QnA 09 26 2023.pdf
PDF 105 KB Posted
- Attached to
- California Road & Bridge Construction MATOC Federal contract opportunity
- Solicitation number
- 6982AF23R000006
About this file
This document contains questions and answers from a pre-solicitation conference for the California Road & Bridge Construction Multiple Award Task Order Contract (MATOC) solicitation. The MATOC solicitation is issued by the Department of Transportation Federal Highway Administration for full bridge replacements requiring fabricator-designed modular steel girder bridges with structural steel decking and vehicular railing. The solicitation does not provide specific bridge plans or manufacturer details, as the bridges will be fabricator-designed to the requirements outlined in the solicitation and standard specifications. Resumes submitted with proposals will not count toward the 20-page limit for proposal volumes.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QnA 10 3 2023.pdf | ||
| Interested Vendor List Vol I - 10 2 2023 .pdf | ||
| QnA 09 28 2023.pdf | ||
| Description - CA MATOC Volume I.pdf | ||
| 6982AF23R000006 CA MATOC Volume I.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for RFPs:
MATOC, California Road & Bridge Construction, Volumes I, II, and III
September 26, 2023
Questions Response 1 Each proposal calls for it to be replaced with a new steel manufactured bridge. Can you provide the manufacturer's name, number and address, also the design and plans of the bridge?
The bridges are fabricator‐designed and furnished. Provide modular steel girder with structural steel decking, and steel vehicular railing as shown in the plans. See Section 555 of the SCRs for additional requirements
2 Can you provide the plans and details for the concrete abutment?
The abutment details are included in the provided plans. Based on the contractor/fabricator design pre‐fabricated steel bridge, final dimensions and elevations would be coordinated with the bridge manufacturer before ordering materials.
3 The existing bridge to be maintained or are they to be replaced with a new steel bridge?
Both the Alder Creek Bridge and Powderhorn Bridge projects are full bridge replacements. Remove existing bridge elements as indicated in the plans and SCRs. Superstructure elements were completely damaged by fire and previously removed.
4 Can you provide plans for the manufactured steel bridge for each of the Task Order Proposals?
The bridges are fabricator‐designed and furnished. Provide modular steel girder with structural steel decking, and steel vehicular railing as shown in the plans. See Section 555 of the SCRs for additional requirements.
5 Can you provide the name of the manufacturer for each of the bridges for each of the Task Order Proposals?
See response to #4
6 Will requested resumes be excluded from the page count? Yes. See Volume I, 6982AF23R000006 (Base Contract), page A‐10, for what is allowed to not count towards the 20 page limit. Bidders Information pages are not counted in the 20 page limit. See Bidders Information, page B‐2, #7, b.