DIVISION_II_-_SPECIAL_PROVISIONS_–_TECHNICAL_SPECIFICATIONS.pdf
PDF 4 MB Posted
- Solicitation number
- MNB035263
- Issued by
- Fairfield County, Bridgeport City, Connecticut
About this file
This is a Special Provisions and Technical Specifications document for Division II work issued by the State of Connecticut Department of Transportation in conjunction with the City of Bridgeport for the Rehabilitation of the Access Ramp of Margaret E. Morton Government Center. The project encompasses comprehensive structural and waterproofing repairs including intumescent fire-resistant paint application, environmental health and safety protocols, trench drain installation, preformed joint seals, partial depth concrete patching, exposed reinforcing steel cleaning and coating, structural steel repairs at two sites, localized paint removal and field painting, three temporary support systems, masonry repointing, and cold liquid elastomeric membrane waterproofing. The specifications detail materials requirements, construction methodologies, quality assurance procedures, and payment terms for each line item. Electronic bid submissions are required through the City's OpenGov Procurement Portal with a deadline of 2:00 p.m. Eastern Standard Time on Tuesday, March 24, 2026; written questions must be submitted by 4:00 p.m. on Wednesday, March 11, 2026. The contract requires Connecticut-licensed contractors with certified employees including SSPC painting contractors (QP1 and QP2 certifications for lead paint work), CAS coating application specialists, and AWS certified welding inspectors with valid field welder certifications.
Successful bidders must provide lump sum pricing for the rehabilitation work and comply with Davis-Bacon prevailing wage requirements, with hourly rates ranging from $33.81 to $66.72 depending on trade classification, plus fringe benefits and paid sick leave provisions. Performance and payment bonds equal to 100 percent of contract price are required, along with a maintenance bond of 25 percent for one year following final acceptance, and bid bonds of 10 percent for bids exceeding $50,000. Comprehensive insurance coverage is mandatory including workers' compensation, commercial general liability of $1,000,000 per occurrence, automobile liability of $1,000,000 per accident, and umbrella liability of $5,000,000, all from Connecticut-licensed carriers with AM Best ratings of A-VII or better. Monthly payments will be made at 95 percent of work performed with 5 percent retained until final completion, and contractors must perform a minimum of 30 percent of the original contract price using their own organization except for designated specialty items. The specific total contract award value is not disclosed in the procurement documents; however, the project requires advanced technical expertise and significant material procurement for specialized components including AASHTO Grade 50 T2 structural steel, polymer concrete trench drains, and qualified waterproofing membrane systems from the CTDOT Qualified Product List.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL PROVISIONS – TECHNICAL SPECIFICATIONS
DIVISION II – SPECIAL PROVISIONS
INDEX
INDEX TO SPECIAL PROVISIONS
Note: This index has been prepared for the convenience of those using this contract with the sole express purpose of locating quickly the information contained herein; and no claims shall arise due to omissions, additions, deletions, etc., as this index shall not be considered part of the contract.
ITEM
ITEM#0000001A - INTUMESCENT FIRE-RESISTANT PAINT
ITEM#0101000A - ENVIRONMENTAL HEALTH AND SAFETY
ITEM#0507900A - TRENCH DRAIN
ITEM#0520041A - PREFORMED JOINT SEAL
ITEM#0601318A - PARTIAL DEPTH PATCH
ITEM#0602980A - CLEAN AND COAT EXPOSED REINFORCING STEEL
ITEM#0603081A - STRUCTURAL STEEL REPAIRS (SITE NO. 1)
ITEM#0603082A - STRUCTURAL STEEL REPAIRS (SITE NO. 2)
ITEM#0603729A - LOCALIZED PAINT REMOVAL AND FIELD PAINTING OF EXISTING STEEL
ITEM#0603779A - TEMPORARY SUPPORT SYSTEM NO. 1
ITEM#0603780A - TEMPORARY SUPPORT SYSTEM NO. 2
ITEM#0603781A - TEMPORARY SUPPORT SYSTEM NO. 3
ITEM#0609001A - REPOINTED MASONRY
ITEM#0707009A - MEMBRANE WATERPROOFING (COLD LIQUID ELASTOMERIC)
ITEM #0000001A
ITEM #0000001A – INTUMESCENT FIRE-RESISTANT PAINT
Description: This work consists of furnishing and applying intumescent fire barrier paint to exposed structural steel in accordance with these Special Provisions, the Contract Plans, and as directed by the Engineer. The fire-resistive material shall be FlameOFF® Fire Barrier Paint as manufactured by FlameOFF Coatings, Inc or approved equal.
Materials: The intumescent fire barrier paint shall comply with the following:
Water-based intumescent coating Approx. 70% solids by volume Supplied in 5-gallon pails Shipping weight: approximately 64 lbs per pail. All materials shall be delivered in original unopened containers bearing the manufacturer’s name, product identification, and batch number.
Substitutions will not be permitted without written approval from the Engineer.
References:
The following standards form a part of this specification:
- ASTM E84 – Surface Burning Characteristics of Building Materials (Steiner Tunnel Test)
- ASTM E119 / UL 263 – Fire Tests of Building Construction and Materials
- UL Fire Resistance Directory
- ICC-ES Evaluation Reports
- CTDOT Standard Specifications, latest edition
Submittals:
The Contractor shall submit the following to the Engineer for review and approval prior to application:
A. Manufacturer’s Product Data, Application Guide, and Installation Instructions.
B. Safety Data Sheets (SDS).
C. UL Classification listings and fire-resistance test reports demonstrating compliance with ASTM E84 (Class A) and ASTM E119 fire-resistance ratings as required by the Contract.
D. Manufacturer Certification confirming material compliance and suitability.
E. Applicator qualifications demonstrating experience with intumescent fire-resistive coatings.
F. Quality Control Plan for Wet Film Thickness (WFT) and Dry Film Thickness (DFT) verification.
Work shall not begin until all submittals are approved by the Engineer.
Construction Methods:
Surface Preparation:
All substrates shall be clean, dry, and free of oil, grease, dirt, rust, loose mill scale, and
ITEM #0000001A
other contaminants. Surface preparation shall be in accordance with manufacturer’s recommendations.
Application:
Application shall be performed by brush, roller, or airless spray equipment as recommended by the manufacturer. Mix material thoroughly prior to application. Do not thin unless approved by the manufacturer.
Environmental Conditions:
Application shall not proceed when ambient temperature or substrate temperature is below manufacturer’s limits, or when relative humidity and conditions may adversely affect curing.
Film Thickness:
Apply coating in multiple coats as required to achieve the specified Dry Film Thickness (DFT). Wet Film Thickness (WFT) and DFT shall be verified using calibrated gauges.
DFT shall not be less than the specified minimum at any point.
Curing and Protection:
Allow coating to cure in accordance with manufacturer’s published recommendations.
Protect applied coating from damage until final acceptance.
Quality Assurance / Quality Control:
A. The Engineer may require inspection and verification of applied thickness.
B. Areas not meeting minimum DFT shall be corrected at no additional cost.
C. Damaged or deficient coating shall be repaired in accordance with manufacturer instructions.
Method Of Measurement:
Intumescent fire barrier paint will be measured by the square foot of surface area coated and accepted, measured in place.
Basis Of Payment:
The accepted quantity of intumescent fire barrier paint will be paid for at the contract unit price per square foot. The price shall include all labor, materials, equipment, surface preparation, application, protection, and incidentals necessary to complete the work.
Pay Item Pay Unit
Intumescent Fire-Resistant Paint S.F.
Rev. Date 08/24/04
ITEM #0101000A
ITEM #0101000A - ENVIRONMENTAL HEALTH AND SAFETY
Description:
Under this item, the Contractor shall establish protocols and provide procedures to protect the health and safety of its employees and subcontractors as related to the proposed construction activities performed within the Project AOEC(s). Work under this Item consists of the development and implementation of a written HASP that addresses the relative risk of exposure to documented hazards present within Project limits. The HASP shall establish health and safety protocols that address the relative risk of exposure to regulated substances in accordance with 29 CFR 1910.120 and 29 CFR 1926.65. Such protocols shall only address those concerns directly related to site conditions.
Note: The Engineer will prepare a site-specific health and safety plan which is compatible with the Contractor’s plan and will be responsible for the health and safety of all Project Inspectors, Department employees and consulting engineers.
Materials:
The Contractor must provide chemical protective clothing (CPC) and personal protective equipment (PPE) as stipulated in the Contractor’s HASP during the performance of work in areas identified as potentially posing a risk to worker health and safety for workers employed by the Contractor and all subcontractors.
Construction Methods:
1-Existing Information: The Contractor shall utilize all available information and existing records and data pertaining to chemical and physical hazards associated with any of the regulated substances identified in the environmental site investigations to develop the HASP. A list of documents containing this data is found in “Notice to Contractor – Environmental Investigations”.
2-General: The requirements set forth herein pertain to the provision of workers’ health and safety as it relates to proposed Project activities when performed in the presence of hazardous or regulated materials or otherwise environmentally sensitive conditions. THE PROVISION OF
WORKER HEALTH AND SAFETY PROTOCOLS WHICH ADDRESS POTENTIAL
AND/OR ACTUAL RISK OF EXPOSURE TO SITE SPECIFIC HAZARDS POSED TO
CONTRACTOR EMPLOYEES IS SOLELY THE RESPONSIBILITY OF THE
CONTRACTOR.
The Contractor shall be responsible for the development, implementation and oversight of the HASP throughout the performance of work within the limits of the AOEC(s), as identified in the Contract Documents, and in other areas identified by the Engineer or by the HASP where site conditions may pose a risk to worker health and safety and/or the environment. No physical aspects of the work within the AOEC shall begin until the HASP is reviewed by the Engineer and is determined to meet the requirements of the specifications. However, the Contract time, in accordance with Article 1.03.08, will begin on the date stipulated in the Notice to Proceed.
3-Regulatory Requirements: All construction related activities performed by the Contractor within the limits of the AOEC(s) or in other areas where site conditions may pose a risk to worker health and safety and/or the environment shall be performed in conformance with 29 CFR 1926, Safety and Health Regulations for Construction and 29 CFR 1910, Safety and Health Regulations for General Industry. Conformance to 29 CFR 1910.120, Hazardous Waste Site Operations and Emergency Response (HAZWOPER) may also be required, where appropriate.
4-Submittals: Three copies of the HASP shall be submitted to the Engineer within four (4) weeks after the Award of Contract or four (4) weeks prior to the start of any work in the AOEC, whichever is first, but not before the Award of the Contract.
The HASP shall be developed by a qualified person designated by the Contractor. This qualified person shall be a Certified Industrial Hygienist (CIH), Certified Hazardous Material Manager (CHMM), or a Certified Safety Professional (CSP). He/she shall have review and approval authority over the HASP and be identified as the Health and Safety Manager (HSM). The HASP shall bear the signature of said HSM indicating that the HASP meets the minimum requirements of 29 CFR 1910.120 and 29 CFR 1926.65.
The Engineer will review the HASP(s) within four (4) weeks of submittal and provide written comments as to deficiencies in and/or exceptions to the plan(s), if any, to assure consistency with the specifications, applicable standards, policies and practices and appropriateness given potential or known site conditions. Items identified in the HASP which do not conform to the specifications will be brought to the attention of the Contractor, and the Contractor shall revise the HASP to correct the deficiencies and resubmit it to the Engineer for determination of compliance with this item. The Contractor shall not be allowed to commence work activities in the AOEC(s), as shown on the Plans, or where site conditions exist which may pose a risk to worker health and safety and/or the environment, until the HASP has been reviewed and accepted by the Engineer. No claim for delay in the progress of work will be considered for the Contractor’s failure to submit a HASP that conforms to the requirements of the Contract.
5-HASP Provisions:
(a) General Requirements: The Contractor shall prepare a HASP covering all Project site work regulated by 29 CFR 1910.120(b)/ 1926.65(b) to be performed by the Contractor and all subcontractors under this Contract. The HASP shall establish in detail, the protocols necessary for the recognition, evaluation, and control of all hazards associated with each task performed under this Contract. The HASP shall address site-specific safety and health hazards of each phase of site operation and include the requirements and procedures for employee protection. The level of detail provided in the HASP shall be tailored to the type of work, complexity of operations to be performed, and hazards anticipated. Details about some activities may not be available when the initial HASP is prepared and submitted. Therefore, the HASP shall address, in as much detail as possible, all anticipated tasks, their related hazards and anticipated control measures.
The HASP shall interface with the Contractor’s Safety and Health Program. Any portions of the Safety and Health Program that are referenced in the HASP shall be included as appendices to the HASP. All topics regulated by the 29 CFR 1910.120(b)(4) and those listed below shall be addressed in the HASP. Where the use of a specific topic is not applicable to the Project, the HASP shall include a statement to justify its omission or reduced level of detail and establish that adequate consideration was given the topic.
(b) Elements:
(i) Site Description and Contamination Characterization: The Contractor shall provide a site description and contaminant characterization in the HASP that meets the requirements of 29 CFR 1910.120/1926.65.
(ii) Safety and Health Risk Analysis/Activity Hazard Analysis: The HASP shall address the safety and health hazards on this site for every operation to be performed. The Contractor shall review existing records and data to identify potential chemical and physical hazards associated with the site and shall evaluate their impact on field operations. Sources, concentrations (if known), potential exposure pathways, and other factors as noted in CFR 1910.120/126.65, paragraph (c)(7) employed to assess risk shall be described. The Contractor shall develop and justify action levels for implementation of engineering controls and personal protective equipment upgrades and downgrades for controlling worker exposure to the identified hazards. If there is no permissible exposure limit (PEL) or published exposure level for an identified hazard, available information from other published studies may be used as guidance. Any modification of an established PEL must be fully documented.
The HASP shall include a comprehensive section that discusses the tasks and objectives of the site operations and logistics and resources required to complete each task. The hazards associated with each task shall be identified. Hazard prevention techniques, procedures and/or equipment shall be identified to mitigate each of the hazards identified.
(iii) Staff Organization, Qualifications and Responsibilities: The HASP shall include a list of personnel expected to be engaged in site activities and certify that said personnel have completed the educational requirements stipulated in 29 CFR 1910.120 and 29 CFR 1926.65, are currently monitored under a medical surveillance program in compliance with those regulations, and that they are fit for work under “level C” conditions.
The Contractor shall assign responsibilities for safety activities and procedures. An outline or flow chart of the safety chain of command shall be provided in the HASP.
Qualifications, including education, experience, certifications, and training in safety and health for all personnel engaged in safety and health functions shall be documented in the HASP. Specific duties of each on-site team member should be identified. Typical team members include but are not limited to Team Leader, Scientific Advisor, Site Safety Officer, Public Information Officer, Security Officer, Record Keeper, Financial Officer, Field Team Leader, and Field Team members.
The HASP shall also include the name and qualifications of the individual proposed to serve as Health and Safety Officer (HSO). The HSO shall have full authority to carry out and ensure compliance with the HASP. The Contractor shall provide a competent HSO on-site who is capable of identifying existing and potential hazards in the surroundings or working conditions which are unsanitary, hazardous or dangerous to employees and who has authorization to take prompt corrective measures to eliminate or control them. The qualifications of the HSO shall include completion of OSHA 40-hour HAZWOPER training and 8-hour HAZWOPER supervisory training; a minimum of one year of working experience with the regulated compounds that have been documented to exist within Project limits; a working knowledge of Federal and State safety regulations;
specialized training or documented experience (one year minimum) in personal and respiratory protective equipment program implementation; the proper use of air monitoring instruments, air sampling methods and procedures; and certification training in first aid and CPR by a recognized, approved organization such as the American Red Cross.
The primary duties of the HSO shall be those associated with worker health and safety.
The Contractor’s HSO responsibilities shall be detailed in the written HASP and shall include, but not be limited to the following:
(A) Directing and implementing the HASP.
(B) Ensuring that all Project personnel have been adequately trained in the recognition and avoidance of unsafe conditions and the regulations applicable to the work environment to control or eliminate any hazards or other exposure to illness or injury (29 CFR 1926.21). All personnel shall be adequately trained in procedures outlined in the Contractor’s written HASP.
(C) Authorizing Stop Work Orders, which shall be executed upon the determination of an imminent health and safety concern.
(D) Contacting the Contractor’s HSM and the Engineer immediately upon the issuance of a Stop Work order when the HSO has made the determination of an imminent health and safety concern.
(E) Authorizing work to resume, upon approval from the Contractor’s HSM.
(F) Directing activities, as defined in the Contractor’s written HASP, during emergency situations; and
(G) Providing personal monitoring where applicable, and as identified in the
HASP.
(iv) Employee Training Assignments: The Contractor shall develop a training program to inform employees, supplier’s representatives, and official visitors of the special hazards and procedures (including PPE, its uses and inspections) to control these hazards during field operations. Official visitors include but are not limited to Federal Agency Representatives, State Agency Representatives, Municipal Agency Representatives, Contractors, subcontractors, etc. This program shall be consistent with the requirements of 29 CFR 1910.120 and 29 CFR 1926.65.
(v) Personal Protective Equipment: The plan shall include the requirements and procedures for employee protection and should include a detailed section on respiratory protection. The Contractor shall describe in detail and provide appropriate personal protective equipment (PPE) to insure that workers are not exposed to levels greater than the action level for identified hazards for each operation stated for each work zone. The level of protection shall be specific for each operation and shall be in compliance with all requirements of 29 CFR 1910 and 29 CFR 1926. The Contractor shall provide, maintain, and properly dispose of all PPE.
(vi) Medical Surveillance Program: All on-site Contractor personnel engaged in 29 CFR
1910.120/1926.65 operations shall have medical examinations meeting the requirements of 29 CFR 1910.120(f) prior to commencement of work.
The HASP shall include certification of medical evaluation and clearance by the physician for each employee engaged in 29 CFR 1910.120/1926.65 operations at the site.
(vii) Exposure Monitoring/Air Sampling Program: The Contractor shall submit an Air
Monitoring Plan as part of the HASP which is consistent with 29 CFR 1910.120, paragraphs (b)(4)(ii)(E), (c)(6), and (h). The Contractor shall identify specific air sampling equipment, locations, and frequencies in the air-monitoring plan. Air and exposure monitoring requirements shall be specified in the Contractor’s HASP. The Contractor’s CIH shall specify exposure monitoring/air sampling requirements after a careful review of the contaminants of concern and planned site activities.
(viii) Site Layout and Control: The HASP shall include a map, work zone delineation
(support, contamination, reduction and exclusion), on/off-site communications, site access controls, and security (physical and procedural).
(ix) Communications: Written procedures for routine and emergency communications procedures shall be included in the Contractor’s HASP.
(x) Personal Hygiene, Personal Decontamination and Equipment Decontamination:
Decontamination facilities and procedures for personnel protective equipment, sampling equipment, and heavy equipment shall be discussed in detail in the HASP.
(xi) Emergency Equipment and First Aid Requirements: The Contractor shall provide appropriate emergency first aid kits and equipment suitable to treat exposure to the hazards identified, including chemical agents. The Contractor will provide personnel that have certified first aid/CPR training on-site at all times during site operations.
(xii) Emergency Response Plan and Spill Containment Program: The Contractor shall establish procedures in order to take emergency action in the event of immediate hazards (i.e., a chemical agent leak or spill, fire or personal injury). Personnel and facilities supplying support in emergency procedures will be identified. The emergency equipment to be present on-site and the Emergency Response Plan procedures, as required 29 CFR 1910.120, paragraph (1)(1)(ii) shall be specified in the Emergency Response Plan. The Emergency Response Plan shall be included as part of the HASP. This Emergency Response Plan shall include written directions to the closest hospital as well as a map showing the route to the hospital.
(xiii) Logs, Reports and Record Keeping: The Contractor shall maintain safety inspections, logs, and reports, accident/incident reports, medical certifications, training logs, monitoring results, etc. All exposure and medical monitoring records are to be maintained according to 29 CFR 1910 and 29 CFR 1926. The format of these logs and reports shall be developed by the Contractor to include training logs, daily logs, weekly reports, safety meetings, medical surveillance records, and a phase-out report. These logs, records, and reports shall be maintained by the Contractor and be made available to the Engineer.
The Contractor shall immediately notify the Engineer of any accident/ incident. Within two working days of any reportable accident, the Contractor shall complete and submit to the Engineer an accident report.
(xiv) Confined space entry procedures: Confined space entry procedures, both permit required and non permit required, shall be discussed in detail.
(xv) Pre-entry briefings: The HASP shall provide for pre-entry briefings to be held prior to initiating any site activity and at such other times as necessary to ensure that employees are apprised of the HASP and that this plan in being followed.
(xvi) Inspections/audits: The HSM or HSO shall conduct Inspections or audits to determine the effectiveness of the HASP. The Contractor shall correct any deficiencies in the effectiveness of the HASP.
6-HASP Implementation: The Contractor shall implement and maintain the HASP throughout the performance of work. In areas identified as having a potential risk to worker health and safety, and in any other areas deemed appropriate by the HSO, the Contractor shall be prepared to immediately implement the appropriate health and safety measures, including but not limited to the use of personal protective equipment (PPE), and engineering and administrative controls.
If the Engineer observes deficiencies in the Contractor’s operations with respect to the HASP, they shall be assembled in a written field directive and given to the Contractor. The Contractor shall immediately correct the deficiencies and respond, in writing, as to how each was corrected.
Failure to bring the work area(s) and implementation procedures into compliance will result in a Stop Work Order and a written directive to discuss an appropriate resolution(s) to the matter.
When the Contractor demonstrates compliance, the Engineer shall remove the Stop Work Order.
If a Stop Work Order has been issued for cause, no delay claims on the part of the Contractor will be honored.
Disposable CPC/PPE, i.e. disposable coveralls, gloves, etc., which come in direct contact with hazardous or potentially hazardous material shall be placed into 55 gallon USDOT 17-H drums and disposed of in accordance with Federal, State, and local regulations. The drums shall be temporarily staged and secured within the WSA until the material is appropriately disposed.
7-HASP Revisions: The HASP shall be maintained on-site by the Contractor and shall be kept current with construction activities and site conditions under this Contract. The HASP shall be recognized as a flexible document which shall be subject to revisions and amendments, as required, in response to actual site conditions, changes in work methods and/or alterations in the relative risk present. All changes and modifications shall be signed by the Contractor’s HSM and shall require the review and acceptance by the Engineer prior to the implementation of such changes.
Should any unforeseen hazard become evident during the performance of the work, the HSO shall bring such hazard to the attention of the Contractor and the Engineer as soon as possible.
In the interim, the Contractor shall take action, including Stop Work Orders and/or upgrading PPE as necessary to re-establish and maintain safe working conditions and to safeguard on-site personnel, visitors, the public and the environment. The HASP shall then be revised/amended to reflect the changed condition.
Method of Measurement:
1-Within thirty (30) calendar days of the award of the Contract, the Contractor shall submit to the Engineer for acceptance a breakdown of its lump sum bid price for this item detailing:
(a) The development costs associated with preparing the HASP in accordance with these
Specifications.
(b) The cost per month for the duration of the Project to implement the HASP and provide the services of the HSM and the HSO.
2-If the lump sum bid price breakdown is unacceptable to the Engineer; substantiation showing that the submitted costs are reasonable shall be required.
3-Upon acceptance of the payment schedule by the Engineer, payments for work performed will be made as follows:
(a) The lump sum development cost will be certified for payment.
(b) The Contractor shall demonstrate to the Engineer monthly that the HASP has been kept current and is being implemented and the monthly cost will be certified for payment.
(c) Any month where the HASP is found not to be current or is not being implemented, the monthly payment for the Environmental Health and Safety Item shall be deferred to the next monthly payment estimate. If the HASP is not current or being implemented for more than thirty calendar days, there will be no monthly payment.
(d) Failure of the Contractor to implement the HASP in accordance with this Specification shall result in the withholding of all Contract payments.
Basis of Payment:
This work will be paid for at the Contract lump sum price for “Environmental Health and Safety” which price shall include all materials, tools, equipment and labor incidental to the completion of this item for the duration of the Project to maintain, revise, monitor and implement the HASP.
Such costs include providing the services of the HSM and HSO, Contractor employee training, chemical protective clothing (CPC), personal protective equipment (PPE), disposal of PPE and CPC, medical surveillance, decontamination facilities, engineering controls, monitoring and all other HASP protocols and procedures established to protect the Health and Safety for all on-site workers.
Environmental Health and Safety L.S.
ITEM NO. 0507900A
ITEM # 0507900A — TRENCH DRAIN
Description This work shall consist of furnishing and installing a polymer concrete trench drain, model PDX 12” drain manufactured by ABT, Inc. or approved equal. All drainage system installation shall be in accordance with the lines, grades, dimensions and details shown on the plans, or as ordered, and in accordance with the provisions of these specifications for the various materials and work which constitute the completed structure.
Materials The materials to be used in the construction shall be those indicated on the plans or ordered by the Engineer and shall meet the requirements:
Drainage Trench System: The surface drainage shall be ABT Inc. Polydrain PDX 12” with cast-in ductile iron grate and 903D inline catch basin with a ductile iron grate or approved equal. Channels shall be manufactured from precast polymer concrete with an integrally cast-in ductile iron edge rail. In concrete areaway use a grate capable of sustaining a pedestrian load case (Case A) minimum or approved equal.
Minimum properties of polymer concrete will be as follows:
• Compressive strength: 17,000 psi
• Flexural strength: 4,000 psi
• Tensile strength: 2,000 psi
• Water absorption: 0.1% max.
• Frostproof
• Dilute acid and alkali resistant
• B117 salt spray test compliant
The system shall be 12" nominal internal width with a 0.5% minimum slope. All channels shall be interlocking with a male/female joint.
Construction Methods The trench drain shall be installed in accordance with the manufacturer's instructions and recommendations.
Excavation shall consist of the removal and disposal of all unsuitable and surplus materials, the removal of which is necessary for the proper completion of the work, to the depth required for installation of the trench drain system or the adjacent proposed work, whichever is deeper.
Earth Excavation and Subbase: Where the soil in the bottom of the trench is found to be unsuitable, the Engineer shall order it to be removed and replaced with M.02.01 Granular Fill.
The granular fill shall be placed in lifts not to exceed 6” and shall be constructed to allow proper placement of the base material. The granular fill materials shall be compacted to a minimum of 95% of laboratory modified proctor, AASHTO T-180. This additional excavation
ITEM NO. 0507900A
and construction of the granular fill shall be considered included if required
Method of Measurement The work will be measured for payment by the accepted number of linear feet of “Trench Drain”, of the type specified, complete in place, including excavation, granular fill base and concrete encasement.
Basis of Payment This item will be paid for at the contract unit price per linear feet furnished, installed and accepted on the project “Trench Drain”, which price shall include all materials, tools, equipment, excavation, and labor incidental thereto.
Pay Item Trench Drain
Pay Unit L.F.
Rev 5/6/19
ITEM #0520041A
ITEM #0520041A - PREFORMED JOINT SEAL
Description: Work under this item consists of removal, furnishing, and installing a preformed joint seal as shown on the plans. Work also includes a pre-installation survey to measure the pavement depth at all locations where the joint meets the curb.
Materials: One of the following Preformed Joint Seals specified on the plans shall be supplied:
V-Shaped Silicone Seals:
1. Silicoflex:
RJ Watson, Inc.
11035 Walden Ave Alden, New York 14004 Tel: (716) 901-7020
Website: http://www.rjwatson.com
2. V-Seal:
D.S. Brown Company 300 East Cherry Street North Baltimore, Ohio 45872 Tel: (419) 257-3561 Website: http://www.dsbrown.com
Foam-Supported Silicone Seals:
3. Bridge Expansion Joint System (B.E.J.S.):
EMSEAL Joint Systems Ltd.
25 Bridle Lane, Westborough, MA 01581 Tel: (508) 836-0280 Website: http://www.emseal.com
4. Wabo FS Bridge Seal Watson Bowman Acme Corp.
95 Pineview Drive Amherst, NY 14228 Tel: (716) 691-9239 Website: https://wbacorp.com/products/bridge-highway/joint-seals/wabofsbridge/
When foam-supported silicone joint seals are the only type allowed on the plans (such as at bridge joints that extend through sidewalks), the CTDOT will consider products from other foam-supported silicone joint manufacturers, if the products have been installed by another State Department of Transportation, are functioning successfully in a similar climate to Connecticut’s for at least one year, and are deemed by the CTDOT to be suitable for use in the specific application for which the Contractor is requesting. To be considered, the Contractor shall submit documentation indicating the product name, manufacturer, the contact information for a Department of Transportation official who can confirm the successful installation and continued success of the product, the date of installation and the nature of the installation, including thermal movement range and skew of the installed joint.
A Materials Certificate for all components of the selected preformed joint seal shall be submitted by the Contractor in accordance with the requirements of Article 1.06.07
Construction Methods: All work at each joint location shall be accomplished in accordance with “Maintenance and Protection of Traffic” and “Prosecution and Progress.”
Submittals:
Prior to ordering preformed joint seals, and prior to forming block-outs for the preformed joint seals in the headers, the Contractor shall submit the following to the Engineer:
The Manufacturer and product information of the selected joint system;
Material safety data sheets (MSDS) and technical product information;
Name and credentials of a qualified technical representative supplied by the manufacturer and acceptable to the Engineer. This person shall be available to provide assistance at the beginning of the work and be available to provide training and guidance throughout the project.
A detailed, step-by-step installation procedure, including surface preparation, splicing of the preformed joint seal, and a list of the specific equipment to be used for the installation.
Installation: The technical representative of the accepted joint system shall be notified of the scheduled installation a minimum of 2 weeks in advance and be present to provide direction and assistance for the first joint installation and succeeding joint installations until the Contractor becomes proficient in the work and to the satisfaction of the Engineer.
The minimum ambient temperature for installing any of the qualified, preformed joint seals is 40°F and rising. When the manufacturer’s requirement for minimum installation temperature is greater than 40°F, the manufacturer’s requirement will govern.
All concrete surfaces to which sealing glands will be bonded shall be prepared in accordance with International Concrete Repair Institute (ICRI) concrete surface profile standards. The minimum acceptable surface profile is CSP2 (grinding), but CSP3 (light abrasive blast) is preferred. Any discontinuities or sharp projections into the plane of the joint shall be ground smooth prior to blasting. Whenever abrasive blast cleaning is performed, the Contractor shall take adequate measures to ensure that the abrasive blast cleaning will not cause damage to adjacent traffic or other facilities. Traffic will not be allowed to pass over the joint after blasting has occurred.
Following blasting, the joint surfaces shall be wiped down or blown clean as recommended by the manufacturer.
The joint surfaces shall be completely dry before installing any of the components of the selected joint seal. The selected joint seal shall not be installed immediately after precipitation or if precipitation is forecast. Joint preparation and installation of the selected preformed joint seal must be done during the same day.
The selected joint sealing system shall be installed continuously with no field splices in the preformed seal in the roadway section, unless field splices are allowed by the manufacturer of the selected preformed joint seal. In no case shall field splices of the preformed joint seal be allowed in a wheel path or within the roadway shoulder. When splices cannot be avoided due to traffic constraints, the splice shall be at a painted lane line.
After the joint seal has been installed, water shall not be able to penetrate the joint. Any joint seal that does not effectively seal against water shall be removed and replaced at the Contractor’s expense.
Method of Measurement: This work will be measured for payment by the number of linear feet of preformed joint sealing system installed and accepted. The measurement will be made along the centerline of the joint at the top surface of header, curb, sidewalk and parapet.
Basis of Payment: This work will be paid for at the Contract unit price per linear foot for "Preformed Joint Seal," complete in place, removal of existing joint material, including all materials, equipment, tools, and labor incidental thereto.
The Contract unit price shall include the cost of assistance from a technical representative of the selected joint system.
Preformed Joint Seal l.f.
Rev. Date 10/21/20
ITEM #0601318A
ITEM #0601318A - PARTIAL DEPTH PATCH
Description: Work under this item shall consist of the removal of spalled, delaminated or otherwise deteriorated concrete from existing bridge decks, approach slabs and headers by pneumatic hammers or hydro-demolition methods, and replacement with fast setting patching material as shown on the plans, as directed by the Engineer and specified herein.
Where ordered by the Engineer, work under this item shall also include inspecting the underside of the deck concrete for popouts caused by the removal of deteriorated concrete.
Work under this item shall also include the furnishing and installation of wire ties for reinforcing bar and vertical supports on inadequately supported or vibrating reinforcing steel within deck patch areas, as ordered by the Engineer.
Materials: The materials shall meet the following requirements:
1) Patching Material: The patching material shall be a concrete composed of a quick setting cement, fine aggregate, coarse aggregate and water. This concrete shall harden within 40 minutes, and develop minimum compressive strengths of 1,000 psi within 1 hour after set and 3,000 psi within 3 days.
The Contractor shall design and submit a quick setting mix to the Engineer for acceptance.
Said mix design shall meet the strength requirements noted above and shall attain a minimum of 2500 psi prior to allowing traffic on patched surfaces. The mix proportions and method of application shall be in accordance with the manufacturer’s recommendations. Sources of supply of all the materials shall be clearly indicated.
Fine aggregate shall meet the requirements of Subarticle M.03.01-2.
The coarse aggregate shall meet the requirements of Subarticle M.03.01-1. The required grading shall be obtained by using 100% of No. 8 size coarse aggregate. Grading of the aggregate shall conform to the gradation for No. 8 stone in Article M.01.01.
Water shall meet the requirements of Subarticle M.03.01-4.
The quick setting cement shall be one of the following materials:
MasterEmaco T 415 Perma Patch BASF Dayton Superior Corporation 23700 Chagrin Blvd. 7130 Ambassador Dr.
Beachwood, OH 44122 Allentown, PA 18106 216-839-7016 800-745-3707 www.master-builders-solutions.basf.us www.daytonsuperior.com
Rapid Set DOT Cement Speed Crete Green Line CTS Cement Manufacturing Corporation Tamms Industries 12442 Knott Street 730 Casey Ave.
Garden Grove, CA 92841 Wilkes-Barre, PA 18702 800-929-3030 ext. 188 800-218-2667 www.ctscement.com www.dpproducts.com/products/tamms.html
Fastcrete Silpro Corporation 2 New England Way Ayer, MA 01432 800-343-1501 www.silpro.com/products/fastcrete.shtml
Gypsum Based Materials will not be allowed.
Construction Methods:
Removal of concrete for partial depth patch will be performed by one of two methods: Hammer Demolition or Hydro-demolition. Prior to beginning any work, the Contractor shall provide submittals outlining intended method, as defined herein.
1) Inspection of the Deck: Before any existing concrete is removed, the Contractor shall provide the Engineer clear access to the bridge deck. During this time, the Engineer will perform an inspection of the structural slab and will designate areas where concrete removal shall be required. It shall be the responsibility of the Contractor to arrange the construction schedule so that the required operations may be performed without causing delay to the work.
No operations will be performed by the Engineer until after the following construction work has been completed:
a) The existing bituminous overlay or concrete wearing course, if present, has been removed.
b) The existing waterproofing system, if present, has been removed.
Note: The removal of this material will be paid for under other applicable items.
It shall be the responsibility of the Contractor to inform the Engineer, in writing, of the date that a structure will be available for inspection operations. Notification shall be given to the Engineer at least 7 days prior to the date that the area in question will be in a condition acceptable to the Engineer.
The Contractor is hereby informed that the following time period will be necessary to perform the required inspection operations:
One working day with suitable weather conditions per each six thousand (6,000) square feet, or portion thereof, of deck area.
The Contractor will not be allowed to do any further work to the structure, until all necessary inspection operations have been performed, unless given permission by the Engineer.
The Contractor shall include any costs related to the allowance for this inspection in the general cost of the work.
2) Hammer Demolition: The maximum allowable noise level caused by equipment used for the removal of deck concrete shall not exceed 90 decibels on the “A” weighted scale, as measured at the nearest residence or occupied building. The Contractor shall demonstrate, to the satisfaction of the Engineer, that the equipment will meet this requirement before the use of such equipment will be allowed.
The weight of pneumatic hammers when used shall not exceed 30 pounds for concrete removal above the top reinforcing steel nor 15 pounds for concrete removal below the top reinforcing steel.
3) Hydro-Demolition Water and Equipment: All hydro-demolition equipment shall be capable of selectively removing spalled, delaminated or otherwise deteriorated concrete and cleaning the existing reinforcing steel of all rust and corrosion products by use of high-velocity water jets acting under continuous automatic control.
The hydro-demolition equipment shall consist of filtering and pumping units operating in conjunction with a remote-controlled robotics device.
All hydro-demolition equipment shall be equipped with an angled and rotating water nozzle to prevent interference of the existing reinforcing steel with the removal of concrete.
The maximum allowable noise level caused by equipment used for the removal of deck concrete shall not exceed ninety (90) decibels on the “A” weighted scale, as measured at the nearest residence or occupied building. The Contractor shall demonstrate, to the satisfaction of the Engineer, that the equipment will meet this requirement before the use of such equipment will be allowed.
The make and model numbers of hydro-demolition equipment shall be submitted for acceptance by the Engineer. No hydro-demolition work shall be initiated until this acceptance is granted.
The Contractor shall provide structurally adequate shields approved by the Engineer for protection of adjacent traffic lanes in the vicinity of the removal and cleanup operations.
Water used for the hydro-demolition shall be potable.
The Contractor is advised that the withdrawal of more than 50,000 gallons of water per day from a single source other than from a municipal water system shall require a diversion permit issued by the Department of Energy and Environmental Protection, Water Resources Unit, in accordance with the Connecticut Water Diversion Policy Act PA 84-402, CGS Sections 22a-365 through 22a-378.
4) Hydro-Demolition Drainage Runoff Control: At least 2 weeks prior to the planned initiation of hydro-demolition operations, the Contractor shall submit to the Engineer for acceptance a comprehensive plan for the hydro-demolition operation. This Hydro-Demolition Plan shall include the following:
a) Equipment
b) Containment
c) Filtration
d) Location of trial areas
e) Disposal of hydro-demolition runoff and concrete debris in conformance with these specifications The Plan shall ensure that all concrete debris and particulate matter will be removed from hydro-demolition runoff water prior to its release to the environment.
The Plan shall include provision for the concurrent vacuuming of all runoff water at the immediate vicinity of the hydro-demolition operation. Runoff water shall be completely contained and vacuumed into a suitably sized water tight mobile tank for transport to a disposal site sedimentation basin acceptable to the Engineer.
Hydro-demolition operations shall proceed only with the simultaneous operation of a runoff water vacuum pickup in the immediate area of the hydro-demolition operation. Runoff water shall not be allowed to flow across adjacent travel lanes, across bridge joints nor through any existing bridge drainage system.
The size and location of the disposal site sedimentation basin shall be detailed in the Hydro- Demolition Plan. The sedimentation basin shall be properly sized so that uncontrolled overflow does not occur. At the conclusion of hydro-demolition operations, the sedimentation basin and all concrete debris shall be removed and the area restored to its original condition.
The Plan shall additionally conform to all applicable requirements of Section 1.10 Environmental Compliance of the Standard Specifications.
The acceptance by the Engineer of the Hydro-Demolition Plan shall in no way relieve the Contractor of any responsibility for its safe and effective performance.
5) Calibration and Testing of Hydro-Demolition Equipment: A trial area will be designated by the Engineer to demonstrate that the equipment, personnel and methods of operation are capable of producing satisfactory results. The trial area will consist of 2 patches, each of approximately 20 square feet, one area of deteriorated or defective concrete and one area of “sound” concrete as determined by the Engineer.
Area of sound concrete is defined as: An area free from chemical defects, delamination, spalling, cracks, etc.
In the “sound area of concrete,” the equipment shall be programmed to remove concrete to a depth 1 inch + 1/4 inch below the top reinforcing steel mat.
After completion of the sound concrete test area, the equipment shall be located over the deteriorated or defective concrete and, using the same parameters as for sound concrete removal, shall remove all deteriorated or defective concrete. If a satisfactory result is obtained, these parameters may be used as a basis for production removal.
If, after calibrating the hydro-demolition equipment and beginning removal operations in a particular zone or area, insufficient removal of concrete is observed, in the opinion of the Engineer, the Contractor shall recalibrate the hydro-demolition equipment for that zone or area to the satisfaction of the Engineer.
6) Removal of Deteriorated Concrete: All deteriorated concrete designated for removal under this construction item shall be removed within the limits shown on the plans and where ordered by the Engineer. The lateral limits of each area to be repaired will be delineated by the Engineer and suitably marked. Where several areas to be repaired are very close together, the Engineer may combine these individual patches into a large area. The outlines of each such area shall first be cut to a depth of 1/2 inch with a powersaw capable of making straight cuts prior to pneumatic demolition. In the event that reinforcing steel is encountered within the upper 1/2 inch depth during sawing operations, the depth of saw-cut shall immediately be adjusted to a shallower depth so as not to damage the steel bars. If so directed by the Engineer, saw cutting shall again be carried down to the 1/2 inch depth at other locations of repair provided reinforcing steel is not again encountered. Where over-breakage occurs resulting in a featheredge, the featheredge shall be squared up to a vertical edge in an acceptable manner. Where sawing is impractical, the area shall be outlined by chisel or other acceptable means.
All deteriorated concrete shall be removed by pneumatic hammers or hydro-demolition methods.
The depth of concrete removal shall be at least 1 inch below the top reinforcing steel mat but shall be such as to include all spalled, delaminated, or otherwise deteriorated concrete.
The Engineer will be the sole determiner of what constitutes deteriorated concrete, using sounding methods or other evaluation measures.
Within 1 hour following the initiation of a concrete removal operation in any patch area, all loose concrete debris shall be removed, followed by water flushing of the existing concrete bonding surface to completely remove all traces of concrete debris and cement residue so that rebonding to the surface of the remaining sound concrete will be prevented. If it is not convenient to clean and flush the patch area within this time frame, all steel reinforcing and concrete bonding surfaces shall be cleaned subsequently by high pressure water blasting at a nozzle pressure not less than 3,000 psi with a sufficient volume to completely remove all rebonded debris and laitance.
Where the existing reinforcing steel is damaged or corroded, it shall be cut out and replaced with new reinforcing steel of the same size. Any sound reinforcing steel damaged during the concrete removal operations, shall be repaired or replaced by the Contractor at its expense, as directed by the Engineer. New steel shall be attached beneath or beside existing steel with a minimum splice length as indicated on the plans, or as directed by the Engineer. The concrete shall be removed to a minimum depth of 1 inch below the new steel.
7) Surface Preparation: Sound reinforcing steel which is in the proper position in the slab shall be left in place and cleaned of all concrete, the smaller fragments to be removed with hand tools in patch areas where pneumatic hammers were used.
Reinforcing bar wire ties and vertical supports shall be installed on inadequately supported or vibrating reinforcing steel, as directed by the Engineer.
The concrete surface and reinforcing steel to receive patching material shall be either sandblasted or water blasted, followed by air blasting in order to remove all loose particles and dust. All blasting operations shall be performed using techniques acceptable to the Engineer, taking care to protect all pedestrians, traffic, and adjacent property. All compressed air sources shall have properly sized and designed oil separators attached and functional to allow delivered air at the nozzle to be oil-free. The patch area shall be cleaned of all additional loose or powder-like rust, oil, solvent, grease, dirt, dust, bitumen, loose particles, and foreign matter just prior to patching.
If the patch area was not cleaned and flushed with clean water immediately following hydro-demolition, or if run-off from a nearby hydro-demolition operation was allowed to travel through the previously cleaned and flushed patch surface, all affected concrete and steel reinforcing bonding surfaces shall be water blast cleaned at a nozzle…