This is a Project Manual for construction documents related to the Herbison Woods Bleachers replacement project for DeWitt Public Schools in DeWitt, Michigan, with GMB Architecture + Engineering serving as the architect and The Skillman Corporation as construction manager. The project involves replacing bleachers at Herbison Woods School located at 3147 W Herbison Rd. Sealed bids are due September 21, 2017 at 3:00 PM at the DeWitt Administration Building, with a pre-bid conference scheduled for September 13, 2017 at 4:00 PM. Construction is anticipated to start within 190 calendar days after receipt of bids and must be completed within 181 consecutive calendar days after Notice to Proceed.

The project will be awarded through multiple prime contracts rather than a single general contractor. Bidders must provide a 5% bid security and successful bidders must furnish 100% performance and payment bonds. The project includes demolition of existing bleachers, firestopping, gymnasium equipment, and telescopic bleacher installation along with associated electrical work. Two alternates are included: providing graphic lettering on the new bleachers and demolition of existing bleachers. Wage rates must comply with Michigan prevailing wage requirements. Bidders must submit a list of subcontractors and manufacturers within 48 hours if they are one of the two lowest responsive bidders.

View the file

Other files

File Type Posted
DeWitt HW Bleachers - Drawings.pdf PDF
DeWitt- HW Bleachers - VOL 3.zip ZIP file
Invitation to Prime Bidders.pdf PDF
DeWitt - HW Bleachers - VOL 4.pdf PDF
DeWitt- HW Bleachers - VOL 2.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT

MANUAL

Construction Documents

DIVISIONS 0 THROUGH 1

DeWitt Public Schools Herbison Woods Bleachers replacement

PROJECT NO. 216011

Volume 1 of 2 August 14, 2017

TSC 216011 Title Page 00 01 00

PROJECT MANUAL VOLUME I

PROJECT: Herbison Woods Bleachers Replacement 3147 W Herbison Rd, DeWitt, MI 48820

TSC PROJECT NO.: 216011

A/E PROJECT NO.: 5-4013

OWNER: DeWitt Public Schools 2957 W Herbison Rd.

DeWitt, MI 48820

ARCHITECT/ENGINEER: GMB Architecture + Engineering

DATED: August 14, 2017

PRE-BID CONFERENCE/SITE

EXAMINATION:

September 13, 2017

4:00 PM

DeWitt Administration Building

BIDS RECEIVED: September 21, 2017

3:00 PM

BIDDERS' CONTACTS: ARCHITECT/ENGINEER:

GMB Architecture + Engineering 85 East Eight St. Suite 200 Holland, MI 49423

Angela N. Pagel Phone: (616) 796-0200

CONSTRUCTION MANAGER:

THE SKILLMAN CORPORATION

8120 Moorsbridge Road, Suite 101 Kalamazoo, MI 49024

Project Manager: Randy Baker Phone: 269-350-5757

TSC 216011 Table of Contents Section 00 00 20-1

TABLE OF CONTENTS

INTRODUCTORY INFORMATION

00 00 10 – Title Page 00 00 20 – Table of Contents

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS

OF THE CONTRACT

Section 00 02 00 Notice to Bidders 00 10 00 Instructions to Bidders 00 12 10 Substitution Request Form 00 20 00 Information Available to Bidders 00 30 50 Bidder Reminder List 00 31 00 Bid Form 00 37 00 Standard Forms 00 41 00 Bid Bond 00 43 50 Subcontractors and Products List 00 50 00 Standard Form of Agreement 00 61 00 Performance Bond and Payment Bond 00 70 00 Amended General Conditions 00 82 00 Schedule of Insurance Requirements 00 83 00 Schedule of Project Construction Wages

DIVISION 1 - GENERAL REQUIREMENTS

Section 01 12 00 Multiple Contract Summary 01 21 00 Allowances 01 23 00 Alternates 01 25 00 Contract Modification Procedures 01 28 00 Schedule of Values 01 29 00 Application for Payment 01 31 00 Project Meetings 01 32 00 Schedules and Reports 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 45 10 Testing Laboratory Services 01 51 60 Temporary Sanitary Facilities 01 53 20 Tree and Plant Protection 01 54 60 Environment Protection 01 54 80 Utility Protection 01 55 00 Access Roads and Parking Areas 01 56 20 Dust Control 01 56 30 Water Control 01 56 80 Erosion Control

01 56 90 Housekeeping and Safety

TSC 216011 Table of Contents Section 00 00 20-2

01 57 60 Project Signs 01 59 10 Project Office 01 60 00 Product Requirements 01 71 50 Final Cleaning 01 72 00 Field Engineering 01 72 50 Work Layout 01 73 10 Cutting and Patching 01 77 00 Contract Closeout

DIVISION 02 THRU 12 PROVIDED BY ARCHITECT

Section 02 41 00 Demolition 07 84 00 Firestopping 11 66 23 Gymnasium Equipment

12 66 13 Telescopic Bleachers

DIVISION 26 PROVIDED BY ARCHITECT

26 05 00 Common Work Results for Electrical 26 05 05 Selective Electrical Demolition 26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems 26 05 34 Conduit for Electrical Systems 26 05 37 Boxes for Electrical Systems 26 05 53 Identification for Electrical Systems 26 05 83 Equipment Wiring Connections 26 24 16 Panelboards 26 27 26 Wiring Devices 26 28 13 Fuses 26 28 17 Enclosed Circuit Breakers 26 28 18 Enclosed Switches

END OF SECTION 00 00 20

TSC 216011 Notice to Bidders Section 00 02 00-1

SECTION 00 02 00 - NOTICE TO BIDDERS

NOTICE TO BIDDERS

Notice is hereby given that sealed bids will be received:

By: DeWitt Public Schools 2957 W Herbison Rd Dewitt, MI 48820

For: Herbison Woods Bleachers Replacement 3147 W Herbison Rd Dewitt, MI 48820

At: DeWitt Administration Building

Until: 3:00 PM, September 21, 2017

Bid Opening: Bids will be publicly opened and read aloud at 3:00 PM, September 21, 2017 in the DeWitt Administration Building.

All work for the complete construction of the Project will be under one or more prime contracts with the Owner based on bids received and on combinations awarded. The Construction Manager will manage the construction of the Project.

Construction shall be in full accordance with the Bidding Documents which are on file with the Owner and may be examined by prospective bidders at the following locations:

Office of the Construction Manager The Skillman Corporation 8120 Moorsbridge Rd. Suite 101 Portage, MI 49024

The Skillman Plan Room www.skillmanplanroom.com

TSC 216011 Notice to Bidders Section 00 02 00-2

Prime and Non-Prime Contract Bidders must place an order on www.skillmanplanroom.com to be able to download documents electronically or request printed documents. There is no cost for downloading the bidding documents. Bidders desiring printed documents shall pay for the cost of printing, shipping and handling. Reprographic Services are provided by:

Kal-Blue, 914 East Vine Street, Kalamazoo, MI 49001 Phone 269-349-8681

WAGE SCALE: As required by the Michigan Code, a minimum wage has been determined for this Project and will be on file at the office of the Owner at least fifteen (15) days prior to the date set for receipt of bids. Contractor shall pay wage rates as established by this Wage Scale. Said Wage Scale is a part of this Contract and is incorporated herein as fully as if here set forth.

A Pre-Bid Conference will be held on September 13, 2017 at 4:00 PM local time, at DeWitt Administration Building. Attendance by bidders is optional, but recommended, in order to clarify or answer questions concerning the Drawings and Project Manual for the Project.

Bid security in the amount of five percent (5%) of the Bid must accompany each Bid in accordance with the Instructions to Bidders.

The successful Bidders will be required to furnish Performance and Payment Bonds for one hundred percent (100%) of their Contract amount prior to execution of Contracts.

Contractors submitting bids for the performance of any Work as specified in this building Project should make such Bids to DeWitt Public Schools. Contractors are advised that the Contract as finally entered into with any successful Bidder shall be entered into with the Dewitt Public Schools.

The Owner reserves the right to accept or reject any Bid (or combination of Bids) and to waive any irregularities in bidding. All Bids may be held for a period not to exceed 120 days before awarding contracts.

By: John B. Deiter

END OF SECTION 00 02 00

TSC 216011 Instructions to Bidders Section 00 10 00-1

SECTION 00 10 00 - INSTRUCTIONS TO BIDDERS

To be considered, bids must be submitted in accordance with these Instructions to Bidders.

PART 1 - GENERAL

General Information Notes

A. Definitions set forth in the amended General Conditions of the Contract for Construction, AIA Document A232 - 2009 Edition, are applicable to these Instructions to Bidders.

B. Communications for the administration of the Contract shall be as set forth in the amended General Conditions and, in general, shall be through the Construction Manager.

C. The advertisement for bid information regarding this project can be found by going to the Michigan Department of Management and Budget website at www.bid4michigan.com.

1.01 DOCUMENTS

A. Prime Bidders shall obtain complete sets of Bidding Documents at www.skillmanplanroom.com.

B. Non-Prime Bidders may select individual sheets. Non-Prime Bidders shall identify sheets requested. The Construction Manager/Architect shall not be responsible for choosing correct sheets for Non-Prime Bidders.

C. Failure to Execute Contract Documents: In the event the Bidder withdraws the bid or fails to execute a satisfactory Contract and furnish a satisfactory Contract Performance Bond and Payment Bond with a surety company in accordance with Article 1.16 of these Instructions to Bidders within 10 days after a contract has been awarded to the Bidder may forfeit their bid security required herein.

D. Test Boring Data concerning subsurface materials or conditions which are based upon test pits or test borings has been obtained by the Owner for the Architect’s use in designing Project. A copy of this report is included in this Project Manual as Section 00 20 00. Its accuracy or completeness is not guaranteed by the Owner, Architect or Construction Manager and in no event is it to be considered as part of the Contract Drawings and Specifications. The Contractor must assume all responsibility in excavating for this Project and shall not rely on subsurface information obtained from Architect, Construction Manager, or Owner. Bidders shall make their own investigation of existing subsurface conditions; neither Owner, Construction Manager, nor Architect will be responsible in any way for additional

TSC 216011 Instructions to Bidders Section 00 10 00-2 compensation for excavation work performed under the Contract due to Contractor’s assumptions based on Test Boring Data prepared solely for Architect’s use.

1.02 BIDDERS' EXAMINATION AND REPRESENTATION

A. Before submitting a bid, each Bidder should carefully examine the Documents and the construction site and fully inform himself with the limitations and conditions related to the Work included in his bid and shall include in his Bid a sum to cover the cost of such items. Contractors will not be given extra payments for conditions, which could have been determined by examining the site and the documents.

B. It is the purpose and intent of the Contract Documents that a fully complete job be accomplished. It shall be each Bidder's responsibility to include costs necessary to provide labor and materials for that portion of the Work bid upon, including incidentals, whether or not specifically required in the Specifications and Drawings.

C. Each Bidder by making his bid represents that he has read and understands the bidding documents.

D. Each Bidder by making his Bid represents that he has visited the site and familiarized himself with the local conditions under which the Work shall be performed.

E. Each Bidder shall be responsible for being completely familiar with the work of other bid package(s), which require interface of Work with the bid package(s) on which the Bidder is bidding.

F. No allowance shall be subsequently made in behalf of a Bidder by reason of an error or oversight on its part resulting from its failure to so examine the Construction Documents for the other trades.

G. Each Bidder understands that past acceptance of products does not assure acceptance on this Project. Products not specifically specified require requests for approval prior to bid due date.

H. This is a construction management project. There is no General Contractor. All

Contractors on this Project are considered Prime Contractors. The Owner will award separate Contracts for all Bid Categories involved in the Project. The Project will be managed and coordinated by the Construction Manager, as a representative of the Owner.

I. Safety Program. Each Contractor and subcontractor is responsible for the safety and security of employees and Work areas under their control and will, therefore, provide a written safety program to The Skillman Corporation for jobsite file.

TSC 216011 Instructions to Bidders Section 00 10 00-3

1.03 QUALIFICATIONS OF BIDDERS

A. The Owner shall have the right to take such other steps as deemed necessary to determine the ability of the Bidder to perform the Work, and the Bidder shall furnish the Owner such data for this purpose as requested.

B. Each Bid and each exact copy thereof must be accompanied by a financial statement with the Bid Form. This shall clearly show the Bidder's financial resources, his construction experience, his organization, and equipment available for Work contemplated.

C. A responsive bid must also be accompanied by a sworn and notarized statement from the bidder, disclosing any familial relationship between the owner or an employee of the bidder and any member of the district’s board or the superintendent of the district. The Board cannot accept a bid that does not contain a sworn and notarized disclosure statement.

1.04 CLARIFICATION OF BIDDERS' QUESTIONS

A. Questions for this Project shall be directed to the Construction Manager and the Architect.

B. Each Bidder is responsible for calling to the attention of the Construction Manager and the Architect ambiguities, inconsistencies, discrepancies, errors, or omissions, which occur in the Contract Documents for his part of the Work. Failing to request clarification, the Bidder will be expected to overcome such conditions without additions to his bid prices.

C. Prospective Bidders in doubt as to the true meaning of a part of the Drawings, Specifications, or other Contract Documents shall submit to the Construction Manager and the Architect, not less than ten (10) days before the date of the bid, a written request for interpretation and clarification.

D. Bidders are instructed to request interpretations and the issuing of Addenda if the

Contract Documents call for materials, equipment, or methods which adversely affect the cost or quality of the Project, or are unavailable.

1.05 APPROVAL BEFORE BIDDING

A. If a contractor preparing bids for submission on the Work is in doubt as to the acceptability of a manufacturer's material or equipment, under the requirements as set forth in the Specifications, he shall require that representatives of the proposed manufacturer or supplier contact the Architect and request a ruling on the acceptability of the material or equipment in question. The contact should be made within the time herein required before the date scheduled for the closing of bids, so that an Addendum can be issued to clarify the situation.

TSC 216011 Instructions to Bidders Section 00 10 00-4

B. It is not possible to set the time allowance for the resolution of every problem;

however, the time allowed shall not be less than ten (10) days before bid date. Each party requesting a ruling under this Article shall be responsible for the proper evaluation of the time involved and shall submit his request in ample time, as determined by the Architect, to process it.

C. Prior to receipt of bids, the Architect will consider proposals for substitution of materials, equipment, and methods only when such proposals are submitted in writing within the time period stated before the date and time set for receipt of bids, and are accompanied by full and complete technical data and other information required by the Architect to evaluate the proposed substitution.

D. Requests for product approval shall be submitted on sample form following this

Section and sent to: (GMB Architecture + Engineering, 85 East Eight Street, Suite 200 Holland, MI 49423, (616) 796 0200 and angelap@gmb.com).

1.06 ADDENDA

A. Additional information required by the Bidders, revisions in the Work, changes or additions, discrepancies in the Bidding Documents, or clarifications will be in the form of addenda written by the Architect and issued by the Construction Manager to Prime Bidders of Record as of the date of such addenda.

B. The Owner, Architect and Construction Manager reserves the right to issue addenda changing, altering, or supplementing the Contract Documents prior to the time set for receiving bids.

C. All addenda will be posted on www.skillmanplanroom.com and each Bidder of

Record Shall be notified. Prospective Bidder requesting a copy shall be directed www.skillmanplanroom.com. Bidders who will submit a bid to the Owner with the intent of entering into a Contract with the Owner and are registered plan holders on www.skillmanplanroom considered “Bidders of Record”. Copies of addenda will be available for inspection wherever Contract Documents are on file for that purpose.

D. Bidders are responsible for acquiring each issued addenda in time to incorporate them into their proposal.

E. In the event delivery of addenda to Bidders is delayed, for reasons not the fault of the

Bidders, the Owner may be requested to allow a reasonable extension of time for the opening of bids, to permit inclusion of such addenda.

F. Each Bidder shall enumerate in his Bid each addendum he has received.

TSC 216011 Instructions to Bidders Section 00 10 00-5

G. If a Bidder fails to indicate receipt of each addendum through the last addendum, issued by the Architect and Construction Manager, on its Bid Proposal Form, the bid of such Bidder shall:

1. Clearly indicate that the Bidder received the addendum, such as where the addendum added another item to be bid upon and the Bidder submitted a bid on that item; or

2. Indicate the addendum involves only a matter of form or is one which has either no effect or has merely a trivial or negligible effect, as determined by the Construction Manager on price, quantity, quality, or delivery of the item bid upon.

Failure to include either item above will be reason to deem the bid nonresponsive.

1.07 ALTERNATIVES

A. Requested alternatives are listed on the Bid Proposal Form and are described in detail under Section 01 23 00 - Alternates, Division 1 - General Requirements. They must be bid with base bid. NOTE: The terms "alternate" and "alternative" are used interchangeably to have the same meaning in this Project Manual and on the Drawings.

B. The cost of each alternate shall include omissions, additions, and adjustments of trades as may be necessary because of each change, substitution, addition, or omission.

C. Each Bidder shall be responsible for bidding alternates which affect the Work of the base bid he is bidding, regardless of whether listed or not listed on the Supplemental Bid Proposal Form. If an applicable alternate(s) is not listed on the Supplemental Bid Proposal Form, the Bidder shall submit on his letterhead the cost of said alternate(s). No additional costs will be allowed after signing of Contract for failure to bid applicable alternates.

D. The Owner retains the right to include or exclude work required by Alternates, for the sums established exercisable within one hundred twenty (120) days from and including the date of signing the Contract.

1.08 UNIT PRICES

A. Not used.

1.09 ARCHITECT'S AND CONSTRUCTION MANAGER'S COOPERATION DURING

BIDDING PERIOD

A. Each Bidder is encouraged to contact the Architect and Construction Manager in the event that problems occur or questions arise in analyzing the Drawings and

TSC 216011 Instructions to Bidders Section 00 10 00-6

Specifications, where additional clarification or information would be helpful in the preparation of a proper bid.

B. The Architect and Construction Manager will cooperate fully in connection with requests, and will provide information required, providing the Architect's and Construction Manager's ethical responsibilities are not encroached upon. This will include, upon request, providing information in order to clarify basic intentions of the Specifications; and other assistance as may be helpful in the preparation of a proper, competitive bid.

C. It is the general policy of the Architect and Construction Manager to be as helpful as possible to Bidders, insofar as is consistent with fair and open competition.

1.10 BIDDING PROCEDURES

A. Each bid shall be submitted on the Bid Form and sealed in an envelope clearly marked as containing a bid, indicating the Project Name, the Bidder’s name, the bid package (scope), the date and time of the bid opening, Owner’s address, and address to where bid is delivered.

B. Any substantial change, alteration or addition in the wording of the Bid Form may cause a bid to be rejected as not responsive for award of a Contract.

C. Unless the Bidder withdraws the bid as provided in Article 1.12 hereof, the Bidder will be required to comply with all requirements of the Contract Documents, regardless of whether the Bidder had actual knowledge of requirements and regardless of any statement or omission made by the Bidder which might indicate a contrary intention.

D. Bids shall be executed upon the Bid Proposal Form provided, and relevant blank spaces in the form shall be written in ink and not in pencil. The signature shall be in longhand and the completed form shall be without interlineation, alteration, or erasure. Each Bidder is required to bid every item called for, including alternate and unit costs.

E. The Bidder shall show all bid amounts in both words and figures. In case of a conflict between the words and figures, the amount shown in words shall govern, where such words are not ambiguous. When the Bidder’s intention and the meaning of the words are clear, omissions or misspelling of words will not render the words ambiguous.

F. Any alteration or erasure of items inserted on the Bid Form shall be initialed by the

Bidder.

TSC 216011 Instructions to Bidders Section 00 10 00-7

G. A bid is nonresponsive if it has not been deposited at the designated location prior to the time and date for receipt of bids indicated in the Notice To Bidders, or prior to extension thereof issued to the Bidders.

H. Telecommunicated bids will not be considered.

I. Bids which are not signed by the individuals making them shall have attached thereto a Power of Attorney evidencing authority to sign the bid in the name of the person for whom it is signed. Bids, which are signed for a partnership, shall be signed by the partners, or by an attorney-in-fact. If signed by an attorney-in-fact, there shall be attached to the bid a Power of Attorney evidencing authority to sign the bid, executed by the partners.

J. Each Bidder shall enumerate in his bid the addenda he has incorporated into his proposal.

K. It is the Bidder’s responsibility to include in his bid costs necessary for a completed and finished project for items of Work bid upon.

L. Submit bids in duplicate with Bid Security and other requested supplemental material attached; properly and completely executed.

M. When an alternate is listed on the bid Form, the Bidder shall fill in the applicable blank with an increased or decreased bid amount. The Owner reserves the right to accept or reject any or all bids on alternates, in whole or in part, and in any order.

N. If no change in the bid amount is required, indicate “No Change”.

O. A blank entry or an entry of “No Bid”, “N/A”, or similar entry on any alternate affecting the Contractor’s scope of work, will cause the bid to be rejected as nonresponsive only if that alternate is selected.

P. If an alternate is not selected, an entry as listed in paragraph hereinbefore on that alternate will not, by itself, render a bid nonresponsive.

Q. In a combined bid, a blank entry or an entry of “No Bid”, “N/A”, or similar entry on an alternate will cause the bid to be rejected as nonresponsive only if that alternate applies to the combined bid and that alternate is selected.

R. Pursuant to Michigan Department of Treasury Revenue Administrative Bulletin

1999-2 Proposals for Work shall include the Michigan Sales Tax for materials to be incorporated into this Project.

S. Out-of-state Bidders, which are corporations, shall submit their Certificate of Authority to transact business in the State of Michigan with their bid.

TSC 216011 Instructions to Bidders Section 00 10 00-8

1.11 BID SECURITY

A. The amount of bid security required, and the type acceptable, is defined in the Notice to Bidders. The Surety for bid security shall be one complying with the requirements of these Instructions to Bidders.

B. The bid security of Bidders, except the selected for each category, may be returned within three (3) days after the opening of bids, at the Owner's or Construction Manager's option.

C. Bid security of the selected Bidders may be held by the Owner, following the bid opening, for not more than the maximum number of days stipulated in the Notice to Bidders, unless the Owner and Bidders agree otherwise; except that in the event a Bidder has been awarded the Contract and has failed to execute same or furnish proper performance and payment bonds, then the bid security of such Bidder will be subject to forfeit, and the next responsive Bidder, if tendered the Contract, will be subject to the same provisions as hereinbefore set forth. Should the award fall to the third responsive Bidder because of default of the previous two Bidders, the same condition will apply to the third Bidder as hereinbefore set forth.

D. The bid security of the selected Bidders will be returned within seventy-two (72) hours after the Form of Agreement has been executed, upon request.

E. In the event that the Owner should decide to reject all bids, the bid securities will be returned within 72 hours following that decision.

F. Bid security is subject to forfeiture if a bid is withdrawn during the time period bids are to be held.

G. The two (2) low responsible Bidders will be required to submit a complete list of subcontractors, material suppliers, and products on Section 00 43 50 – Subcontractors and Products List, to the Construction Manager within 48 hours, after being notified by the Skillman Corporation. Failure to submit this information within the required time may be considered as grounds for rejection of the bid.

H. Manufacturers approved by addenda may be written in appropriate location.

I. If Bidder awarded the Contract fails to indicate a specific product or manufacturer or lists multiple products and manufacturers for the same product, that Bidder (Contractor) shall provide the first listed product and manufacturer in the specification section.

1.12 MODIFICATION OR WITHDRAWAL OF BID PROPOSAL

A. A Bidder may withdraw his bid prior to the scheduled time for the receipt of bids, without forfeiture of bid security. If a postponement of the time for receiving bids is

TSC 216011 Instructions to Bidders Section 00 10 00-9 made, the new time established therein shall be the time within the meaning of this Article.

B. Bids may be modified prior to bid opening time.

C. After commencement of the opening of bids, no Bidder may recall his bid.

TSC 216011 Instructions to Bidders Section 00 10 00-10

1.13 OPENING OF BIDS

A. The Notice to Bidders indicates the time and place fixed for opening of bids.

B. Bids received prior to the time of opening will be securely kept, unopened. The officer whose duty it is to open them will decide when the specified time has arrived, and no Bid received thereafter will be considered responsive.

C. No responsibility will be attached to an officer for the premature opening of a bid not properly addressed and identified.

D. The amounts involved in alternates requested will be read or disclosed as part of the requirements of this Article. Voluntary alternates will not be considered.

E. The Owner reserves the right to delay the time for opening of bids when, in his judgment, it is desirable or necessary.

1.14 DISQUALIFICATION

A. The Owner reserves the right to reject each and every Bid, to waive formalities or informalities in bidding, to accept or reject alternates regardless of their order or sequence.

B. The right is reserved to reject a Bid where an investigation of the available evidence of information does not satisfy the Owner that the Bidder is responsible to perform the terms of the Contract Documents.

C. Only “bona fide” bids in a definite stated amount, without special clauses governing price of labor and material increases, will be considered. The Contract shall not include what is commonly known as an “Escalator Clause".

D. Bids which contain qualifications or conditions that are contrary to the text or intent of the Contract Documents, and which are inserted in the bid for the purpose of limiting or otherwise qualifying the responsibility of the Bidder, outside of the text or intent of the Contract Documents, will be determined to be nonresponsive.

E. Failure to submit the requested information with the bid shall be grounds for rejecting the bid.

F. The ability of the Bidder to obtain or qualify for a performance bond or payment bond shall not be regarded as a sole test of such Bidder's competence or responsibility.

G. The Bidder acknowledges the right of the Owner to reject bids and to waive informalities or irregularities in bids received. In addition, the Bidder recognizes the right of the Owner to reject a bid if the Bidder failed to furnish the required bid

TSC 216011 Instructions to Bidders Section 00 10 00-11 security or to submit the data required by the bidding Documents or if the bid is incomplete or irregular.

1.15 DETERMINATION OF LOWEST RESPONSIBLE AND RESPONSIVE BID

A. Subject to the right of the Owner to reject each and every bid, the Owner will award the Contract for the Work to the Bidder submitting the lowest responsive and responsible bid. In making their determination the Owner may take into consideration not only the amount of the bid but also:

1. Whether the Bidder has submitted a bid or quote that conforms in all material respects to the specifications.

2. Whether the Bidder has submitted a bid that complies specifically with the

Invitation to Bid and the Instructions to Bidders.

3. Whether the Bidder has complied with all applicable statutes.

4. The ability and capacity of the Bidder to perform the Work.

5. The integrity, character, and reputation of the Bidder.

6. The competence and experience of the Bidder.

B. The failure to submit requested information on a timely basis may result in the determination that the Bidder is not responsible.

C. In addition to the above items; the Owner will consider in awarding Work if the intent of the Guideline Schedule and completion of Work can be met within the specified number of consecutive calendar days.

1.16 PERFORMANCE BOND AND PAYMENT BOND

A. The successful Bidder, awarded the Contract on this Project and prior to the execution of the Form of Agreement, shall provide a Performance Bond and Payment Bond, covering the faithful performance of the Contract and the payment of obligations arising thereunder in a penal sum equal to 100 percent of the amount of the Contract sum. Said bonds shall remain in effect for 12 months after date established as start of one year correction period. Premiums shall be included and paid-for by the Contractor.

B. Bonds shall be submitted on AIA Doc. A312.

C. The Bidder shall deliver the required bonds to the Owner not later than the date of execution of the Contract.

D. The Bidder shall require the attorney-in-fact that executes the required bonds on behalf of the Surety to affix thereto a certified and current copy of his Power of Attorney indicating the monetary limit of such power.

TSC 216011 Instructions to Bidders Section 00 10 00-12

E. Surety Company shall comply with the following:

1. Insurance and Surety Companies shall be deemed qualified and acceptable to the Owner in connection with Contractor bonding and insurance requirements under said Contracts only if such companies have a policy holders rating of “A+”, “A”, or “A-“, a financial category not less than Class VII as shown on Best’s Key Rating Guide, latest edition; provided, however, that the bond is furnished by one of the aforesaid qualified Sureties who is also listed in the Department of the Treasury Circular 570, Volume 41, No.

132 Part V (Federal Register) and is licensed in the State of Michigan and the penal sum of the bond does not extend the underwriting limitation set forth in the subject Circular, unless the excess, if any, is reinsured with the approval of the Owner.

2. Bonds shall be executed and be in force on the date of the execution of the Contract.

3. The bonds shall be made out for not less than 100 percent of the entire amounts due under the Contract, and shall make provisions to cover additional amounts which may be authorized as provided for under changes in the work; and authorized as provided for under changes in the work; and authorized extensions of time by either making provisions for such additional items in the text of the bond or by the issuance of an amendment or rider to provide for such additional coverage.

1.17 EXECUTION OF THE CONTRACT

A. Subsequent to the award, and within ten (10) days after the prescribed Form of Agreement is presented for his signature, the Awardee shall execute and deliver them to the Owner through the Construction Manager, in such number of counterparts as the Owner may require.

B. The failure of the Awardee to execute such Contract and to supply the required bonds when the Agreement is presented for signature or within such extended period as the Owner may grant, based upon reasons determined adequate by the Owner, shall constitute a default; and the Owner may either award the Contract to the next responsible Bidder or re-advertise for bids. In the event of default, the Owner shall have the right to declare the amount of the bid security forfeited. It shall be a further condition that the Owner shall not collect more on a defaulted Bid than the difference between the defaulted bid amount and the bid of the firm to which the award is made, after giving due weight and consideration to alternatives accepted.

1.18 TIME OF COMMENCEMENT AND COMPLETION

A. The Contractor shall commence work within ten (10) days of being notified in writing to proceed, and shall complete the Work within the time limitations established in the Form of Agreement, these instructions to Bidders, and in Section 01 12 00 – Multiple Contract Summary.

TSC 216011 Instructions to Bidders Section 00 10 00-13

1. It is anticipated that construction will start within 190 calendar days after receipt of bids.

2. Construction shall be complete within 181 consecutive calendar days, or earlier, after Notice to Proceed.

3. See Section 01 32 00c – Schedules and Reports for Guideline Project Schedule.

1.19 WAGE RATES

A. Each Bidder is required to make provisions in his bid for complying with the requirements of section 00 83 00 – Schedule of Prevailing Construction Wages.

1.20 COMBINED BIDS

A. Bids shall be submitted for each individual bid category. Bids may also be submitted for a combination of two or more bid categories but may not be accepted unless individual bids have been submitted for each bid in the combination.

B. Combination bid shall be submitted on a separate bid form. Insert the combination of bid categories on the bid form where noted “Insert Category No.(s) and Name(s)” and address all alternates for the combination bid.

C. Separate bids and combination bids may be enclosed in a single envelope.

D. A single bid bond is acceptable if the amount of the bond is for the maximum amount of any individual bid or combination bid to include any alternates.

1.21 LIST OF MAJOR SUBCONTRACTORS, SUPPLIERS, AND MANUFACTURERS

A. The three low responsive Bidders shall submit a listing of major subcontractors and manufacturers within 48 hours of notification that their bid is being considered.

B. After submission of this list by the Bidder, and after approval by the Owner, Construction Manager, and Architect, it shall not be changed unless written approval of change is authorized by the Owner, Construction Manager, and Architect.

END OF SECTION 00 10 00

TSC 216011 Substitution Request Form Section 00 12 10-1

DOCUMENT 00 12 10 – SUBSTITUTION REQUEST FORM

TO: ___________________________________________________________________________

Project: ________________________________________________________________________

We hereby submit for your consideration the following product instead of the specified item for the above project:

Section Paragraph Specified Item

Proposed Substitution: ______________________________________________________

Attach complete technical data including laboratory tests if applicable.

Include complete information changes to Drawings and/or Specifications which proposed substitution require for proper installation.

Fill in Blanks Below, use additional sheets if necessary:

A. Does the substitution affect dimensions shown on Drawings?

B. Will the undersigned pay for changes to building design, including engineering and detailing costs caused by substitution, if any?

C. What effect does substitution have on other trades?

D. Differences between proposed substitution and specified item?

E. Manufacturer’s guarantees of proposed and specified items are:

______________Same __________Different (explain on attachment)

The undersigned states that the function, appearance and quality are equivalent or superior to the specified item.

Submitted by:

________________________________ For use by Design Consultant Signature ________________________________ Accepted Accepted as Noted Firm_____________________________ Not Accepted Received too Late Address__________________________ By________________________________ Date_______________________________ _________________________________ Remarks____________________________ Telephone_________________________ ___________________________________

TSC 216011 Information Available To Bidders Section 00 20 00-1

SECTION 00 20 00 - INFORMATION AVAILABLE TO BIDDERS

A. Lead Based Paint: Lead Based Paint Report (if applicable), prepared for the Owner, is not part of the Construction Documents, and is on file at the Owner’s Office and is available for review upon written request. The Architect and Construction Manager do not accept responsibility for the information contained in the report.

END OF SECTION 00 20 00

TSC 216011 Bidder Reminder List Section 00 30 50-1

NAME OF BIDDER

BIDDER REMINDER LIST TO BE COMPLETED AND INCLUDED

IN BID PACKAGE FOR REVIEW AT BID OPENING

YES NO

Have you properly and completely executed the Bid Form (Section 00 31 00)?

Is the Bid Total written in both words and figures?

Are the Alternate quantities in both words and figures and noted as Add or Deduct?

Is the Non-Collusion Affidavit, part of the Bid Form, signed & notarized?

Is the Familial Disclosure Affidavit, part of the Bid Form, signed and notarized?

Is the Iran Sanctions Act Certificate of Compliance, part of the Bid Form, signed and notarized?

Have you enclosed a certified check or Bid Bond?

(Note: bond must be signed by Surety and Principal)

Have you included your company's Financial Statement?

On the outside of the envelope containing your Bid have you indicated:

The Project Name Bidder’s Name Bid Category No.

Date and Time of Bid Opening Owner’s Address Address to Where Bid is to be Delivered if different from Owners Address

NOTE: IF ANY OF THE REQUIRED BIDDING DOCUMENTS ARE NOT

INCLUDED, DATED OR PROPERLY EXECUTED, THE

CONTRACTOR'S BID MAY NOT BE ACCEPTED.

TSC 216011 Bid Form Section 00 31 00-1

(Amended for DPS)

CONTRACTOR'S BID FOR PUBLIC WORKS

Herbison Woods Bleachers Replacement

Clinton County

PART I

(To be completed for all bids) (Please type or print)

BIDDER (firm)

Address P.O. Box

City/State/Zip

Telephone Number Fax Number

Person to contact regarding this Bid:

Pursuant to notices given, the undersigned offers to furnish labor and materials necessary to complete the construction work for:

Insert Bid Category No.(s) and Name(s) of public works project, Herbison Woods Bleachers Replacement, in accordance with Plans and Specifications prepared by GMB Architecture + Engineering, 85 East Eight Street, Suite 200, Holland, MI 49423, as follows:

BASE BID

For the sum of (sum in words)

DOLLARS ($ )

(sum in figures)

The undersigned acknowledges receipt of the following Addenda:

TSC 216011 Bid Form Section 00 31 00-2

Receipt of Addenda No.(s) _______________________________________________

PROPOSAL TIME

Bidder agrees that this Bid shall remain in force for a period of sixty (60) consecutive calendar days from the due date, and Bids may be accepted or rejected during this period. Bids not accepted within said sixty (60) consecutive calendar days shall be deemed rejected.

Attended pre-bid conference YES NO

Has visited the jobsite YES NO

The Bidder must attach to this bid, the sworn and notarized affidavit (attached at the end of this Bid Form) disclosing any familial relationship between the Owner or an employee of the bidder and any member of the District's Board or the Superintendent of the District.

The Bidder has reviewed the Guideline Schedule in Section 01 32 00 and the intent of the schedule can be met. YES NO

The undersigned further agrees to furnish a bond or certified check with this Bid for an amount specified in the Notice to Bidders. If Alternate Bids apply, submit a proposal for each in accordance with the Plans and Specifications.

ALTERNATE BIDS

A blank entry or an entry of “No Bid”, “N/A”, or similar entry on any Alternate will cause the bid to be rejected as non-responsive only if that Alternate is selected. If no change in the bid amount is required, indicate “No Change”.

TSC 216011 Bid Form Section 00 31 00-3

**MARK "ADD" OR "DEDUCT" FOR EACH ALTERNATE**

Alternate Bid No. 1 – Provide graphic lettering on Herbison Woods Bleachers.

Change the Base Bid the sum of (sum in words)

ADD

DOLLARS ($ ) DEDUCT

(sum in figures)

Alternate Bid No. 1 – Demolish Existing Bleachers at Herbison Woods

Change the Base Bid the sum of (sum in words)

ADD

DOLLARS ($ ) DEDUCT

(sum in figures)

TSC 216011 Bid Form Section 00 31 00-4

NON-COLLUSION AFFIDAVIT

The undersigned Bidder or agent, being duly sworn on oath, says that he has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this Bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding.

He further says that no person or persons, firms, or corporations has, have, or will receive directly or indirectly, any rebate, fee, gift, commission, or thing of value on account of such sale.

OATH AND AFFIRMATION

I affirm under the penalties of perjury that the foregoing facts and information are true and correct to the best of my knowledge and belief.

Dated at this day of , 20___.

(Name of Organization)

By (Title of Person Signing)

ACKNOWLEDGEMENT

STATE OF )

) SS:

COUNTY OF )

being duly sworn, deposes and says that he is of the above (Title) (Name of Organization) and that the statements contained in the foregoing Bid, certification and Affidavit are true and correct.

Subscribed and sworn to before me this day of , 20 .

Notary Public

My Commission Expires:

County of Residence:

TSC 216011 Bid Form Section 00 31 00-5

PART II

(Complete sections I, II, and III for all state and local public works projects)

These statements to be submitted under oath by each bidder with and as a part of his bid. (Attach additional pages for each section as needed.)

SECTION I EXPERIENCE QUESTIONNAIRE

1. What public works projects has your organization completed?

Contract Amount

Class of Work

When Completed

Name and Address of Owner

2. What public works projects has your organization now in process of construction:

Contract Amount

Class of Work

When Completed

Name and Address of Owner

3. Have you ever failed to complete any work awarded to you? If so, where and why?___________________________________________________________________

4. List references from private firms for which you have performed work.

TSC 216011 Bid Form Section 00 31 00-6

SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE

1. Explain your plan or layout for performing proposed Work.

2. If you intend to sublet any portion of the Work, state the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you expect to require a bond.

3. What equipment do you intend to use for the proposed Project?

4. Have you made contracts or received offers for all materials within prices used in preparing your proposal? yes no.

TSC 216011 Bid Form Section 00 31 00-7

SECTION III OATH AND AFFIRMATION

I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing Bid for public works are true and correct to the best of my knowledge and belief.

IN TESTIMONY WHEREOF, The Bidder has hereunto set his hand this day of , 20 .

Bidder: ___

IN TESTIMONY WHEREOF, The Bidder (a firm) have hereunto set their hands this day of , 20 .

Firm Name:

By:

Individual names:

TSC 216011 Bid Form Section 00 31 00-8

IN TESTIMONY WHEREOF, The Bidder (a corporation) has caused this proposal to be signed by its President and Secretary and affixed its corporate seal this day of , 20 .

Name of Corporation:

President:

Secretary:

ACKNOWLEDGEMENT

STATE OF )

) SS:

COUNTY OF )

being duly sworn, deposes and says that he is of the above

(Title) (Name of Organization) and that the answers to the questions in the foregoing questionnaires and all statements therein contained are true and correct.

Subscribed and sworn to before me this day of , 20 .

Notary Public

County of Residence:

TSC 216011 Bid Form Section 00 31 00-9

AFFIDAVIT OF BIDDER - FAMILIAL DISCLOSURE

The undersigned, the Owner or authorized officer of _________________ (the 'Bidder'), pursuant to the familial disclosure requirement provided in the DeWitt Public Schools advertisement for construction bids, hereby represent and warrant, except as provided below, that no familial relationships exist between the Owner(s) or any employee of _______________________ and any member of the Board of Education of the School District or the

Superintendent of the School District.

List any Familial Relationships:

BIDDER:

Its:

STATE OF MICHIGAN )

)ss.

COUNTY OF _________ )

This instrument was acknowledged before me on the _____ day of ____________, 20__, by

, Notary Public

County, Michigan

Acting in the County of:

TSC 216011 Bid Form Section 00 31 00-10

CERTIFICATION OF COMPLIANCE – IRAN ECONOMIC SANCTIONS ACT

Michigan Public Act No. 517 of 2012

The undersigned, the owner, or authorized officer of the below-named company (the “Company”), pursuant to the compliance certification requirement provided in the DEWITT PUBLIC SCHOOLS’s Request For Proposal (the

“RFP”), hereby certifies, represents, and warrants that the Company (which includes its officers, directors and employees) is not an “Iran Linked Business” within the meaning of the Iran Economic Sanctions Act, Michigan

Public Act No. 517 of 2012 (the “Act”), and that in the event the Company is awarded a contract by the DEWITT

PUBLIC SCHOOLS as a result of the aforementioned RFP, the Company is not and will not become an “Iran

Linked Business” at any time during the course of performing any services under the contract.

The Company further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or two (2) times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of the DEWITT PUBLIC

SCHOOLS’s investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three (3) years from the date that it is determined that the person has submitted the false certification.

BIDDER:

Its:

STATE OF MICHIGAN )

)ss.

COUNTY OF _________ )

This instrument was acknowledged before me on the _____ day of ____________, 20__, by

, Notary Public

County, Michigan

Acting in the County of:

END OF SECTION 00 31 00

Activity Name Original Duration

Start Finish

Herbison Woods Bleachers Replacem 184 23-Aug-17 A 07-May-18

Project Administration 34 23-Aug-17 A 10-Oct-17

Bid Documents Issued 0 23-Aug-17 A

Pre-Bid Walkthrough 0 13-Sep-17*

Bid Date 0 21-Sep-17*

Recomendation To Board For Approval 0 25-Sep-17*

Notice To Proceed Issued 0 09-Oct-17*

Contracts Issued 0 10-Oct-17*

Construction 151 09-Oct-17 07-May-18

Shop Drawings 15 09-Oct-17* 27-Oct-17

Bleachers Ordered 60 30-Oct-17 19-Jan-18

Bleacher Demo 1 30-Mar-18* 30-Mar-18

Electrical Installation 2 02-Apr-18* 03-Apr-18

Install New Bleachers 5 02-Apr-18 06-Apr-18

Final Inspections 1 06-Apr-18* 06-Apr-18

Project Closeouts 20 10-Apr-18 07-May-18

31 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 05 12 19 26 05 12 19 26 02 09 16 23 30 07 14 21 28 August September October November December January February March April May

2017 2018

Herbison Woods Bleachers Replacement

Project Administration

Bid Documents Issued

Pre-Bid Walkthrough

Bid Date

Recomendation To Board For Approval

Notice To Proc eed Issued

Contracts Issued

Construction

Shop Drawings

Bleachers Ordered

Bleacher Demo

Electrical Installation

Install New Bleachers

Final Inspections

Project Closeouts

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

216011 Herbison Woods Bleachers Replacement

Guideline Schedule - August 23, 2017

TSC 216011 Standard Forms Section 00 37 00-1

SECTION 00 37 00 - STANDARD FORMS

PART 1 - GENERAL

1.01 The purpose of this Section is to identify some of the forms that will be used in conjunction with the administration of this Project.

1.02 BIDDING FORMS: The following two (2) forms must be submitted with the Contractor's

Bid. Failure to furnish any one of the forms can be cause for the rejection of the Contractor's Bid.

A. Bid Form: See Section 00 31 00

1. Non-Collusion Affidavit: Part of Bid Form

2. Familial Disclosure Affidavit Part of Bid Form

3. Certification of Compliance–Iran Economic Sanctions Act Part of Bid Form

B. Bid Security: See Bid Bond – Section 00 41 00

1.03 CONTRACT FORMS: The following seven (7) forms must be submitted and approved by the Construction Manager prior to acceptance and execution of the Agreement by the Owner.

A. Subcontractor and Material Suppliers List: See Section 00 43 50 B. Contract: See Section 00 50 00 – Agreement C. Performance and Payment Bond (00 61 00) D. Document 00 82 00 - Certificate of Insurance E. IRS Form W-9, Request for Taxpayer Identification Number (end of this Section) F. Wage Scale Affidavit: (end of this Section) G. Schedule of Wages (end of this Section)

1.04 ADMINISTRATIVE FORMS: Forms for monthly pay requests and the final pay request shall be acquired after the award of the Contract, by the Contractor.

A. Request for Information (RFI) (end of this section) B. Submittal Transmittal Record (see Section 01 33 00) C. Look Ahead Schedule (see Section 01 32 00) D. Punch List Verification Form (see Section 01 77 00) E. Receipt For Extra Stock (see Section 01 77 00) F. Verification of Owner Training (see Section 01 77 00)

END OF SECTION 00 37 00

Give form to the requester. Do not send to the IRS.

Form W-9 Request for Taxpayer Identification Number and Certification(Rev. January 2003)

Department of…