DID_SURGE.pdf

PDF 173 KB Posted

Attached to
Remanufacture of B-52s Primary/Secondary Heat Exchangers
Solicitation number
FA8118-26-R-0017
Issued by

About this file

This Data Item Description (DID) provides guidelines for a Production Surge Plan, which outlines a contractor's capability to rapidly accelerate and sustain production using existing facilities and equipment in a peace-time acquisition environment without a declaration of war or mobilization. The document (Identification Number DI-MGMT-80969) specifies detailed requirements for preparing a comprehensive surge plan that includes:

Key plan components include: maximum sustainable production rate with production building schedule, lists of subcontracted and non-subcontracted items/components, potential surge impacts, labor requirements, strategic/critical materials identification, and production equipment details. The plan must address long-leadtime items, critical components, pacing items that could adversely impact production rates, and provide a list of Government contracts where production surge capability might be applied. The document is marked with Distribution Statement A, indicating approval for public release with unlimited distribution.

View the file

Other files

File Type Posted
SOW.pdf PDF
GFP_.pdf PDF
DID_TDP.pdf PDF
SPI.pdf PDF
DID_SHIP_PACK.pdf PDF
DID_GP.pdf PDF
DID_CAV.pdf PDF
TRANSPORTATION.pdf PDF
0001UID_Redacted.pdf PDF
0002ITEMDESCRIPTION_Redacted.pdf PDF
CAVAF.pdf PDF
0001ITEMDESCRIPTION_Redacted.pdf PDF
0002IUID_Redacted.pdf PDF
FA8118-26-R-0017.pdf PDF
CDRLs.pdf PDF
DID_CDM.pdf PDF
PACKAGING.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .