This file contains 65% Design Development drawings for the Renovate Radiology Space project at VA Southern Nevada Healthcare System in North Las Vegas, Nevada (Project #593-CSI-313). The comprehensive drawing set includes general information, structural, architectural, fire protection, plumbing, electrical, mechanical, security, and technology discipline sheets prepared by HFS Company Architecture and Engineering (Seal #23365, dated March 20, 2026). The project scope encompasses renovation of approximately 4,591 square feet of radiology department space including SPECT CT imaging rooms, X-ray rooms, ultrasound rooms, hot lab, dose administration, DEXA, thyroid uptake, cardiac stress testing, and supporting administrative and auxiliary spaces. The project is organized into five phased construction phases to maintain operational continuity in the occupied healthcare facility, with ICRA (Infection Control Risk Assessment) Level 4 precautions required throughout construction, including negative air handling and temporary barriers.
The drawing set specifies new medical equipment installations including three SPECT/CT gantry systems, two X-ray systems, three fan coil units for cooling, and associated supporting infrastructure. Key construction requirements include lead-lined shielding for radiation rooms per physicist specifications, new structural steel supports for equipment exceeding 8,000 pounds, medical gas systems, dedicated electrical feeds (480V/277V three-phase power), HVAC modifications with dedicated exhaust fans, plumbing relocations, fire suppression and alarm system modifications, access control security systems with card readers, and telecommunications (Category 6A cabling) upgrades. The design incorporates accessibility standards compliance, maintains existing 2-hour fire/smoke-rated wall assemblies where applicable, and requires coordination among multiple construction trades. The drawings are marked as interim review documents and are not intended for regulatory submission or construction; a Request for Proposal is anticipated for release in late June 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW Renovate Radiology Space_DRAFT.docx | DOCX document | |
| 36C26126Q0565.docx | DOCX document | |
| SOW Appendices_DRAFT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(THIS DRAWING SET NOT INTENDED FOR CONSTRUCTION)
PROJECT MANAGEMENT,
ARCHITECTURE, SECURITY &
TECHNOLOGY
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
VA SOUTHERN NEVADA HEALTHCARE SYSTEM
6900 N. Pecos Road
North Las Vegas, NV 89086
RENOVATE RADIOLOGY SPACE
PROJECT # 593-CSI-313
GI-000
COVER SHEET
HR
MECHANICAL, ELECTRICAL,
PLUMBING,STRUCTRAL, & FIRE
PROTECTION
INDEX OF DRAWINGS
SHEET # SHEET NAME ISSUE DATE SHT # SHEET NAME ISSUE DATE SHT # SHEET NAME ISSUE DATE SHT # SHEET NAME ISSUE DATE
GENERAL
GI-000 COVER SHEET/INDEX OF DRAWINGS
GI-010 GENERAL INFORMATION SYMBOLS & LOCATION MAP
GI-011 CODE SUMMARY
GI-012 ICRA / PHASING PLANS - PHASE 1
GI-013 ICRA / PHASING PLANS - PHASE 2
GI-014 ICRA / PHASING PLANS - PHASE 3
GI-015 ICRA / PHASING PLANS - PHASE 4
GI-016 ICRA / PHASING PLANS - PHASE 5
GI-020 ARCHITECTURAL ABBREVIATIONS
GI-030 ACCESSIBILITY STANDARDS
STRUCTURAL
SF101 FRAMING PLAN AND DETAILS
ARCHITECTURAL
AS-100 SITE PLAN
AS-101 CONTRACTOR PATH OF TRAVEL AND SOW LOCATIONS
AD-100 OVERALL GROUND FLOOR PLAN - DEMOLITION
AD-101 OVERALL BASEMENT FLOOR PLAN - DEMOLITION
AD-102 OVERALL & ENLARGED ROOF PLAN - LEVEL 7
AD-110 ENLARGED GROUND FLOOR PLAN - DEMOLITION
AD-150 OVERALL GROUND FLOOR PLAN - DEMOLITION
AD-160 ENLARGED GROUND FLOOR RCP - DEMOLITION
AE-100 OVERALL GROUND FLOOR PLAN - RENOVATION
AE-110 ENLARGED GROUND FLOOR PLAN - RENOVATION
AE-111 ENLARGED EQUIPMENT FLOOR PLAN - RENOVATION
AE-150 OVERALL GROUND FLOOR PLAN- RENOVATION
AE-160 ENLARGED GROUND FLOOR RCP - RENOVATION
AE-400 ROOM FINISH SCHEDULE FINISH MATERIAL SCHEDULE
AE-410 DOOR SCHEDULE, DOOR TYPE, AND WINDOWS TYPE
AE-500 INTERIOR ELEVATION
AE-510 MILLWORK DETAILS
FIRE PROTECTION
FD101 FIRE PROTECTION DEMOLITION PLAN LEVEL 1 - RADIOLOGY
FA101 FIRE ALARM PLAN LEVEL 1 - RADIOLOGY
FX101 FIRE SUPPRESSION PLAN LEVEL 1 - RADIOLOGY
PLUMBING
P-001 PLUMBING NOTES AND SYMBOLS
PD100 PLUMBING DEMOLITION PLAN BASEMENT
PD101 PLUMBING DEMOLITION PLAN LEVEL 1 - RADIOLOGY
PD121 MEDICAL GAS DEMOLITION PLAN LEVEL 1 - RADIOLOGY
PP100 PLUMBING PLAN BASEMENT
PP101 PLUMBING PLAN LEVEL 1 - RADIOLOGY
PP121 MEDICAL GAS PLAN LEVEL 1 - RADIOLOGY
P-601 PLUMBING DETAILS & SCHEDULES
ELECTRICAL
E-001 ELECTRICAL SYMBOLS AND GENERAL NOTES
ED101 EXISTING ELECTRICAL PLAN LEVEL 1 - AREA D & G
ED102 ELECTRICAL DEMOLITION PLAN LEVEL - RADIOLOGY
EP100 POWER PLAN BASEMENT - AREA D
EP101 POWER PLAN LEVEL 1 - RADIOLOGY
EP102 POWER PLAN LEVEL 7 - ROOF
EL101 LIGHTING CONTROL PLAN LEVEL 1 - RADIOLOGY
EL102 LIGHTING PLAN LEVEL 1 - RADIOLOGY
E-601 ELECTRICAL SCHEDULES
E-602 ELECTRICAL ONE-LINE DIAGRAM
E-603 ELECTRICAL PANEL SCHEDULES
E-604 ELECTRICAL PANEL SCHEDULES
E-701 LIGHTING SCHEDULES
MECHANICAL
M-001 MECHANICAL NOTES AND SYMBOLS
MA101 MECHANICAL DEMOLITION PLAN LEVEL 1 - RADIOLOGY
MD111 PIPING DEMOLITION PLAN LEVEL 1 - RADIOLOGY
MH100 MECHANICAL PLAN BASEMENT
MH101 HVAC PLAN LEVEL 1 - RADIOLOGY
MH102 HVAC PLAN LEVEL 7 - ROOF
MP101 PIPING PLAN LEVEL 1 - RADIOLOGY
M-301 MECHANICAL SECTIONS
M-501 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULE
M-701 MECHANICAL CONTROLS
SECURITY
TY-001 GENERAL INFORMATION
1-TY-102 SECURITY DEMOLITION
1-TY-202 NEW SECURITY
1-TY-300 EXISTING SECURITY PATHWAY
TY-700 SCHEDULES
TY-701 DOOR ACCESS DETAILS
TECHNOLOGY
T-001 GENERAL INFORMATION
T-002 SCHEDULES
1-TD-101 TECHNOLOGY DEMOLITION
1-TN-201 NEW TECHNOLOGY
1-TN-300 EXISTING PATHWAYS
T-500 TELECOMMUNICATION DETAILS
T-501 TELECOMMUNICATION DETAILS
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
FULLY SPRINKLERED
593-CSI-313
3/20/2026
65% DESIGN
DEVELOPMENT
RENOVATE RADIOLOGY
SPACE
6900 N. Pecos Road North Las Vegas, NV 89086
INTERIM REVIEW
DOCUMENTS
These documents are preliminary and are only for review. They are not to be submitted for regulatory review, permitting, and/or construction.
RICHARD DERAS
Seal # 23365 03/20/2026
DRAFT
DISCIPLINE REFERENCES
DRAWING FOR THE FOLLOWING DISCIPLINES ARE
CONTAINED IN THE DOCUMENT. THE DISCIPLINES ARE
IDENTIFIED BY THE REFERENCE WHICH IS INCORPORATED
INTO THE SHEET TITLE.
G GENERAL INFORMATION
H HAZARDOUS
V SURVEY/MAPPING
B GEOTECHNICAL
W CIVIL WORKS
C CIVIL
L LANDSCAPE
S STRUCTURAL
A ARCHITECTURAL
I INTERIORS
Q EQUIPMENT
F FIRE PROTECTION
P PLUMBING
D PROCESS
M MECHANICAL
E ELECTRICAL
T TELECOMM
SHEET NUMBER
DRAWING NUMBERING
1 BUILDING SECTION
SCALE: 1/8" = 1'-0"
EACH DRAWING IS NUMBERED ACCORDING TO IT'S
LOCATION ON THE SHEET. THE DRAWING TITLE APPEARS
ABOVE THE DEMARCATION LINE AND THE APPROPRIATE
SCALE IS LOCATED BELOW THE DEMARCATION LINE.
DRAWING REFERENCE
ARCHITECTURAL SYMBOLS
CENTER LINE
ELEVATION INDICATORXXX.XX'
CENTER LINE INDICATOR
DEMOLITION LINE
EXISTING TO REMAIN LINE
FEATURES ABOVE LINE INDICATOR
CONSTRUCTION LIMITS
BREAK, ROUND (USER DEFINES SIZE)
BREAK, STRAIGHT (SEE SECTION
INDICATORS, BUILDING BREAK
STANDARDS)
DIMENSION LINE
X'-X"
1/AS-101 INTERIOR ELEVATION
P-1
WALL OR PARTITION TYPE
ROOM NAME
ROOM NAME
ROOM NAME AND NUMBER
A
COLUMN GRID
22 KEYED NOTE
N
NORTH ARROW
REVISIONS
EXTENT OF
CURRENT
REVISION
REVISION
NUMBER
REFER TO REVISION HISTORY ON TITLE BLOCK OF EACH
SHEET.
DETAIL INDICATOR
BUILDING SECTION INDICATOR
101 DOOR NUMBER
A WINDOW INDICATOR
GENERAL NOTES
1. UNLESS NOTED AS EXISTING, ALL MATERIALS, EQUIPMENT,
MANUFACTURED ITEMS AND ASSEMBLIES INCORPORATED
INTO THE WORK SHALL BE NEW.
2. UNLESS NOTED TO BE REMOVED AND DISPOSED, ALL
EXISTING ITEMS ARE TO REMAIN. THEY SHALL BE
PROTECTED FROM DAMAGE DUE TO CONSTRUCTION
ACTIVITIES. ANY EXISTING ITEMS TO REMAIN THAT
BECOME DAMAGED DUE TO CONSTRUCTION ACTIVITIES
SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING
AT NO ADDITIONAL COST TO THE OWNER.
3. NOTATIONS FOR ITEMS OF WORK APPLY TO EACH
GRAPHICAL INDICATION SHOWN ON THE DRAWINGS,
WHETHER OR NOT NOTED.
4. ALL ITEMS NOTED TO HAVE PAINT FINISH SHALL BE
CLEANED AND PREPARED IN ACCORDANCE WITH THE
SPECIFICATIONS PRIOR TO THE APPLICATION OF PRIMER
AND PAINT.
5. THE CONTRACTOR SHALL FAMILIARIZE THEMSELF WITH
THE ARCHITECTURAL, STRUCTURAL, MECHANICAL,
ELECTRICAL, PLUMBING, TECHNOLOGY, ETC. WORK
SCOPE AND SATISFY THAT ALL REQUIREMENTS FOR
SUPPORT, FLOOR, WALL AND ROOF OPENINGS, FLASHINGS
AND CURBS, ETC. ARE IMPLEMENTED. THE ARCHITECT
SHALL BE NOTIFIED OF CONFLICTS OR DISCREPANCIES
PRIOR TO COMMENCEMENT OF CONSTRUCTION.
6. CONTRACTOR TO REPLACE AND ACCURATELY LOCATE
ALL EXISTING SIGNAGE AND LABELS NOTING RATED WALL
ASSEMBLIES AND SMOKE PARTITIONS.
7. THE GENERAL CONTRACTOR SHALL VISIT THE SITE,
VERIFY FIELD CONDITIONS AND COMPARE SUCH FIELD
CONDITIONS AND OTHER INFORMATION KNOWN TO THE
CONTRACTOR WITH CONTRACT DOCUMENTS.
8. THE GENERAL CONTRACTOR SHALL REPORT ANY
UNFORESEEN FIELD CONDITIONS, ERRORS,
INCONSISTENCIES, OR OMISSIONS DISCOVERED AT ANY
TIME DURING THE WORK. UPON SUCH DISCOVERY, THE
CONTRACTOR SHALL CONTACT THE CONTRACT OFFICER
FOR CLARIFICATION BEFORE PROCEEDING OR
CONTINUING WITH THAT PORTION OF THE WORK OR ANY
PORTION RELATED THERE TO.
9. ALL WORK SHALL CONFORM TO MOST CURRENT VERSION
OF APPLICABLE CODES AND STANDARDS INCLUDING THE
INTERNATIONAL BUILDING CODE, VA MASTER
SPECIFICATIONS, AND LATEST ADOPTED NFPA.
10. THE GENERAL CONTRACTOR SHALL NOTIFY THE
CONTRACT OFFICER, CONTRACTING OFFICER'S
REPRESENTATIVE, AND ARCHITECT OF ANY
DISCREPANCIES BETWEEN THE DRAWINGS, NOTES, AND
ACTUAL FIELD CONDITIONS BEFORE BIDDING AND
COMMENCING ANY WORK, AND REQUEST CLARIFICATION
IN WRITING.
11. WHEN UNANTICIPATED ARCHITECTURAL, STRUCTURAL,
MECHANICAL, ELECTRICAL, PLUMBING, TECHNOLOGY, ETC.
ELEMENTS CONFLICTING WITH THE INTENDED FUNCTION
OR DESIGN ARE ENCOUNTERED, INVESTIGATE AND
MEASURE THE CONFLICTS NATURE AND EXTENT. SUBMIT
A WRITTEN REPORT TO THE CONTRACT OFFICER.
12. WHERE MOUNTING HEIGHTS ARE NOT INDICATED, INSTALL
COMPONENTS USING MANUFACTURER'S OR INDUSTRY
STANDARDS. WHERE STANDARDS DO NOT EXIST, NOTIFY
THE ARCHITECT FOR CLARIFICATION.
13. CONTRACTOR SHALL NOT BARRICADE/BARRIER
EMERGENCY EGRESS TO OR FROM THIS AREA.
CONTRACTOR SHALL MAINTAIN EXIT TO EXTERIOR DURING
THE WORK PROGRESS.
14. PROVIDE ACCESS TO THE WORK AS DIRECTED BY THE
CONTRACTING OFFICER REPRESENTATIVE. SECURE
ACCESS POINT AS SPECIFIED AND DIRECTED BY THE
CONTRACTING OFFICER REPRESENTATIVE PROJECT
ENGINEER. PROVIDE WALK-OFF MATS TO MEET FACILITY
INFECTION CONTROL GUIDELINES AT EACH REQUIRED
ACCESS POINT.
15. ALL EXISTING WALL MOUNTED ITEMS AND DEVICES ARE
TO BE REMOVED PRIOR TO DEMOLITION WORK, FULLY
REFURBISHED, AND REINSTALLED IN THE NEW WALL
ASSEMBLY. LOCATION TO BE VERIFIED BY CONTRACTING
OFFICER REPRESENTATIVE. ITEMS MAY INCLUDE: DOOR
STOPS, HAND SANITIZER DISPENSERS, FIRE STROBES,
SWITCHES, ELECTRIC COVER PLATES, FIRE ALARM PULL
BOXES, ELECTRIC OUTLETS, SIGNAGE, BULLETIN BOARDS,
MILLWORK, CARD READERS, CLOCK, DATA OUTLET, PUSH
BUTTON, FIRE CONTROL BOX, PHONE, ETC.
16. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
LEGAL DISPOSAL OF ALL DEBRIS.
17. OWNER SHALL HAVE THE RIGHT OF FIRST REFUSAL ON
ITEMS INDICATED TO BE SALVAGED.
18. EXISTING SPRAYED-ON FIREPROOFING SHALL BE
MAINTAINED THROUGH THE DURATION OF CONSTRUCTION
ACTIVITIES AND THE CONTRACTOR SHALL REPAIR ANY
COMPROMISE OF EXISTING FIREPROOFING.
19. BUILDINGS WILL BE OCCUPIED AT ALL TIMES THROUGH
THE DURATION OF CONSTRUCTION.
DIMENSIONING CONVENTIONS
ALIGN
DIMENSION,
WHEN OCCURS
5. WHERE OPENINGS IN WALLS (INTERIOR WINDOWS OR
DOORS) ARE NOT DIMENSIONED BUT SHOWN AS BEING
CENTERED IN A GIVEN WALL SURFACE. LOCATE OPENINGS
AS GRAPHICALLY REPRESENTED.
MATERIAL GRAPHICS
CONCRETE
EARTH
BASE COURSE
BATT INSULATION
RIGID INSULATION
N
GI-010
GENERAL INFORMATION,
SYMBOLS, & LOCATION MAP
1/3-AE-101
SHEET NUMBER
DRAWING NUMBER
ON SHEET BY
LOCATION
1/3-A101
3-AE-100BUILDING
NUMBER
( IF APPLICABLE)
DISCIPLINE
SHEET NUMBER
1. EXCEPT WHERE DIRECTED TO PLACE WORK ITEMS AT THE
"APPROXIMATE LOCATION SHOWN." DO NOT SCALE
DRAWINGS FOR DIMENSIONAL INFORMATION.
2. ALL ELEMENTS OF THE DOCUMENTS MAY NOT BE DRAWN
TO EXACT SCALE. DIMENSIONS REQUESTED ARE SHOWN
(OR DERIVED FROM THOSE SHOWN OR NOTED) ON FLOOR
PLANS, DETAIL PLANS, ELEVATIONS, SECTIONS,
SCHEDULES, CONFIGURATION DETAILS, AND
SPECIFICATIONS. SEE THE NOTES BELOW AND SYMBOLS
FOR DIMENSIONING CONVENTIONS.
3. EXCEPT WHERE SPECIFICALLY NOTED TO THE CONTRARY,
ALL DIMENSIONS SHOWN ON THE ARCHITECTURAL
DRAWINGS CONFORM TO THE FOLLOWING CONVENTIONS.
A. MEASURED FROM FACE OF PARTITION ASSEMBLY:
FACE OF PARTITION ASSEMBLY (EXCLUSIVE OF
APPLIED FINISHES HAVING THICKNESS WHICH MAY BE
ADDED TO SUCH WALL) AS DEFINED BY THE
PARTITION SCHEDULE. UNLESS NOTED AS "FACE OF
FINISH" OR "CLEAR" DIMENSION, DIMENSIONS ARE NOT
MEASURED TO THE FACE OF APPLIED FINISH BUT
RATHER TO THE FACE OF CORE STRUCTURE (STUD,
CMU, ETC.). REFER TO EACH PARTITION TYPES
THICKNESS.
B. DIMENSIONS UTILIZING "CENTERLINE" SYMBOL ARE
MEASURED TO:
CENTERLINE OF PARTITION ASSEMBLY (EXCLUSIVE OF
ANY APPLIED FINISHES HAVING THICKNESS WHICH
MAY BE ADDED TO SUCH WALLS) AT PARTITIONS
FRAMED WITH METAL STUDS. REFER TO "PARTITION
SCHEDULE" TO DETERMINE EACH PARTITION TYPES
THICKNESS.
CENTERLINE OF DOOR, WINDOW, OR LOUVER
OPENING.
CENTERLINE OF OTHER FEATURES AS INDICATED.
C. WHERE "EQUAL" DIMENSIONS USED ON REFLECTED
CEILING PLANS TO LOCATE CEILING GRID WORK
POINTS, MEASURE DIMENSIONS TO:
EDGE OF INDICATED CEILING AT THE FACE OF THE
ADJACENT APPLIED FINISH MEASURED AT THE
CEILING PLANE.
CAUTION: DUE TO THE POSSIBLE APPLICATION OF
APPLIED FINISHES - THICKNESS WHICH MAY VARY
BETWEEN FLOOR AND CEILING AND NOT ACCOUNTED
FOR (EXCEPT AS INDICATED BY "FACE OF FINISH" OR
"CLEAR") BY THE DIMENSION SHOWN ON FLOOR
PLANS - THE CONTRACTOR MUST ADJUST THE FLOOR
PLAN DIMENSIONS TO REFLECT ACTUAL DIMENSIONS
FOUND AT THE CEILING PLANE.
4. WHERE WALLS AND/OR PARTITIONS OF UNEQUAL
THICKNESS ABUT, ALIGN EXPOSED FACES, UNLESS
OTHERWISE NOTED.
C
1/AS-101
L
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
FULLY SPRINKLERED
593-CSI-313
3/20/2026
65% DESIGN
DEVELOPMENT
RENOVATE RADIOLOGY
SPACE
6900 N. Pecos Road North Las Vegas, NV 89086
INTERIM REVIEW
DOCUMENTS
These documents are preliminary and are only for review. They are not to be submitted for regulatory review, permitting, and/or construction.
RICHARD DERAS
Seal # 23365 03/20/2026
SITE MAP
N
LOCATION MAP
REFER TO AE-100 FOR LOCATION ON GROUND FLOOR
TYPE
DRAFT
1 RADIOLOGY FLOOR PLAN AEEA - CODE REVIEW
SCALE: 1/8" = 1'-0"
DEXA
1D141
201 SF
DOSE
ADMIN
1D140
112 SF
HOT
LAB
1D139
220 SF
SPEC CT-3
1D144
380 SF
SPEC-CT-1
1D114
372 SF
SPEC CT-2
1D118
542 SF THYROID
UPTAKE
1D119
57 SF
OFFICE
1D147
90 SF
CARDIAC
STRESS
1D146
226 SF
X-RAY 2
1D152
326 SF
X-RAY 2
1D158
326 SF
CORR.
1D137
- SF
CONTROL
1D153
- SF
VASC.
ULTRASOUND
1D145
180 SF
HOT
WAIT
1D142
CORRIDOR
C1-75
C O
R R
ID
O
R C
1-
PATIENT
TOILET
1D154
50 SF
DRESS
1D156
42 SF
STAFF
TOILET
1D136
44 SF
R/F 1D122
- SF
PATIENT
TOILET
1D123
50 SF
EL
EC
1D
- S F
EL
EC
1D
- S F
EL
EC
1D
- S F
PATIENT
TOILET
1D148
63 SF
CORRIDOR
C1-84
CORRIDOR
C1-80
PATIENT
TOILET
1D116
52 SF
DRESS
1D115
35 SF
ULTRASOUND
1D117
152 SF
ULTRASOUND
1D121
152 SF
PATIENT
TOILET
1D117A
61 SF
QC
1D134
- SF
DRESS
1D150
44 SF
STORAGE
1D120
90 SF
CORRIDOR
C1-71
CORRIDOR
C1-72
PIPE RISERS
1D105
CORRIDOR
C1-85A
PATIENT
TOILET
1D121A
RESIDENT
VIEWING
1D125
PATIENT
TOILET
1D127A
ULTRASOUND
1D127
PRINTER
ALCOVE
1D126
STAFF
LOUNGE
1D128
PET
F EW
AY
PET
INDUCTION
1D163
PHYS. OFFICE
1D157
PHYS. OFFICE
1D159
PATIENT
TOILET
1D131
ULTRASOUND
1D129
ELEVATOR
LOBBY
C1-85
ELEVATOR
P-7
ELEVATOR
P-4WAITING
1D107
RECEPTION
1D108
ADMIN. ASSIST
1D110
CHIEF'S
OFFICE
1D112C
O R
R
ID
O R
C 1-
CHIEF
TECHNICIAN
1D111
AO OFFICE
1D109
FACILITIES
SYSTEMS
1D104
IT TELECOM
1D103
VE
ST
IB
U
LE
1D
ELECTRICAL
ROOM
1D101
STAIR
G
H
J
10 10.2 10.3 11 11.2 12 12.2 12.6 13
START
GI-011
CODE SUMMARY
RD
RD
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
FULLY SPRINKLERED
593-CSI-313
3/20/2026
65% DESIGN
DEVELOPMENT
RENOVATE RADIOLOGY
SPACE
6900 N. Pecos Road North Las Vegas, NV 89086
INTERIM REVIEW
DOCUMENTS
These documents are preliminary and are only for review. They are not to be submitted for regulatory review, permitting, and/or construction.
RICHARD DERAS
Seal # 23365 03/20/2026
SCALE: NOT TO SCALE
RADIOLOGY
LAB
GENERAL NOTES
KEYED NOTES
1. EXISTING FIRE EXTINGUISHER TO REMAIN.
KEY PLAN
LEGEND
EXISTING TO REMAIN - U.O.N.
PROJECT LIMITS
EXISTING SMOKE PARTITION
(WALL TYPE A) WITH ONE
LAYER OF 5/8" GYP. BD ON
BOTH SIDES OF METAL STUD
WALL.
NEW SMOKE PARTITION (WALL
TYPE A) WITH ONE LAYER OF
5/8" GYP. BD ON BOTH SIDES OF
METAL STUD WALL.
NEW CONSTRUCTION
A. RENOVATION SCOPE OF WORK TO BE PHASED.
REFER TO GI-012 PHASING DRAWINGS IN THIS
SET FOR ADDITIONAL INFORMATION.
B. REFER TO SHEET AE-013 FOR INFECTION
CONTROL RISK ASSESSMENT (ICRA) PLANS
AND OWNER FOR ADDITIONAL INFORMATION
AND DIRECTIVES.
C. REFER TO SHEET AS-100 FOR CONTRACTOR
PATH TO CONSTRUCTION SITE.
OCCUPANT SQ. FT.
HEALTHCARE (B) 4,533
STORAGE (S) 58
TOTAL SF 4,591
INDICATES DEAD END OR
COMMON PATHS
EXIT ACCESS TRAVEL DISTANCE
(TABLE 1017.2)
OCCUPANT LOAD S.F. & LEGEND
EXISTING BUILDING AREA (NOT
IN SCOPE OF WORK)
EXIT SEPARATION RE:
SECTION 1007
START
FEC
EXISTING
SEMI-RECESSED FIRE
EXTINGUISHERS CABINETS
FIRE RESISTANCE RATINGS
EXIT ACCESS REQUIREMENTS
INTERIOR FINISHES
PLUMBING FIXTURE COUNTS
OCCUPANT LOAD
CHAP. 6
CHAP. 10
CHAP. 8
CHAP. 29
CODE SUMMARY TABLE
USE AND OCCUPANCY CLASSIFICATION
APPLICABLE CODES
CHAP. 3
PROJECT SUMMARY
ADDITIONAL APPLICABLE CODE INFORMATION PER SOW
PROJECT AREA LIMITS IN
RADIOLOGY LAB SPACE
2 HOUR FIRE/SMOKE RATED
WALL
TRUE
NORTH
PLAN
NORTH
DRAFT
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-5
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-6
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1-87
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1-70
AutoCAD SHX Text
PRIVATE
AutoCAD SHX Text
CONSULT
AutoCAD SHX Text 1D313
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
PROCUREMENT
AutoCAD SHX Text
PHARMACIST
AutoCAD SHX Text
UP
AutoCAD SHX Text
TO 2ND FLOOR
AutoCAD SHX Text
DOWN
AutoCAD SHX Text
TO BASEMENT
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text 14.2
AutoCAD SHX Text 9.7
AutoCAD SHX Text
MEANS OF EGRESS
AutoCAD SHX Text
EGRESS WIDTH
AutoCAD SHX Text
BUSINESS (B)
AutoCAD SHX Text
MINIMUM EXITS (NUMBER)
AutoCAD SHX Text
MINIMUM CORRIDOR WIDTH (INCHES)
AutoCAD SHX Text
MINIMUM EXIT SEPARATION (FEET)
AutoCAD SHX Text
MAXIMUM DEAD ENDS
AutoCAD SHX Text
MAXIMUM COMMON PATH OF EGRESS TRAVEL
AutoCAD SHX Text
MAXIMUM FLAME-SPREAD CLASS
AutoCAD SHX Text
ROOMS AND ENCLOSED SPACES
AutoCAD SHX Text
OCCUPANCY
AutoCAD SHX Text
STORAGE (S)
AutoCAD SHX Text
NO CHANGE
AutoCAD SHX Text
REMARKS
AutoCAD SHX Text
FACTOR (SFPP)
AutoCAD SHX Text
OCCUPANT LOAD
AutoCAD SHX Text 0.15
AutoCAD SHX Text
REMARKS
AutoCAD SHX Text
REMARKS
AutoCAD SHX Text
MINIMUM UNITS/ REQUIRE
AutoCAD SHX Text
PROVIDED UNITS
AutoCAD SHX Text
FACTOR (IPP)
AutoCAD SHX Text
NO CHANGES PER THIS PROJECT'S SCOPE OF WORK
AutoCAD SHX Text
TABLE 1006.3.3
AutoCAD SHX Text
TABLE 1020.3
AutoCAD SHX Text
SECTION 1007
AutoCAD SHX Text
SECTION 1020.4
AutoCAD SHX Text
TABLE 1006.3.4(2)
AutoCAD SHX Text
TABLE 1004.5
AutoCAD SHX Text
TABLE 1005.3.2
AutoCAD SHX Text
SECTION OR TABLE
AutoCAD SHX Text
TABLE 803.13
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text
FLAME SPREAD INDEX 26-75 SMOKE DEVELOPED INDEX 0-450
AutoCAD SHX Text
FLAME SPREAD INDEX 26-75 SMOKE DEVELOPED INDEX 0-450
AutoCAD SHX Text
FLAME SPREAD INDEX 76-200 SMOKE DEVELOPED INDEX 0-450
AutoCAD SHX Text
EXIT ACCESS TRAVEL DISTANCE (MAXIMUM)
AutoCAD SHX Text
TABLE 1017.2
AutoCAD SHX Text
NO CHANGES
AutoCAD SHX Text
OCCUPANT LOAD
AutoCAD SHX Text
PERMIT REVIEW
AutoCAD SHX Text
OKLAHOMA CITY VA MEDICAL CENTER
AutoCAD SHX Text
DISCIPLINE
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
FIRE
AutoCAD SHX Text
ACCESSIBILITY
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
PLUMBING
AutoCAD SHX Text
FUEL
AutoCAD SHX Text
ENERGY
AutoCAD SHX Text
USE GROUP
AutoCAD SHX Text
STORAGE (S)
AutoCAD SHX Text
SECTION 304
AutoCAD SHX Text
CITY
AutoCAD SHX Text
STATE
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
TITLE
AutoCAD SHX Text
EDITION
AutoCAD SHX Text
SECTION OR TABLE
AutoCAD SHX Text
NOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
IB
AutoCAD SHX Text
SPRINKLERED
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
AREA (SF)
AutoCAD SHX Text
IEBC CATAGORY
AutoCAD SHX Text
HEALTHCARE (BUSINESS B)
AutoCAD SHX Text
AMERICAN BARRIERS ACT ACCESSIBILITY STANDARDS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INTERNATIONAL BUILDING CODE
AutoCAD SHX Text
INTERNATIONAL EXISTING BUILDING CODE
AutoCAD SHX Text
NFPA 101 LIFE SAFETY CODE
AutoCAD SHX Text
INTERNATIONAL MECHANICAL CODE
AutoCAD SHX Text
NATIONAL ELECTRICAL CODE
AutoCAD SHX Text
INTERNATIONAL PLUMBING CODE
AutoCAD SHX Text
INTERNATIONAL FUEL GAS CODE
AutoCAD SHX Text
INTERNATIONAL ENERGY CONSERVATION CODE
AutoCAD SHX Text
NORTH LAS VEGAS
AutoCAD SHX Text
OKLAHOMA
AutoCAD SHX Text
NEVADA
AutoCAD SHX Text
INTERIOR EXIT STAIRWAYS AND RAMPS AND EXIT PASSAGEWAYS
AutoCAD SHX Text
CORRIDORS AND ENCLOSURE FOR EXIT ACCESS STAIRWAYS AND RAMPS
AutoCAD SHX Text
INTERIOR
AutoCAD SHX Text
TOTALS
AutoCAD SHX Text
REQUIRED
AutoCAD SHX Text
PROVIDED
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text
BARRIER FREE DESIGN GUIDE (PG-18-13)
AutoCAD SHX Text 01/01/2017
AutoCAD SHX Text
REV 06/01/24
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REMARKS (TESTED IN ACCORDANCE WITH ASTM E84 AND UL 723)
AutoCAD SHX Text
HEALTHCARE (B)
AutoCAD SHX Text
SQUARE FOOTAGE
AutoCAD SHX Text
REQUIRED
AutoCAD SHX Text
PROVIDED IPP / O.L.
AutoCAD SHX Text
NO CHANGES
AutoCAD SHX Text
NO CHANGE
AutoCAD SHX Text
NO CHANGES
AutoCAD SHX Text THE PLUMBING FIXTURE COUNT IS EXISTING AND PART OF THE OVERALL HOSPITAL BUILDING CORE DESIGN. NO CHANGES TO THE EXISTING HOSPITAL CORE TOILETS IS PART OF THIS PROJECT'S SCOPE OF WORK. SCOPE OF WORK INCLUDES THE REMOVAL, ADDITION AND/OR RELOCATION OF FIXTURES IN THE AREA OF THE PROJECT AS REQUIRED FOR THE FACILITY. REFER TO DEMOLITION PLANS AND REVISED FLOOR PLANS FOR LOCATIONS.
AutoCAD SHX Text
ALTERATION LEVEL 2
AutoCAD SHX Text
INTERNATIONAL FIRE CODE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NFPA NATIONAL FIRE CODES
AutoCAD SHX Text
AutoCAD SHX Text THE A/E SHALL INCORPORATE, BUT NOT BE LIMITED TO REFERENCES FOR DESIGN, AVAILABLE AT HTTP://WWW.CFM.VA.GOV/TIL/SPEC.ASP OR FROM THE PROJECT ENGINEER, AS APPLICABLE: 1. CONSTRUCTION CRITERIA BASE OR WHOLE BUILDING DESIGN GUIDE CONSTRUCTION CRITERIA BASE OR WHOLE BUILDING DESIGN GUIDE 2. VA MEDICAL CENTER DESIGN STANDARDS VA MEDICAL CENTER DESIGN STANDARDS 3. SITE SPECIFIC SPECIFICATIONS SITE SPECIFIC SPECIFICATIONS 4. VA DESIGN GUIDES/DESIGN MANUALS VA DESIGN GUIDES/DESIGN MANUALS 5. VA MASTER SPECIFICATIONS VA MASTER SPECIFICATIONS 6. VHA NATIONAL CAD STANDARDS AND DETAILS VHA NATIONAL CAD STANDARDS AND DETAILS 7. USP CODES USP CODES 8. STATE AND FEDERAL REGULATIONS STATE AND FEDERAL REGULATIONS 9. ASHRAE STANDARDS ASHRAE STANDARDS 10. NFPA AND LIFE SAFETY CODE NFPA AND LIFE SAFETY CODE 11. VA SPACE CRITERIAVA SPACE CRITERIA
AutoCAD SHX Text
AutoCAD SHX Text THE VA SOUTHERN NEVADA HEALTHCARE SYSTEM (VASNHS) REQUIRES THE SERVICES OF A QUALIFIED ARCHITECT / ENGINEER (A/E) FIRM TO PROVIDE DESIGN SERVICES ALLOWING FOR THE PHASED IMPROVEMENTS AND REMODEL FOR NEW SPEC CT EQUIPMENT AND RELOCATION OF EXISTING EQUIPMENT FOR THE RADIOLOGY DEPARTMENT. THIS PROJECT WILL BE LIMITED TO THE RENOVATION OF THE RADIOLOGY DEPARTMENT PATIENT SERVICE AREA FOR THE SPEC CT, X-RAY, CARDIAC STRESS, ULTRASOUND, DEXA, DOSE ADMIN, HOT LAB, THYROID UPTAKE, AND THE ADJACENT AUXILIARY ROOMS. REFER TO THE DEMO AND REVISEWD PLANS FOR PROJECT LIMITS. ADDITIONAL LOCATIONS FOR THIS SCOPE OF WORK WILL INCLUDE ELECTRICAL AND MECHANICAL ROOMS THAT SERVICE THE RADIOLOGY DEPARTMENT.
AutoCAD SHX Text THE FIRE RESISTANCE RATINGS ARE EXISTING TO REMAIN. REFER TO REVISED AREAS OF FLOOR PLAN FOR MODIFICATIONS TO EXISTING PARTITIONS INCLUDED IN THIS PROJECT'S SCOPE OF WORK.
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
NONE
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
NO CHANGES
AutoCAD SHX Text 300'
AutoCAD SHX Text 84'
AutoCAD SHX Text 44"
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
NO CHANGES
AutoCAD SHX Text 30'
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text SCOPE OF WORK TO INCLUDE THE PATCH, REPAIR AND INSTALL OF FINISHES TO MATCH EXISTING CONDITIONS. REFER TO FINISH PLAN ON SHEET AE-400 FOR NEW FINISHES.
AutoCAD SHX Text
AutoCAD SHX Text 4,533
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
NO CHANGE
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text 4,591
AutoCAD SHX Text 4,591 SF FOR THIS PROJECT SOW AREA. (TOTAL RADIOLOGY LAB AREA SQUARE FOOTAGE IS 10,993.)
AutoCAD SHX Text
CONSTRUCTION TYPE
AutoCAD SHX Text
ADDITIONAL USE GROUPS
1 10
HOT
WAIT
1D142
CORRIDOR
C1-75
C O
R R
ID
O
R C
1-
STAFF.
CORR.
1D153
PATIENT
TOILET
1D154
THYROID
UPTAKE
1D150
DRESS
1D156
STAFF
TOILET
1D136
R/F 1D122
DRESS
1D124
PATIENT
TOILET
1D123
EL
EC
1D
EL
EC
1D
EL
EC
1D
PATIENT
TOILET
1D148
CORRIDOR
C1-84
CORRIDOR
C1-80
PATIENT
TOILET
1D116
DRESS
1D115
ULTRASOUND
1D117
ULTRASOUND
1D121
PATIENT
TOILET
1D117AHOT
LAB
1D143
DOSE
ADMIN.
1D141
OFFICE
1D145
RADIOLOGY
1D145
CARDIAC
STRESS
1D144
BONE
DENS.
1D140
CHEST
X-RAY
1D139
INJ
ROOM
1D147
CARDIAC
IMAGING
1D146
GAMMA
IMAGING
1D152
GAMMA
IMAGING
1D158
TECH. WORK
SUPP. ALCOVE
1D137
QC
1D134
PATIENT
TOILET
1D119
DRESS
1D120
RADIOLOGY
1D114
OR
CORRIDOR
C1-72
PIPE RISERS
1D105
CORRIDOR
C1-85A
PATIENT
TOILET
1D121A
RESIDENT
VIEWING
1D125
PATIENT
TOILET
1D127A
ULTRASOUND
1D127
PRINTER
ALCOVE
1D126
STAFF
LOUNGE
1D128
PHYS. OFFICE
1D157
PATIENT
TOILET
VE
S 1
10 10.2 10.3 11 11.2 12 12.2 12.6 13
G
H
J
CONTRACTOR SECURE ENTRY/EXIT
CONTRACTOR SECURE
ENTRY/EXIT
NOTICE TO
PROCEED
REMOVE EXISTING
EQUIPMENT/FURNTURE
ICRA ISOLATE
WORK AREA PER
PHASE
DEMO WALLS,
CEILING, FINISHES,
DOORS, WINDOWS,
ETC,
REMOVE SHIELDING IN
WALLS, DOOR,
WINDOWS, ETC.
(IF REQUIRED)
INSTALL NEW
EQUIPMENT
REMOVE
ICRA
BARRIERS
PROCEED
TO NEXT
PHASE
INSTALL NEW DOORS,
WINDOWS FINISHES AND
CEILING
INSTALL NEW
UTILITIES
CONSTRUCT
NEW WALLS
NOTE: THIS CRITICAL PATH METHOD IS A TYPICAL PATH AND APPLIES TO EACH PHASE.
DEXA
1D141
DOSE
ADMIN
1D140
HOT
LAB
1D139
SPEC CT-3
1D144
SPEC-CT-1
1D114
SPEC CT-2
1D118
THYROID
UPTAKE
1D119
OFFICE
1D147
CARDIAC
STRESS
1D146
X-RAY 2
1D152
X-RAY 2
1D158
CORR.
1D137
CONTROL
1D153
VASC.
ULTRASOUND
1D145
HOT
WAIT
1D142
CORRIDOR
C1-75
C O
R R
ID
O
R C
1-
PATIENT
TOILET
1D154
DRESS
1D156
STAFF
TOILET
1D136
R/F 1D122
PATIENT
TOILET
1D123
EL
EC
1D
EL
EC
1D
EL
EC
1D
PATIENT
TOILET
1D148
CORRIDOR
C1-84
CORRIDOR
C1-80
PATIENT
TOILET
1D116
DRESS
1D115
ULTRASOUND
1D117
ULTRASOUND
1D121
PATIENT
TOILET
1D117A
QC
1D134
DRESS
1D150
STORAGE
1D120
RRIDOR
1-71
CORRIDOR
C1-72
PIPE RISERS
1D105
CORRIDOR
C1-85A
PATIENT
TOILET
1D121A
RESIDENT
VIEWING
1D125
PATIENT
TOILET
1D127A
ULTRASOUND
1D127
PRINTER
ALCOVE
1D126
STAFF
LOUNGE
1D128
PHYS. OFFICE
1D157
PATIENT
TOILET
VE
S 1
G
H
J
10.2 10.3 11 11.2 12 12.2 12.6 13
3 8
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
FULLY SPRINKLERED
593-CSI-313
3/20/2026
65% DESIGN
DEVELOPMENT
RENOVATE RADIOLOGY
SPACE
6900 N. Pecos Road North Las Vegas, NV 89086
INTERIM REVIEW
DOCUMENTS
These documents are preliminary and are only for review. They are not to be submitted for regulatory review, permitting, and/or construction.
RICHARD DERAS
Seal # 23365 03/20/2026
GI-012
ICRA / PHASING PLAN -
PHASE 1
RD
RDD
NEW CONSTRUCTION
LEGEND - ALL PHASES
EXISTING TO REMAIN
PROJECT LIMITS
EXISTING TO BE DEMOED
SCREENED AREA INDICATES
AREA IN THIS PHASE AND
UNDER CONTRUCTION.
TEMPORARY PARTITION
DISPOSABLE WALK OFF MATT ATTACHED TO FLOOR.
NEGATIVE AIR MACHINE MAINTAIN PRESSURE IN ROOM 24/7 FOR
DURATION OF WORK.PROVIDE PRACTICE COUNTER TO MEASURE
AIR BEING DISCHARGED.
NEW FLEX DUCT BELOW CEILING ATTACHED TO T-BAK GRID AT 6'0"
O.C. FROM ROOMS TO HEPA FILTERED EXHAUST LOCATION ON
LEVEL 1.
CONSTRUCTION THIS AREA IS PER LEVEL 4 PRECAUTIONS,
ACTIVITY LEVEL C ON VHA FORMS.
NEW 12"X24" TEMPORARY OPENING AT WALL. PROVIDE FUSABLE
LINK FIRE DAMPER. PATCH AND REPAIR WALL TO MATCH EXISTING
CONDITIONS.
DOOR TO REMAIN CLOSED AND SEALED UNTIL REMOVED.
NEW FLEX DUCT BELOW CEILING TO GO UP ABOVE CEILING WALL
CONTRACTOR SECURED ENTRY/EXIT WITH WALK OFF MATS ON
BOTH SIDES OF DOORS.
THIS ROOM IS FOR STAGING ONLY. CONSULT WITH CLIENT FOR
DIRECTIVE.
TEMPORARY WALLS PER OWNER ICRA REQUIREMENTS
PROVIDED BY CONTRACTOR.
EXIT COMPLAIN TEMPORARY POWER PER CLIENT ICRA
REQUIRMENTS PROVIDED BY CONTRACTOR.
KEYED NOTES
1 DEMO FLOOR PLAN
SCALE: 1/8" = 1'-0" 2 NEW FLOOR PLAN
SCALE: 1/8" = 1'-0"
3 TYPICAL CONTRACTOR SECURE/ENTRY
SCALE: 1/8" = 1'-0"
TRUE
NORTH
PLAN
NORTH
A. ICRA CLASSIFICATION FOR THIS PROJECT IS CLASS 4.
B. THE ENTRY/EXITS TO WORK AREA SHOULD BE NEGATIVE
PRESSURE.
C. REFER TO SPECIFICATIONS FOR HOSPITAL STANDARDS ICRA
REQUIREMENTS.
D. REFER TO CONSULTANTS DRAWINGS IN THIS SET FOR
SCOPE OF WORK PER EACH PHASE.
GENERAL NOTES
PHASE 1:
A. ROOM 1D114
1. DEINSTALL YSIO MAX XRAY ROOM 1
2. REMOVE DOOR FROM 1D116 TO 1D114 (NO ACCESS)
3. RELOCATE DOOR CONNECTING 1D114 AND HALLWAY
4. MOVE TECH CONTROL STATION TO OPPOSITE WALL
a. CONTROL WORKSTATION LEAD LINED DIVIDER &
WINDOW
b. ADD LEAD LINED, WINDOWED DOOR BETWEEN
TECH CONTROL AREA AND 1D114
c. OPEN WALL BEHIND TECH CONTROL AREA TO
NEW 1D114 TECH DOOR
5. ADDITIONAL SITE PREP AS NEEDED FOR SPEC-CT
INSTALLATION
6. INSTALL NEW SPEC-CT
B. ROOM 1D158
1. DEINSTALL PHILIPS BRIGHTVIEW SPEC-CT (DISPOSAL)
2. SITE PREP FOR NEW XRAY SYSTEM
a.. LEAD LINING FOR WALLS & DOORS PER
PHYSICIST SPECIFICATIONS
B. CONTROL WORKSTATION LEAD LINED DIVIDER &
WINDOW
C. INSTALL TECHNICIAN DOOR FROM ROOM TO
RADIOLOGY TECH HALLWAY
D. RELOCATE EXISTING SINK OUT OF ENTRYWAY
TO BACK WALL
3. INSTALL NEW XRAY SYSTEM
PHASE 1 NARRATIVE
TRUE
NORTH
PLAN
NORTH
4 TYPICAL CRITICAL PATH METHOD FOR EACH PHASE
DRAFT
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1-87
AutoCAD SHX Text
UP
AutoCAD SHX Text
TO 2ND FLOOR
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1-87
AutoCAD SHX Text
UP
AutoCAD SHX Text
TO 2ND FLOOR
HOT
WAIT
1D142
CORRIDOR
C1-75
C O
R R
ID
O
R C
1-
STAFF.
CORR.
1D153
PATIENT
TOILET
1D154
THYROID
UPTAKE
1D150
DRESS
1D156
STAFF
TOILET
1D136
R/F 1D122
DRESS
1D124
PATIENT
TOILET
1D123
EL
EC
1D
EL
EC
1D
EL
EC
1D
PATIENT
TOILET
1D148
CORRIDOR
C1-84
CORRIDOR
C1-80
PATIENT
TOILET
1D116
DRESS
1D115
ULTRASOUND
1D117
ULTRASOUND
1D121
PATIENT
TOILET
1D117AHOT
LAB
1D143
DOSE
ADMIN.
1D141
OFFICE
1D145
RADIOLOGY
1D145
CARDIAC
STRESS
1D144
BONE
DENS.
1D140
CHEST
X-RAY
1D139
INJ
ROOM
1D147
CARDIAC
IMAGING
1D146
GAMMA
IMAGING
1D152
GAMMA
IMAGING
1D158
TECH. WORK
SUPP. ALCOVE
1D137
QC
1D134
PATIENT
TOILET
1D119
DRESS
1D120
RADIOLOGY
1D114
RRIDOR
1-71
CORRIDOR
C1-72
PIPE RISERS
1D105
CORRIDOR
C1-85A
PATIENT
TOILET
1D121A
RESIDENT
VIEWING
1D125
PATIENT
TOILET
1D127A
ULTRASOUND
1D127
PRINTER
ALCOVE
1D126
STAFF
LOUNGE
1D128
PHYS. OFFICE
1D157
PATIENT
TOILET
VE
S 1
G
H
J
10 10.2 10.3 11 11.2 12 12.2 12.6 13
DEXA
1D141
DOSE
ADMIN
1D140
HOT
LAB
1D139
SPEC CT-3
1D144
SPEC-CT-1
1D114
SPEC CT-2
1D118
THYROID
UPTAKE
1D119
OFFICE
1D147
CARDIAC
STRESS
1D146
X-RAY 2
1D152
X-RAY 2
1D158
CORR.
1D137
CONTROL
1D153
VASC.
ULTRASOUND
1D145
HOT
WAIT
1D142
CORRIDOR
C1-75
C O
R R
ID
O
R C
1-
PATIENT
TOILET
1D154
DRESS
1D156
STAFF
TOILET
1D136
R/F 1D122
PATIENT
TOILET
1D123
EL
EC
1D
EL
EC
1D
EL
EC
1D
PATIENT
TOILET
1D148
CORRIDOR
C1-84
CORRIDOR
C1-80
PATIENT
TOILET
1D116
DRESS
1D115
ULTRASOUND
1D117
ULTRASOUND
1D121
PATIENT
TOILET
1D117A
QC
1D134
DRESS
1D150
STORAGE
1D120
RRIDOR
1-71
CORRIDOR
C1-72
PIPE RISERS
1D105
CORRIDOR
C1-85A
PATIENT
TOILET
1D121A
RESIDENT
VIEWING
1D125
PATIENT
TOILET
1D127A
ULTRASOUND
1D127
PRINTER
ALCOVE
1D126
STAFF
LOUNGE
1D128
PHYS. OFFICE
1D157
PATIENT
TOILET
VE
S 1
G
H
J
10.2 10.3 11 11.2 12 12.2 12.6 13
NEW CONSTRUCTION
LEGEND - ALL PHASES
EXISTING TO REMAIN
PROJECT LIMITS
EXISTING TO BE DEMOED
SCREENED AREA INDICATES
AREA IN THIS PHASE AND
UNDER CONTRUCTION.
TEMPORARY PARTITION
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
FULLY SPRINKLERED
593-CSI-313
3/20/2026
65% DESIGN
DEVELOPMENT
RENOVATE RADIOLOGY
SPACE
6900 N. Pecos Road North Las Vegas, NV 89086
INTERIM REVIEW
DOCUMENTS
These documents are preliminary and are only for review. They are not to be submitted for regulatory review, permitting, and/or construction.
RICHARD DERAS
Seal # 23365 03/20/2026
GI-013
ICRA / PHASING PLAN -
PHASE 2
RD
RDD
DISPOSABLE WALK OFF MATT ATTACHED TO FLOOR.
NEGATIVE AIR MACHINE MAINTAIN PRESSURE IN ROOM 24/7 FOR
DURATION OF WORK.PROVIDE PRACTICE COUNTER TO MEASURE
AIR BEING DISCHARGED.
NEW FLEX DUCT BELOW CEILING ATTACHED TO T-BAK GRID AT 6'0"
O.C. FROM ROOMS TO HEPA FILTERED EXHAUST LOCATION ON
LEVEL 1.
CONSTRUCTION THIS AREA IS PER LEVEL 4 PRECAUTIONS,
ACTIVITY LEVEL C ON VHA FORMS.
NEW 12"X24" TEMPORARY OPENING AT WALL. PROVIDE FUSABLE
LINK FIRE DAMPER. PATCH AND REPAIR WALL TO MATCH EXISTING
CONDITIONS.
DOOR TO REMAIN CLOSED AND SEALED UNTIL REMOVED.
NEW FLEX DUCT BELOW CEILING TO GO UP ABOVE CEILING WALL
CONTRACTOR SECURED ENTRY/EXIT WITH WALK OFF MATS ON
BOTH SIDES OF DOORS.
THIS ROOM IS FOR STAGING ONLY. CONSULT WITH CLIENT FOR
DIRECTIVE.
KEYED NOTES
1 DEMO FLOOR PLAN
SCALE: 1/8" = 1'-0" 2 NEW FLOOR PLAN
SCALE: 1/8" = 1'-0"
A. ICRA CLASSIFICATION FOR THIS PROJECT IS CLASS 4.
B. THE ENTRY/EXITS TO WORK AREA SHOULD BE NEGATIVE
PRESSURE.
C. REFER TO SPECIFICATIONS FOR HOSPITAL STANDARDS ICRA
REQUIREMENTS.
GENERAL NOTES
TRUE
NORTH
PLAN
NORTH
TRUE
NORTH
PLAN
NORTH
PHASE 2 NARRATIVE
A. ROOM 1D118
1. DEINSTALL YSIO MAX XRAY ROOM 2
2. OPEN WALLS AT CONTROL AREA FOR SHARED
CONTROL OF BOTH 1D114 & 1D118 SYSTEMS
a. CONTROL WORKSTATION LEAD LINED DIVIDER &
WINDOW
b. ADD LEAD LINED, WINDOWED DOOR BETWEEN
TECH CONTROL AREA AND 1D118
c. OPEN WALL BEHIND TECH CONTROL AREA TO NEW
1D118 TECH DOOR
3. REMOVE RESTROOM WALL AND RESTROOM FIXTURES
a. INSTALL PATIENT DOOR FROM 1D118 TO HALLWAY
4. ADDITIONAL SITE PREP AS NEEDED FOR SPEC-CT
INSTALLATION
5. INSTALL NEW SPEC-CT
B. ROOM 1D152
1. DEINSTALL PHILIPS BRIGHTVIEW (DISPOSAL)
2. SITE PREP FOR NEW XRAY SYSTEM
a. LEAD LINING FOR WALLS & DOORS PER PHYSICIST
SPECIFICATIONS
b. CONTROL WORKSTATION LEAD LINED DIVIDER &
WINDOW
c. INSTALL TECHNICIAN DOOR FROM ROOM TO
RADIOLOGY TECH HALLWAY
C. TECH HALLWAY
a. ADD DOOR WITH WINDOW IN TECH HALLWAY AT
JUNCTION OF 1D118 AND 1D122 TO SEPARATE
NUCMED FROM RADIOLOGYDRAFT
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1-87
AutoCAD SHX Text
UP
AutoCAD SHX Text
TO 2ND FLOOR
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1-87
AutoCAD SHX Text
UP
AutoCAD SHX Text
TO 2ND FLOOR
1D142
CORRIDOR
C1-75
C O
R R
ID
O
R C
1-
STAFF.
CORR.
1D153
PATIENT
TOILET
1D154
THYROID
UPTAKE
1D150
DRESS
1D156
STAFF
TOILET
1D136
R/F 1D122
DRESS
1D124
PATIENT
TOILET
1D123
EL
EC
1D
EL
EC
1D
EL
EC
1D
PATIENT
TOILET
1D148
CORRIDOR
C1-84
CORRIDOR
C1-80
PATIENT
TOILET
1D116
DRESS
1D115
ULTRASOUND
1D117
ULTRASOUND
1D121
PATIENT
TOILET
1D117AHOT
LAB
1D143
DOSE
ADMIN.
1D141
OFFICE
1D145
RADIOLOGY
1D145
CARDIAC
STRESS
1D144
BONE
DENS.
1D140
CHEST
X-RAY
1D139
INJ
ROOM
1D147
CARDIAC
IMAGING
1D146
GAMMA
IMAGING
1D152
GAMMA
IMAGING
1D158
TECH. WORK
SUPP. ALCOVE
1D137
QC
1D134
PATIENT
TOILET
1D119
DRESS
1D120
RADIOLOGY
1D114
RRIDOR
1-71
CORRIDOR
C1-72
PIPE RISERS
1D105
CORRIDOR
C1-85A
PATIENT
TOILET
1D121A
RESIDENT
VIEWING
1D125
PATIENT
TOILET
1D127A
ULTRASOUND
1D127
PRINTER
ALCOVE
1D126
STAFF
LOUNGE
1D128
PHYS. OFFICE
1D157
PATIENT
TOILET
VE
S 1
G
H
J
10 10.2 10.3 11 11.2 12 12.2 12.6 13
DEXA
1D141
DOSE
ADMIN
1D140
HOT
LAB
1D139
SPEC CT-3
1D144
SPEC-CT-1
1D114
SPEC CT-2
1D118
THYROID
UPTAKE
1D119
OFFICE
1D147
CARDIAC
STRESS
1D146
X-RAY 2
1D152
X-RAY 2
1D158
CORR.
1D137
CONTROL
1D153
VASC.
ULTRASOUND
1D145
HOT
WAIT
1D142
CORRIDOR
C1-75
C O
R R
ID
O
R C
1-
PATIENT
TOILET
1D154
DRESS
1D156
STAFF
TOILET
1D136
R/F 1D122
PATIENT
TOILET
1D123
EL
EC
1D
EL
EC
1D
EL
EC
1D
PATIENT
TOILET
1D148
CORRIDOR
C1-84
CORRIDOR
C1-80
PATIENT
TOILET
1D116
DRESS
1D115
ULTRASOUND
1D117
ULTRASOUND
1D121
PATIENT
TOILET
1D117A
QC
1D134
DRESS
1D150
STORAGE
1D120
RRIDOR
1-71
CORRIDOR
C1-72
PIPE RISERS
1D105
CORRIDOR
C1-85A
PATIENT
TOILET
1D121A
RESIDENT
VIEWING
1D125
PATIENT
TOILET
1D127A
ULTRASOUND
1D127
PRINTER
ALCOVE
1D126
STAFF
LOUNGE
1D128
PHYS. OFFICE
1D157
PATIENT
TOILET
VE
S 1
G
H
J
10.2 10.3 11 11.2 12 12.2 12.6 13
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
FULLY SPRINKLERED
593-CSI-313
3/20/2026
65% DESIGN
DEVELOPMENT
RENOVATE RADIOLOGY
SPACE
6900 N. Pecos Road North Las Vegas, NV 89086
INTERIM REVIEW
DOCUMENTS
These documents are preliminary and are only for review. They are not to be submitted for regulatory review, permitting, and/or construction.
RICHARD DERAS
Seal # 23365 03/20/2026
NEW CONSTRUCTION
LEGEND - ALL PHASES
EXISTING TO REMAIN
PROJECT LIMITS
EXISTING TO BE DEMOED
SCREENED AREA INDICATES
AREA IN THIS PHASE AND
UNDER CONTRUCTION.
TEMPORARY PARTITION
GI-014
ICRA / PHASING PLAN -
PHASE 3
RD
RDD
DISPOSABLE WALK OFF MATT ATTACHED TO FLOOR.
NEGATIVE AIR MACHINE MAINTAIN PRESSURE IN ROOM 24/7 FOR
DURATION OF WORK.PROVIDE PRACTICE COUNTER TO MEASURE
AIR BEING DISCHARGED.
NEW FLEX DUCT BELOW CEILING ATTACHED TO T-BAK GRID AT 6'0"
O.C. FROM ROOMS TO HEPA FILTERED EXHAUST LOCATION ON
LEVEL 1.
CONSTRUCTION THIS AREA IS PER LEVEL 4 PRECAUTIONS,
ACTIVITY LEVEL C ON VHA FORMS.
NEW 12"X24" TEMPORARY OPENING AT WALL. PROVIDE FUSABLE
LINK FIRE DAMPER. PATCH AND REPAIR WALL TO MATCH EXISTING
CONDITIONS.
DOOR TO REMAIN CLOSED AND SEALED UNTIL REMOVED.
NEW FLEX DUCT BELOW CEILING TO GO UP ABOVE CEILING WALL
CONTRACTOR SECURED ENTRY/EXIT WITH WALK OFF MATS ON
BOTH SIDES OF DOORS.
THIS ROOM IS FOR STAGING ONLY. CONSULT WITH CLIENT FOR
DIRECTIVE.
KEYED NOTES
1 DEMO FLOOR PLAN
SCALE: 1/8" = 1'-0" 2 NEW FLOOR PLAN
SCALE: 1/8" = 1'-0"
TRUE
NORTH
PLAN
NORTH
A. ICRA CLASSIFICATION FOR THIS PROJECT IS CLASS 4.
B. THE ENTRY/EXITS TO WORK AREA SHOULD BE NEGATIVE
PRESSURE.
C. REFER TO SPECIFICATIONS FOR HOSPITAL STANDARDS ICRA
REQUIREMENTS.
GENERAL NOTES
TRUE
NORTH
PLAN
NORTH
PHASE 3 NARRATIVE
A. ROOM 1D144
1. RELOCATE CARDIAC STRESS TO 1D152 (TEMPORARY DURING
CONSTRUCTION)
2. ELIMINATE DRESSING ROOM 1D147 & MOVE WALL OF 1D144 TO
ABSORB 1D147
3. NEW PATIENT DOOR TO 1D144
4. INSTALL CONTROL AREA WALL AND GLASS (LEAD LINED) W/
ACCESS DOOR TO 1D144 AND REMOVAL OF WALL AT
TECH HALLWAY
5. LEAD LINING FOR WALLS & DOORS PER PHYSICIST SPECIFICATIONS
6. ADDITIONAL SITE PREP AS NEEDED FOR SPEC-CT
7. INSTALL NEW SPEC-CT SYSTEM
B. ROOM 1D139
1. RELOCATE VASCULAR ULTRASOUND TO 1D117 (TEMPORARY
DURING CONSTRUCTION)\
C. ROOM 1D140
1. RELOCATE BONE DENSITY TO 1D217 (TEMPORARY DURING
CONSTRUCTION)
D. ROOM 1D146
1. DEINSTALL PHILIPS BRIGHTVIEW SPEC-CT (DISPOSAL)
2. REMODEL INTO 2 ROOMS
a. NUCMED ADMIN SPACE WALL W/ ACCESS DOORS TO TECH
HALL & 1D146
b. CARDIAC STRESS IN REMAINDER OF 1D146
c. NEW PATIENT DOOR AND RETURN WALL TO 1D146A
3. RELOCATE CARDIAC STRESS FROM 1D152 TO 1D146A (PERMANENT)
4. RELOCATE NUCMED ADMIN FROM 1D145 TO 1D146B (PERMANENT)
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1-87
AutoCAD SHX Text
UP
AutoCAD SHX Text
TO 2ND FLOOR
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1-87
AutoCAD SHX Text
UP
AutoCAD SHX Text
TO 2ND FLOOR
1D142
CORRIDOR
C1-75
C O
R R
ID
O
R C
1-
STAFF.
CORR.
1D153
PATIENT
TOILET
1D154
THYROID
UPTAKE
1D150
DRESS
1D156
STAFF
TOILET
1D136
R/F 1D122
DRESS
1D124
PATIENT
TOILET
1D123
EL
EC
1D
EL
EC
1D
EL
EC
1D
PATIENT
TOILET
1D148
CORRIDOR
C1-84
CORRIDOR
C1-80
PATIENT
TOILET
1D116
DRESS
1D115
ULTRASOUND
1D117
ULTRASOUND
1D121
PATIENT
TOILET
1D117AHOT
LAB
1D143
DOSE
ADMIN.
1D141
OFFICE
1D145
RADIOLOGY
1D145
CARDIAC
STRESS
1D144
BONE
DENS.
1D140
CHEST
X-RAY
1D139
INJ
ROOM
1D147
CARDIAC
IMAGING
1D146
GAMMA
IMAGING
1D152
GAMMA
IMAGING
1D158
TECH. WORK
SUPP. ALCOVE
1D137
QC
1D134
PATIENT
TOILET
1D119
DRESS
1D120
RADIOLOGY
1D114
RRIDOR
1-71
CORRIDOR
C1-72
PIPE RISERS
1D105
CORRIDOR
C1-85A
PATIENT
TOILET
1D121A
RESIDENT
VIEWING
1D125
PATIENT
TOILET
1D127A
ULTRASOUND
1D127
PRINTER
ALCOVE
1D126
STAFF
LOUNGE
1D128
PHYS. OFFICE
1D157
PATIENT
TOILET
VE
S 1
G
H
J
10 10.2 10.3 11 11.2 12 12.2 12.6 13
8 1
DEXA
1D141
DOSE
ADMIN
1D140
HOT
LAB
1D139
SPEC CT-3
1D144
SPEC-CT-1
1D114
SPEC CT-2
1D118
THYROID
UPTAKE
1D119
OFFICE
1D147
CARDIAC
STRESS
1D146
X-RAY 2
1D152
X-RAY 2
1D158
CORR.
1D137
CONTROL
1D153
VASC.
ULTRASOUND
1D145
HOT
WAIT
1D142
CORRIDOR
C1-75
C O
R R
ID
O
R C
1-
PATIENT
TOILET
1D154
DRESS
1D156
STAFF
TOILET
1D136
R/F 1D122
PATIENT
TOILET
1D123
EL
EC
1D
EL
EC
1D
EL
EC
1D
PATIENT
TOILET
1D148
CORRIDOR
C1-84
CORRIDOR
C1-80
PATIENT
TOILET
1D116
DRESS
1D115
ULTRASOUND
1D117
ULTRASOUND
1D121
PATIENT
TOILET
1D117A
QC
1D134
DRESS
1D150
STORAGE
1D120
RRIDOR
1-71
CORRIDOR
C1-72
PIPE RISERS
1D105
CORRIDOR
C1-85A
PATIENT
TOILET
1D121A
RESIDENT
VIEWING
1D125
PATIENT
TOILET
1D127A
ULTRASOUND
1D127
PRINTER
ALCOVE
1D126
STAFF
LOUNGE
1D128
PHYS. OFFICE
1D157
PATIENT
TOILET
VE
S 1
G
H
J
10.2 10.3 11 11.2 12 12.2 12.6 13
8 1
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
FULLY SPRINKLERED
593-CSI-313
3/20/2026
65% DESIGN
DEVELOPMENT
RENOVATE RADIOLOGY
SPACE
6900 N. Pecos Road North Las Vegas, NV 89086
INTERIM REVIEW
DOCUMENTS
These documents are preliminary and are only for review. They are not to be submitted for regulatory review, permitting, and/or construction.
RICHARD DERAS
Seal # 23365 03/20/2026
NEW CONSTRUCTION
LEGEND - ALL PHASES
EXISTING TO REMAIN
PROJECT LIMITS
EXISTING TO BE DEMOED
SCREENED AREA INDICATES
AREA IN THIS PHASE AND
UNDER CONTRUCTION.
TEMPORARY PARTITION
GI-015
ICRA / PHASING PLAN -
PHASE 4
RD
RDD
DISPOSABLE WALK OFF MATT ATTACHED TO FLOOR.
NEGATIVE AIR MACHINE MAINTAIN PRESSURE IN ROOM 24/7 FOR
DURATION OF WORK.PROVIDE PRACTICE COUNTER TO MEASURE
AIR BEING DISCHARGED.
NEW FLEX DUCT BELOW CEILING ATTACHED TO T-BAK GRID AT 6'0"
O.C. FROM ROOMS TO HEPA FILTERED EXHAUST LOCATION ON
LEVEL 1.
CONSTRUCTION THIS AREA IS PER LEVEL 4 PRECAUTIONS,
ACTIVITY LEVEL C ON VHA FORMS.
NEW 12"X24" TEMPORARY OPENING AT WALL. PROVIDE FUSABLE
LINK FIRE DAMPER. PATCH AND REPAIR WALL TO MATCH EXISTING
CONDITIONS.
DOOR TO REMAIN CLOSED AND SEALED UNTIL REMOVED.
NEW FLEX DUCT BELOW CEILING TO GO UP ABOVE CEILING WALL
CONTRACTOR SECURED ENTRY/EXIT WITH WALK OFF MATS ON
BOTH SIDES OF DOORS.
THIS ROOM IS FOR STAGING ONLY. CONSULT WITH CLIENT FOR
DIRECTIVE.
KEYED NOTES
1 DEMO FLOOR PLAN
SCALE: 1/8" = 1'-0" 2 NEW FLOOR PLAN
SCALE: 1/8" = 1'-0"
TRUE
NORTH
PLAN
NORTH
A. ICRA CLASSIFICATION FOR THIS PROJECT IS CLASS 4.
B. THE ENTRY/EXITS TO WORK AREA SHOULD BE NEGATIVE
PRESSURE.
C. REFER TO SPECIFICATIONS FOR HOSPITAL STANDARDS ICRA
REQUIREMENTS.
GENERAL NOTESPHASE 4 NARRATIVE
TRUE
NORTH
PLAN
NORTH
A. Room 1D139
1.1. REMODEL 1D139 FOR NUCMED HOT LAB
1.2. UTILITIES
1.3. PORTS
1.4. COUNTERS
1. RELOCATE NUCMED HOT LAB TO 1D139 (PERMANENT)
ROOM 1D140
1. REMODEL 1D140 TO DOSE ADMIN
2. ADD DOOR TO PATIENT WAITING AREA 1D142
3. RELOCATE DOSE ADMIN 1D141 TO 1D140 (PERMANENT)
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1-87
AutoCAD SHX Text
UP
AutoCAD SHX Text
TO 2ND FLOOR
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1-87
AutoCAD SHX Text
UP
AutoCAD SHX Text
TO 2ND FLOOR
1D142
CORRIDOR
C1-75
C O
R R
ID
O
R C
1-
STAFF.
CORR.
1D153
PATIENT
TOILET
1D154
THYROID
UPTAKE
1D150
DRESS
1D156
STAFF
TOILET
1D136
R/F 1D122
DRESS
1D124
PATIENT
TOILET
1D123
EL
EC
1D
EL
EC
1D
EL
EC
1D
PATIENT
TOILET
1D148
CORRIDOR
C1-84
CORRIDOR
C1-80
PATIENT
TOILET
1D116
DRESS
1D115
ULTRASOUND
1D117
ULTRASOUND
1D121
PATIENT
TOILET
1D117AHOT
LAB
1D143
DOSE
ADMIN.
1D141
OFFICE
1D145
RADIOLOGY
1D145
CARDIAC
STRESS
1D144
BONE
DENS.
1D140
CHEST
X-RAY
1D139
INJ
ROOM
1D147
CARDIAC
IMAGING
1D146
GAMMA
IMAGING
1D152
GAMMA
IMAGING
1D158
TECH. WORK
SUPP. ALCOVE
1D137
QC
1D134
PATIENT
TOILET
1D119
DRESS
1D120
RADIOLOGY
1D114
RRIDOR
1-71
CORRIDOR
C1-72
PIPE RISERS
1D105
CORRIDOR
C1-85A
PATIENT
TOILET
1D121A
RESIDENT
VIEWING
1D125
PATIENT
TOILET
1D127A
ULTRASOUND
1D127
PRINTER
ALCOVE
1D126
STAFF
LOUNGE
1D128
PHYS. OFFICE
1D157
PATIENT
TOILET
VE
S 1
G
H
J
10 10.2 10.3 11 11.2 12 12.2 12.6 13
DEXA
1D141
DOSE
ADMIN
1D140
HOT
LAB
1D139
SPEC CT-3
1D144
SPEC-CT-1
1D114
SPEC CT-2
1D118
THYROID
UPTAKE
1D119
OFFICE
1D147
CARDIAC
STRESS
1D146
X-RAY 2
1D152
X-RAY 2
1D158
CORR.
1D137
CONTROL
1D153
VASC.
ULTRASOUND
1D145
HOT
WAIT
1D142
CORRIDOR
C1-75
C O
R R
ID
O
R C
1-
PATIENT
TOILET
1D154
DRESS
1D156
STAFF
TOILET
1D136
R/F 1D122
PATIENT
TOILET
1D123
EL
EC
1D
EL
EC
1D
EL
EC
1D
PATIENT
TOILET
1D148
CORRIDOR
C1-84
CORRIDOR
C1-80
PATIENT
TOILET
1D116
DRESS
1D115
ULTRASOUND
1D117
ULTRASOUND
1D121
PATIENT
TOILET
1D117A
QC
1D134
DRESS
1D150
STORAGE
1D120
RRIDOR
1-71
CORRIDOR
C1-72
PIPE RISERS
1D105
CORRIDOR
C1-85A
PATIENT
TOILET
1D121A
RESIDENT
VIEWING
1D125
PATIENT
TOILET
1D127A
ULTRASOUND
1D127
PRINTER
ALCOVE
1D126
STAFF
LOUNGE
1D128
PHYS. OFFICE
1D157
PATIENT
TOILET
VE
S 1
G
H
J
10.2 10.3 11 11.2 12 12.2 12.6 13
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com
FULLY SPRINKLERED
593-CSI-313
3/20/2026
65% DESIGN
DEVELOPMENT
RENOVATE RADIOLOGY
SPACE
6900 N. Pecos Road North Las Vegas, NV 89086
INTERIM REVIEW
DOCUMENTS
These documents are preliminary and are only for review. They are not to be submitted for regulatory review, permitting, and/or construction.
RICHARD DERAS
Seal # 23365 03/20/2026
NEW CONSTRUCTION
LEGEND - ALL PHASES
EXISTING TO REMAIN
PROJECT LIMITS
EXISTING TO BE DEMOED
SCREENED AREA INDICATES
AREA IN THIS PHASE AND
UNDER CONTRUCTION.
TEMPORARY PARTITION
GI-016
ICRA / PHASING PLAN -
PHASE 5
RD
RDD
DISPOSABLE WALK OFF MATT ATTACHED TO FLOOR.
NEGATIVE AIR MACHINE MAINTAIN PRESSURE IN ROOM 24/7 FOR
DURATION OF WORK.PROVIDE PRACTICE COUNTER TO MEASURE
AIR BEING DISCHARGED.
NEW FLEX DUCT BELOW CEILING ATTACHED TO T-BAK GRID AT 6'0"
O.C. FROM ROOMS TO HEPA FILTERED EXHAUST LOCATION ON
LEVEL 1.
CONSTRUCTION THIS AREA IS PER LEVEL 4 PRECAUTIONS,
ACTIVITY LEVEL C ON VHA FORMS.
NEW 12"X24" TEMPORARY OPENING AT WALL. PROVIDE FUSABLE
LINK FIRE DAMPER. PATCH AND REPAIR WALL TO MATCH EXISTING
CONDITIONS.
DOOR TO REMAIN CLOSED AND SEALED UNTIL REMOVED.
NEW FLEX DUCT BELOW CEILING TO GO UP ABOVE CEILING WALL
CONTRACTOR SECURED ENTRY/EXIT WITH WALK OFF MATS ON
BOTH SIDES OF DOORS.
THIS ROOM IS FOR STAGING ONLY. CONSULT WITH CLIENT FOR
DIRECTIVE.
KEYED NOTES
1 DEMO FLOOR PLAN
SCALE: 1/8" = 1'-0" 2 NEW FLOOR PLAN
SCALE: 1/8" = 1'-0"
A. ICRA CLASSIFICATION FOR THIS PROJECT IS CLASS 4.
B. THE ENTRY/EXITS TO WORK AREA SHOULD BE NEGATIVE
PRESSURE.
C. REFER TO SPECIFICATIONS FOR HOSPITAL STANDARDS ICRA
REQUIREMENTS.
GENERAL NOTES
TRUE
NORTH
PLAN
NORTH
PHASE 5 NARRATIVE
TRUE
NORTH
PLAN
NORTH
A. ROOM 1D141/1D143/1D145
1. REMOVE WALLS & ELIMINATE ROOM 1D143
2. INSTALL SINGLE WALL TO DIVIDE 1D141 & 1D145 (AND REMOVE
DOOR)
3. REMODEL 1D141 FOR DEXA SYSTEM
4. REMODEL 1D145 FOR VASCULAR ULTRASOUND
5. RELOCATE DEXA SYSTEM FROM 1D217 TO 1D141 (PERMANENT)
6. RELOCATE VASCULAR ULTRASOUND FROM 1D117 TO 1D145
(PERMANENT)
B. ROOM 1D152
1. INSTALL NEW XRAY SYSTEM
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1-87
AutoCAD SHX Text
UP
AutoCAD SHX Text
TO 2ND FLOOR
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1-87
AutoCAD SHX Text
UP
AutoCAD SHX Text
TO 2ND FLOOR
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAMA AMERICAN ARCHITECTURAL
MANUFACTURERS ASSOCIATION
AB ANCHOR BOLT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR
ASPHALTIC CONCRETE
ACI AMERICAN CONCRETE INSTITUTE
ACM ASBESTOS CONTAINING
MATERIAL
ACP ACRYLIC GLAZING
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES
ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
ADB AUTOMATIC DOOR BOTTOM
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGA AMERICAN GAS ASSOCIATION
AGC ASSOCIATED GENERAL
CONTRACTORS
AGGR AGGREGATE
AHJ AUTHORITY HAVING
JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZED
ANSI AMERICAN NATIONAL
STANDARDS INSTITUTE
ANT ANTENNA
APA AMERICAN PLYWOOD
ASSOCIATION
APPD APPROVED
APPROX APPROXIMATE
APT APARTMENT
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL
INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ASTM AMERICAN SOCIETY FOR TESTING
AND MATERIALS
ATCH ATTACHMENT
ATM AUTOMATIC TELLER MACHINE
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVE AVENUE
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING
INSTITUTE
AWPA AMERICAN WOOD PRESERVERS'
ASSOCIATION
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B LABEL CLASS B DOOR
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BD FT BOARD FEET (FOOT)
BEV BEVEL
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKT BLANKET
BLVD BOULEVARD
BM BEAM OR BENCHMARK
BOT BOTTOM
BR BEDROOM
BRCG BRACING
BRDG BRIDGING
BRDG JST BRIDGING JOIST
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BU BUSHEL
BUR BUILT-UP ROOFING
ARCHITECTURAL ABBREVIATIONS
C CELSIUS CHANNEL
C CHANNEL CELSIUS
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
C TO C CENTER TO CENTER
CAB CABINET
CAC CEILING ATTENUATION CLASS
CB CATCH BASIN OR CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS OR
CONTRACT DOCUMENTS
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR
FURNISHED/CONTRACTOR
INSTALLED
CF/OI CONTRACTOR
FURNISHED/OWNER INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CENTER OF GRAVITY OR CORNER
GUARD
CGSFU CERAMIC GLAZED STRUCTURAL
FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CHK CHECK
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR
CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
cm SQUARE CENTIMETER cm CUBIC CENTIMETER
CM CONSTRUCTION MANAGEMENT
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE,
CERTIFICATE OF OCCUPANCY,
CLEANOUT, OR COMPANY
CO2 CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
CONC FLR CONCRETE FLOOR
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CRSI CONCRETE REINFORCING STEEL
INSTITUTE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSI CONSTRUCTION SPECIFICATIONS
INSTITUTE
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER CONTOUR
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CYLINDER LOCK
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL DIAGRAM
DIAG DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOUG FIR DOUGLAS FIR
DOZ DOZEN
DR DOOR, DRAIN, DRESSING
ROOM, OR DRIVE
DR CL DOOR CLOSER
DR FR DOOR FRAME
DR OPNG DOOR OPENING
DS DOWNSPOUT
DSGN DESIGN
DW DISHWASHER
DWG DRAWING
DWTR DUMBWAITER
E EAST
E LABEL CLASS E DOOR
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC
ELEC DR OP ELECTRIC DOOR OPENER
ELEV ELEVATOR
EMER EMERGENCY
EMER SHR EMERGENCY SHOWER
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPDM ETHYLENE PROPYLENE DIENE
MOMOMER
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE
BOARD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .