Ditch Redesigns.pdf

PDF 5 MB Posted

Attached to
Irrigation Delivery System at Sonny Bono Salton Se
Solicitation number
140F0120Q0146
Issued by

About this file

This document provides details for a federal contract solicitation to redesign irrigation delivery systems at the Sonny Bono Salton Sea National Wildlife Refuge Complex. The solicitation seeks bids to improve irrigation ditches and pipelines indicated on the overview map that delivers water to the refuge from the All American and Coachella Canals. Interested vendors should submit proposals under solicitation number 140F0120Q0146 by the specified deadline to the Department of the Interior Fish and Wildlife Service, the contracting federal agency responsible for managing the refuge. The selected contractor will redesign the delivery systems for Reidmann 273 and 273A and pipeline 258 to update the infrastructure and ensure the continued provision of water to the refuge habitats and lands.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Fish & Wildlife Service

Sonny Bono Salton Sea National Wildlife Refuge Ditch Redesign Overview Map.

Reidmann

273 & 273A

Sources: Esri, Airbus DS, USGS, NGA, NASA, CGIAR, N Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, Rijkswaterstaat, GSA, Geoland, FEMA, Intermap and the GIS user community

0 2 4 6 81 Miles ¯

Legend

Pipelines

Sonny Bono Salton Sea National Wildlife Refuge Cadastral Boundaries

National Wildlife Refuges (<3M) National Wildlife Refuge

NWRS/NFH/WPA Easement

Agreement

Secondary to other federal agency

Partial interest

Unit 1 258 Ditch Redesign.

B1

B2

B3

T G a te

Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community ¯0 200 400 600 800100

Feet

IID Structure Turnout 29" Concrete

Water flowing W from gate

2661 of 24" PIP80 pipe 1: 7' of 10"PVC Air Vent Assembly

1 Concrete tie-in with IID tie in on E end of pipeline.

1 PVC to PVC tie-in with pre-existing pipeline on W end.

Legend

Air Vents

Main Water Supply Ditch

New Pipeline

ABPonds

Hazard Unit 273 & 273A Ditch Redesign.

U.S. Fish & Wildlife Service

6743' of 21" PIP80 pipe 11: 200"x21" Overflow valves & Assemblies (Waterman or Equal) 11: Valve protectors 6: In-line screw gate (Fresno or equal)

Minus rock around each valve 3: 7' of 10" PVC Air Vent Assembly Concrete Tie-in

H4 H5 H6

H3

H1A H2A H3A

Ruddy Pond

H9A

H8/9

H7A

Hazard Lake

Oxbow Lake

H1 H2

Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

IID Structure Turnout 29" Concrete

Water flowing W ¯0 340 680 1,0201,360170 Feet

Legend

Air Vents

In-line Valves

Valves

Pipe Under the Road

Main Water Supply Ditch

Hazard Pond Boundaries

Unit 1 Reidmann Ditch Redesign.

2095' of 21" PIP80 pipe 8: 20"x21" Overflow valves & Assemblies (Waterman or Equal) - East ponds 8: Valve protectors 3: In-line screw gate (Fresno or equal)

Minus rock around each valve 1: 7' of 10"PVC Air Vent Assembly Concrete Tie-in

Reidmann 4 w Reidmann 4 E

Reidmann 3 EReidmann 3 w

Reidmann 2 W Reidmann 2 E

Reidmann 1 EReidmann 1 W

T G a te

A

Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Communitȳ 0 200 400 600 800100

Feet

IID Structure Turnout 29" Concrete

Water flowing N from gate

Legend

Air Vents

In-line Valves

Valves

Pipe Under the Road

Main Water Supply Ditch

Riedmann Ponds

SBSS Ditch Design Overview
Ditch Redesigns
A06 258 Pipeline final
A06 273 & 273A Pipeline
A06 Reidmann Pipeline

File details come from the government source that posted it. Updated .