DID Production Surge Plan.pdf

PDF 368 KB Posted

Attached to
Remanufacture of B-1 Direct Current Motor
Solicitation number
FA811825R0022
Issued by

About this file

This is a Data Item Description (DID) form that outlines the requirements for a Production Surge Plan, identified as DI-MGMT-80969. The document specifies how contractors must detail their capability to rapidly accelerate and sustain production using existing facilities and equipment during peacetime acquisition, without requiring war declaration or mobilization.

The Production Surge Plan must include: maximum sustainable production rates with monthly buildup schedules; lists of subcontracted and non-subcontracted items/components with leadtimes; identification of critical/pacing items; list of relevant government contracts that could be surged with their priorities; impact analysis on other contracts and commercial business; skilled labor requirements; strategic/critical materials inventory needs with six-month sustainability; and equipment/tooling requirements that could increase surge capacity by at least 10%. The contractor must provide their plan in their own format, addressing all these elements while considering impacts on subcontractor tiers and vertical planning requirements. This DID supersedes DI-P-1634A and is used in conjunction with DI-P-7046 for Industrial Preparedness Planning.

View the file

Other files

File Type Posted
TRANSPORTATION DATA 28 Oct 24.pdf PDF
DID Government Property Inventory Report.pdf PDF
FA811825R0022 EDA.pdf PDF
CDRL Report 2400448.pdf PDF
DID COMMERCIAL ASSET VISIBILITY (CAV) REPORTING.pdf PDF
GFP.pdf PDF
SOW PRFD20302400448 03.docx DOCX document
DID CONTRACT DEPOT MAINTENANCE.pdf PDF
PACKAGING REQUIREMENTS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .