4-24-5573.00 ADDENDUM NO 2.pdf

PDF 383 KB Posted

Attached to
2025 Sanitary Sewer Televising, Contract 25-S2A or 25-S2B
Solicitation number
US.196494
Issued by
Chester County, Pennsylvania

View the file

Other files

File Type Posted
6-24-5573.00 ADDENDUM NO 4.pdf PDF
5-24-5573.00 ADDENDUM NO 3.pdf PDF
1-24-5573.00 Project Manual.pdf PDF
3-24-5573.00 ADDENDUM NO 1.pdf PDF
2-24-5573.00 Televising Maps.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

00 9100-4

24-5573.00 ADDENDUM NO 2.docx

DOCUMENT 00 9100

SPECIFICATIONS AND

CONTRACT DOCUMENTS

FOR

2025 SANITARY SEWER TELEVISING

CONTRACT 25-S2

AUGUST 11, 2025

WILLISTOWN TOWNSHIP

688 SUGARTOWN ROAD

MALVERN, PA 19355

A D D E N D U M N O . T W O

This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents, dated July 2025. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.

The following items are issued to add to, modify, and clarify the Contract Documents. These items shall have the same force and effect as the Contract Documents, and any cost involved shall be included in the bid price:

“Copyright© - 2025 Carroll Engineering Corporation - All Rights Reserved - These documents were prepared by, and are owned by, Carroll Engineering

Corporation; and as such, represent instruments of professional service with respect to the project for which they were specifically designed and to the listed client and/or applicant. The documents and information are not intended or represented to be suitable for reuse by the listed client/applicant, or by others, on extensions or modification of the project or any other project. The reproduction of a copy of these plans, or reuse of these documents, and/or the copying of any portion of information shown on these plans is not permitted and in no circumstance will be approved without an assignment of copyright privileges. Violation of this restriction shall be considered a violation of the Professional Code of Ethics and a theft of corporate assets, both of which shall be prosecuted to the fullest extent of current statutes. In the event of any unauthorized use, the person initiating the use shall accept all responsibility, both for copyright violation and professional liability, for any claims, damages, losses, and expenses arising from the unauthorized reproduction, misuse, or misappropriation of these documents or information shown on said documents.”

00 9100-5

24-5573.00 ADDENDUM NO 2.docx

DOCUMENT 00 9100

ADDENDUM NO. TWO

CHANGES AND CLARIFICATIONS OF THE PROJECT MANUAL AND PLAN SET

This Addendum consists of pages 00 9100-4 through 00 9100-5 and the following revisions:

A. CHANGES AND CLARIFICATIONS TO THE PROJECT MANUAL

1. SECTION 01 2973 – MEASUREMENT AND PAYMENT

REPLACE Sections 01 2973.3.01 and 01 2973.3.02 with the attached REVISED

Sections 01 2973.3.01, and 01 2973.3.02.

2. SECTION 33 0130.16 – SANITARY SEWER TELEVISION INSPECTION

REPLACE Paragraphs 33 0130.16.3.01.A, and 33 0130.16.3.02.F with the attached

REVISED Paragraphs 33 0130.16.3.01.A, and 33 0130.16.3.02.F.

END OF ADDENDUM NO. TWO

01-2973-1

(7/25) 245573.00_01 2973 (A2).docx

PART 3 - EXECUTION

3.01 SEWER CLEANING AND TV (Contract A and Contract B Item Nos. 1 through 11)

A. Measurement of sewer cleaning and TV work will be based on the actual linear feet of sewer pipe cleaned and televised. Length of sewer lines will be based upon TV monitor lengths. Lengths of sewer runs shown on the Drawings are estimated. Should the ENGINEER have reason to believe that lengths shown on the TV tapes are in error, lengths will be based upon straight line surface measurements between center of manholes. TV work of quality unacceptable to the ENGINEER will not be measured for payment.

B. Payment for sewer cleaning and TV work will be made at the applicable unit price listed in the bid schedule for the pipe size and material indicated. This price and payment will constitute full compensation for furnishing bypass pumping lines as necessary, labor, materials, and equipment to acceptably clean and televise sewer lines, and shall include locating of manholes where necessary, opening each manhole for inspection by the OWNER’S Representative, including removal of any paving material that may be preventing the lid from being opened, properly closing each sewer manhole, cleaning, removal and disposal of grease, and debris from sewer lines, televising, sewer flow control as necessary, restoration or replacement of any damaged property, cleanup at grade, and provision of logs, videos, and NASSCO formatted database files.

3.02 SEWER CLEANING AND TV WITH TRAFFIC CONTROL (Contract B Item Nos. 12 through 20, not included in Contract A)

A. Measurement of sewer cleaning and TV work will be based on the actual linear feet of sewer pipe cleaned and televised. Length of sewer lines will be based upon TV monitor lengths. Lengths of sewer runs shown on the Drawings are estimated. Should the ENGINEER have reason to believe that lengths shown on the TV tapes are in error, lengths will be based upon straight line surface measurements between center of manholes. TV work of quality unacceptable to the ENGINEER will not be measured for payment.

B. Payment for sewer cleaning and TV work will be made at the applicable unit price listed in the bid schedule for the pipe size and material indicated. This price and payment will constitute full compensation for furnishing all traffic control, bypass pumping lines as necessary, labor, materials, and equipment to acceptably clean and televise sewer lines, and shall include locating of manholes where necessary, opening each manhole for inspection by the OWNER’S Representative, including removal of any paving material that may be preventing the lid from being opened, properly closing each sewer manhole, cleaning, removal and disposal of grease, and debris from sewer lines, televising, sewer flow control as necessary, restoration or replacement of any damaged property, cleanup at grade, and provision of logs, videos, and NASSCO formatted database files..

01-2973-2

(7/25) 245573.00_01 2973 (A2).docx

33 0130.16-1 (7/25) 245573.00_33 0130.16 (A2).docx

PART 3 - EXECUTION

3.01 CLEANING

A. Prior to TV work, each sewer line shall be cleaned using a high-velocity jet or other equipment as approved by the ENGINEER. Cleaning shall remove dirt, grease, rocks, sand, and other materials and obstructions from sewer lines and manholes. Materials cleaned from the pipe shall not be washed downstream but shall be removed from the pipe and disposed of by the

CONTRACTOR.

1. Cleaning of Asbestos Concrete Pipe shall be conducted at the lowest pressure possible to reduce the chances of damage to potentially weakened pipe.

2. If tree roots are encountered during cleaning operations, do not cut roots or use chemical root treatments.

3.02 SEWER TELEVISION INSPECTION

F. When conditions such as crushed pipe, debris that cannot be lightly cleared, extremely extended lateral connections, root intrusion or the like prevent the free movement of the camera, or would otherwise present the danger of equipment loss or damage, audio and written notation shall be made a part of the required report, and the equipment shall be withdrawn. Operations shall then be attempted from the downstream manhole, pulling the equipment to the point of blockage and resuming the operations. Any damage or loss of equipment or excessive damage to the sewer because of passing such obstacles shall be the sole responsibility of the CONTRACTOR, and in no way shall the OWNER be held liable for such action.