DID Production Surge Plan.pdf

PDF 368 KB Posted

Attached to
Upgrade/Remanufacture of the B-1B Actuator, Electronic-Mechanical
Solicitation number
FD20302400767
Issued by

About this file

This document is a Data Item Description (DID) for a Production Surge Plan, with identification number DI-MGMT-80969. The document provides detailed instructions for contractors to develop a plan demonstrating their capability to rapidly accelerate and sustain production utilizing existing facilities and equipment during a peace-time acquisition environment or subsequent emergency war powers scenario.

The DID outlines specific requirements for the Production Surge Plan, including: detailing the maximum sustainable production rate, creating lists of subcontracted and non-subcontracted items/components, identifying critical items that could impact production, listing government contracts at the contractor's facility that might be subject to surge, specifying additional labor requirements, identifying strategic or critical materials needed, and documenting production equipment and potential surge capabilities. The plan must include details such as production buildup timelines, critical component identification, potential surge impacts, and a comprehensive analysis of the contractor's ability to increase production rates within existing facilities.

View the file

Other files

File Type Posted
CDRL.pdf PDF
GFP.pdf PDF
PACKAGING REQUIREMENTS.pdf PDF
DID Government Property Inventory Report.pdf PDF
CAV AF Reporting Requirements.docx DOCX document
SOW.pdf PDF
DID CAV Reporting.pdf PDF
DID CONTRACT DEPOT MAINTENANCE.pdf PDF
TRANSPORTATION DATA.pdf PDF
DID Technical Data Package.pdf PDF
DID Report of Shipping and Packaging Discrepancy.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .