DID Production Surge Plan.pdf
PDF 368 KB Posted
- Attached to
- Remanufacture of B-1 Direct Current Motor
- Solicitation number
- FA811825R0022
About this file
This is a Data Item Description (DID) form that outlines the requirements for a Production Surge Plan, identified as DI-MGMT-80969. The document specifies how contractors must detail their capability to rapidly accelerate and sustain production using existing facilities and equipment during peacetime acquisition, without requiring war declaration or mobilization.
The Production Surge Plan must include: maximum sustainable production rates with monthly buildup schedules; lists of subcontracted and non-subcontracted items/components with leadtimes; identification of critical/pacing items; list of relevant government contracts that could be surged with their priorities; impact analysis on other contracts and commercial business; skilled labor requirements; strategic/critical materials inventory needs with six-month sustainability; and equipment/tooling requirements that could increase surge capacity by at least 10%. The contractor must provide their plan in their own format, addressing all these elements while considering impacts on subcontractor tiers and vertical planning requirements. This DID supersedes DI-P-1634A and is used in conjunction with DI-P-7046 for Industrial Preparedness Planning.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TRANSPORTATION DATA 28 Oct 24.pdf | ||
| DID Government Property Inventory Report.pdf | ||
| FA811825R0022 EDA.pdf | ||
| CDRL Report 2400448.pdf | ||
| DID COMMERCIAL ASSET VISIBILITY (CAV) REPORTING.pdf | ||
| GFP.pdf | ||
| SOW PRFD20302400448 03.docx | DOCX document | |
| DID CONTRACT DEPOT MAINTENANCE.pdf | ||
| PACKAGING REQUIREMENTS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .