Design Build Project Statement.pdf.pdf
PDF 93 KB Posted
- Solicitation number
- RFQ 171 190000000455 2
- Issued by
- Macomb County, Lansing City, Michigan
About this file
This Design Build Project Advertisement is issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design & Construction Division, on behalf of the Department of Corrections for a propane system upgrade project. The project involves restoring the existing propane plant at Macomb Correctional Facility (34625 26 Mile Road, Lenox Township, Michigan) to full operational status through design and installation of a new propane blender system. The scope includes a propane air Venturi mixing system capable of supplying 30 MM BTU per hour at 8 pounds of pressure, propane flow pumps with bypass valves connected to the existing tank, a propane water bath vaporization unit rated at 30 MM BTU per hour at -20 degrees Fahrenheit and 200 PSIG, and all associated gas piping and electrical connections with modified or replaced grounding as required. A mandatory walk-through inspection is scheduled for Thursday, June 20th, 2019 at 10:00 a.m. at the Administration Building of the facility. The advertisement period runs through June 20th, 2019, with questions accepted until June 24th at noon EST. Bids are due July 3rd, 2019 at 2:00 p.m. EST.
The project requires 5% bid security and must comply with all applicable federal codes administered by the EPA, OSHA, and DOT, as well as state regulations from the Michigan Department of Consumer & Industry Services, Department of Environmental Quality, Department of Natural Resources, and MIOSHA. Bidders must obtain all necessary permits and approvals from the State of Michigan Bureau of Construction Codes and Bureau of Fire Services. As a design/build project, proposals must include design recommendations for restoring the system to full operational condition. The DTMB File Number is 472/19214.MNB, with project management directed by Chris Mustafa Bahjet, P.E., who can be contacted at (517) 749-7519 or Bahjetc@Michigan.gov. Bid documents are available through the Michigan SIGMA system at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19214 Pre Bid Propane.pdf | ||
| Design Build RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0415 (R 10/17)
DESIGN BUILD PROJECT ADVERTISEMENT
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN & CONSTRUCTION DIVISION
This form is required for the advertisement of all construction projects. (1984 PA 431)
TO:
DESIGN & CONSTRUCTION DIVISION
DATE
May 21st, 2019
FROM:
Department of Corrections
PROJECT MANAGER
Chris Mustafa Bahjet, P.E
DTMB FILE NUMBER
472/19214.MNB
Accounting Template 472_MRFMainProj
ADVERTISEMENT DATE
Through June 20th, 2019
BID DUE DATE
July 3rd, 2019 at 2:00 p.m. EST
PROJECT NAME AND LOCATION (INCLUDE STREET ADDRESS)
Propane Blender Upgrades Macomb Correctional Facility- 34625 26 Mile Road, Lenox Twp., MI 48048
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION
Thursday, June 20th, 2019 at 10:00 am EST at the Administration Building of the Macomb Correctional Facility- 34625 26 Mile Road, Lenox Twp., MI 48048
Mandatory Yes No
LEIN CHECK (Dept. of Corrections ONLY) All contractor/vender representatives attending a Pre-Bid Walk Through Meeting must submit a Vendor/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vendor/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Tracy Falor at email address: FalorT@michigan.gov. The email “Subject” must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting).
Since work will be outside security zone, no need for LEIN checks.
NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.
DESCRIPTION OF WORK: DESIGN/BUILD
To restore the existing propane plant to be fully functional, that will include replacement/ installation of one Propane blender system consisting of: new propane air Venturi mixing system supplying 30 MM Btu per hour of mixed gas at 8 pounds of pressure; Propane flow pumps to the existing propane tank (includes bypass valves); Propane water bath vaporization unit at 30MM Btu per hour @-20 deg F and 200 PSIG. This will include all associated gas piping and electrical connections, grounding to be modified or replaced as required for a safe, operational system. All applicable codes shall be complied with including permits and approvals from the State of Michigan, Bureau of Construction Codes, and Bureau of Fire Services. Since this is a design/build project, the submitted proposal shall include design recommendations to restore the existing system to full operation in good repair.
5% Bid Security:
Required
Not Required
NIGP CODES: 90692 92595 91356 91389 90977 90924 91036
ACCEPTING QUESTIONS UNTIL: June 24th at noon (12:00 pm EST)
REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers’ safety rules that are administered by federal agencies (EPA, OSHA and DOT), state agencies (DCH, DEQ, DNR, and MIOSHA), and any other local regulations and standards that may apply.
Documents & Bid Results may be obtained from:
https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
Project Director: Chris Mustafa Bahjet P.E
3044 W. Grand Blvd, Detroit MI 48202
Phone: (517) 749-7519 Bahjetc@Michigan.gov
Fax:
Approved by: Bahjet, Chris Mustafa mailto:FalorT@michigan.gov https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
File details come from the government source that posted it. Updated .