DIGNITY CLAUSE.docx

DOCX document 21 KB Posted

Attached to
Benicia Arsenal Post Cemetery Grounds Maintenance -- S208
Solicitation number
QSE--36C78626Q50046
Issued by

About this file

The file is a Dignity Clause document specifying requirements for contractor conduct at national cemeteries, with a focus on reverent and careful treatment of burial sites. The clause mandates strict protocols for contractor personnel, including: prohibiting standing, sitting, or driving on headstones/markers; avoiding damage to markers and turf; preventing contact with burial remains; and requiring employees to sign a compliance statement before beginning work. The clause is specifically related to a Department of Veterans Affairs National Cemetery Administration solicitation for Benicia Arsenal Post Cemetery Grounds Maintenance services, emphasizing the critical importance of respectful treatment of veterans' final resting places during maintenance operations.

View the file

Other files

File Type Posted
PWS Benicia GMC Revised.pdf PDF
QSE_36C78626Q50046_0001.pdf PDF
Responses to Questions.pdf PDF
Contract Guarantee Minimum.docx DOCX document
RFQ_Addendum_Submission Instructions_ Evaluation.docx DOCX document
Past Performance Reference.docx DOCX document
Administrative Information.pdf PDF
Solicitation.pdf PDF
WD 2015 5655 Rev 25 12 03 2025.pdf PDF
Benicia GMC PWS Final -1 09 2026.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIGNITY CLAUSE

Respect for Headstones and Markers in National Cemeteries, Handling of Markers and Headstones

1. Every action by contractor personnel at a national cemetery must be performed with the special care, reverence, dignity, and respect that acknowledges the cemetery as the final resting place that commemorates the service and sacrifice that service members, Veterans and their families made for our Nation. Critically important is the awareness required of the Contractor employees of the remains buried in the grounds where the work is performed. The utmost care must be given to these remains and the headstones and flat grave markers that mark those gravesites and memorialize the service of individuals.

a. Contractors cannot walk, stand, lean, sit or jump on headstones or markers. Nor can they drive over them.

b. No tools, equipment or other items will be placed or leaned on headstones or markers.

c. Use care not to scratch or damage markers in any manner.

d. Contractor shall be responsible for replacing damaged headstones and markers and for restoring turf damaged during performance of this work.

e. Additionally, should any activity result in the exposure and/or damage to any remains, container for remains (e.g., casket or urn), or outer burial container, the contractor must contact the COR, Director/Assistant Director, or Contracting Officer (CO) for guidance.

2. Any doubts as to proper procedures shall be brought to the attention of the COR, Director/Assistant Director, or CO for guidance or resolution.

3. The contractor is required to discuss the guidance with employees and/or subcontractors and have each employee sign a statement of compliance and deliver the signed statement to the COR before work may begin.

(END)

File details come from the government source that posted it. Updated .