About this file
This is a Question and Answer document for Invitation for Bid (IFB) B-50236 regarding dish machine procurement at Illinois River Correctional Center. The document addresses technical specifications and installation requirements for a flight-type dish washing machine intended for the facility's dietary department. Key specifications include a round duct system made from stainless steel if modifications are needed, a CFM rating of 1500 at 0.63 water column, and power requirements of 460 three-phase volts with three breakers rated at 120, 60, and 25 amps. The facility processes up to 4,800 trays daily depending on lockdown status. Critical installation requirements specify that the vendor is responsible for shipping, transportation, and delivery of the machine into the dietary building, with total loading and unloading space of 22.5 feet available. A factory technician is required to perform startup on the flight-type machine, and plumbing work must be performed by a certified plumber.
Responsibility for various aspects of the installation are divided between the vendor and Illinois River Correctional Center staff. The center will coordinate detergent removal and installation, remove walls and windows necessary for delivery and installation, and construct a cage around the water softener after installation. The water softener will be located in the dish room with the machine. The vendor must communicate machine dimensions to the facility to ensure sufficient access during delivery. No liftgate is required for unloading, as the facility will not receive the shipment directly but instead requires the vendor to bring equipment to the site.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ipg-active-registered-vendor-disclosure-formerly-forms-b-v.23.1~44.docx | DOCX document | |
| RFQ - Centralia Sewage Treatment Plant Upgrades - B-50235~2.docx | DOCX document | |
| Dish Machine Question and Answer B50236~1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dish machine IFB Question and Answer #2 B-50236
1. Do you need a round or square duct, and what should it be made from?
The current duct is round. If square is needed, a modification must be performed and made from stainless steel.
2. Does the fan need replaced?
No
3. What is the CFM?
1500 cfm @ 0.63 wc
4. Will a cage need installed around the water softner? And where will it be located?
Illinois River Correctional Center staff will build a cage after installation. Water softner will be located in Dish Room with the machine.
5. How will the machine get inside of the Dietary Building?
Vendor is responsible for shipping and transportation of machine into the Dietary Building.
6. Does the person working on the water lines have to be a certified plumber?
Yes. See section 1.2.1.
7. Approximately how many trays are washed in a day?
Up to 4,800 depending on lockdown status.
8. Who is responsible for the detergent removal/installation?
Illinois River Correctional Center will coordinate any removal and installation of the detergent.
9. How many AMPs and what is the power?
Power is 460 3 phase volts, there are three breakers 120, 60, and 25 amps
10. Will it be required to have a “Factory Technician” perform start up on the Flight Type Machine?
Yes
11. Is the facility able to receive the shipment if shipped to facility? Will a liftgate be needed?
No, facility will not be responsible for receiving shipment. Vendor must bring equipment to facility. Liftgate will not be needed.
12. Who is removing walls and windows needed for installation?
Illinois River Correctional staff will remove the necessary walls and windows for delivery/installation into the Dietary Department. Vendor must communicate size and dimensions of machine to ensure access is sufficient.
13. What is the total length available for loading and unloading the machine.
The total length that could be utilized is 22.5 feet.