DID Production Surge Plan.pdf
PDF 368 KB Posted
- Solicitation number
- FA811825R0013
About this file
This document is a Data Item Description (DID) form that provides instructions and requirements for preparing a Production Surge Plan, identified as DI-MGMT-80969. The plan delineates a contractor's capability to rapidly accelerate and sustain production utilizing existing facilities and equipment during peacetime acquisition without requiring war declaration or mobilization.
The Production Surge Plan must include specific components: maximum sustainable production rates with buildup schedules, lists of subcontracted and non-subcontracted items/components with nomenclature and leadtimes, a list of government contracts that could be surged, impact analysis on other contracts and commercial business, labor requirements, strategic/critical materials needs, and production equipment details. The plan must identify any tooling or equipment that could increase surge production by at least 10% and provide rolling inventory requirements for maintaining surge production within six months. This DID supersedes DI-P-1634A and is applicable for contracts requiring production surge capability for select critical items, working in conjunction with Industrial Preparedness Planning requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA811825R0013 01 Amendment.pdf | ||
| SOW 13 Sep 24.pdf | ||
| DID COMMERCIAL ASSET VISIBILITY.pdf | ||
| CDRL FD20302401142.pdf | ||
| Transportation Data 30 Oct 24.pdf | ||
| GFP.pdf | ||
| DID Government Property.pdf | ||
| DID CONTRACT DEPOT MAINTENANCE.pdf | ||
| Packaging Requirements 25 Oct 25.pdf | ||
| FA811825R0013.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .