DISTRICT 6-614075-135133-A-1.pdf

PDF 2 MB Posted

Attached to
614075 DISTRICT 6 Bridge Drainage Installation & Rehabilitation at Various Locations
Solicitation number
BD-27-1030-0H100-0H002-131108
Issued by
Massachusetts

About this file

This is Addendum No. 1 issued by the Massachusetts Department of Transportation Highway Division for Project 614075, a bridge drainage installation and rehabilitation contract covering District 6 at various locations. The addendum, dated July 16, 2026, modifies contract documents and supplements specifications for the project valued at $792,000. Sealed proposals are due August 4, 2026 at 2:00 p.m. through www.bidx.com. Prospective bidders must be pre-qualified by MassDOT in the BRIDGE-CONSTRUCTION category before proposal submission, with the Request Proposal Form (R109) required at least 14 days prior to bid opening. The addendum revises multiple documents including the table of contents, notice to contractors, supplemental specifications, and price adjustment provisions for structural steel and reinforcing steel. Key specification changes include modifications to drainage system sediment measurement and payment sections, updates to cement concrete pavement joint filler materials, comprehensive new subsections for milled rumble strips with four types (A, B, C, D), revised impact attenuator payment items, new subsections for power pedestals in traffic control wiring, addition of traffic signal detection systems including vehicle detection systems and pedestrian detectors, new connected work zone notification system requirements, and updated materials specifications for preformed expansion joint filler and traffic control devices.

The contract requires a proposal guaranty of 5% of the bid value and is subject to Massachusetts prevailing wage rates as determined by the Commissioner of the Massachusetts Department of Labor and Workforce Development. Price adjustments apply to hot mix asphalt (base price $712.50/ton), Portland cement ($452.13/ton), diesel fuel ($3.911/gallon), gasoline ($3.136/gallon), and structural and reinforcing steel with a base price index of 370.1. Price adjustments for steel are mandatory and calculated using the U.S. Department of Labor Bureau of Labor Statistics Producer Price Index Series WPU101702, with adjustments applying only when variances between base and period prices reach 5% or more. The project is subject to Massachusetts General Laws Chapter 30 Section 39R and 39O requirements, Architectural Access Board regulations (521 CMR 1.00 et seq.), and all work must comply with 2026 Standard Specifications for Highways and Bridges as amended by these supplemental specifications. Informational contract documents are available upon request to MassDOTBidDocuments@dot.state.ma.us, and prospective bidders should access documents and submit bids through www.commbuys.com or www.bidx.com as directed.

View the file

Other files

File Type Posted
Link to Bid Opening 8-4-2026.pdf PDF
614075 - Plan Holders List 7-21-2026.pdf PDF
614075 Bid Items List.txt TXT text file
614075 - Bid Tabulations.pdf PDF
BIDS OPENED - Tuesday - August 4-2026.pdf PDF
DISTRICT 6-614075-135133-A-2.pdf PDF
A00801-614075.pdf PDF
A00803-614075.pdf PDF
A00820-614075.pdf PDF
A00875-614075.pdf PDF
614075 - Plan Holders List 8-3-2026.pdf PDF
614075 - Notice to Contractors.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 mass.gov/massdot

July 16, 2026

614075-135133

ADDENDUM NO. 1

To Prospective Bidders and Others on:

DISTRICT 6

Bridge Drainage Installation & Rehabilitation at Various Locations

THIS PROPOSAL TO BE OPENED AND READ: TUESDAY, AUGUST 4, 2026 at 2:00 P.M.

Transmitting revisions to the Contract Documents as follows:

DOCUMENT 00010: Revised page 1.

DOCUMENT 00102: Revised page 2.

DOCUMENT 00715: Deleted document in its entirety and inserted new document (20 pages).

DOCUMENT 00813: Deleted document in its entirety and inserted new document (4 pages).

Take note of the above, substitute the revised pages for the originals, delete the documents indicated, insert the new documents in proper order, and acknowledge Addendum No. 1 in your Expedite Proposal file before submitting your bid.

Very truly yours, Eric M. Cardone, P.E.

Construction Contracts Engineer

CS

cc: Alina Daragan, Project Manager

THIS PAGE IS INTENTIONALLY LEFT BLANK

Massachusetts Department Of Transportation Highway Division Proposal No. 614075-135133

00010 - 1

① Addendum No. 1, July 16, 2026

DOCUMENT 00010

TABLE OF CONTENTS

DOCUMENT 00010

TABLE OF CONTENTS ....................................................................................................... 00010-1 through 2

DOCUMENT 00102

NOTICE TO CONTRACTORS ............................................................................................ 00102- 1 through 2

DOCUMENT 00210

REQUIREMENTS OF MASSACHUSETTS GENERAL

LAWS CHAPTER 30 SECTION 39R; CHAPTER 30, SECTION 39O .................................. 00210-1 through 4

DOCUMENT 00331

LOCUS MAP ........................................................................................................................ 00331-1 through 2

DOCUMENT 00439

CONTRACTOR PROJECT EVALUATION FORM .............................................................. 00439-1 through 2

DOCUMENT 00440

SUBCONTRACTOR PROJECT EVALUATION FORM ...................................................... 00440-1 through 2

DOCUMENT 00710

GENERAL CONTRACT PROVISIONS ............................................................................... 00710-1 through 2

① DOCUMENT 00715

SUPPLEMENTAL SPECIFICATIONS ............................................................................... 00715-1 through 20

DOCUMENT 00718

SPECIAL PROVISION FOR PARTICIPATION BY MINORITY OR WOMEN'S

BUSINESS ENTERPRISES AND SERVICE- DISABLED VETERAN- OWNED

BUSINESS ENTERPRISES ................................................................................................ 00718-1 through 10

DOCUMENT 00761

SPECIAL PROVISIONS FOR CERTIFICATION REGARDING DEBARMENT,

SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION .................................. 00761-1 through 4

DOCUMENT 00811

MONTHLY PRICE ADJUSTMENT FOR HOT MIX ASPHALT

(HMA) MIXTURES .............................................................................................................. 00811-1 through 2

DOCUMENT 00812

MONTHLY PRICE ADJUSTMENT FOR DIESEL FUEL AND GASOLINE ....................... 00812-1 through 2

DOCUMENT 00813

PRICE ADJUSTMENT FOR STRUCTURAL STEEL

AND REINFORCING STEEL .............................................................................................. 00813-1 through 4

DOCUMENT 00814

PRICE ADJUSTMENT FOR PORTLAND CEMENT CONCRETE MIXES ......................... 00814-1 through 2

DOCUMENT 00820

THE COMMONWEALTH OF MASSACHUSETTS

SUPPLEMENTAL EQUAL EMPLOYMENT OPPORTUNITY,

NON-DISCRIMINATION AND AFFIRMATIVE ACTION PROGRAM .............................. 00820-1 through 6

DOCUMENT 00821

ELECTRONIC REPORTING REQUIREMENTS

CIVIL RIGHTS PROGRAM AND CERTIFIED PAYROLL ................................................. 00821-1 through 2

DOCUMENT 00859

CONTRACTOR/SUBCONTRACTOR CERTIFICATION FORM ........................................ 00859-1 through 2

00102 - 2

① Addendum No. 1, July 16, 2026 NOTICE TO CONTRACTORS (Continued)

All parties who wish to have access to information plans and specification must send a “Request for Informational Documents” to MassDOTBidDocuments@dot.state.ma.us.

A Proposal Guaranty in the amount of 5% of the value of the bid is required.

This project is subject to the schedule of prevailing wage rates as determined by the Commissioner of the Massachusetts Department of Labor and Workforce Development, and the Division of Occupational Safety.

PRICE ADJUSTMENTS

① This Contract contains price adjustments for hot mix asphalt and Portland cement mixtures, diesel fuel, and gasoline. For reference the base prices are as follows: liquid asphalt $712.50 per ton, Portland cement $452.13 per ton, diesel fuel $3.911 per gallon, and gasoline $3.136 per gallon, and Steel Base Price Index 370.1. MassDOT posts the Price Adjustments on their Highway Division’s website at https://www.mass.gov/massdot-contract-price-adjustments

This Contract contains Price Adjustments for steel. See Document 00813 - PRICE ADJUSTMENT FOR STRUCTURAL STEEL AND REINFORCING STEEL for their application and base prices.

MassDOT projects are subject to the rules and regulations of the Architectural Access Board (521 CMR 1.00 et seq.)

Prospective bidders and interested parties can access this information and more via the internet at

WWW.COMMBUYS.COM.

BY: Phillip Eng, Interim MassDOT Secretary Jonathan L. Gulliver, Undersecretary and Highway Administrator

SATURDAY, JULY 4, 2026

mailto:MassDOTBidDocuments@dot.state.ma.us https://www.mass.gov/massdot-contract-price-adjustments http://www.commbuys.com/

Massachusetts Department of Transportation Highway Division

00715 - 1

DOCUMENT 00715

SUPPLEMENTALSPECIFICATIONS
JUNE30,2026
The2026StandardSpecificationsforHighwaysandBridgesareamendedbythefollowingmodifications,
additionsanddeletions.TheseSupplementalSpecificationsprevailoverthosepublishedintheStandard

Specifications.

TheSpecificationsCommitteehasissuedtheseSupplementalSpecificationsforinclusionintoeach
proposaluntilsuchtimeastheyareupdatedorincorporatedintothenextStandardSpecifications.

Contractors are cautioned that these Supplemental Specifications are dated and will change as they are updated.

DIVISION I

GENERAL REQUIREMENTS AND COVENANTS

SECTION5.00:CONTROLOFWORK
Subsection5.03:ConformitywithPlansandSpecifications
ChangetheMGLreferenceinthefirstsentencetoChapter30,Section39I(fromSection39L).

DIVISION II

CONSTRUCTION DETAILS

SECTION 200: DRAINAGE

SUBSECTION 227: DRAINAGE SYSTEM SEDIMENT

Subsection227.30,MethodofMeasurement
Changethesubsectionnumberto227.80
Subsection227.31,BasisofPayment
Changethesubsectionnumberto227.81
Subsection227.31,PaymentItems
Changethesubsectionnumberto227.82
SECTION400:SUB‐BASE,BASECOURSE,SHOULDERS,
PAVEMENTANDBERMS

SUBSECTION 430: CEMENT CONCRETE BASE COURSE

Subsection430.40:General
ChangeAppliedCrackSealertoHotAppliedCrackSealer.

Addendum No. 1, July 16, 2026

00715 - 2

SUBSECTION 476: CEMENT CONCRETE PAVEMENT

Subsection476.20:Materials
DeletePreformedBituminousJointFillerforConcrete‐M3.05.5andaddthefollowinginMnumbersequence:

Preformed Expansion Joint Filler M9.14.0

SUBSECTION 477: MILLED RUMBLE STRIPS

Subsection477:MilledRumbleStrips
Replacethissubsectionwiththefollowing:

DESCRIPTION

477.20: General

Theworkconsistsofconstructingrumblestripsonroadwaysbymillinggroovesintofinishedsurfaces.Milled
RumbleStripsarecategorizedasTypeA,TypeB,TypeC,orTypeD.TypeAarerectangularmilledgroovesat
regularintervalsinthepavedsurface,TypeBrumblestripsarerectangulargroovesatregularintervalswith
designedgapsbetweenintervalstoaccommodatebicyclists,andTypeCandTypeDrumblestripsform
continuousgroovesinthepavedsurfaceintheformofaverticalsinusoidalwavepattern.

CONSTRUCTION METHODS

477.61: Equipment

The equipment shall self‐align with the slope of the roadway surface and/or any irregularities in the roadway surface.

TheContractorshalldemonstratetotheEngineertheabilitytoachievethedesiredgroovewithouttearingor
snaggingtheroadwaysurfacepriortobeginningthework.

477.62: Installation of Rumble Strips

Rumble strips shall be installed in accordance with the locations, dimensions, and Type shown on the plans.

TypeAandTypeBrumblestripsshallbeinstalledafterthelongitudinalpavementmarkingstheysupplement
(typicallyedgelinesorchannelizinglines)areinplace.Installationofanydiagonalorchevronpavement
markingsthatcrosstheTypeAorTypeBrumblestripsshallonlyoccuraftertherumblestripsareinplace.
TypeCrumblestripsshallbeinstalledafterthelocationofthelongitudinalpavementmarkingsthey
supplement(typicallycenterlines)hasbeenlaidout,butbeforethepavementmarkingsareinstalled.The
pavementmarkingsshallonlybeinstalledaftertheTypeCrumblestripsareinplace.
TypeDrumblestripsshallbeinstalledafterthelongitudinalpavementmarkingstheysupplement(typically
centerlines)areinplace.

477.63: Control of the Work Area

Attheendofeachworkingday,allequipmentshallbemovedtoalocationwhereitdoesnotpresentahazard
totraffic.Thepavementshallbecleanedbysweepingandtheworkareashallbereopenedtotraffic.

Pavement millings shall become the property of the Contractor and shall be removed and disposed of off‐site.

COMPENSATION

477.80: Method of Measurement

MilledRumbleStrip(TypeA),MilledRumbleStrip(TypeC),andMilledRumbleStrip(TypeD)willbe
measuredbythetotallengthofinstalledrumblestrip.MilledRumbleStrip(TypeB)willbemeasuredbythe
totallengthofinstalledrumblestripexcludingthedesignedgaps.Breaksatcastings,bridgedecks,
intersectionsorotherbreakswillnotbemeasuredforpaymentforalltypes.

00715 - 3

477.81: Basis of Payment

PaymentforMilledRumbleStrip(TypeA),MilledRumbleStrip(TypeB),MilledRumbleStrip(TypeC),and
MilledRumbleStrip(TypeD)willbemadeatthecontractunitpriceperfootofrumblestrips,completein
place.Suchpaymentwillbefullcompensationforfurnishingallequipmentandlaborforsatisfactorily
performingtheworkincludingcleanupanddisposalofexcessmaterials.

477.82: Payment Items

Item number Description Unit

477. Milled Rumble Strip (Type A) Foot

477.1 Milled Rumble Strip (Type B) Foot

477.2 Milled Rumble Strip (Type C) Foot

477.3 Milled Rumble Strip (Type D) Foot

SUBSECTION 482: SAWCUTTING

Subsection482.80:MethodofMeasurement
Replacethissubsectionwiththefollowing:

Sawcutting, when included in the Contract as its own bid item, will be measured for payment by the foot along the cut line, regardless of depth.

SECTION 600: HIGHWAY GUARD, FENCES AND WALLS

SUBSECTION 628: IMPACT ATTENUATORS

Subsection628.82:PaymentItems
Replacethissubsectionwiththefollowing:

Item number Description Unit

628.302 Permanent Impact Attenuator, Non‐Redirective, TL‐2 Each

628.303 Permanent Impact Attenuator, Non‐Redirective, TL‐3 Each

628.304 Temporary Impact Attenuator, Non‐Redirective, TL‐2 Each

628.305 Temporary Impact Attenuator, Non‐Redirective, TL‐3 Each

628.312 Permanent Impact Attenuator, Redirective, TL‐2 Each

628.313 Permanent Impact Attenuator, Redirective, TL‐3 Each

628.314 Temporary Impact Attenuator, Redirective, TL‐2 Each

628.315 Temporary Impact Attenuator, Redirective, TL‐3 Each

628.322 Permanent Impact Attenuator, Low‐Maintenance, TL‐2 Each

628.323 Permanent Impact Attenuator, Low‐Maintenance, TL‐3 Each

00715 - 4

SECTION 800: TRAFFIC CONTROL DEVICES

SUBSECTION 813: WIRING, GROUNDING AND SERVICE CONNECTIONS

Subsection813.20:General
Replacethissubsectionwiththefollowing:
Thisworkshallconsistoffurnishingandinstallingwireandcableofthetypeandsizeindicatedfortraffic
signalsandothertrafficcontroldevices,ITSsystems,highwaylightingandrelatedelectricalsystems,
equipmentgroundingsystems,newgroundelectrodesorconnectionstoexistinggroundelectrodes,power
pedestals,andallmaterialsandequipmentnecessarytodeliverpowertosuchsystems.
Servicepointsshownontheplansareapproximateonly.TheContractorshalldetermineexactlocationsfor
bothoverheadandundergroundserviceaccesspoints.TheContractorshalldetermineriserelevationsor
connections/routingtomanholefacilitiesfromtheservingutility,andarrangetocompletetheservice

connections.

All work under this Subsection shall comply with the MEC and the National Electrical Safety Code.

Subsection813.41:GroundingandBondingConductions
Replacethissubsectionwiththefollowing:
GroundingandbondingconductorsshallconformtoM8.16.10:Type10GroundingandBondingConductors
(SolidorStranded,InsulatedorBare).
Subsection813.42:GroundRods
Replacethissubsectionwiththefollowing:
Groundrodsshallconsistofdrivenrod(s)conformingtoM8.17.0:GroundRodorotherdevicesapprovedfor
thepurpose.
Subsection813.44:PowerPedestal
Addthissubsectioninnumericalorder:
APowerPedestalsshallconsistofaside‐of‐postmountedlockableloadcenterenclosure,aloadcenterwith
circuitbreakers,anexterior‐mountedelectricalmeter,signalpostandbase,equipmentbonding,ground
rod(s)conformingto813.42:GroundRods,andacementconcretefoundation.Theenclosure,lock,circuit
breakers,signalpostandbase,andfoundationshallallbeincludedintheShopDrawingsubmission.
TheenclosureshallberatedtomeetorexceedNEMA3Randbesuitableforpost‐mountingandshallbesized
appropriatelytohousetheloadcenter.Theenclosureshallbecapableofbeingsecuredwithanintegrated
lockingmechanismorbyaContractor‐suppliedpadlock;regardlessoflockingmechanism,itshallbe
operatedwitha#2key.
Thecircuitbreakersshallbedesignedforsingle‐phase,3‐wire,120/240VAC.Circuitbreakersshallprovidea
meanstomanuallyoperateacircuitand/orautomaticallyopenacircuitthatisinoverloadorshortcircuit
conditions.AllcircuitbreakersshallbeULlistedandhaveCSAcertification.
Theenclosureshallbefurnishedwithametersocketinstalled.Themetersocketshallbeapprovedbythe
servicingelectricalutility.
ThesignalpostandbaseshallconformtoM10.05.1:SignalPostsandBasesandthePlans.TheContractor
shallsupplyasquarealuminumbasewithanaturaloranodizedfinishandaSchedule80aluminumpostwith
abrushedorspunfinish,unlessotherwiseindicatedinthePlans.
TheContractorshallsupplymountingequipmentrecommendedbytheenclosuremanufacturertoside‐
mountthecabinettothepost.

Bonding for the Power Pedestal shall utilize a #8 AWG or larger ASTM‐B3 wire.

00715 - 5

ThecementconcretefoundationshallconformtothePlansandM4.02.0:ConcreteProducedbyStationary
andTruckMixers,M4.03.0:ConcreteProducedbyVolumetricMixers,M4.06.1:ConventionalConcrete,
M4.09.0:Precast,Prestressed,andPrefabricatedConcreteProducts,M4.11.0:EvaporationReducing
Materials,andM4.12.0:CuringMaterials,asapplicable.
Subsection813.64:PowerPedestal
Addthissubsectioninnumericalorder:

No work shall commence until Shop Drawings have been approved.

ThePowerPedestalCabinetshallbemountedside‐of‐posttotheSignalPost,perthemanufacturer's
recommendations.ThePowerPedestalCabinetshouldbeinstalleddirectlybelowthemetersocket,perthe
Plans.Ifdissimilarmetalsarepresent,theyshallbeelectricallyinsulatedtopreventgalvaniccorrosion.
TheContractorshallsupplytheappropriatetype(singlepoleordoublepole)andnumberofcircuitbreakers
includedwithinthePowerPedestalCabinettoprovidetherecommendedACpowertoeachdevicereceiving
powerfromtheCabinet.Thecircuitbreakersshallbeclearlylabeledastowhichdevicetheyarepowering
(e.g.RRFB‐1,RRFB‐2,WarningBeacon,SpeedFeedbackSign,etc.).
ThePowerPedestalshallbegroundedandbondedper813.61:EquipmentGroundingandBondingand
813.62:GroundingElectrodes.
Subsection813.80.E:PowerPedestal
Addthissubsectioninnumericalorder:

Power Pedestals will be measured by the number of Power Pedestals each furnished and installed.

Subsection813.81.E:PowerPedestal
Addthissubsectioninnumericalorder:
PowerPedestalswillbepaidforatthecontractunitpriceforeachinstalledinplace.Thisincludesalllabor
andmaterialsrequiredforaworkingsystem.

All costs associated with grounding and bonding of Power Pedestals shall be considered incidental to the item.

AllcostsassociatedwithprovidingserviceconnectionstoPowerPedestalsshallbepaidforundertheir
respectivepayitems.
Subsection813.82:PaymentItems
Changetheunitofmeasureforitems813.80and813.81toEachandaddthefollowingpayitem:
Subsection815.82:PaymentItems
Deletepaymentitems818.90to818.94,819.39,819.832,819.52,819.53,819.60to819.64,819.70,819.71,
819.72,819.800,819.801,819.802,819.803,:819.810,819.811,819.820,819.821,819.850,819.851,819.852.

Add the following payment item:

813.90 Power Pedestal Each

00715 - 6

SUBSECTION 819: TRAFFIC SIGNAL DETECTION

Subsection819:TrafficSignalDetection
Addthissubsection:

DESCRIPTION

819.20: General

WorkunderthisSubsectionconsistsoffurnishingandinstallingdetectiondevicesforvehicles,bicycles,
pedestrians,andotherroadusers.

MATERIALS

819.40: General

Materials shall meet the requirements specified in the following Subsections of Division III, Materials:

Material Section

Vehicle Detection Systems M10.08.0

Passive Stop Line Detectors M10.08.1

Passive Advanced Detectors M10.08.2

Pedestrian Detectors M10.09.0

Pedestrian Pushbutton Assembly M10.09.1

APS Pushbutton Assembly M10.09.2

The Contractor shall furnish Vehicle Detection Systems (VDS) and Pedestrian Detectors that are listed on the

QTCE.

Anysoftware,firmware,cables,oradaptersrequiredtoprogram,adjust,fine‐tune,ormonitorVDSor
PedestrianDetectorsshallbeprovidedbytheContractor.VDSandPedestrianDetectorsshallhavethelatest
versionsofsoftwareand/orfirmwareinstalledpriortoinspection.Manufacturerupdatestosoftwareand/or
firmwareshallbeincludedatnocostforthelifeoftheproducts.

819.40.A: Vehicle Detection Systems

AVDSshallconsistofoneormoreInternetProtocol(IP)‐baseddetector/sensorassembliesandacabinet
interfacedevicethatisinstalledinaTrafficSignalControllerCabinetorsimilardevice.
StopLineVDSshallbecapableofprovidingmotorvehicleandbicycledetectionatalllocationsshownonthe
Plans.TheContractormayfurnishaVDSthatutilizesasingledetector/sensorormultiple,aslongasallstop
linemotorvehicleandbicycledetectionzonesareencompassedandthetrafficsignalorotherdeviceutilizing
thedetectioncanoperateperthePlans.AllPassiveStopLineDetectorsrequiredtoprovidestopline
detectionatanintersectionshallbeincludedinthecostofasingleStopLineVehicleDetectionSystem.
IftheContractorfurnishesaStopLineVDSthatdoesnotutilizeanintegratedvideomonitoringsystem,a
separatevideomonitoringsystemper819.41:VideoMonitoringSystemshallbefurnishedandinstalledatno
additionalcost.
AdvancedVDSshallbecapableofprovidingmotorvehicledetectiononasingleapproach,atthelocation
shownonthePlans.TheContractorShallfurnishPassiveAdvancedDetectorsthatutilize,andarecompatible
with,thesameinterfacedeviceinstalledintheTrafficSignalControllerCabinet,orsimilardevice,astheStop
LineVDS.

00715 - 7

All VDSs shall be furnished with manufacturer‐supplied mounting hardware.

IfmultipleVDSsovermultiplelocationsaresuppliedunderasinglecontract,allcomponentsfurnishedbythe
Contractorshallbeofthesamemakeandmodel.

819.40.B: Pedestrian Detectors

PedestrianPushbuttonAssemblyandAccessiblePedestrianSignal(APS)PushbuttonAssemblyshallboth
includeapushbutton,sign,housing,manufacturer‐specifiedmountinghardware,andwiring.TheContractor
shallreviewtheContractDocumentstodetermineifoneormorein‐cabinetcontrolunitsarerequiredto
meetthepedestriandetectortypeandoperationalrequirements.In‐cabinetcontrolunitsshallbeconsidered
incidentaltothecostoftheitem.
TheContractorshallprovideapushbuttonhousingthatconformstotheshapeofthepoleitismountedtoor
shallfurnishandinstallamanufacturer‐suppliedsaddletoprovideaflush,securefit,atnoadditionalcost.
AnAPSPushbuttonAssemblyshallincludeapedestrianpushbuttonsignthatconformstothePlans.Ifthe
signisnotintegraltothehousing,separatemountingequipmentshallbefurnishedandinstalledbythe
Contractor.Allcostsassociatedwiththesignandmountingequipmentshallbeconsideredincidentaltothe
costoftheitem.

819.41: Video Monitoring System

Whenrequiredby819.40.A:VehicleDetectionSystems,theContractorshallfurnishandinstallaVideo
MonitoringSystem.TheVideoMonitoringSystemshallconsistofoneormoreIP‐based4K,1080p,H.264
dome‐typeCCTVcameras;mountinghardware,includingbutnotlimitedto:brackets,bands,straps,posts,
plates,andpolemountadapters;powerdistributionandconditioningequipmentincludingsurge
suppression;andallnecessarycablingandwiring.
AllequipmentprovidedfortheVideoMonitoringSystemshallbecommercial,off‐the‐shelfproducts.Custom
equipmentdesignedspecificallyfortheContractwillnotbeaccepted.Allcablingandwiringshallbe
recommendedbythemanufacturerandratedforoutdooruse.Anyspecialwiringorconnectorsrequiredby
themanufacturershallbeidentifiedintheShopDrawings.
TheVideoMonitoringSystemshallconformtoNationalElectricalManufacturesAssociation(NEMA)
standards,Underwriters’Laboratory(UL),andMilitaryStandards(MIL),asapplicable.Allcomponentsofthe
VideoMonitoringSystemshallbenewandstillunderproductionbythemanufacturer.Obsolete,nolonger
produced,and/ornolongersupportedcomponentswillnotbeaccepted.

The Video Monitoring System shall be capable of operating in temperatures ranging from ‐29Ԭ to +165Ԭ.

The camera shall meet or exceed the requirements found in Table 819.41‐1:

Table 819.41‐1: Minimum Camera Requirements

Feature Requirement

Zoom Ratio The minimum zoom ratio shall be 30x Optical and 12x Digital

Camera Type The camera shall be an IP‐type CCTV camera.

AutoFocusThecamerashallincludeautofocuswithaselectionformanualoverrideof
autofocus.

Lens Aperture Ratio Typical: F/1.6 to F/4.7 (wide to telephoto)

On‐Screen Direction The CCTV camera shall display on‐screen azimuth indications.

PrivacyZonesTheCCTVcamerashallbeprogrammabletoblankoutupto8,four‐sidedareas
toelectronicallyblockportionsofthecamera’sfieldofviewfrombeing

00715 - 8

Feature Requirement

displayed.Theseprivacyzonesshallmoveandadjustsizingsynchronously
withcameramovementsanddegreeoflenszooming.
On‐ScreenLabels,Text
andTitles
TheCCTVcamerashalldisplayaminimumof20programmablecharactersfor
on‐screencameraID,presetposition,sector,andalarmtitles.
On‐ScreenLabels,Text
andTitlePositioning
Thepositionoftheon‐screentextshallbeadjustabletoappearatselectable
positionsontheCCTVcamerascreenimage.
NumberofPixelsThecamerashallprovideaminimumof1280Hx720Veffectivepixels.The
camerashallbecapableofbeingconfiguredtooperateatallstandardlower
resolutionsdownto320Hx180Veffectivepixels.

Image Sensor Size The camera shall include an image sensor of 1/1.8 in., nominal.

Lens Focal Length The camera shall include a zoom lens of 4.3 mm to 129 mm, minimum focal length.

ColorandBlack&White
ImageSelection
ThecamerashallhaveColorandBlack&Whitevideoimagedisplaymodes
incorporatingbothautomaticandmanualoverrideimagemodeselection.The
camerashalltransitionautomaticallytoaBlack&Whitemode(whenin
automaticmode)whentheluminancelevelreachesauserpredefined
threshold.Atalltimesthecamerashallprovideafullmotionvideooutputat
30framespersecond.
ImageStabilizationTheCCTVcamerashallincorporateelectronicimagestabilizationtoreduce
theeffectsofvibrationandwindgustsonthedisplayedvideoimage.
AutomaticIrisThecamerashallincludebothautomaticiriscontrolandanoverridefor
manualirisadjustments.

Wide Dynamic Range The CCTV camera’s wide dynamic range shall be 120 dB.

CCTV Camera Optical Sensitivity

Thecamera’ssensitivityshallbesufficienttoprovideaclear,usablecolor
videoimagedisplaywithasceneilluminationof≤0.1luxatanapertureof
F1.6,nominal.

Power Input The power input for the CCTV camera and dome shall be PoE+.

Alarms No alarm contacts shall be wired.

TheContractorshallmountthecameraatalocationthatoptimizesline‐of‐sightforallapproaches.Theview
ofeachapproachshallhaveaclearlineofsight,freefromobstructionsfromtrees,overheadwires,buildings,
and/orotherobstructions.IftheContractorisunabletoprovideaclearlineofsightforallapproachestothe
satisfactionoftheEngineer,asecondcamera,includingmountinghardware,cabling,andwiring,shallbe
furnishedandinstalledonadifferenttrafficsignalstructureatnoadditionalcost.

The Contractor shall be responsible for the following items prior to installation:

Ensurethatallcomponentsareassembledandfactory‐testedpriortodeliverytotheprojectsite.
Fullyconfigurethecamerasettings,includingbutnotlimitedto:cameraresolution,cameraaddress,
defaultsettings,andpre‐setandhomepositions,perthedirectionoftheEngineer.
CoordinatewiththeEngineertosetthecameraaddressnumbertoprovideuniqueidentificationthat

is compatible with the CCTV camera addressing schema utilized by the Department.

The Contractor shall deliver the camera(s) fully assembled to the project site.

00715 - 9

TheContractorshallprovideupto3hardcopysetsofoperatingmanuals,servicemanuals,andmaintenance
instructionsforallcomponentsofthesystem.AttherequestoftheEngineer,thenumberofcopiesmaybe
reducedifthemanualsareprovidedin.pdffileformat.

819.42: Material Warranties

AllcomponentsofVehicleDetectionSystems,includingVideoMonitoringSystems,andPedestrianDetectors
shallincludeaminimumtwo‐yearmanufacturer’sreplacementwarrantythatwillcommenceupon
acceptancebytheEngineer.Thewarrantyshallcoveranymanufacturingdefectsoftheproducts.

Construction Methods

819.60: General

TheContractorshallusediscretionininstallingthedetectors/sensorsatlocationsthatoptimizethe
performanceoftheVDSandtoeliminatefalsecalls.TheContractorshallnotifytheEngineerifthesizeor
locationofthedetectionzonesdiffersfromwhatisshowninthePlans.AtthedirectionoftheEngineer,the
Contractorwillberequiredtoreadjustthelocationofthedetectionzonesand/ormodifythedetection
channelsiffalsecallsareobservedorthetrafficsignalsystemisnotoperatingperthePlansduetothe
performanceoftheVDS;thisworkshallbeconsideredincidentaltothecostoftheitem.
TheContractorshallusemanufacturer‐specifiedmountinghardwareforalldetectors/sensors.Ifmountedto
mastarmsorstrainpoles,anyadditionweightorwindloadingfromthedetector/sensorshallbeaccounted
forinthestructuralcalculations.
TheContractorshallinstallthecabinetinterfacedeviceinthetrafficsignalcontrollercabinet.Thecabinet
interfacedeviceshallbeconnectedtotheFieldMonitoringUnit(FMU)oranethernetswitchinthetraffic
signalcontrollercabinet.AllcommunicationbetweendevicesshallbeIP‐based.Useofexternal
communicationsthatarenotroutedthroughtheFMUisprohibited.
TheContractorshallfurnishandinstalllowvoltagepowercablingsurgeprotectionequipmentrequiredfor
alldataandpowerlinesassociatedwithVDS,VideoMonitoringSystems,and/orPedestrianDetection
Systemsenteringthetrafficsignalcontrollercabinet.
TheContractorshallinstallthemanufacturer‐specifiedcablebetweenthedetectors/sensorstothecabinet
interfacedeviceinthetrafficsignalcontrollercabinetviatrafficsignalstructures,conduit,and/orpullboxes.
Thisshallincludeallconnectors,sealingtape,andincidentalworktocompletetheconnection(s).All
equipmentinstallationandwiringshallbeinstalledinaneatandorderlymannerandperthemanufacturer’s

specifications.

TheVDSshallbepoweredthroughoneofthepoweroutletsavailableontheFMU.TheVDSshallbecapableof
beingpowereddownandremotelyrestartedthroughremotecontrolofthepoweroutletontheFMU.
UnderthesupervisionoftheEngineer,theContractorshallinstalltheVDSsoftwarethatallowsvisual
confirmationofthedetectionzonesonDepartmentcomputers.

The Contractor shall install Pedestrian Detectors at the location(s) and mounting height shown on the Plans.

TheContractorshallmountandorienttheAPSPushbuttonAssemblyinamannersothatthevibrotactile
arrowisalignedparalleltothecrosswalk.
Priortoacceptance,theContractorshallfurnishallpasswordsforVehicleDetectionSystemsandPedestrian
DetectorstotheEngineer.Theuseofdefaultpasswordsisprohibited.

00715 - 10

819.61: Programming APS Pushbuttons

EachAPSPushbuttonshallhaveanaudiblewalkindicationduringtheassociatedwalkinterval.Theduration
oftheaudiblewalkindicationshallmatchthedurationofthewalkintervalunlessthepedestriansignalis
programmedtorestinwalk.Ifprogrammedtorestinwalk,theaudiblewalkindicationshallbelimitedto7
secondsinlengthbutmayberecalledbyasubsequentbuttonpressduringthewalkinterval.
TheAPSPushbuttonlocatortoneandaudiblewalkindicationshallbeprogrammedtobroadcastatvolume5
dBAlouderthanambientsound,exceptwhenaudiblebeaconingisprovidedinresponsetoanextended
pushbuttonpress.Thebroadcastvolumeshallbeprogrammedtonotexceed100dBAat3ft.fromthe
emitter,regardlessofambientnoiseconditions.

The locator tone shall have a duration of 0.15 seconds or less and shall repeat at 1‐second intervals.

The locator tone shall be active during all signal intervals, except for the following conditions:

Whentheaudiblewalkindicationisbeingbroadcast.
Ifthesignalisprogrammedtorestinwalk,thelocatortoneshallresume7secondsafterthestartof
thewalkinterval.
Thelocatortoneshallbedisabledifthetrafficcontrolsignalorpedestrianhybridbeaconisoperating

in an emergency or fault flashing mode.

Thelocatortoneshallbeactiveduringtheflashingyellowandalternatingflashingredintervalsofa
pedestrianhybridbeaconphasingsequence.
Uponbuttonpress,thelocatortoneatthatpushbuttonshallbeinterruptedandaspeechmessageof“Wait”
shallbebroadcast.
Thenormalstatusofthepilotlightshallbedark.Thepilotlightshallilluminateuponbuttonpressandstay
illuminateduntilthestartofthewalkinterval,whenitshallreturntodark.Iftheassociatedpedestrianphase
issettopedestrianrecall,thepilotlightshallstayilluminatedforallintervalsexceptforthewalkinterval.
TheaudiblewalkindicationshallanaudibletoneunlessaspeechmessageiscalledforinthePlans.The
audibletoneshallrepeatat8to10tickspersecond,inmultiplefrequencies,withthedominantcomponentat
880Hz.

If a speech message is used, the following shall apply:

Forexclusivepedestrianphases,duringthewalkintervalthespeechmessageshallbe:“walksignis
onforallcrossings.”Thismessageshallbebroadcastasingleinstance.
*Forconcurrentpedestrianphases,duringthewalkintervalthespeechmessageshallbe:“[STREET
NAME].Walksignisonfor[STREETNAME].”Thismessageshallbebroadcastasingleinstance.
Ifthesignalisprogrammedtorestinwalk,theconcurrentpedestrianspeechmessageshallbe
repeateduponeachsubsequentbuttonpress.

*Note: See Plans for Street Name information.

The vibrotactile arrow shall vibrate during the walk interval.

TheContractorshallincludeafaultrelaythatwilldefaulttoplacingaconstantpedestriancallfromany
pushbuttonassemblythatfailstocommunicatebacktothein‐cabinetcontrolunit.
TheContractorshallconnectthein‐cabinetcontrolunittotheFieldMonitoringUnit(FMU)viaanopen
ethernetport.

00715 - 11

819.62: VDS Testing and Evaluation

AftertheVDSisinstalled,butpriortoacceptance,theContractorshallconductanevaluationofthesystemin
thepresenceoftheEngineer.Thepurposeoftheevaluationistocertifythesystemisoperatingperthe
requirementsofM10.08.0:VehicleDetectionSystems,M10.08.1:PassiveStopLineDetectors,andM10.08.2:
PassiveAdvancedDetectors,asapplicable.TheContractorshallsubmittheirtestingandevaluationplanasa
partoftheShopDrawingsubmittal.
Thetestingandevaluationshalltakeplaceforaminimumof30minutesundermoderatelivetraffic
conditions.Testingshallnotbeconductedduringinclementweather.
IftheEngineerdeterminesthatthesystemdoesnotmeettheoperationalrequirements,theContractorwill
berequiredtoadjustthelocation,orientation,and/ornumberofdetector/sensors.TheContractormayalso
adjustthelocationofthedetectionzonesatthistime.Uponcompletionofthiswork,thesystemshallbe
reevaluatedinthepresenceoftheEngineer.Thisprocessshallberepeateduntiltheoperational
requirementsaremet.
AllcostsassociatedwithtestingandevaluationoftheVDS,includingtherepositioningoradditionofnew
materials,shallbeconsideredincidentaltotheitem.

Compensation

819.80: Method of Measurement

Stop Line Vehicle Detection Systems will be measured as each system furnished and installed.

Advanced Vehicle Detection Systems will be measured as each system furnished and installed.

Pedestrian Pushbuttons and APS Pushbuttons will be measured as each pushbutton furnished and installed.

819.81: Basis of Payment

StopLineVehicleDetectionSystemswillbepaidforeachsysteminstalledatanintersection.Forthepurposes
ofthiswork,anintersectionshallbedefinedasallroadway,path,and/ortrailapproachescontrolledbya
singletrafficsignalcontroller.WhereaVideoMonitoringSystemisrequiredper819.40:General,itshallbe
includedinthecostofItem819.840.

Advanced Vehicle Detection System will be paid for each system installed on an intersection approach.

PedestrianPushbuttonandAPSPushbuttonwillbepaidforeachpushbuttonassemblyinstalled.The
pedestriansignmounteddirectlyabovethepushbuttonshallbeconsideredincidentaltotheitem.
Theunitcostofeachvehicledetectionsystemorpushbuttonitemshallincludeallwiring,cabling,mounting
hardware,software,firmware,videomonitoringsystem(ifrequired),testing,calibrating,Department
Acceptance,training,andallotherlaborandmaterialsrequiredforthesystem(s)tooperateperthePlans.

819.82: Payment Items

Item number Description Unit

819.840 Stop Line Vehicle Detection System Each

819.845 Advanced Vehicle Detection System Each

819.850 Pedestrian Pushbutton Each

819.855 APS Pushbutton Each

00715 - 12

SUBSECTION850:TRAFFICCONTROLSFORCONSTRUCTIONAND
MAINTENANCEOPERATIONS
Subsection850.25:ArrowBoard
Subsection850.45:ArrowBoard
Subsection850.65:ArrowBoard
Deletethesesubsections.
Subsection850.80:MethodofMeasurement
Deletethe7thparagraphbeginningwith“ArrowBoardwillbemeasured…”
Subsection850.81:BasisofPayment
Deletethe7thparagraphbeginningwith“ArrowBoardwillbepaidfor…”
Subsection850.82:PaymentItems
Revisedescriptionandunitofitem852.toSafetySigningforTrafficManagement/SquareFoot.
Deleteitemnumber856.
SUBSECTION856:CONNECTEDWORKZONENOTIFICATIONSYSTEMAND
ASSOCIATEDDEVICES
Subsection856:ConnectedWorkZoneNotificationSystemandAssociatedDevices
Addthisnewsubsection.

DESCRIPTION

856.20: General

TheConnectedWorkZoneNotificationSystem(CWZNS)isasystemoffielddevicesthattransmitreal‐time
location‐baseddataaboutworkzones.CWZNSfielddevicedataisprovidedinaWorkZoneDataExchange
(WZDx)DeviceFeedinaccordancewiththeUnitedStatesDepartmentofTransportation(USDOT)WZDx
Specification.TheDeviceFeedisconsumedbytheMassDOTWorkZoneManager(WZM)application.
TheContractorshallberesponsibleforfurnishing,installing,repositioning,operating,maintaining,and
removingtheseCWZNSdevices.

MATERIALS

856.40: General

Materials shall meet the requirements specified in the following Subsections of Division III, Materials:

Material Section

Connected Work Zone Notification System Devices M10.18.0

Location Marker M10.18.1

Connected Arrow Board M10.18.2

EndLocationMarkersshallconformtoM10.18.1:LocationMarkerandincludepowerandcommunication
statuslightsandanon/offswitch.

856.41: Arrow Board

ArrowBoardsshallconsistofamatrixofyellowelementsthatmaybeilluminatedinflashingorsequential
patterns,onanon‐reflective,blackbackground.ThelightoutputfromtheArrowBoardshallmeetthe
minimumlegibilitydistance,pertheMUTCD.Theelementsshallbecapableofatleast50%dimmingfromfull
brilliancetoavoidnighttimeglare.ArrowBoardsthatarecontinuouslyoperationalinbothdaylightand
nighttimeconditionsshallautomaticallyadjustthelightoutputbaseduponambientlightconditions.

The mounting height of the Arrow Board, when in operation, shall be per the Plans.

00715 - 13

The minimum dimensions and number of elements for Arrow Boards shall be per Table 856.41‐1.

Table 856.41‐1: Arrow Board Dimensions and Elements

ItemNumbers
MUTCDType MinimumDimensions
(widthbyheight)
MinimumNumberof

Elements

856.060,856.160
B60in.by30in. 13
856.096,856.196
C96in.by48in. 15

Arrow Boards shall be capable of the following operating modes, per the MUTCD:

FourCornersFlashingCaution
AlternatingDiamondCaution
FlashingArrow(leftorright)
SequentialChevron(leftorright)
FlashingDoubleArrow
ArrowBoardsthatarecategorizedas“ConnectedArrowBoards”(Items856.160and856.196)shallmeetthe
requirementsofM10.18.2:ConnectedArrowBoardinadditiontotherequirementsofanArrowBoard
describedinthisSubsection.

856.42: Shop Drawings

Within30daysoftheNoticetoProceed,theContractorshallsubmittotheEngineerforreviewandapproval
cutsheetsforeachmodelofCWZNSdevicetobeused.Thecutsheetsshalldocumentdevicespecifications,
includingdetailsofhowtheCWZNSdevicewillcommunicate.WorkthatrequirestheuseofCWZNSdevices
shallnotcommenceuntilthesubmissionhasbeenapproved.

CONSTRUCTION METHODS

856.60: General

Atleast15dayspriortodeployingCWZNSdevices,theContractorshallvisitthesitetoverifycellular
coverage.IfthedevicestheContractorplanstodeploydonothavecoverage,theContractorshallswapout
thecellularmodem,SIMcard,orbothtoacarrierthatprovidescoverage.Ifnoadequatecellularcoverage
existsfrom4GLTEor5Gproviders,theContractorshallimmediatelynotifytheEngineer.

The Contractor shall install CWZNS devices at the locations shown on the Plans.

PertheWZDxSpecificationDeviceFeed,anEndLocationMarkershallhaveasingleMarkedLocationwiththe
“type”propertyas“work‐zone‐end”.
TheContractorshallinstallandpowerontheEndLocationMarkercoincidingwiththedeploymentofthe
temporarytrafficcontrolsetupthatcallsforitsuse.TheContractorshallpowerdownandremovethe
LocationMarkerattheconclusionoftheremovalofthetemporarytrafficcontrolsetup.Ifthelocationofthe
workmovesduringaworkshift,theContractorshallpowerdowntheLocationMarker,relocateit,andthen
poweritbackon.
TheoperatingmodefortheArrowBoardorConnectedArrowBoardshallbeperthePlans.Whenactivated,
theminimumelementon‐timeshallbe50%fortheflashingmode,withequalintervalsof25%foreach
sequentialphase.Theflashingrateshallbenotlessthan25ormorethan40flashesperminute.
IfaConnectedArrowBoardisbeingusedtotransmititslocationwithoututilizingotherarrowboard
functions,suchasoperatingaFlashingArrow,thearrowboardshallremaindarkandremovedfromthe
roadwayorprotectedfromapproachingtrafficwhilethedataisbeingtransmitted.
TheContractorshallberesponsibleforremediatinganyCWZNSdevicethatisnotoperatingasspecified,at
noadditionalcosttotheDepartment.

00715 - 14

CWZNSdevicesthatarelost,stolen,vandalized,damaged,destroyed,ordeemedunacceptablewhiletheiruse
isrequiredontheprojectshallbereplacedbytheContractoratnoadditionalcosttotheDepartment.

COMPENSATION

856.80: Method of Measurement

ArrowBoardsandConnectedArrowBoardswillbemeasuredbytheDay.Eachperiodofupto24hours
duringwhichanArrowBoardorConnectedArrowBoardisinusewillbemeasuredasoneday,regardlessof
thenumberoftimesthattheunitispositioned,repositioned,removed,orreturnedtoservice.
EndLocationMarkerswillbemeasuredbytheDay.Eachperiodofupto24hoursduringwhichaEnd
LocationMarkerisinusewillbemeasuredasoneday,regardlessofthenumberoftimesthattheunitis
positioned,repositioned,removed,orreturnedtoservice.

856.81: Basis of Payment

ArrowBoardsandConnectedArrowBoardswillbepaidforatthecontractunitpriceperdaywhichshall
includefullcompensationforlaborandmaterials,positioning,repositioning,andremovingorreturningto

service.

EndLocationMarkerswillbepaidforatthecontractunitpriceperdaywhichshallincludefullcompensation
forlaborandmaterials,positioning,repositioning,andremovingorreturningtoservice.
IfanEndLocationMarkerisattachedtoanothertrafficcontroldevicethatisnototherwisecalledforinthe
PlansorSpecifications,thatancillarydeviceshallbeconsideredincidentaltothecostoftheEndLocation

Marker.

Licenses,fees,communicationcosts,powercosts,andaccesstoreal‐timeandrecordeddataassociatedwith
theDeviceFeedforCWZNSdevicesshallbeconsideredincidentaltothecostoftheitem.

The Department will not pay for CWZNS devices that fail to operate as specified.

856.82: Payment Items

Item number Description Unit

856.060 Arrow Board (Type B) Day

856.096 Arrow Board (Type C) Day

856.160 Connected Arrow Board (Type B) Day

856.196 Connected Arrow Board (Type C) Day

856.201 End Location Marker Day

SECTION 900: STRUCTURES

SUBSECTION 901: CEMENT CONCRETE

Subsection901.20:Materials
DeleteAsphalticMaterials–M3,PreformedBituminousFiberJointFiller–M3.05.3andaddthefollowinginM
numbersequence:

Preformed Expansion Joint Filler M9.14.0

00715 - 15

SUBSECTION 983: REVETMENT

Subsection983.40:General
DeletePreformedBituminousFiberJointFiller–M3.05.3andaddthefollowinginMnumbersequence:

Preformed Expansion Joint Filler M9.14.0

DIVISION III

MATERIALS SPECIFICATIONS

SECTION M3: ASPHALTIC MATERIALS

SubsectionM3.05.5:PreformedBituminousJointFillerforConcrete
Deletethissubsection.

SECTION M9: MISCELLANEOUS MATERIALS

SubsectionM9.14.0:PreformedExpansionJointFiller
Replacethissubsectionwiththefollowing:
Preformedexpansionjointfillerforconcreteapplicationsandstructuralconstructionshallmeetthe
requirementsspecifiedherein.TheContractorshallprovidecertifiedtestdatawhichdocumentscompliance
withtherequiredphysicalproperties.ThecertifiedtestdatashallbesubmittedtotheEngineerforapproval.

Table M9.14.0‐1: Types of Preformed Expansion Joint Filler

Speciϐication Type and Description

AASHTOM153
TypeI–SpongeRubber
TypeII–Cork
TypeIII–Self‐ExpandingCork
TypeIV–Polyurethane‐BondedRecycledRubber
AASHTOM213
TypeI–Asphalt‐SaturatedCellulosicFiber
TypeII–AsphaltBinder‐CorkwithAsphalt‐SaturatedorGlassFiberFelt
TypeIII–Polyurethane‐BondedRecycledRubber
ASTMD1752
TypeIV–RecycledPVC
ASTMD7174
TypeI–Closed‐CellPolyethyleneorBlendedPolyethyleneFoam
ASTMD8139
TypeI–Closed‐CellPolypropyleneFoam
SubsectionM9.14.2:ClosedCellFoamJointFiller
Deletethissubsection:

M10.03.1: Field Monitoring Unit

AllFieldMonitoringUnits(FMU)shallbecompatiblewiththeMassDOTCriticalOperationsMulti‐
jurisdictionalModularSystem(MCOMMS),cloud‐basedmanagementsystem.
SubsectionM9.14.2:ClosedCellFoamJointFiller
Deletethissubsection:

00715 - 16

SECTION M10: TRAFFIC CONTROL DEVICES

SubsectionM10.03.1:FieldMonitoringUnit
Addthesenewsubsections:

M10.03.1: Field Monitoring Unit

AllFieldMonitoringUnits(FMU)shallbecompatiblewiththeMassDOTCriticalOperationsMulti‐
jurisdictionalModularSystem(MCOMMS),cloud‐basedmanagementsystem.
FMUsshallbecapableofoperatingindependentlyfromthebrandoftrafficsignalcontroller,vehicleand
pedestriandetectionsystems,batterybackupsystem(BBS),andanyotherEthernet‐based,webaccessible
devicepresentinthetrafficsignalcontrollercabinet.

M10.03.1.A: Hardware

TheFMUshallcommunicateviaanEthernetportwithanRJ45connectorandhaveanintegratedEthernet
switchwithaminimumoffourports.
TheFMUshallbepoweredviastandard120VACinputpower.TheFMUshallincludeanintegratedbattery
andbatterycharging/monitoringcircuitthatwillallowtheFMUtofullyfunctionevenifallotherelectrical
servicetothecabinethasbeeninterrupted.ThebatteryshallcontinuetosupplytheFMUwithpowerfora
minimumof5hoursonasinglecharge.
TheFMUshallhaveanintegratedGPSthatwillallowforautomatedtelemetrywithoutadditional
configuration.TheGPSshallbecapableofprovidingatimesyncpulsetotheinternalclockofaconnected
trafficsignalcontroller.TheFMUshallutilizetheintegratedGPStogeolocateitselfonamapviatheFMU
managementsoftware.

M10.03.1.B: Software

TheconfigurationoftheFMUshallbeaccomplishedbyaccessingFMUmanagementsoftwareviaaninternet
browser.ItshallbepossibletoconfiguretheFMUwithoutanyspecialsoftware.
TheFMUshalloperatewithoutrequiringastaticIPaddress.TheonlyconfigurationrequiredattheFMUisto
entertheURLtothehostoftheFMUmanagementsoftware.
TheFMUshallutilizeHTTPSprotocolsandXMLdatastructureforcommunicationswiththeFMU
managementsoftware.Thedatashallbescalableforfutureexpansion;proprietaryprotocolsshallnotbe

used.

M10.03.1.C: Wireless Connectivity

The FMU shall be supplied with an internal 4G LTE cellular modem.

Themodemshallsupportfutureupgradesto5Gservice,whenavailable,andshallbecompatiblewithSIM
cardsfrommultiplecellularcarriers.

M10.03.1.D: Remote Access

RemoteaccesstoanytrafficsignalcabinetcomponentthathasawebinterfaceviatheFMUshallnotrequire
theendusertocreateaseparateVirtualPrivateNetwork(VPN)connection.
SubsectionM10.08.0:VehicleDetectionSystems
SubsectionM10.08.0:VehicleDetectionSystems
SubsectionM10.08.0:VehicleDetectionSystems
Addthesesnewsubsections:

M10.08.0: Vehicle Detection Systems

VehicleDetectionSystems(VDS)shallbecapableofdetectingthepresenceofallmotorvehicletypesand
bicyclesindesignatedareasandsendingcorrespondingdetectoroutputstoatrafficsignalcontroller.

00715 - 17

All in‐cabinet components of VDS shall be compatible with the following standards:

• ATCC5301v02
• ATC5201v06
• NEMATS2environmentalstandards
Throughanethernet‐basedconnectiontothedetectionmoduleand/orcabinetinterfacedeviceinthefieldor
throughtheinternalnetworkofthetrafficsignalcontrollercabinet,theVDSshallsupportremote
managementofmotorvehicleandbicycledetectionconfigurationsandaccesstodataincluding:
• Thenumber,location,andsizeofdetectionzones.
• Configurationofthedetectorchannelandassignedphaseforeachzone.
• Configurationofdetectionzonesforsignalperformancemeasurementdatacollection.
• Theabilitytoaddandremoveusers.
• Signalperformancedata:
o Monitoringandrecordingthestatusofthephaseanddetectorchannelsfromthetrafficsignal
controllerthroughtheSIUbusatafrequencyofnolessthan10timespersecond.
o Estimationofthespeedofvehiclesatdefined,user‐configurablepoints,suchasenteringor
exitingadetectionzone.
o Retrievalofthesignalperformancedatathroughanhttp‐basedApplicationProgramming
Interface(API),orequivalentprocess,in.xml,.json,or.csvformat.
o Thedatashallbeavailableinapervehicleformat,beviewableinrealtime,andstoreatleast
168hoursofdatalocallyonthedevice.

VDS shall be capable of supporting user‐based restrictions to limit functionality, including:

This is the start of the file's text. The full file is on GovTribe.