3-24-5573.00 ADDENDUM NO 1.pdf

PDF 258 KB Posted

Attached to
2025 Sanitary Sewer Televising, Contract 25-S2A or 25-S2B
Solicitation number
US.196494
Issued by
Chester County, Pennsylvania

View the file

Other files

File Type Posted
6-24-5573.00 ADDENDUM NO 4.pdf PDF
5-24-5573.00 ADDENDUM NO 3.pdf PDF
1-24-5573.00 Project Manual.pdf PDF
2-24-5573.00 Televising Maps.pdf PDF
4-24-5573.00 ADDENDUM NO 2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Today’s Commitment to Tomorrow’s Challenges

Corporate Office: 630 Freedom Business Center 433 Lancaster Avenue 101 Larry Holmes Drive 105 Raider Boulevard 949 Easton Road Third Floor Suite 200 Suite 201 Suite 206

Warrington, PA 18976 King of Prussia, PA 19406 Malvern, PA 19355 Easton, PA 18042 Hillsborough, NJ 08844

215.343.5700 610.572.7093 610.489.5100 610.989.4940 908.874.7500 www.carrollengineering.com 24-5573.00 ADDENDUM NO 1.docx

DOCUMENT 00 9100

SPECIFICATIONS AND

CONTRACT DOCUMENTS

FOR

2025 SANITARY SEWER TELEVISING

CONTRACT 25-S2

AUGUST 8, 2025

WILLISTOWN TOWNSHIP

688 SUGARTOWN ROAD

MALVERN, PA 19355

A D D E N D U M N O . O N E

The following items are issued to add to, modify, and clarify the Contract Documents. These items shall have the same force and effect as the Contract Documents, and any cost involved shall be included in the bid price:

“Copyright - 2025 Carroll Engineering Corporation - All Rights Reserved - These documents were prepared by, and are owned by, Carroll Engineering Corporation; and as such, represent instruments of professional service with respect to the project for which they were specifically designed and to the listed client and/or applicant. The documents and information are not intended or represented to be suitable for reuse by the listed client/applicant, or by others, on extensions or modification of the project or any other project. The reproduction of a copy of these plans, or reuse of these documents, and/or the copying of any portion of information shown on these plans is not permitted and in no circumstance will be approved without an assignment of copyright privileges. Violation of this restriction shall be considered a violation of the Professional Code of Ethics and a theft of corporate assets, both of which shall be prosecuted to the fullest extent of current statutes. In the event of any unauthorized use, the person initiating the use shall accept all responsibility, both for copyright violation and professional liability, for any claims, damages, losses, and expenses arising from the unauthorized reproduction, misuse, or misappropriation of these documents or information shown on said documents.”

00 9100-2

00 9100-3 24-5573.00 ADDENDUM NO 1.docx

DOCUMENT 00 9100

ADDENDUM NO. ONE

This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents, dated July 2025. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.

CHANGES AND CLARIFICATIONS OF THE PROJECT MANUAL AND PLAN SET

This Addendum consists of pages 00 9100-2 through 00 9100-3 and the following revisions:

A. CHANGES AND CLARIFICATIONS TO THE PROJECT MANUAL

1. SECTION 00 5200 – AGREEMENT

REPLACE Document 00 5200 with the REVISED 00 5200(R). The Document revises the Contract Times in Article 4.02.

END OF ADDENDUM NO. ONE

00 5200(R)-1 (7/25) 24-5573.00 00 5200(R).docx

DOCUMENT 00 5200

STANDARD FORM OF AGREEMENT

BETWEEN OWNER AND CONTRACTOR

ON THE BASIS OF A STIPULATED PRICE

THIS AGREEMENT is by and between the Willistown Township (hereinafter called OWNER) and

(hereinafter called CONTRACTOR) OWNER and

CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows:

ARTICLE 1 – WORK

1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents.

The Work is generally described as follows:

The project consists of the cleaning and televising of approximately 97,500 feet of eight- to eighteen-inch sanitary sewer main.

ARTICLE 2 – THE PROJECT

2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows:

The project consists of the cleaning and televising of approximately 97,500 feet of eight- to eighteen-inch sanitary sewer main.

ARTICLE 3 – ENGINEER

3.01 The Project has been designed by Carroll Engineering Corporation, 949 Easton Road, Warrington, PA 18976 who is hereinafter called ENGINEER and who is to act as OWNER’s representative, assume all duties and responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents.

ARTICLE 4 – CONTRACT TIMES

4.01 TIME OF THE ESSENCE

All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract.

00 5200(R)-2

4.02 DAYS TO ACHIEVE SUBSTANTIAL COMPLETION AND FINAL PAYMENT

The Work will be substantially completed within 90 days after the date when the Contract Times commence to run as provided in paragraph 2.03 of the General Conditions and completed and ready for final payment in accordance with paragraph 14.07 of the General Conditions within 105 days after the date when the Contract Times commence to run.

4.03 LIQUIDATED DAMAGES

CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that

OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER $700.00 for each day that expires after the time specified in paragraph 4.02 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER $700.00 for each day that expires after the time specified in paragraph 4.02 for completion and readiness for final payment until the Work is completed and ready for final payment.

ARTICLE 5 – CONTRACT PRICE

5.01 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined pursuant to paragraphs 5.01.A below:

[Contractor’s Bid which is attached as an Exhibit to this Agreement.]

ARTICLE 6 – PAYMENT PROCEDURES

6.01 SUBMITTAL AND PROCESSING OF PAYMENTS

CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the

General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions.

6.02 PROGRESS PAYMENTS; RETAINAGE

OWNER shall make progress payments on account of the Contract Price on the basis of

CONTRACTOR’s Applications for Payment on or about the 25th day of each month during performance of the Work as provided in paragraphs 6.02.A.1 and 6.02.A.2 below. All such payments will be measured by the schedule of values established in paragraph 2.07.A of the General Conditions.

00 5200(R)-3

1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.02 of the General Conditions.

a. In accordance with the provisions of 73 P.S. Section 1625, the OWNER may retain a portion of the amount due the CONTRACTOR to insure the proper performance of the contract. Where less than 50% of the Work has been completed, payment will be made with 10% retained. When the contract is 50% completed, one-half of the amount retained by the OWNER shall be returned to the CONTRACTOR provided that the ENGINEER approves the application for payment and provided further that the CONTRACTOR is making satisfactory progress and there is no specific cause for greater withholding. The sum or sums withheld by the OWNER from the CONTRACTOR after the contract is 50 percent completed shall not exceed 5 percent of the value of the completed work based on monthly progress payment requests. However, all such moneys retained by the OWNER may be withheld from the CONTRACTOR until substantial completion of the contract.

b. For materials and equipment not incorporated in the Work (but delivered, suitably stored and accompanied by documentation satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions), payment will be made with 10% retained.

2. Upon Substantial Completion, OWNER shall pay an amount sufficient to increase total payments to CONTRACTOR to 100% of the Work completed, less such amounts as ENGINEER shall determine in accordance with paragraph 14.02.B.5 of the General Conditions and less 110% of ENGINEER’s estimate of the value of Work to be completed or corrected as shown on the tentative list of items to be completed or corrected attached to the certificate of Substantial Completion.

6.03 FINAL PAYMENT

Upon final completion and acceptance of the Work in accordance with paragraph 14.07 of the

General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.07.

ARTICLE 7 – INTEREST

7.01 All moneys not paid when due as provided in Article 14 of the General Conditions shall bear interest at the maximum rate allowed by law at the place of the Project.

ARTICLE 8 – CONTRACTOR’S REPRESENTATIONS

8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations:

A. CONTRACTOR has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents.

00 5200(R)-4

B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.

C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work.

D. CONTRACTOR has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (Except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General Conditions.

E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by CONTRACTOR, including applying the specific means, methods, techniques, sequences, and procedures of construction, if any, expressly required by the Contract Documents to be employed by CONTRACTOR, and safety precautions and programs incident thereto.

F. CONTRACTOR does not consider that any further examinations, investigations, explorations, tests, studies, and data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents.

G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Contract Documents.

H. CONTRACTOR has correlated the information known to CONTRACTOR, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents.

I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that CONTRACTOR has discovered in the Contract Documents, and the written resolution thereof by ENGINEER is acceptable to

CONTRACTOR.

J. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.

00 5200(R)-5

ARTICLE 9 – CONTRACT DOCUMENTS

9.01 CONTENTS

A. The Contract Documents consist of the following:

1. This Agreement (page 00 5200-1 to 00 5200-7, inclusive);

2. Performance Bond;

3. Payment Bond;

4. General Conditions (pages C-700-1 to C-700-62, inclusive);

5. Supplementary Conditions (pages 00 7300-1 to 00 7300-11 inclusive);

6. Specifications as listed in the table of contents of the Project Manual;

7. Drawings consisting of a cover sheet and sheets numbered 1 through 9, inclusive, with each sheet bearing the following general title, “2025 Sanitary Sewer Televising.”

8. Addenda;

9. Exhibits to this Agreement (enumerated as follows):

a. Notice to Proceed;

b. CONTRACTOR’s Bid;

c. Documentation submitted by CONTRACTOR prior to Notice of Award (if any);

10. The following which may be delivered or issued on or after the Effective Date of the Agreement and are not attached hereto:

B. The documents listed in paragraph 9.01 are attached to this Agreement (except as expressly noted otherwise above).

C. There are no Contract Documents other than those listed above in this Article 9.

D. The Contract Documents may only be amended, modified, or supplemented as provided in paragraph 3.05 of the General Conditions.

00 5200(R)-6

ARTICLE 10 – MISCELLANEOUS

10.01 TERMS

Terms used in this Agreement will have the meanings indicated in the General Conditions.

10.02 ASSIGNMENT OF CONTRACT

No assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty of responsibility under the Contract Documents.

10.03 SUCCESSORS AND ASSIGNS

OWNER and CONTRACTOR each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents.

10.04 SEVERABILITY

Any provision or part of the Contract Documents held to be void or unenforceable under any

Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon OWNER and CONTRACTOR, who agree that the Contract Documents shall be reformed to replace such stricken provisions or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision.

00 5200(R)-7

IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in duplicate.

One counterpart each has been delivered to OWNER and CONTRACTOR. All portions of the Contract Documents have been signed or identified by OWNER and CONTRACTOR or on their behalf.

This Agreement will be effective on ______________ ___, 20___ (which is the Effective Date of the Agreement).

OWNER: WILLISTOWN TOWNSHIP

By:___________________________________________

[CORPORATE SEAL]

Attest________________________________________

Address for giving notices:

Willistown Township

688 Sugartown Road

Malvern, PA 19355

(If OWNER is a corporation, attach evidence of authority to sign. If OWNER is a public body, attach evidence of authority to sign and resolution or other documents authorizing execution of OWNER-CONTRACTOR Agreement.)

Designated Representative:

Name: Shanna Lodge

Title: Township Manager

Address: 688 Sugartown Road

Malvern, PA 19355

Phone: (610) 647-5300

Facsimile: (610) 647-8156

CONTRACTOR:

By:___________________________________________

[CORPORATE SEAL]

Attest________________________________________

Address for giving notices:

License No.____________________________________ (Where applicable)

Agent for service of process:______________________

(If CONTRACTOR is a corporation or a partnership, attach evidence of authority to sign.)

Designated Representative:

Name:________________________________________

Title:_________________________________________

Address:______________________________________

Phone:________________________________________

Facsimile:_____________________________________

END OF DOCUMENT

END OF ADDENDUM NO. ONE