614075 - Bid Tabulations.pdf
PDF 749 KB Posted
- Solicitation number
- BD-27-1030-0H100-0H002-131108
- Issued by
- Massachusetts
About this file
This is a Bid Tabulations report from the Massachusetts Department of Transportation (MassDOT) for Project 614075, a District 6 Bridge Drainage Installation & Rehabilitation contract. The project encompasses drainage installation and rehabilitation work at various locations within District 6, with bids opened on August 4, 2026. The scope of work includes base labor (1,194 hours), cleaning of scuppers (14 each), removal and cleaning of drainage pipes and structures (various quantities in feet and days), installation of bridge downspout systems in both steel pipe (350 feet) and fiberglass pipe (200 feet), and traffic management services including cones, signing, truck-mounted attenuators, temporary illumination, rumble strips, arrow boards, message signs, and reflectorized drums (ranging from 70 to 2,180 days of service). Bidders were required to be pre-qualified by MassDOT in the BRIDGE-CONSTRUCTION category prior to submission, with proposals submitted through www.bidx.com.
Four contractors submitted bids for this project: NEL Corporation at $791,735.00, SPS New England Inc. at $1,027,350.00, S&R Corporation at $2,349,969.00, and one unnamed bidder totaling $943,139.00. The office estimate was $791,735.00, with NEL Corporation matching this estimate as the lowest bid. Unit prices varied significantly among bidders, particularly for specialized items such as cleaning of scuppers (ranging from $2,000.00 to $23,965.00 per each) and traffic management services. The project required a 5% proposal guaranty, and contract awards were subject to Massachusetts prevailing wage rates and Architectural Access Board regulations. Price adjustments were applicable for hot mix asphalt, Portland cement mixtures, diesel fuel, gasoline, and structural steel based on reference base prices specified in the bid notice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Link to Bid Opening 8-4-2026.pdf | ||
| 614075 - Plan Holders List 7-21-2026.pdf | ||
| 614075 Bid Items List.txt | TXT text file | |
| BIDS OPENED - Tuesday - August 4-2026.pdf | ||
| DISTRICT 6-614075-135133-A-2.pdf | ||
| A00801-614075.pdf | ||
| A00803-614075.pdf | ||
| DISTRICT 6-614075-135133-A-1.pdf | ||
| A00820-614075.pdf | ||
| A00875-614075.pdf | ||
| 614075 - Plan Holders List 8-3-2026.pdf | ||
| 614075 - Notice to Contractors.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prelims Unit
Bid Tabulations
Project # : 614075 Bids Open Date : 04 Aug 2026 Location : DISTRICT6 Contract # : 135133 District : 6 Description : DISTRICT 6- BRIDGE DRAINAGE INSTALLATION & REHABILITATION AT VARIOUS LOCATIONS
Office Estimate NEL CORPORATION
Item # Quantity Units Description Unit Price Amount Unit Price Amount
100.1 1,194.000 HR BASE LABOR RATE $180.00 $214,920.00 $180.00 $214,920.00
227.02 14.000 EA CLEANING OF SCUPPERS $2,000.00 $28,000.00 $3,270.00 $45,780.00
227.31 200.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $50.00 $10,000.00 $112.00 $22,400.00
227.321 550.000 FT CLEANING DOWNSPOUT DRAINAGE PIPES $120.00 $66,000.00 $90.00 $49,500.00
227.331 14.000 EA REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $1,000.00 $14,000.00 $1,600.00 $22,400.00
234.07 350.000 FT BRIDGE DOWNSPOUT SYSTEM – STEEL PIPE $500.00 $175,000.00 $824.00 $288,400.00
234.08 200.000 FT BRIDGE DOWNSPOUT SYSTEM – FIBERGLASS PIPE $500.00 $100,000.00 $718.00 $143,600.00
851.1 135.000 DAY TRAFFIC CONES FOR TRAFFIC MANAGEMENT $250.00 $33,750.00 $175.00 $23,625.00
852. 750.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $18.00 $13,500.00 $8.00 $6,000.00
853.403 225.000 DAY TRUCK MOUNTED ATTENUATOR $480.00 $108,000.00 $355.00 $79,875.00
853.8 135.000 DAY TEMPORARY ILLUMINATION FOR WORK ZONE $72.00 $9,720.00 $110.00 $14,850.00
854.6 320.000 DAY TEMPORARY PORTABLE RUMBLE STRIP $22.00 $7,040.00 $8.00 $2,560.00
856.096 225.000 DAY ARROW BOARD (TYPE C) $20.00 $4,500.00 $105.00 $23,625.00
856.12 70.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $25.00 $1,750.00 $45.00 $3,150.00
859. 2,180.000 DAY REFLECTORIZED DRUM $1.00 $2,180.00 $0.30 $654.00
859.1 225.000 DAY REFLECTORIZED DRUMS WITH SEQUENTIAL
FLASHING WARNING LIGHTS
$15.00 $3,375.00 $8.00 $1,800.00
Total : $791,735.00 Total : $943,139.00
CMS105 - Report Date: 8/4/2026 2:38 PM Page 1 of 2
Bid Tabulations
Project # : 614075 Bids Open Date : 04 Aug 2026 Location : DISTRICT6 Contract # : 135133 District : 6 Description : DISTRICT 6- BRIDGE DRAINAGE INSTALLATION & REHABILITATION AT VARIOUS LOCATIONS
SPS NEW ENGLAND INC S&R CORPORATION
Item # Quantity Units Description Unit Price Amount Unit Price Amount
100.1 1,194.000 HR BASE LABOR RATE $195.00 $232,830.00 $236.00 $281,784.00
227.02 14.000 EA CLEANING OF SCUPPERS $2,100.00 $29,400.00 $23,965.00 $335,510.00
227.31 200.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $145.00 $29,000.00 $705.00 $141,000.00
227.321 550.000 FT CLEANING DOWNSPOUT DRAINAGE PIPES $145.00 $79,750.00 $420.00 $231,000.00
227.331 14.000 EA REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $1,800.00 $25,200.00 $19,465.00 $272,510.00
234.07 350.000 FT BRIDGE DOWNSPOUT SYSTEM – STEEL PIPE $880.00 $308,000.00 $778.00 $272,300.00
234.08 200.000 FT BRIDGE DOWNSPOUT SYSTEM – FIBERGLASS PIPE $500.00 $100,000.00 $755.00 $151,000.00
851.1 135.000 DAY TRAFFIC CONES FOR TRAFFIC MANAGEMENT $1,130.00 $152,550.00 $1,315.00 $177,525.00
852. 750.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $15.00 $11,250.00 $56.40 $42,300.00
853.403 225.000 DAY TRUCK MOUNTED ATTENUATOR $100.00 $22,500.00 $985.00 $221,625.00
853.8 135.000 DAY TEMPORARY ILLUMINATION FOR WORK ZONE $75.00 $10,125.00 $1,063.00 $143,505.00
854.6 320.000 DAY TEMPORARY PORTABLE RUMBLE STRIP $35.00 $11,200.00 $163.00 $52,160.00
856.096 225.000 DAY ARROW BOARD (TYPE C) $35.00 $7,875.00 $30.00 $6,750.00
856.12 70.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $28.00 $1,960.00 $37.00 $2,590.00
859. 2,180.000 DAY REFLECTORIZED DRUM $2.00 $4,360.00 $7.00 $15,260.00
859.1 225.000 DAY REFLECTORIZED DRUMS WITH SEQUENTIAL
FLASHING WARNING LIGHTS
$6.00 $1,350.00 $14.00 $3,150.00
Total : $1,027,350.00 Total : $2,349,969.00
CMS105 - Report Date: 8/4/2026 2:38 PM Page 2 of 2
File details come from the government source that posted it. Updated .