DID Production Surge Plan.pdf

PDF 368 KB Posted

Attached to
REMANUFACTURE OF B-52 AIR HEAT EXCHANGER
Solicitation number
FA811825R0090
Issued by

About this file

This document is a Data Item Description (DID) for a Production Surge Plan, with the identification number DI-MGMT-80969. The document provides detailed instructions and requirements for contractors to develop a comprehensive plan that demonstrates their capability to rapidly accelerate and sustain production using existing facilities and equipment during a peace-time acquisition environment or subsequent emergency war periods.

The Production Surge Plan must include specific elements such as: the maximum sustainable production rate (with a production-building schedule), detailed lists of subcontracted and non-subcontracted items/components, identification of critical materials and potential supply chain impacts, assessment of potential surge impacts on other government contracts, labor requirements for skilled workers, a list of strategic or critical materials needed, and an inventory of production equipment and tooling. The plan should provide granular details about production capabilities, potential bottlenecks, and strategies to increase production rates by up to 10 percent within current facility limitations.

View the file

Other files

File Type Posted
TRANSPORTATION DATA.pdf PDF
IUID.pdf PDF
Special Packaging Instruction.pdf PDF
GFP.pdf PDF
SOW.pdf PDF
DID Report of Shipping.pdf PDF
PACKAGING REQUIREMENTS.pdf PDF
DID CAV Reporting.pdf PDF
ITEM DESCRIPTION.pdf PDF
CAV AF REPORTING REQUIREMENTS.pdf PDF
JQRR.pdf PDF
DID Government Property.pdf PDF
FA811825R0090.pdf PDF
CDRL.pdf PDF
DID Contract Depot Maintenance.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .