District Two HVAC bid FY26.docx

DOCX document 255 KB Posted

Attached to
Wildlife District Two FY26 HVAC Maintenance and Inspection
Solicitation number
SRC0000030962
Issued by
Hancock County, Ohio

About this file

This document appears to be a bid specification for HVAC maintenance and inspection for Wildlife District Two Office located at 952 Lima Ave., Findlay, OH 45840. The document details the existing HVAC infrastructure, including a Trane condenser unit, ice tank, chiller unit, boilers (models EVG-299 and EVG-399), control units, ultraviolet air handler units, hot water and chiller circulating pumps, and AC and furnace units for the main building and Building Two. The specification involves a comprehensive review and potential maintenance of these HVAC systems, though specific bid dates, contract terms, and response requirements are not clearly outlined in the provided document.

The file provides technical equipment details but lacks specific financial or procurement information such as budget allocations, funding sources, or pricing expectations. The images referenced (image1.jpeg through image13.jpeg) suggest visual documentation of the HVAC systems and equipment, which could be used to support the maintenance and inspection scope. While the document indicates a potential fiscal year 2026 (FY26) procurement cycle, no definitive contract parameters, bidder instructions, or evaluation criteria are present in the current file excerpt.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Wildlife District Two Office HVAC Maintenance and Inspection 952 Lima Ave., Findlay, OH 45840

Information panel on Trane condenser unit for main building.

Ice tank and chiller unit for main building.

Trane chiller for main building.

Main building boilers.

Information plate for EVG-299 boiler, other boiler is model EVG-399.

Main building control units and power supply.

Ultraviolet unit in air handlers

Hot water circulating pumps in main building.

Chiller circulating pumps in main building.

Building Two AC unit information panel.

Building Two AC unit.

Building Two Furnace unit.

Hot water heating units.

image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image1.jpeg image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg

File details come from the government source that posted it. Updated .