The document is a Scope of Work and Proposal Form for Division 13 Pre-Engineered Metal Buildings (PEMB) issued by the City of Sulphur Springs, Texas, for a Senior Center construction project. The project involves constructing three interconnected buildings (A, B, and C) totaling 9,053 square feet of conditioned and covered space, with detailed specifications for structural framing, roof and wall panels, insulation, and architectural elements. The buildings will feature specific requirements for bay spacing, roof panel types (24 ga. standing seam with varying profiles), wall framing, and include provisions for six roof top units (RTUs) and six skylights.
The project is designed under the 2018 International Building Code with specific engineering parameters, including wind speed of 105 mph, exposure category B, seismic design category B, and various load specifications. The PEMB contractor will be responsible for providing comprehensive engineering, labor, equipment, and materials for the entire package, including specialized roof and wall panels from manufacturers like MBCI and McElroy, with specific finish and insulation requirements. The contract includes detailed technical specifications for panel types, thermal spacers, gutters, downspouts, and framing, with minimum insulation values of R-38 for roofing and R-26 for walls, indicating a focus on energy efficiency and detailed construction standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Sulphur Springs – Pre-Engineered Metal Building Scope of work and Proposal Form
The City of Sulphur Springs is soliciting a proposal for Division 13- Pre-Engineered Metal Buildings.
Buildings consist of the following:
1. Plans consist of Cover sheet, A-100, A-101, A-101A, A-103, A-201, A-202, A-301 and A-302
2. The Senior Center Building(s) include multiple eave heights. The conditioned space totals 8,331
SF with covered drive adding 722 SF, in total 9,053 SF under roof.
3. Building A is a gable building with an offset ridge line.
a. Dimensions are noted on Sheet A-101A
b. The endwall at line 1 shall include girts and columns framing.
c. The endwall at line 4 shall include girts above the roof line of Building B and columns as required.
d. The sidewall at line C between frame lines 1 & 2 shall include girts and column framing from eave to foundation. The side wall between lines 2 & 4 shall include girts above the roof of building B and columns as required.
e. The sidewall at line B shall include girts above the roof line of Building B and columns as required.
f. Bracing shall be provided between frame lines 2 & 3
i. A portal frame is required at line B to a height of 12’ AFF w/ rod bracing above
ii. Rod or Cable bracing is allowed at line C.
g. Building A columns shall provide support of Building B frames at lines B & C.
4. Building B is a double slope structure with varying widths.
a. The ridge shall align with Building C frame line “G”
b. Endwalls of Building B will be Structural Steel studs extending to top of parapet and provided by others.
c. Sidewalls of Building B shall have a support girt at 10’ AFF to support a Structural Steel stud wall system by others. Framing and sheeting above this girt to the top of parapet are to be provided by the PEMB manufacturer.
i. The PEMB Contractor shall include a welded steel gutter behind the parapet wall.
d. Bracing shall be provided as follows:
i. Rod or Cable bracing between frames 3 & 4 at line D
ii. Portal Frame between frames 2 & 3 at line A
5. Building C is a single slope structure covering both conditioned space and the drive thru.
a. Dimensions are noted on Sheet A-101A (50’-10” x 23’-5”)
b. Building C includes an overhang with façade to be provided by the PEMB manufacturer.
c. Portal Frame Bracing may be located at line 7 to a height of 10’ AFF ( in the transom space above the storefront doors ).
d. Building C Frame G shall provide support for intersecting Frame 6 of Building B.
e. Building C shall support a rafter for Building B between G & F.
6. Refer to Sheet A-302 for building height requirements.
7. This contract shall include the following:
a. Engineering, Labor, Equipment and Material required to provide and erect the entire PEMB package.
b. Bay spacing as shown on the referenced plans by REES.
c. Roof purlins are to be 10” deep to allow for insulation.
d. Roof Panels for Building A
i. 24 ga. Standing Seam UL 90 with Kynar finish. Panel profile to be 16” wide with 2” rib.
ii. Roof panels to be installed with thermal spacers.
iii. Roof panels shall be equal to MBCI “SuperLok” or McElroy “Maxima”
iv. Roof slope as shown.
e. Roof Panels for Building B & C
i. 24 ga. Standing seam UL 90 galvalume roof. Panel profile to be 24” wide with 3” rib.
ii. Roof panels to be installed with thermal spacers.
iii. Roof panels shall be equal to MBCI “Double-Lok” or McElroy “Masterlok-FS
iv. Roof slope shall be ¼” per foot.
f. The PEMB Contractor (this contract) shall provide parapet wall framing as noted on the sidewall applications. The parapet frame shall be covered on the outside with a metal panel suitable for masonry back up. The Parapet wall on the back side shall be covered with an exposed fastener metal panel to close the wall and flash the parapet gutter.
g. Parapet wall framing shown on end walls shall be by others.
h. The PEMB Contractor shall provide and install the welded steel parapet gutters.
i. The PEMB Contractor shall provide downspout extensions thru the exterior wall and collector heads with downspouts on the masonry wall.
i. Provide sub framing for 6 each RTU roof curbs as well as roof curbs contoured to fit the panel profile. Roof curbs shall be manufactured by LMC.
j. Provide sub framing for 6 each skylights roof curbs as well as roof curbs contoured to fit the panel profile. Roof curbs shall be manufactured by LMC.
k. Provide wall framing (girts) with exterior factory painted panels where shown on the reference plan (elevations).
i. Provide framed openings in these walls as shown on the referenced plan (elevations)
ii. Wall panels shall be exposed fastener 24 ga. Panels installed vertically with Kynar finish.
1. Wall panels shall be equal to MBCI “7.2” or McElroy “Mega Rib”
l. Walls left open for structural stud framing by others. Provide a high wall girt for support of the stud wall. Consider the loading (deflection / drift) for a rigid wall.
m. PEMB contractor to provide 24 ga. soffit panels equal to MBCI Artisan or McElroy FW
Panel at the following locations:
i. Building A overhang
ii. Building C overhang and drive thru ceiling.
n. PEMB contractor to provide Roof insulation with minimum R-38 value equal to Silvercote
Energy Saver FP PEMB contractor to provide wall insulation over and in the wall girts equal to Silvercote Energy Saver Double Layer Wall with a minimum R-26 value.
o. PEMB contractor to provide personnel door and frame 115b.
p. Cable or rod bracing is allowed in bays without openings.
8. Refer to notes on the sheets and as listed below.
1.0 Design Notes:
1.1 Building Code 2018 International Building Code
1.2 Occupancy / Risk Category II Standard
1.3 Dead Load 2.5 psf – Weight of Materials of Construction
1.4 Collateral Load 5.0 psf - Mechanical
1.5 Roof Live Load 20 psf- Reduction Allowed
1.6 Wind Speed 105 mph Vasd = 90mph
1.6.1 Exposure B
1.6.2 Importance Factor N/A
1.6.3 Enclosure Closed
1.7 Snow Load (Ground) 5.0 psf
1.7.1 Importance Factor 1.0
1.7.2 Exposure Partially Exposed
1.7.3 Thermal Factor 1.0
1.8 Seismic
1.8.1 Design Category B
1.8.2 Importance Factor 1.0
1.8.3 Site Class D
2.0 Deflection Criteria:
2.1 Drift
2.2 Vertical Frame Deflection H/240
2.3 Purlin Deflection L/240
2.5 Girt Deflection L/240