DID_SURGE.pdf
PDF 173 KB Posted
- Solicitation number
- FA8118-26-R-0017
About this file
This Data Item Description (DID) provides guidelines for a Production Surge Plan, which outlines a contractor's capability to rapidly accelerate and sustain production using existing facilities and equipment in a peace-time acquisition environment without a declaration of war or mobilization. The document (Identification Number DI-MGMT-80969) specifies detailed requirements for preparing a comprehensive surge plan that includes:
Key plan components include: maximum sustainable production rate with production building schedule, lists of subcontracted and non-subcontracted items/components, potential surge impacts, labor requirements, strategic/critical materials identification, and production equipment details. The plan must address long-leadtime items, critical components, pacing items that could adversely impact production rates, and provide a list of Government contracts where production surge capability might be applied. The document is marked with Distribution Statement A, indicating approval for public release with unlimited distribution.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW.pdf | ||
| GFP_.pdf | ||
| DID_TDP.pdf | ||
| SPI.pdf | ||
| DID_SHIP_PACK.pdf | ||
| DID_GP.pdf | ||
| DID_CAV.pdf | ||
| TRANSPORTATION.pdf | ||
| 0001UID_Redacted.pdf | ||
| 0002ITEMDESCRIPTION_Redacted.pdf | ||
| CAVAF.pdf | ||
| 0001ITEMDESCRIPTION_Redacted.pdf | ||
| 0002IUID_Redacted.pdf | ||
| FA8118-26-R-0017.pdf | ||
| CDRLs.pdf | ||
| DID_CDM.pdf | ||
| PACKAGING.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .