This document provides details for the California Road & Bridge Construction Multiple Award Task Order Contract (MATOC). The MATOC will have a base period of 12 months and two 12-month option periods to issue task orders for a variety of bridge and road construction elements including earthwork, structures, bridges, walls, drainage, surfacing and culverts. Projects may be in environmentally sensitive areas requiring specialized techniques. Offerors must submit pricing for the base period MATOC item and two option period items, as well as for the initial task orders for the Alder Creek Bridge and Powderhorn Bridge projects. The Federal Highway Administration will award the MATOC and initial task orders to the offeror with the lowest prices.

View the file

Other files for this federal contract opportunity

Other files attached to California Road & Bridge Construction MATOC, newest first.
File Type Posted
QnA 10 3 2023.pdf PDF
Interested Vendor List Vol I - 10 2 2023 .pdf PDF
QnA 09 28 2023.pdf PDF
QnA 09 26 2023.pdf PDF
6982AF23R000006 CA MATOC Volume I.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A-i

NOTICE TO OFFERORS

ELECTRONIC PROPOSALS WILL BE ACCEPTED WITH EXCEPTION TO THE

BID BOND. SUBMIT AN ELECTRONIC COPY OF YOUR PROPOSAL TO

CFLcontracts@dot.gov. ORIGINAL BID BONDS MUST BE RECEIVED AT THE

OFFICE LOCATION DESIGNATED IN BOX 7 OF THE SF-1442 PRIOR TO THE DUE

DATE.

It is the responsibility of the offeror to verify that this proposal booklet is complete as listed in the table of contents. Also, the offeror is responsible for submitting all required forms and documents with the bid.

Applicable FAR provisions and clauses in this RFP are incorporated by reference or full text.

FAR provisions and clauses incorporated by reference can be accessed on the Internet at https://www.acquisition.gov/far/. Offerors are strongly encouraged to review the provisions and clauses referenced in this document before submitting a proposal.

Notice of SAM Registration – you must be registered in the System for Award Management (SAM) prior to submission of a bid in response to this solicitation. Failure to register prior to submission of a bid may require award to the next successful registered offeror. See FAR Subpart 4.1102. Register online at www.sam.gov.

Volume I, MATOC (Technical Proposal):

SF 1442

Offeror's Bidder's Information Authority to Bind certificate

Volume II, Task Order CA ERFO FS ELDOR 2021-02(4) Alder Creek Bridge:

SF 1442

Bid Schedule Original Bid Bond

Volume III, Task Order CA ERFO FS SEQUI 2021-02(2), Powderhorn Bridge:

SF 1442

Bid Schedule Original Bid Bond

I. PRE-PROPOSAL INFORMATION

jorey.deml Sticky Note Completed set by jorey.deml jorey.deml Sticky Note Completed set by jorey.deml jorey.deml Sticky Note Completed set by jorey.deml jorey.deml Sticky Note Completed set by jorey.deml

A-4

SCHEDULE OF ITEMS

BASE PERIOD Item 0001 (12 months from date of contract award)

Task Orders may require a variety of elements necessary for bridge and road construction such as, but not limited to, earthwork, soil stabilization, structures, bridges, walls, drainage, surfacing, culverts, and parking lots. Projects may be in environmentally sensitive areas that necessitate context-sensitive construction techniques and processes.

1st OPTION PERIOD Item 0002 (24 months from date of contract award)

Task Orders may require a variety of elements necessary for bridge and road construction such as, but not limited to, earthwork, soil stabilization, structures, bridges, walls, drainage, surfacing, culverts, and parking lots. Projects may be in environmentally sensitive areas that necessitate context-sensitive construction techniques and processes.

2nd OPTION PERIOD Item 0003 (24 months from end of 1st option period)

Task Orders may require a variety of elements necessary for bridge and road construction such as, but not limited to, earthwork, soil stabilization, structures, bridges, walls, drainage, surfacing, culverts, and parking lots. Projects may be in environmentally sensitive areas that necessitate context-sensitive construction techniques and processes.

Offerors must submit a price for the first two (2) Task Orders, Alder Creek Bridge (Volume II) and Powderhorn Bridge (Volume III), which are being issued simultaneously with this MATOC Request for Proposal. The Government intends to award Alder Creek Bridge Task Order and Powderhorn Bridge Task Order to the successful MATOC Offeror with the lowest individual Task Order price.