
| Total Indirect Costs | |||||||||||||||
| Contractor Site Labor (Subcontractor) Total Costs |
| FBI Site Labor (Subcontractor) | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | ||||||||||
| Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | |
| Subcontractor A (enter company name here) | |||||||||||||||
| Labor Category | |||||||||||||||
| ….(insert rows as needed) | |||||||||||||||
| Total Subcontractor A | |||||||||||||||
| Subcontractor B (enter company name here) | |||||||||||||||
| Labor Category | |||||||||||||||
| ….(insert rows as needed) | |||||||||||||||
| Total Subcontractor B | |||||||||||||||
| ….(insert other subcontractors as needed) | |||||||||||||||
| Total Direct Labor | |||||||||||||||
| Indirect Charge* (enter indirect charge name here) | |||||||||||||||
| Indirect Rate: | |||||||||||||||
| Indirect Cost | |||||||||||||||
| ….(insert other charges as needed) | |||||||||||||||
| Total Indirect Costs | |||||||||||||||
| FBI Site Labor (Subcontractor) Total Costs |
| Non-Labor Direct Costs | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 |
| Direct Materials** | |||||
| Indirect Charge* (enter indirect charge name here) | |||||
| Indirect Rate: | |||||
| Indirect Cost | |||||
| ….(insert other charges as needed) | |||||
| Total Indirect Costs | |||||
| Total Direct Materials | |||||
| Other Direct Costs | |||||
| Postal/Shipping Expenses | |||||
| Facilities | |||||
| Travel | |||||
| Training | |||||
| Consulting Services | |||||
| ….(insert rows as needed) | |||||
| Total Other Direct Costs | |||||
| Indirect Charge* (enter indirect charge name here) | |||||
| Indirect Rate: | |||||
| Indirect Cost | |||||
| ….(insert other charges as needed) | |||||
| Total Indirect Costs | |||||
| Non-Labor Direct Total Costs |
| Summary | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 |
| Contractor Site Labor (Prime) Total Costs | |||||
| FBI Site Labor (Prime) Total Costs | |||||
| Contractor Site Labor (Subcontractor) Total Costs | |||||
| FBI Site Labor (Subcontractor) Total Costs | |||||
| Non-Labor Direct Total Costs |
SubTotal
| G&A Rate: |
| G&A Cost |
SubTotal
| FCCOM Rate: |
| FCCOM Cost |
Total Costs
| Profit Rate:*** |
| Profit |
| Total: Price |
| Base Fee Rate: | N/A | N/A | N/A | N/A | N/A |
| Base Fee | |||||
| Award Fee Rate: | |||||
| Award Fee | |||||
| Total Fee |
| Total: Cost Plus Fee |
| * Includes charges such as material handling. Excludes G&A. |
| ** Excludes the procurement of significant hardware, software, hardware maintenance, and software maintenance items (which are included in CLINs x0004, x0005, x0006, and x0007). |
| *** If the proposal does not apply the same profit rate across all cost elements, please detail what rates are applied to each cost element. |
HW
Item # Manufacturer Description HW Model Name HW Model Number Support Level Qty List Price Proposed Price Discount Rate Extended Price MHX G&A Sub-Total Item Cost Fee Total Item Cost Quote Reference Comments HW Discount
SW
Item # Manufacturer Description SW Version Number SW Serial/License Number SW Part Number Support Level Qty List Price Proposed Price Discount Rate Extended Price MHX G&A Sub-Total Item Cost Fee Total Item Cost Quote Reference Comments SW Discount
File details come from the government source that posted it. Updated .