Description Draft.pdf
PDF 122 KB Posted
- Solicitation number
- 1240LT25R0005
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a draft description/specifications/statement of work for the Smiley Creek Bridge Replacement & Road Realignment project. The project will construct a new single lane road bridge across Smiley Creek, including new road approaches on each side totaling approximately 300 linear feet each, and other miscellaneous improvements. The project is located approximately 5.5 miles south of Sawtooth City, Idaho. The estimated price range is $500,000 to $1 million, and the anticipated performance period is from May 5, 2025 to October 31, 2025. A site visit is scheduled for November 7, 2024 at 11:00 AM Mountain Time. The project will be procured by the USDA Forest Service, and all applicable Federal Lands Highway Standard Specifications (FP-14) and Forest Service Supplemental Specifications will apply.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT – NOT FOR PROPOSAL/QUOTE/BID
DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Smiley Creek Bridge Replacement & Road Realignment
Project Description:
Furnish all labor, equipment and materials necessary to accomplish the work under this contract.
This project will construct a new single lane road bridge across Smiley Creek including connecting road approaches. Construction will consist of 1) installing a new approximately 16’ wide by 60’ long prefabricated steel bridge superstructure set on new treated timber abutments including construction of new abutment riprap armoring material and placement of new aggregate wear surface; 2) constructing new road approaches on either side of the new bridge totaling approximately 300 lineal feet on each side; and 3) performing other miscellaneous improvements as required.
Project Location:
From Sawtooth City, Idaho travel south along Forest Road 70077 approximately 5.5 miles to the project location.
Coordinates: 43.833352° N, 114.821909° W
Use of Premises (Camping):
Camping for contract personnel will be permitted near the new bridge site at a location as approved on the ground by the Contracting Officer. Disturbance to the site shall be minimized, weed-free prevention practices shall be followed, and appropriate camp site cleanliness/etiquette shall be met.
Site Visit Information:
A Site Visit for this project will be held on November 7, 2024, at 11:00 AM Mountain Time at the project site
Anticipated Start Date:
May 5, 2025
Anticipated End Date:
October 31, 2025
Estimated Price Range:
$500,000 to $1 Million
Specifications:
Standard Specifications (FP-14), attached Forest Service Supplemental Specifications (FSSS), including “CSI Specs” Supplemental Specifications, are applicable to this Public Works contract.
All applicable FSSS, including “CSI Specs” Supplemental Specifications, are included in full text. All specifications not included in the specification listing but referenced by listed specifications are applicable. Standard Specifications (FP-14) are available in pdf format on-line at https://highways.dot.gov/federal-lands/specs https://highways.dot.gov/federal-lands/specs
| Project Description: |
| Use of Premises (Camping): |
| Anticipated Start Date: |
| Anticipated End Date: |
| Estimated Price Range: |
| Specifications: |
File details come from the government source that posted it. Updated .