Digitization PWS021220.docx

DOCX document 87 KB Posted

Attached to
WV ARNG records digitilization and indexing services Federal contract opportunity
Solicitation number
W912L820Q0021
Issued by
Department of the Army West Virginia Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to WV ARNG records digitilization and indexing services, newest first.
File Type Posted
Digitization QASP.DOCX DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

WVARNG Permanent Records Digitization Initiative

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Records Digitization and Indexing Services, as defined in this PWS.

1.2 Background: The West Virginia Army National Guard (WVARNG) has maintained discharge documents pertaining to the time in service of former Soldiers for well over 70 years. These records exist in paper, Micro-Film and digital media. There is a critical need to digitize the paper and micro film to ensure it is available for these Soldiers and their families for years to come. The equipment needed to read/print Micro-Film is quickly becoming an extinct technology. In addition, the US National Archives and Records Administration (NARA) implemented the Technical Guidelines for Digitizing Archival Materials for Electronic Access: Creation of Production Master Files – Raster Images in 2004. To ensure we are meeting regulatory requirements and to maintain the ability of providing Soldiers copies of their service records, it is imperative we move to digitize first the Micro-Film then the paper records as soon as possible.

1.3 Period of Performance PoP: The Period of Performance shall be 1 Base Year of 12 months and four 12-month option years.

1.4 General Information:

1.4.1 Quality Control (QC): The contractor shall develop and maintain an agreed upon effective QC Plan (QCP) that involves the WVARNG, to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The agreed upon QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS). A final QCP shall be submitted to the Contracting Officer Representative (COR) NLT 10 working days after contract award. After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s (KO’s) acceptance in writing of any proposed changes to its QCP.

1.4.2 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

1.4.3 Recognized Holidays: The following are recognized United States (US) holidays. The contractor shall not perform services on these days:

1.4.3.1 New Year’s Day: January 1st

1.4.3.2 Martin Luther King, Jr.’s Birthday

1.4.3.3 President’s Day

1.4.3.4 Memorial Day

1.4.3.5 Independence Day: July 4th

1.4.3.6 Labor Day

1.4.3.7 Columbus Day

1.4.3.8 Veteran’s Day: November 11th

1.4.3.9 Thanksgiving Day

1.4.4 Place and Performance of Services: The contractor shall provide a suitable worksite that meets all climate control standards dictated by the National Archive and Records Administration (NARA) Directive NARA-571 dated, February 15, 2002, Appendix A, Temperature and Relative Humidity Standards for Archival Records. The work site will have adequate space to maintain necessary on-hand boxes in an organized manner, stacking no more than 4 boxes high. The contractor shall provide services between the hours of 0800-1700 Monday through Friday, except on recognized US Federal holidays. The contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.4.4.1 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.4.2 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation which may affect performance. The Government reserves the right to direct the removal of an employee for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.5 Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.4.5.1 For contractors requiring Common Access Card (CAC): The CAC is the DoD Federal Personal Identity Verification (PIV) credential. CAC issuance requirements are as follows:

In accordance with Department of Defense Manual (DoDM) 1000.13-M-V1, DoD Identification (ID) Cards, January 23, 2014, initial issuance of a CAC requires, at a minimum, the completion of an Federal Bureau of Investigation (FBI) fingerprint check with favorable results and submission of a National Agency Check with Inquiries (NACI) (or investigation approved in Federal Investigative Standards) to the Under Secretary of Defense for Intelligence (USD(I)) approved investigative service provider. The issuance of a CAC will be based on four criteria: (a) eligibility for a CAC; (b) verification of DoD affiliation from an authoritative data source; (c) completion of background vetting requirements according to the Federal Information Processing Standards Publication 201-2, Personal Identity Verification (PIV) of Federal Employees and Contractors, August 2013, and DoD Manual 5200.02, Procedures for the DoD Personnel Security Program (PSP), April 3, 2017, and (d) verification of a claimed identity. Sponsorship and enrollment information about each applicant must be registered in the Defense Enrollment Eligibility Reporting System (DEERS) through either the Real-Time Automated Personnel ID System (RAPIDS) using the DD Form 1172-2, or the Trusted Associate Sponsorship System (TASS).

1.4.5.1.1 HSPD-12 Background Investigation Requirements: The contractor shall ensure that all contractor and subcontractor personnel whose duties require CAC card issuance obtain them, and shall process all CAC card applications. The contractor shall ensure that all employees requiring an initial background investigation complete a Personnel Security Investigation Portal (PSIP) form at Attachment TBD, at the earliest possible date and that this form is forwarded to the COR immediately. The COR will review the form for completeness and accuracy and forward it to the National Guard Bureau (NGB) Personnel Security manager who will initiate the investigation process via the PSIP. Contractor personnel will then receive two e-mail messages; the first will confirm that the investigative service provider has received the request, and the second will provide instructions for the completion of the appropriate form via the Electronic 1.4.5.1.2Questionnaires for Investigations Processing (e-QIP) system. Upon completion of the e-QIP questionnaire and submittal of all required documents, including fingerprint card to the security manager, the background investigation (BI) will be initiated. The contractor shall ensure immediate compliance with all instructions regarding background investigation processing, including those provided verbally, by e-mail or via a Government system. The contractor is cautioned that the entire process from submittal of the PSIP form to return of the FBI fingerprint check may routinely take from two to six weeks and shall factor this lead time into its hiring/placement process. The contractor shall make all reasonable efforts to ensure that contractor employees meet CAC eligibility standards upon assignment to the contract and shall be held responsible for delays, failure to meet performance requirements or decreases in efficiency in accordance with the applicable inspection clause.

1.4.5.1.3 Trusted Associate Sponsorship System (TASS): The contractor shall process CAC applications through the TASS, the procedures for which are described below. Although there is no requirement for the contractor to designate a “Corporate Facility Security Officer" (FSO) to serve as its single point of contact for the BI, the TASS application process and other CAC and security-related matters, such designation facilitates these processes. If an FSO is not established, all contractor employees requiring a CAC will be required to process their own applications. The submission process for CAC applications is as follows:

1.4.5.1.4 The contractor's FSO or contractor employee shall submit requests for a CAC via email to the designated TASS Trusted Agent (TA). The TASS TA for this requirement will be: TBD

1.4.5.1.5 The Government will establish a TASS application account for each CAC Request and will provide each contractor employee a USER ID and password, via email, to the FSO. The FSO or contractor employee shall access the TASS account and complete the CAC application (entering/editing contractor information as applicable) at: https://www.dmdc.osd.mil/tass/. The FSO or contractor employee shall follow up to ensure that the TA is processing the request.

1.4.5.1.6 The Government will inform the contractor's applicant, via email, of one of the following:

1.4.5.1.6.1 Approval.* Upon approval, the information is transferred to the DEERS database and an email notification is sent to the contractor with instructions on obtaining their CAC. The contractor proceeds to a RAPIDS station (RAPIDS Site Locator: http://www.dmdc.osd.mil/rsl/).

1.4.5.1.6.2 Rejection.* The Government, in separate correspondence, will provide reason(s) for rejection.

1.4.5.1.6.3 Return. Additional information or correction to the application required by the contractor employee.

*The contractor shall maintain records of all approved and rejected applications.

1.4.5.1.7 At the RAPIDS station, the RAPIDS Verification Officer will verify the contractor employee by SSN and two forms of identification. Identity source documents must come from the list of acceptable documents included in Form I-9, OMB No. 1615-0047, "Employment Eligibility Verification." Consistent with applicable law, at least one document from the Form I-9 list shall be a valid (unexpired) State or Federal Government-issued picture ID. The Identity documents will be inspected for authenticity and scanned and stored in the DEERS upon issuance of an ID. The photo ID requirement cannot be waived, consistent with applicable statutory requirements. The Verification Officer will capture primary and alternate fingerprints, picture, and updates to DEERS, and will then issue a CAC. Issued CACs will be valid for no longer than three years, or until the individual's contract end date (inclusive of any options), whichever is earlier.

1.4.5.1.8 The contractor shall return issued CACs to the DEERS office upon departure or dismissal of each contractor employee, and shall obtain a receipt for each card and provide it to the TA/COR.

1.4.5.1.9 The contractor shall manage requests for new or renewal CAC cards in sufficient time to ensure that all contractor employees have them when needed to perform work under this contract. The contractor shall provide at least 10 calendar days advance notice to the TA, unless there are extenuating circumstances approved by the COR or KO.

1.4.5.1.10 The contractor shall obtain an Army Knowledge Online (AKO) email address for each applicant, including subcontractors, who may be deployed or require logical access to a government computer network. This can be done by going to: http://www.us.army.mil and registering as an "Army Guest," with the sponsor being the COR or a COR- designated individual if the COR is ineligible to Serve as an AKO Sponsor. Note: If employees of a contractor lose the privilege to access AKO, they lose the ability to renew their CAC. Therefore, it is critical that contractor employees maintain their AKO accounts.

1.4.5.2 For contractors that do not require a CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), and applicable installation, facility and area commander installation/facility access, and local security policies and procedures (provided by a government representative).

1.4.5.3 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.5.4 Use of Government Information Systems (IS) and access to Government networks is a revocable privilege, not a right. Users are the foundation of the DoD strategy and their actions affect the most vulnerable portion of the Army Enterprise Infostructure (AEI). Contractor employees shall have a favorable background investigation or hold a security clearance and access approvals commensurate with the level of information processed or available on the system. Contractor employees shall:

1.4.5.4.1 Comply with the command's Acceptable Use Policy (AUP) for Government owned IS and sign an AUP prior to or upon account activation.

1.4.5.4.2 Complete initial and/or annual Information Assurance (IA) training as defined in the IA Best Business Practices (BBP) training (https://informationassurance.us.army.mil).

1.4.5.4.3 Mark and safeguard files, output products, and storage media per classification level and disseminate them only to individuals authorized to receive them with a valid need to know.

1.4.5.4.4 Protect IS and IS peripherals located in their respective areas in accordance with physical security and data protection requirements.

1.4.5.4.5 Practice safe network and Internet operating principles and take no actions that threaten the integrity of the system or network.

1.4.5.5 Protection of Personally Identifiable Information (PII). The contractor shall protect all PII encountered in the performance of services in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 224.103 Personally Identifiable Information and Department of Defense Directive (DoDD) 5400.11, Department of Defense Privacy Program, and DoD 5400.11-R. If a PII breach results from the contractor’s violation of the aforementioned policies, the contractor shall bear all notification costs, call-center support costs, and credit monitoring service costs for all individuals whose PII has been compromised.

1.4.5.6 AT Level 1 Awareness Training (AT): All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete Level 1 AT within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR (LTC William Annie) within 15 calendar days after completion of training. Level 1 AT is available at http://jko.jten.mil/courses/atl1/launch.html .

1.4.5.7 Information Assurance (IA)/Information Technology (IT) Training: All contractor employees and associated subcontractor employees shall complete the DoD IA Awareness Training before issuance of network access and annually thereafter. All contractor employees performing services involving IA/IT functions shall comply with DoD and Army workforce training requirements in DoDD 8140.01, DoD 8570.01-M and AR 25-2 within six months of the start of contract performance. In accordance with DoD 8570.01-M, DFARS 252.239.7001 and AR 25-2, contractor employees performing Information Assurance Technical (IAT) functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M shall be completed upon contract award.

1.4.5.8 Information Awareness: All contractor employees with access to a government information system shall be registered in the Army Training Certification Tracking System (ATCTS) (https://atc.us.army.mil/iastar/index.php) at commencement of services, and shall successfully complete the DoD Information Assurance awareness training prior to access to the IS and then annually thereafter. (https://ia.signal.army.mil/DoDIAA/).

1.4.5.9 iWATCH Training: The contractor and all associated subcontractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program. This local developed training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or the KO. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each contractor employee and subcontractor employee to the COR, within 15 calendar days after completion of training.

1.4.5.10 OPSEC Training: In accordance with AR 530-1, Operations Security, new contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training. Level 1 OPSEC training is available at http://cdsetrain.dtic.mil/opsec/.

1.4.5.11 OPSEC SOP/Plan. The contractor shall develop an OPSEC Standard Operating Procedure (SOP)/Plan and provide it to the COR within 30 business days of contract award, to be reviewed and approved by the responsible Government OPSEC officer, per AR 530-1, Operations Security. This SOP/Plan shall include a process to identify the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. Contractor shall implement OPSEC measures as required by the Government. In addition, the contractor shall identify an individual who will be an OPSEC Coordinator. The contractor shall ensure this individual becomes OPSEC Level II certified within 90 days of appointment as OPSEC coordinator in accordance with AR 530-1. Contractor shall provide a copy of the certification to the COR NLT 15 days after completion.

1.4.5.12 Classified Information. The contractor shall comply with Federal Acquisition Regulation (FAR) Clause 52.204-2, Security Requirements. This clause applies to contracts that involve access to information classified “Confidential,” “Secret,” or “Top Secret,” and requires contractors to comply with the Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22-M) and applicable updates/changes.

1.4.5.13 Threat Awareness and Reporting Program (TARP). Per AR 381-12, Threat Awareness and Reporting Program (TARP), contractor employees with security clearances must receive annual TARP training by a counterintelligence (CI) agent or other trainer as specified in Chapter 2 Threat Awareness and Education, Section II, paragraph 2-4b. The contractor shall identify annual TARP training, personnel trained and date of training with the Monthly Progress Report.

1.4.5.14 Contractor will develop a Production timeline within 30 days of contract award and provide to COR for review comments and approval.

1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured. All work performed (scanning/duplicating/copying, binding, and packing, etc.) must be accomplished in a secured area within the contractor’s facility that the general public is unable to access or view any documents being processed. The facility must have controlled access and/or locking mechanism on all doors leading to and from the production area. All retained copies/furnished materials (SBU data) shall be located in a locked or secured area during non-duty hours.

1.4.6.1 The contractor shall take all appropriate action and measures to minimize exposure of the furnished materials to a minimum number of employees. The Contractor will be required to account for all furnished originals and manufactured copies. Unless otherwise indicated, all extra copies (in any format), waste, spoilage sheets, and so forth are to be destroyed beyond recognition and reconstruction in accordance with HIPPA standards. All electronic files and data shall be completely purged from all data storage components of the contractor's computer facility.

1.4.6.2 Facility must be monitored with 24/7/365 Video Surveillance which is monitored by a dedicated corporate security team.

1.4.6.3 The Contractor must be Safe Harbor compliant and be able to provide a current Service Organization Controls (SOC) Type 2 Audit for Chain of Custody and Security Procedures

1.4.7 Personnel Security: Contractor shall ensure that all employees involved in the processing of these documents have passed background checks and drug testing. All contractor employees involved in the processing of these documents must sign non-disclosure and confidentiality agreements.

1.4.8 Safe Custody: Contractor shall ensure that all copy materials constantly remain in safe custody from the time they are picked-up until the time they are returned.

1.4.8.1 Safe custody ensures the legal documents remain in the original cartons until they arrive at the contractor's secure area within the contractor’s production facility. The legal document cartons and litigation copy cartons must always remain in view of authorized personnel. No unauthorized personnel are to handle the cartons.

1.4.8.2 Contractor shall use a Contractor Owned Vehicle for the pick-up and delivery of Government Furnished Materials (GFM), no third party carriers will be allowed in order to ensure the integrity of the chain of custody. The Contractor’s vehicle used to transport cartons must be locked at all times unless loading and unloading cartons. If there is to be more than one trip to load or unload cartons, the Contractor must have another authorized person guarding the cartons in the vehicle.

1.4.8.3 Contractor shall provide a procedure for the safeguarding of all documents. A Chain of Custody form must be signed by the Agency Contracting Office Representative (COR) to ensure the secure hand off of these documents into the Contractor’s care. The procedure should set forth all precautions that will be taken to ensure integrity of documents.

1.4.8.4 A Chain of Custody form is required to be signed by contractor upon receipt of materials to be copied.

1.4.8.5 Key Control. NOTE: All references to keys include key cards. The contractor shall establish and implement methods of ensuring that no keys/key cards issued by the Government are lost or misplaced or are used by unauthorized persons. No keys issued by the Government shall be duplicated. The contractor shall include procedures covering key control in the QCP. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The contractor shall immediately report any occurrences of lost or duplicated keys/key cards to the COR.

1.4.8.5.1 In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction by the KO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the Government replaces or re-keys the locks, the Government will deduct the total cost of lock replacement or re-keying from the monthly payment due the contractor. In the event a master key is lost or duplicated, the Government will replace all locks and keys for that system, and will deduct the total cost from the monthly payment due the contractor.

1.4.8.5.2 The contactor shall prohibit the use of the Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contactor employees engaged in the performance of services in those areas, or personnel authorized entrance by the KO.

1.4.8.6 Lock Combinations: The contractor shall establish and implement methods of ensuring that no lock combinations are revealed to unauthorized persons. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the contractor’s QCP.

1.4.9 Special Qualifications:

NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified and qualified to provide services.)

1.4.10 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR Subpart 42.5. The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government. Regularly scheduled meetings will occur on a quarterly basis and could be attended remotely by VTC or conference call. Contractor will also make a representative available for non-regularly scheduled meetings to address problem resolution should the need arise.

1.4.11 Contract Manager (CM): Contractor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate, who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.12 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed. The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the KO within 14 days of an employee’s departure.

1.4.13 Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described in FAR 22.17.

1.4.14 Contractor Travel: The contractor shall travel during the performance of this contract to attend meetings, and deliver materials.

1.4.14.1 The contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. All travel requires COR recommendation for approval and/or authorization by the KO prior to travel arrangements being made

1.4.15 Data Rights: The Government has unlimited rights to all documents/materials produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.4.16 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.4.17 Phase In / Phase Out Periods are not applicable to this contract.

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2 Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3 Contracting Officer Representative (COR): An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment will be in writing and will state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.5 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.6 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.8 Quality Assurance: The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.11 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms:

AEIArmy Enterprise Info-structure
ARArmy Regulation
AT/OPSECAntiterrorism/Operational Security
BIBackground Investigation
CMContract Manager
CMRAContractor Manpower Reporting Application
CORContracting Officer Representative
DADepartment of the Army
DD254Department of Defense Contract Security Classification Specification
DFARSDefense Federal Acquisition Regulation Supplement
DoDDepartment of Defense
DoDDDepartment of Defense Directive
FARFederal Acquisition Regulation
GFP/M/E/SGovernment Furnished Property/Material/Equipment/Services
HQDAHeadquarters, Department of the Army
HSPDHomeland Security Presidential Directive
IAInformation Assurance
ISInformation System(s)
KOContracting Officer
NGBNational Guard Bureau
OCIOrganizational Conflict of Interest
PIIPersonally Identifiable Information
POCPoint of Contact
PRSPerformance Requirements Summary
PWSPerformance Work Statement
QAQuality Assurance
QASPQuality Assurance Surveillance Plan
QCQuality Control
QCPQuality Control Program
SSNSocial Security Number
TETechnical Exhibit

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the material and/or services listed below solely for the purpose of performance under this contract:

3.1 Property: Not Applicable. The government will not provide property.

3.2 Materials: Following completion of Micro-Film digitization WVARNG will provide approximately 5639 boxes of records at an agreed upon schedule and rate (boxes per delivery).

3.3 Equipment: Not Applicable. The government will not provide equipment.

3.4 Services: The government shall provide oversight of the transfer of Micro-Film and the shipments of boxes to the contracted vendors work site.

3.5 Utilities: Not Applicable

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

4.2 Secret Facility Clearance: The contractor shall possess or be eligible to receive and maintain a SECRET facility clearance from the Defense Security Services. The contractor’s employees performing work in support of this contract shall have been granted a SECRET security clearance from the Defense Industry Security Clearance Office.

5.0 Requirements: The contractor shall provide the following services. While providing the services, contractor shall maintain a clean and orderly work area.

5.1 WVARNG will provide approximately 1348 rolls of 215 foot, 16mm Micro-Film and 16872 Micro-fish Cards to the agreed upon site, to be digitized and returned. Pick-up the 1348 Rolls of Micro-film, 16872 Micro-fish Cards, and 5639 10.24x16x12.5 inch boxes of records from WVARNG HQ in Charleston, WV. Micro-fish and micro-film may be picked up all at once. Record boxes will be picked up on a rotational basis, leaving 2/3 of the records at the WVARNG HQ in Charleston.

5.1.1 Digitize Micro-film, Micro-fish, and Records into PDF format.

5.1.2 Combine digitized PDF data in such a manner so that all images relating to a single individual are contained in one file.

5.1.3 Index PDF files created from Micro-Film using the following fields, in the following order: Last Name, First Name, Middle Initial, SSN (Pursuant to DoDI 1000.30) or Service #, Discharge Date, Date of Birth, Date of Birth, and City and State of Birth.

5.1.3.1 Personnel Files Indexing

File Level Indexing

(Index field Name)
(Min/Max Length)
(Format)
(Source Disposition)
(Source Location)
Last Name
OtherAlphanumericMachine PrintedFirst Page in File
First Name
OtherAlphanumericMachine PrintedFirst Page in File
Middle Initial
1-5AlphanumericMachine PrintedFirst Page in File
Last 4 SSN or Service #
6-10NumericMachine PrintedFirst Page in File
Discharge Date
6-10NumericMachine PrintedFirst Page in File
Date of Birth
6-10NumericMachine PrintedSecond Page in File
City/State of Birth
OtherAlphanumericMachine PrintedSecond Page in File

5.1.3.2 Data & Image File Format Specifications

Data and Image File Format(s)
Describes the deliverables for data and images.

Technical specifications detailing the delivery format and naming conventions will be documented under separate cover for review, validation and authorization by Client prior to commencement of production processing.

2TB EXTERNAL HARD DRIVE (3.0)

Batch001

BOX001

IMAGE000001.pdf
IMAGE000002.pdf

INDEX DATA.csv

Index Format: Last Name_FirstName_Last4SSN (or Military ID#)_DischargeDate_DateofBirth_CityStateofBirth.pdf

Example: Garcia_Jerry_7777_19991231_19541024_CharlestonWV.pdf

Images will be delivered as multipage PDF/A Data and images will be formatted for Adobe Viewer.

OCR Processing
OCR will be performed on all pages of ALL populations.

5.1.4 Provide 3 sets of digitized PDF files created from Micro-Film on sequentially numbered and labeled External Hard Drives.

5.1.5 Contractor will return the 1348 rolls of Micro-Film and 16872 cards of Micro-fish to the COR.

5.1.6 Contractor will transport and coordinate schedule for transfer of 5639 miracle boxes of paper records for digitization.

5.1.6.1 Contractor will mark and safeguard files, output products, and storage media per classification level of FOUO and disseminate them only to individuals authorized to receive them with a valid need to know.

5.1.7 Communicate with WVARNG COR who shall facilitate the transfer of records from the State Records Holding Area to the contractor.

5.1.8 Remove documents from records jackets, removing staples, paperclips, binder clips or any other items that may affect the digitization process without harming any of the documents.

5.1.9 Digitize each piece of paper in every file, to include, single sided pages, duplex pages, multi part fan-fold pages, “onion-skin” pages, non-standard sized pages, 3x5 cards, notes or post-its and any other additional types of paper based information found in each file.

5.1.10 Index PDF files created from paper records using the following fields, Last Name, First Name, Full SSN, and Discharge Date. Example: Garcia_Jerry_555-66-7777_19991231_DateofBirth_CityStateofBirth.pdf

5.1.11 Provide 3 sets of digitized PDF files created from paper based records on sequentially numbered External Hard Drives.

5.1.12 Provide the hard drives of the scanning equipment so that the WVARNG can facilitate destruction for protection of PII.

5.2 Document Scanning capture requirements.

Scan Capture
File Level
N/A
Section Divider (tab level)
N/A
Document Level
N/A
Image Resolution
Other 400 DPI
Oversize Pages (>11”x17”)
Yes
Oversize Resolution
N/A
Color Documents
Yes
Color Resolution
Other 400 DPI
Image Size for Size
Yes
Remove Standard Language
No
Post-It® Notes
Move on same page

5.3 The vendor shall provide file access services for the duration of this project. Requests shall be initiated via email to the Contract Manager. Requests will contain identifiable information for physical file retrieval. The file will be retrieved, scanned and returned via email as a PDF attachment within twenty-four (24) hours from the time of request. The vendor shall action all requests. Required for paper records only.

5.4 Contractor Manpower Reporting Application (CMRA):

5.4.1 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the National Guard Bureau via a secure data collection site.

5.4.2 The contractor shall completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2020. Contractors may direct questions to the help desk at http://www.ecmra.mil.

6.0 Applicable Publications: Publications applicable to this PWS are listed below:

Publication (Chapter/Page)

Date of Publication
Mandatory or Advisory
Website

Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar or http://farsite.hill.af.mil/

Defense Federal Acquisition Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html or http://farsite.hill.af.mil/

DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b) 01/23/2014 http://www.esd.whs.mil/Directives/issuances/dodm/

DoDI 1000.30 Reduction of Social Security Number (SSN) Use Within DoD
08/01/2012

https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/100030p.pdf

Federal Information Processing Standards (FIPS) Publication 201-2 Personal Identity Verification (PIV) of Federal Employees and Contractors (paragraph 9) August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf

DoDM 5200.2 Regulation 5200.02 Procedures for the DoD Personnel Security Program (PSP)
04/03/2017

http://www.dtic.mil/whs/directives/corres/pub1.html

AR 190-13

The Army Physical Security Program 02/25/2011 http://www.apd.army.mil/ProductMaps/PubForm/AR.aspx

DoDD 5400.11 Department of Defense Privacy Program 10/29/2014 http://www.dtic.mil/whs/directives/corres/dir.html#

DoD 5400.11-R Department of Defense Privacy Program 05/14/2007 http://www.dtic.mil/whs/directives/corres/pub1.html

DoDD 8140.01 Cyberspace Workforce Management

08/11/2015
OK
http://www.dtic.mil/whs/directives/corres/dir.html

DoD 8570.01-M Information Assurance Workforce Improvement Program

12/19/2005 (Change 4: 11/10/2015)
OK
http://www.dtic.mil/whs/directives/corres/pub1.html

AR 25-2

Information Assurance

10/24/2007
OK
http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx

AR 530-1

Operations Security

09/26/2014
OK
http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx

DoD 5220.22-M National Industrial Security Program Operating Manual 02/28/2006 (Change 2: 05/18/2016)

OK
http://www.dtic.mil/whs/directives/corres/pub1.html

AR 381-12

Threat Awareness and Reporting Program (TARP) (Section II, ¶ 2-4.b)

06/01/2016
OK
http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx

6.1 Applicable Forms: Forms applicable to the PWS are listed below:

Form
Date
Website

DD 441

Department of Defense Security Agreement

Jan 2017
http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm

DD 250

Material Inspection and Receiving Report

Aug 2000
http://dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm

TECHNICAL EXHIBIT 1

Performance Requirements Summary (PRS)

This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

Performance Objective
Performance Standard
Acceptable Quality Levels (AQL)
Surveillance Method / By Whom
5.1
Pick-up the 1348 Rolls of Micro-film, 16872 Micro-fish Cards, and 5639 10.24x16x12.5 inch boxes of records from WVARNG HQ
100% All rolls will be transferred
COR will sign off
5.1.1
Digitize Micro-film, Micro-fish, and Records into PDF format
100%

Clarity must be comparable to original documents Random Files will be selected by COR prior to transfer to monitor for completeness and clarity

5.1.2
Combine digitized PDF data in such a manner so that all images relating to a single individual are contained in one file
100%

No Soldiers should have multiple files either unique or duplicated COR will review and verify files are created to specified requirements

5.1.3
Index PDF files created from Micro-Film using the following fields, in the following order: Full SSN, Last Name, First Name, Date of Birth, Discharge Date, Date of Birth, and City and State of Birth
100%

All files should have accurately indexed fields as indicated COR will review and verify files are created to specified requirements

5.1.4
Provide 3 sets of digitized PDF files created from Micro-Film on sequentially numbered and labeled External Hard Drives
100% files must be named/numbered accordingly
COR will sign off on final product.
5.1.5
The 1348 rolls of Micro-Film and 16872 cards of Micro-fish will be provided to the COR.
100% of transferred Micro-Film rolls must be returned.
COR will sign off on transfer
5.1.6
Contract transportation services and coordinate schedule for transfer of 5639 miracle boxes of paper records for digitization.
100% All boxes will be transferred on scheduled basis
COR will sign off on transfer
5.1.8
Remove documents from records jackets, removing staples, paperclips, binder clips or any other items that may affect the digitization process without harming any of the documents.
100% of paper based records must be prepared for scanning

Random Files will be selected by COR prior to transfer to monitor for completeness

5.1.9
Digitize each piece of paper in every file to include single sided and duplex pages, multi part fan fold pages, “onion-skin”, non-standard pages, 3x5 cards, notes, post-it notes and any other additional paper based information contained in each file.
100%

Clarity must be comparable to original documents.

Random Files will be selected by COR prior to transfer to monitor for completeness and clarity

5.1.10
Index each PDF file created from paper records into a single file using the following index fields, full SSN or service #, last name, first name, middle initial, date of birth, discharge date, date of birth, city/state of birth
No Soldiers should have multiple files either unique or duplicated.

All files should have accurately indexed fields as indicated COR will review and verify files are created to specified requirements

5.1.11
Provide 3 sets of indexed, digitized PDF files created from the paper based records on sequentially numbered and labeled External hard Drives
100%

3 External Hard Drives will be provided COR will sign off on final product

5.1.12
Provide the hard drives of the scanning equipment so that the WVARNG can facilitate destruction for protection of PII.
100%

All Hard Drives will be provided Contractor will provide notarized certification that all hard drives from scanning equipment have been provided

TECHNICAL EXHIBIT 2

Deliverables Schedule

PWS Reference / Deliverable Title
Frequency
Number of Copies
Medium/Format
Submit To
1.4.1 Quality Control Plan

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .