TVA Load Request Questionnaire_2025.pdf

PDF 580 KB Posted

Attached to
Request for Proposals: Artificial Intelligence Infrastructure and Energy Generation on DOE Land at the Oak Ridge Reservation
Solicitation number
DE-ORR-0037830
Issued by

About this file

This document is a Load Profile Questionnaire from the Tennessee Valley Authority (TVA) Economic Development department, designed to collect comprehensive details about a potential project's electrical power requirements and operational characteristics. The questionnaire requests specific information across several key sections, including project and site details (such as NAICS code and site coordinates), power projections (minimum power needs, voltage requirements, and a 10-year demand ramp-up schedule), economic projections (capital investment and employment details), and operational characteristics. Critical operational questions cover power interruption capabilities, potential on-site generation, shift schedules, peak hour considerations, and energy consumption patterns. The form provides spaces to detail power demands from Year 1 through Year 10, including peak and average demand, monthly usage, load factor, and power factor, while also offering guidance to use TVA's online power usage calculator for assistance in completing the document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOAD PROFILE

QUESTIONNAIRE

Quickly calculate usage with the TVA power usage calculator at tvasites.com/power-usage-calculator/

PROJECT & SITE INFORMATION

PROJECT NAME

NAICS CODE

LATITUDE/LONGITUDE COORDINATES OF SITE(S)/BUILDING(S) TO BE STUDIED

SITE CONTROL provide documentation of ownership, option to purchase and/or consent letter to develop/market

POWER PROJECTIONS

DATE OF PERMANENT ELECTRICAL FACILITIES NEEDED IN PLACE FOR FULL PRODUCTION

MINIMUM AMOUNT OF POWER NEEDED TO BEGIN PRODUCTION INCLUDING MONTH/YEAR

CONSTRUCTION POWER NEEDED

REQUIRED VOLTAGE DELIVERY

COMPLETE DETAILED RAMP-UP SCHEDULE TO REACH EXPECTED MW LEVELS PER YEAR AND MONTH

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

PEAK DEMAND

MW

AVERAGE DEMAND

MW

AVERAGE MONTHLY USAGE

kWH

LOAD FACTOR %

POWER FACTOR %

LOAD PROFILE

QUESTIONNAIRE

Quickly calculate usage with the TVA power usage calculator at tvasites.com/power-usage-calculator/

ECONOMIC PROJECTIONS

PROJECTED YEAR-YEAR, FULL-PRODUCTION CAPITAL INVESTMENT

PROJECTED YEAR-YEAR, FULL-TIME DIRECT EMPLOYEES AT FACILITY

AVERAGE WAGE/SALARY OF ALL FULL-TIME DIRECT EMPLOYEES

OPERATION CHARACTERISTICS

CAN THIS LOAD BE INTERRUPTED? IF SO, HOW MUCH?

WILL COMPANY UTILIZE ANY ON-SITE OR BACKUP GENERATION (SOLAR, GENERATOR, BATTERY, ETC.)? WHAT TYPE OF

GENERATION IS BEING CONSIDERED, PLEASE DESCRIBE THE TYPE OF TECHNOLOGY? WHAT SIZE (MW)

IS COMPANY OPEN TO PARTNERING WITH TVA FOR POTENTIAL PURCHASE AGREEMENTS FOR EXCESS POWER?

CAN THIS LOAD BE DESIGNED TO RUN OUTSIDE TVA PEAK HOURS?

TVA peak hours

Summer Season (June – September): Weekdays 1:00 PM - 7:00 PM CST

Winter Season (December – March): Weekdays 4:00 AM – 10:00 AM CST

No peak hours on the following holidays: New Year, Memorial, Independence, Labor, Thanksgiving, & Christmas Days

IF THERE ARE DISCRETE PIECES OF THE LOAD (E.G., DIFFERENT PORTIONS OF THE FACILITY OR PRODUCTION LINES

THAT MAY OPERATE INDEPENDENTLY), PLEASE DESCRIBE THEM.

DAYS AND HOURS OF OPERATION (E.G., 24X7X365)

HOW MANY SHIFTS WILL THE PLANT RUN? PLEASE PROVIDE THE SHIFT SCHEDULE.

HOW MANY OUTAGES/PLANT SHUTDOWNS TAKEN PER YEAR? WHEN DO THEY OCCUR AND HOW LARGE ARE THEY?

ARE THERE SPIKES IN THE DEMAND OR DOES THE PROCESS CONSUME ENERGY AT A CONSISTENT RATE?

Text1:
Text2: Is respondent responding based on Site A, Site B or both? please specify.

Site A: 35.93537420215302, -84.39469923177226 Site B: 35.92046576786983, -84.33654275948444

Text3: This study is in response to DOE's solicitation of RFI responses, so this documentation is not required.
Text4:
Text5:
Text6:
Text7:
Text8:
Text9:
Text10:
Text11:
Text12:
Text13:
Text14:
Text15:
Text16:
Text17:
Text18:
Text19:
Text20:
Text21:
Text22:
Text23:
Text24:
Text25:
Text26:
Text27:
Text28:
Text29:
Text30:
Text31:
Text32:
Text33:
Text34:
Text35:
Text36:
Text37:
Text38:
Text39:
Text40:
Text41:
Text42:
Text43:
Text44:
Text45:
Text46:
Text47:
Text48:
Text49:
Text50:
Text51:
Text52:
Text53:
Text54:
Text55:
Text56:
Text57:
Text58:
Text59:
Text60:
Text61:
Text62:
Text63:
Text64:
Text65:
Text66:
Text67:
Text68:
Text69:
Project Name:

File details come from the government source that posted it. Updated .