Demolition_Permit_B25-04335-Approved.pdf
PDF 5 MB Posted
- Attached to
- South Mall Building "B"
- Solicitation number
- 148097
- Issued by
- Riverside County, California
About this file
This is a Demolition Permit approved by the City of Corona, California, for interior and structural demolition work at Corona South Mall Building "B" located at 725 S. Main Street, Corona, California. The project involves demolition of non-structural interior walls, ceilings, plumbing fixtures, light fixtures, electrical equipment, and piping on the first and mezzanine floors; complete demolition of the mezzanine level; and demolition of interior mechanical units, equipment, pipes, ductwork, and HVAC system components on the first and mezzanine floors. The existing building comprises 25,000 square feet on the first floor with an addition of 1,950 square feet for a total core and shell improvement of 26,950 square feet. The permit was issued on October 15, 2026, with plan check submittal dated December 8, 2025, and back check submittal dated January 19, 2026. The project is classified as Construction Type III-B with Mercantile Group M occupancy in the Downtown Corona Revitalization Specific Plan zone.
The contractor is responsible for obtaining all required building permits prior to commencing work and must comply with the 2022 California Building Code, California Fire Code, California Electrical Code, California Mechanical Code, California Plumbing Code, and California Energy Code. The owner will provide lead and asbestos inspection reports, with the contractor responsible for all abatement costs for materials disturbed during work. The contractor must perform a discovery process to identify complications, verify all existing conditions including pipes and ducts, provide temporary support and protection during cutting and patching operations, and restore any damaged existing work indicated to remain. All demolition work must comply with Chapter 33 of the California Building Code and Section 103.3.3 of the California Fire Code. Fire safety during construction and demolition must comply with CFC Chapter 14, with provisions for temporary fire suppression systems and evacuation procedures. Deferred submittals include fire alarm system and fire sprinkler demolition and modifications, with the general contractor responsible for providing shop drawings for architect comment and approval prior to Authority Having Jurisdiction issuance.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFF ABOVE FINISHED FLOOR
ACST ACOUSTIC
ACT ACOUSTIC CEILING TILE
APC ACOUSTIC PANEL CEILING
AWP ACOUSTIC WALL PANEL
AWT ACOUSTIC WALL TREATMENT
ADJ ADJUSTABLE
A/C AIR CONDITIONING
AHU AIR HANDLING UNIT
ALT. ALTERNATE
AL ALUMINUM
AB ANCHOR BOLT
APPROX. APPROXIMATE
ARCH ARCHITECT
ASPH ASPHALT
ASSY ASSEMBLY
AUTO AUTOMATIC
AWN AWNING
A/V AUDIO-VISUAL
B BASEMENT
BALC BALCONY
BATH BATHROOM
BM BEAM
BR BEDROOM
BMRK BENCHMARK
BLK BLOCK/BLOCKING
BD BOARD
BKSH BOOKSHELVES
BOT BOTTOM
BRKT BRACKET
BC BROOM CLOSET
BLDG BUILDING
BLT-IN BUILT IN
BUR BUILT-UP ROOFING
BOS BOTTOM OF SLAB
CF/CI CONTRACTOR FURNISHED /
CONTRACTOR INSTALLED
CA CLEAR ANODIZED
CAB CABINET
CPT CARPET
CSMT CASEMENT
CI CAST IRON
CB CATCH BASIN
CLG CEILING
CEM CEMENT
CL CENTER LINE
CER CERAMIC
CT CERAMIC TILE
CO CLEAN OUT
CLR CLEAR
COL COLUMN
CBP COMPOSITE BUILDING PANEL
CONC CONCRETE
CMU CONCRETE MASONRY UNIT
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CJ CONTROL JOINT
COP COPPER
CG CORNER GUARD
CORR CORRIDOR
CTR COUNTER
CSMS COUNTERSUNK METAL SCREW
CSWS COUNTERSUNK WOOD SCREW
CRS COURSES
CC CUBICLE CURTAIN
CM CENTIMETER
DL DEAD LOAD
DE DUAL EGRESS
DEMO DEMOLISH / DEMOLITION
DET DETAIL
DIA DIAMETER
DIFF DIFFUSER
DIM DIMENSION
DO DITTO
DR DOOR
DH DOUBLE HUNG
DN DOWN
DS DOWN SPOUT
D DRAIN
DWR DRAWER
DWG DRAWING
DWGS DRAWINGS
DF DRINKING FOUNTAIN
DUP DUPLICATOR
DOP DISPERSED OIL PARTICULATE
(E) EXISTING
EXIST EXISTING
ETR EXISTING TO REMAIN
EA EACH
E EAST
EQ EQUAL
EQPT EQUIPMENT
EWC ELECTRIC WATER COOLER
ELEC ELECTRICAL
ELEV ELEVATOR
EMERG EMEGENCY
EG END GUARD
ENGR ENGINEER
EQUIP EQUIPMENT
EQPT EQUIPMENT
EXP EXPANSION
EB EXPANSION BOLT
EJ EXPANSION JOINT
EXPC EXPOSED CONSTRUCTION
EXT EXTERIOR
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
FF FINISH FLOOR
FWC FABRIC WALL COVERING
FWS FABRIC WALL SYSTEM
FT FEET / FOOT
FG FINISH GRADE
FV FIELD VERIFY
FIN FINISH
FDV FIRE DEPARTMENT VALVE
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FHC FIRE HOSE CABINET
FP FIRE PROOFING
FRP FIBERGLASS REINFORCED PANEL
FIX FIXTURE
FLASH FLASHING
FLEX FLEXIBLE
FL FLOOR
FD FLOOR DRAIN
FS FLOOR SINK
FLUOR FLUORESCENT
FTG FOOTING
FDN FOUNDATION
FRMG FRAMING
FURN FURNACE
FTDF FIRE TREATED DOUGLAS FIR
FOF FACE OF FINISH
FOS FACE OF STUD
FLS FIRE LIFE SAFETY
GA GAGE
GALV GALVANIZED
GI GALVANIZED IRON
GEN GENERATOR
GL GLASS
GLB GLASS BLOCK
GB GRAB BAR
GR GRADE
GT GRANITE TILE
GFI GROUND FAULT CIRCUIT INTERRUPT
GUTT GUTTER
GYP GYPSUM
GYP BD GYPSUM BOARD
HR HAND RAIL
HDW HARDWIRE
HD WD HARDWOOD
HD HEAD
HVAC HEATING, VENTILATING, AND
AIR CONDITIONING
HT HEIGHT
HPAC HIGH PERMORMANCE
ARHICTECTURAL COATING
HP HIGH POINT
HC HOLLOW CORE
HM HOLLOW METAL
HORZ HORIZONTAL
HB HOSE BIBB
HOSP HOSPITAL
HC HOT AND COLD
HO HOLD-OPEN
HSS HOLLOW STEEL SECTION
IN INCH / INCHES
INFO INFORMATION
ID INSIDE DIAMETER
INS INSULATED
INSUL INSULATION
IR INTEGRAL RESILIENT BASE
INT INTERIOR
ILSM INTERIM LIFE SAFETY MEASURE
JAN JANITOR
JT JOINT
JST JOIST
KG KILOGRAM
KD KNOCK-DOWN FRAME
LL LIVE LOAD
LAB LABORATORY
LAV LAVATORY
LAM LAMINATE
LC LAUNDRY CHUTE
LT LIGHT
LTWT LIGHT WEIGHT
LB POUNDS
LIN. DIFF. LINEAR DIFFUSER
LP LOW POINT
LLV LONG LEG VERTICAL
LVT LUXURY VINYL TILE
M METER
MM MILLIMETER
MACH MACHINE
MAT MATERIAL
MH MANHOLE
MFD MANUFACTURED
MFR MANUFACTURER
MT MARBLE TILE
MK MARK
MB MARKER BOARD
MO MASONRY OPENING
MAX MAXIMUM
MIN MINIMUM
MECH MECHANICAL
MC MEDICINE CHEST
MEMB MEMBRANE
MTL METAL
MFTSM MINERAL-FILLED THERMOPLASTIC
SURFACING MATERIAL
MDF MEDIUM DENSITY FIBERBOARD
MHO MAGNETIC HOLD-OPEN
MISC MISCELLANEOUS
MOD MODIFIED
MLDG MOLDING
(N) NEW
N NORTH
N/A NOT APPLICABLE
NF NATURAL FINISH
NOM NOMINAL
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NO. NUMBER
OF/OI OWNER FURNISHED /
OWNER INSTALLED
OF/CI OWNER FURNISHED /
CONTRACOTR INSTALLED
OFF OFFICE
OC ON CENTER
OA OUTSIDE AIR
OPP OPPOSITE
OH OPPOSITE HAND
ORCH ORCHESTRA
OP ORNAMENTAL PAINT
OPL ORNAMENTAL PLASTER
OD OUTSIDE DIAMETER
P PAINT
PL PLATE
PNL PANEL
PLAM PLASTIC LAMINATE
PTC PEDESTRIAN TRAFFIC COATING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PREFAB PREFABRICATED
PERF PERFORATED
PLUMB PLUMBING
QTY QUANTITY
QT QUARRY TILE
RAD RADIUS
RDWD REDWOOD
REF REFRIGERATOR
REINF REINFORCED
REBAR REINFORCING BAR
REV REVISION
RO ROUGH OPENING
RM ROOM
RA RETURN AIR
RD ROOF DRAIN
RS RESILIENT SHEET FLOORING
REQ REQUIRED
SS STAINLESS STEEL
SMS SHEET METAL SCREW
SC SOLID CORE
SCH SCHEDULE
SECT SECTION
SHTHG SHEATHING
SHT SHEET
SLV SHORT LEG VERTICAL
SPR SINGLE PLY ROOFING
SL GL DR SLIDING GLASS DOOR
SP SOLID POLYMER
SAP SOUND ABSORTIVE PANEL
SPECS SPECIFICATIONS
SQ SQUARE
SQ FT SQUARE FEET
S&V STAIN AND VARNISH
STD STANDARD
STL STEEL
STLC STEEL CHANNEL
SEJ SEISMIC JOINT
SJ STEEL JOIST
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SW SWITCH
$ SWITCH
S SOUTH
SYM SYMMETRICAL
SIM SIMILAR
TBD TO BE DETERMINED
TB TACKBOARD
TELE TELEPHONE
TV TELEVISION
TG TEMPERED GLASS
TEMP TEMPORARY
TLT TOILET
TOS TOP OF SLAB
TO TOP OF
TYP TYPICAL
U/S UNDERSIDE
UC UNDER CABINET
UNFIN UNFINISHED
U.N.O. UNLESS NOTED OTHERWISE
VF/VI VENDOR FURNISHED /
VENDOR INSTALLED
VF/CI VENDOR FURNISHED /
CONTRACTOR INSTALLED
VAC VACUUM
VB VAPOR BARRIER
VERT VERTICAL
VIF VERIFY IN FIELD
VEST VESTIBULE
VCT VINYL COMPOSITION TILE
VWC VINYL WALL COVERING
W/ WITH
W/O WITHOUT
WC WASH CLOSET
WD WOOD
WT WEIGHT
WP WATER PROOF
WRB WATER RESISTANT CEMENT BOARD
WWF WELDED WIRE FRAME
WWM WELDED WIRE MESH
WF WIDE FLANGE
W WEST
WD WOOD
YD YARD
ROOM NAME / NUMBER /
AREA
EXISTING PARTITION / WALL
DEMO PARTITION / WALL
NEW PARTITION / WALL
EXISTING DOOR
NEW DOOR
DOOR TAG
WINDOW TAG
KEYNOTE
WALL TYPE TAG
INTERIOR ELEVATION VIEW
DETAIL CALLOUT
DETAIL CUT
WALL SECTION CUT
ROOM NAME
ROOM NUMBER
CEILING HEIGHT
ROOM FINISHES CODE
ROOM AREA
ROOM NAME
150 SF
4501.1
A101
OFFICE
CV-001
996 SF
RF-1 RB-1 P-1 GYP
PL-1
A6.01
A101
A101
SIM
W1
N
W
S
E
A101
8'-0"
FINISH MATERIAL TAG
EQUIPMENT TYPE TAG
CEILING HEIGHT TAG
GRID COLUMN
CENTER LINE
REVISION TAG
ALIGN ARROW SYMBOL
EXIT SIGN ANNOTATION SYMBOL
SPOT ELEVATION
NORTH ARROW
VIEW NAME
REFERENCE SHEET
FLOOR-LEVEL EXIT SIGN PER
CBC 2022 1013.7 MOUNTED 6-8"
AFF TO INDICATE THE PATH OF
EXIT TRAVEL IN GROUP 'A'
CORRIDOR. APPLY TO DOOR OR
CLOSEST EDGE OF SIGN WITHIN
4" OF THE DOOR FRAME
EXIT
10'-0"
A
2022 CALIFORNIA ADMINISTRATIVE CODE (CAC)
2022 CALIFORNIA BUILDING CODE (CBC)
2022 CALIFORNIA ELECTRICAL CODE (CEC)
2022 CALIFORNIA MECHANICAL CODE (CMC)
2022 CALIFORNIA PLUMBING CODE (CPC)
2022 CALIFORNIA FIRE CODE (CFC)
2022 CALIFORNIA ENERGY CODE
2010 ADA STANDARDS
2022 GREEN STANDARD CODE
2022 GREEN STANDARD CODE
UNDERWRITERS LABORATORY (UL)
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
AMERICAN SOCIETY FOR MECHANICAL ENGINEERS (ASME)
SHEET METAL AND AIR CONDITIONING CONTRACTOR'S
NATIONAL ASSOCIATION (SMACNA)
FOR A COMPLETE LIST OF APPLICABLE NFPA STANDARD REFER TO
2022 CBC (SFM) CHAPTER 35 AND CALIFORNIA FIRE CODE
CHAPTER 80
SEE CALIFORNIA BUILDING CODE, CHAPTER 35 FOR STATE OF
CALIFORNIA AMENDMENTS TO NFPA STANDARD
PROJECT ADDRESS:
725 S. MAIN ST.,
CORONA, CA 92882
N
W
S
E
FREEWAY 91
W. G
RAND BLVD.
S
M A
IN
S
T
F R E E W
A Y
W. 6TH ST.
W. 9TH ST.
STRUCTURAL ENGINEER OF RECORD
SAID HILMY
IDS GROUP INC.
1 PETERS CANYON ROAD, SUITE 130
IRVINE, CALIFORNIA 92606
PHONE: 949-387-8500 EXT 116
MECHANICAL/PLUMBING/FIRE SPRINKLER
ENGINEER OF RECORD
DARREN SMITH
IDS GROUP INC.
1 PETERS CANYON ROAD, SUITE 130
IRVINE, CALIFORNIA 92606
PHONE: 949-387-8500 EXT 454
ELECTRICAL ENGINEER OF RECORD
STEVEN COLLINS
IDS GROUP INC.
1 PETERS CANYON ROAD, SUITE 130
IRVINE, CALIFORNIA 92606
PHONE: 949-387-8500 EXT 325
OWNER: CITY OF CORONA
JOEL BELDING
IDS GROUP INC.
400 S VICENTIA AVE
CORONA, CALIFORNIA 92882
PHONE: 951-736-2297
E-MAIL:
JOEL.BELDING@CORONACA.GOV
PROJECT MANAGER
AMIT BHARGAVA
IDS GROUP INC.
1 PETERS CANYON ROAD, SUITE 130
IRVINE, CALIFORNIA 92606
PHONE: 949-387-8500 EXT 158
EMAIL: AMIT.BHARGAVA@IDSGI.COM
ARCHITECT OF RECORD
JOHN SILBER
IDS GROUP INC.
1 PETERS CANYON ROAD, SUITE 130
IRVINE, CALIFORNIA 92606
PHONE: 949-387-8500 EXT 154
THE CONSTRUCTION DOCUMENT PACKAGE INCLUDES, BUT ARE NOT LIMITED TO THE FOLLOWING SCOPE:
- DEMOLITION OF NON-STRUCTURAL INTERIOR WALLS, CEILINGS, PLUMBING FIXTURES, LIGHT FIXTURES, ELECTRICAL EQUIPMENT, AND
PIPING ON THE FIRST AND MEZZANINE FLOORS
- DEMOLITION OF MEZZANINE LEVEL IN ITS ENTIRETY
- DEMOLITION OF INTERIOR MECHANICAL UNITS/EQUIPMENT, PIPES, DUCT WORK, SUPPORTS, AND ACCESSORIES RELATED TO THE HVAC
SYSTEM ON THE FIRST AND MEZZANINE FLOORS
NOTE:
OWNER TO PROVIDE LEAD AND ASBESTOS INSPECTION REPORTS. ITEMS IDENTIFIED BY POSITIVE TESTING BUT INDICATED TO REMAIN ARE TO BE UNDISTURBED. FOR ANY SUCH ITEMS THAT ARE INDICATED FOR REFINISHING, PATCHING, RELOCATION, PAINTING, ETC: DO NOT SAND
OR DISTURB AFFECTED SURFACES / MATERIALS.
ASBESTOS/LEAD ABATEMENT: CONTRACTOR TO NOTE ASBESTOS & LEAD MATERIALS EXISTING
ONSITE. ABATEMENT IS REQUIRED WHERE THESE MATERIALS ARE IMPACTED BY WORK. CONTRACTOR TO ASSUME ALL COSTS REQUIRED TO ABATE ASBESTOS AND LEAD CONTAINING MATERIALS DISTURBED TO COMPLETE THE WORK, WHETHER OR NOT IT IS
SPECIFICALLY IDENTIFIED HEREIN.
GENERAL
G.001 COVER SHEET
G.003 GENERAL NOTES
ARCHITECTURAL DRAWINGS
A.111 FIRST FLOOR PLAN - DEMO
A.112 FIRST FLOOR REFLECTED CEILING PLAN - DEMO
A.121 MEZZANINE FLOOR PLAN AND RCP - DEMO
A.131 ROOF PLAN - DEMO
PROJECT LOCATION: 725 S MAIN ST, CORONA, CA 92882
A.P.N.: 117191011
CONSTRUCTION TYPE: (E) III-B
OCCUPANCY CLASSIFICATION: MERCANTILE GROUP M
NUMBER OF STORIES: 1-STORY
SPRINKLED: YES
ZONE: D (DOWNTOWN) WITHIN THE DOWNTOWN CORONA
REVITALIZATION SPECIFIC PLAN
GENERAL PLAN: MUD (MIXED USED DOWNTOWN)
AREA:
1ST FLOOR: EXISTING 25,000 S.F. + ADDITION 1,950 S.F. = 26,950 S.F.
TOTAL CORE AND SHELL IMPROVEMENT 26,950 S.F
FINAL DESIGN, CONSTRUCTION DRAWINGS, AND AHJ SUBMITTALS FOR THE FOLLOWING TO BE DEFERRED. GC TO PROVIDE ARCHITECT WITH SHOP DRAWINGS FOR COMMENT AND/OR APPROVAL PRIOR TO AHJ ISSUANCE. BASIS OF DESIGN DRAWINGS ARE INCLUDED IN THIS SET.
1. FIRE ALARM SYSTEM DEMOLITION AND MODIFICATIONS
2. FIRE SPRINKLER DEMOLITION AND MODIFICATIONS
IDS
1 PETERS CANYON ROAD, SUITE 130
IRVINE, CA. 92606
TEL: 949-387-8500, FAX: 949-387-0800
IDS GROUP
IDS PROJECT NO.
DRAWN BY
CHECKED BY
APPROVED BY
PROJECT IDENTIFICATION
THIS DRAWING WAS CREATED IN REVIT V. 2023
UNLESS OTHERWISE NOTED.
THE ORIGINAL SIZE OF THIS SHEET IS 30" X 42"
THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY AND
COPYRIGHT OF IDS GROUP AND SHALL NOT BE USED ON ANY
OTHER PROJECT OR LOCATIONS EXCEPT AS DESCRIBED ON THE
DRAWINGS, WITHOUT THE WRITTEN AGREEMENT WITH IDS GROUP.
SHEET NO. OF
ISSUE
STAMP
STAMP
ENGINEER/ARCHITECT
CLIENT
SHEET TITLE
SHEET NUMBER
APPROVAL STAMP
P L
A N
C H
E C
K S
U B
M
IT
T A
L
ID
S
G R
O U
P
F
IL
E L
O C
A T
IO
N
P
L O
T D
A T
E
U S
E R
400 S VICENTIA AVE, CORONA, CA 92882
DEMOLITION
PERMIT FOR
CORONA SOUTH
MALL
BUILDING "B"
725 S MAIN ST,
CORONA, CA 92882
PLAN CHECK SUBMITTAL 12/08/25
YY
MM
AB/JM
T E
HE D A R C
I
T
I A
R
A L I FO F C
O
N
CC
E N
L
S T
E
A T
I
S E
J
OJ
N H
O
S
R E
BLISHP
No. C 15573
REN. 7-31-27
DATEDESCRIPTIONREV.
2 BACK CHECK SUBMITTAL 01/19/26
C U se rs
\P a tr ic k .m o b in i\D o cu m e n ts \2
X
.0
A rc h
B L D
G B p a tr ic k.
m o b in i.r vt
/1 /2
:1 :1
P
M
G.001
COVER SHEET
24X084.01
K D
ABBREVIATIONS
SYMBOLS LEGEND
APPLICABLE CODES
VICINITY MAP
DEMOLITION PERMIT FOR CORONA SOUTH MALL
BUILDING "B"
725 S. MAIN ST., CORONA, CA 92882
PLAN CHECK SUBMITTAL
ISSUE: 01/19/26
PROJECT TEAM
PROJECT DESCRIPTION - DEMO
SHEET INDEX - DEMO
PROJECT DATA
DEFERRED SUBMITTALS
2/11/2026
B25-04335
Jasmine Garcia
_________________________Date:________ Javier Luna, P.E
City Engineer
Approved for Construction by:
Docusign Envelope ID: 59DF7FA3-B809-8D6D-80A0-5085F9670382
10/15/2026
CONTRACTOR OBLIGATIONS
1. CONTRACTOR FOR THE PROJECT SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED BUILDING
PERMITS PRIOR TO COMMENCING WORK.
2. THE CONTRACTOR SHALL INSURE THAT ALL WORK IS DONE IN A PROFESSIONAL WORK-MAN-LIKE MANNER BY SKILLED MECHANICS AND SHALL REPLACE ANY NEW AND/OR EXISTING MATERIALS OR
ITEMS INDICATED TO REMAIN DAMAGED BY ANY CAUSE DURING CONSTRUCTION.
3. THE CONTRACTOR AND/OR SUBCONTRACTOR SHALL, PRIOR TO THE SUBMISSION OF HIS BID OR PERFORMANCE OF WORK, NOTIFY THE OWNER OF ANY WORK CALLED OUT ON THE DRAWINGS OR IN THE SPECIFICATIONS IN HIS TRADE THAT CANNOT BE FULLY GUARANTEED OR WARRANTED FROM
DEFECTIVE WORKMANSHIP OR MATERIAL DEFECTS.
4. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IF DETAILS ARE CONSIDERED UNSOUND, UNSAFE, NOT WATERPROOF, OR NOT WITHIN CUSTOMARY TRADE PRACTICE. IF WORK IS PERFORMED, IT WILL BE ASSUMED THAT THERE IS NO OBJECTIONS TO THE DETAIL. DETAILS ARE INTENDED TO SHOW END RESULT OF DESIGN, MINOR MODIFICATIONS MAY BE REQUIRED TO SUIT JOB CONDITIONS AND CURRENT
TRADE PRACTICE AND SHALL BE INCLUDED AS PART OF THIS PROJECT.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FINISHES AT POINT OF CONNECTIONS FOR ALL WORK (ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL) FINISHES WILL MATCH THOSE SPECIFIED OR EXISTING IN LINE, TEXTURE AND FINISH. SPOT PAINTING IS NOT ACCEPTABLE. NEW
FINISHES SHALL BE FROM CORNER TO CORNER, FLOOR TO CEILING, ETC.
6. UNLESS OTHERWISE NOTED, ALL MATERIALS SHALL BE NEW AND OF GOOD QUALITY. WHERE
EXISTING MATERIALS ARE INDICATED TO BE SALVAGED, CONTRACTOR SHALL INVENTORY, CLEAN,BOX PROTECT, AND STORE ITEMS FOR REUSE ON THE PROJECT. ITEMS NOT REUSED SHALL BE RETURNED
TO OWNER.
7. COORDINATION: THE GENERAL AND EACH SUB CONTRACTOR SHALL BE RESPONSIBLE FOR
VERIFICATION AND COORDINATION WITH OTHER SUB CONTRACTORS TO ASSURE COMPLIANCE WITH DRAWINGS AND SPECIFICATIONS, AND THE ACCURATE LOCATION OF ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL BUILDING ELEMENTS. THEIR REQUIRED OPENINGS CLEARANCES
SUPPORT SYSTEMS ARE ALL INTERCONNECTED AND COORDINATED.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF ALL TRADES AND FOR BEING AWARE OF ALL CONDITIONS THAT AFFECT THEIR WORK. NOTIFY OWNER, IN WRITING, WITHIN 3
WORKING DAYS OF AWARD OF CONTRACT, OF THE PROPOSED DELIVERY SCHEDULE, OF ANY
EQUIPMENT, FINISHES OR MATERIAL, FOR WHICH THAT SCHEDULE WILL PREVENT THE INSTALLATION
FROM BEING COMPLETED AT THE TIME OF THE SCHEDULED PROJECT COMPLETION.
COORDINATION OF WORK:
• THE CONTRACTORS SHALL PROVIDE AND COORDINATE THE EXACT DIMENSIONS SIZES AND
POSITIONS OF ALL SYSTEMS, EQUIPMENT, MOUNTING, AND ATTACHMENTS RELATING TO THE
WORK.
• THE CONTRACTOR SHALL PROVIDE AND COORDINATE ALL DIMENSIONS SIZES AND POSITIONS OF
OPENINGS IN SLABS AND WALLS NECESSARY TO THE INSTALLATION OF THE WORK.
• ALL EQUIPMENT, CONTROLS AND TERMINATIONS SHALL BE POSITIONED FOR SAFE, DIRECT AND
EASY ACCESS.
• IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK WITH THE ARCHITECTURAL
DRAWINGS BEFORE PROCEEDING WITH INSTALLATION OF CIVIL, STRUCTURAL, MECHANICAL,
PLUMBING, AND ELECTRICAL WORK. SHOULD THERE BE ANY DISCREPANCIES BETWEEN THE
ARCHITECT'S AND THE ENGINEER'S DRAWINGS AND SPECIFICATIONS THAT WOULD CAUSE A
CONFLICT, IT SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION FOR CLARIFICATION PRIOR TO
INSTALLATION OF SAID WORK. ANY WORK INSTALLED IN CONFLICT WITH THE ARCHITECTURAL
DRAWINGS SHALL BE CORRECTED BY THE CONTRACTOR AT HIS EXPENSE AND AT NO ADDITIONAL
EXPENSE TO THE OWNER OR ARCHITECT.
9. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS OF EXISTING SITE PRIOR TO BIDDING AND START OF CONSTRUCTION. THE CONTRACTOR SHALL REPORT TO THE ARCHITECT ALL CONDITIONS WHICH PREVENT THE PROPER EXECUTION OF ITS WORK. THE DRAWINGS SHALL NOT BE
SCALED.
10. ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED TO BE
CONSTRUCTION STANDARDS. IF THE CONTRACTOR HAS QUESTIONS REGARDING ABBREVIATIONS OR THEIR EXACT MEANING, THE ARCHITECT SHALL BE NOTIFIED IN WRITING FOR CLARIFICATION.
11. CONTRACTOR SHALL PROVIDE AND INSTALL ALL STIFFENERS, BRACING, BACK-UP PLATES, AND SUPPORTING BRACKETS REQUIRED FOR THE INSTALLATION OF ALL CASEWORK, STAIR RAILINGS, TOILET ACCESSORIES, PARTITIONS, AND OF ALL WALL MOUNTED OR SUSPENDED MECHANICAL, ELECTRICAL, OR MISC. EQUIPMENT.
12. CONTRACTOR SHALL VERIFY SIZES AND LOCATIONS OF ALL MECHANICAL AND ELECTRICAL PADS
AND BASES AS WELL AS POWER OR WATER AND DRAIN INSTALLATIONS WITH EQUIPMENT
MANUFACTURERS BEFORE PROCEEDING WITH WORK. CHANGES TO ACCOMMODATE FIELD
CONDITIONS OR SUBSTITUTIONS SHALL BE MADE WITHOUT ADDITIONAL CHARGE TO OWNER.
EXITS
1. EXIT DOORS SHALL BE OF THE PIVOTED OR SIDE-HINGED SWINGING TYPE. EXIT DOORS SHALL SWING IN THE DIRECTION OF EXIT TRAVEL WHEN THE AREA SERVED HAS AN OCCUPANT LOAD OF 50 OR
MORE.
2. EVERY EXIT DOOR SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY
SPECIAL KNOWLEDGE OR EFFORT. NOTE ALSO THAT FLUSH BOLTS OR SURFACE BOLTS ARE
PROHIBITED.
3. PANIC HARDWARE SHALL BE PROVIDED ON EXIT DOORS OF ROOMS, CORRIDORS, STAIRWAYS, HANDLING AN OCCUPANT CAPACITY OF 50 OR MORE PERSONS.
4. EXIT SIGNS SHALL BE INSTALLED AT REQUIRED EXIT DOORWAYS AND WHERE OTHERWISE
NECESSARY TO CLEARLY INDICATE THE DIRECTION OF EGRESS IN COMPLIANCE WITH THE CODE OF
JURISDICTION.
5. EGRESS DOORS SHALL BE SET IN MOTION WHEN SUBJECTED TO A 30 LB. FORCE. THE DOOR SHALL SWING TO THE FULLY OPEN POSITION WHEN AN OPENING FORCE NOT EXCEEDING 15 LBS IS APPLIED
TO THE LATCH SIDE.
6. EACH DOOR IN A MEANS OF EGRESS FROM A GROUP 'A' OCCUPANCY SHALL NOT BE PROVIDED WITH A LATCH OR LOCK UNLESS IT IS PANIC HARDWARE OR FIRE EXIT HARDWARE (CBC 1008.1.9).
7. DOOR HANDLES, LOCK AND OTHER OPERATING DEVICES SHALL BE INSTALLED AT A MIN. 34" AND A
MAX. 48" A.F.F.
8. EXIT SIGNS SHALL BE CONNECTED TO AN EMERGENCY POWER SYSTEM THAT WILL PROVIDE AN ILLUMINATION OF NOT LESS THAT 90min IN DURATION. IN CASE OF PRIMARY POWER LOSS (CBC 1011.2 - 1011.5.3)
9. THE MEANS OF EGRESS, INCLUDING THE EXIT DISCHARGE, SHALL BE ILLUMINATED AT ALL TIMES
THE BUILDING SPACE SERVED BY THE MEANS OF EGRESS IS OCCUPIED.
THERMAL ENVELOPE NOTES
1. DURING CONSTRUCTION OF THIS SCOPE OF WORK, CONTRACTORS MUST COMPLY AS APPLICABLE
TO CCR TITLE 24 CALIFORNIA FIRE CODE CHAPTER 33 FIRE SAFETY DURING CONSTRUCTION AND
DEMOLITION.
2. ENSURE EXITS PROVIDE FREE AND UNOBSTRUCTED EGRESS. PERSONNEL RECEIVE TRAINING IF
ALTERNATIVE EXITS MUST BE DESIGNATED. BUILDING/AREAS UNDER CONSTRUCTION MUST
MAINTAIN ESCAPE FACILITIES FOR CONSTRUCTION WORKERS AT ALL TIMES. MEANS OF EGRESS IN
CONSTRUCTION AREAS ARE INSPECTED DAILY.
3. FIRE ALARM, DETECTION & SUPPRESSION SYSTEMS ARE NOT TO BE IMPAIRED. A TEMPORARY BUT
EQUIVALENT SYSTEM SHALL BE PROVIDED WHEN ANY FIRE SYSTEM IS IMPAIRED. TEMPORARY
SYSTEMS MUST BE INSPECTED AND TESTED MONTHLY.
4. PROVIDE ADDITIONAL FIRE-FIGHTING EQUIPMENT AND USE TRAINED PERSONNEL. CONTRACTOR TO
TRAIN STAFF ON LOCATION OF AFS SHUT OFF VALVES SERVING PROJECT AREA.
5. SMOKING SHALL BE PROHIBITED AT ALL TIMES, IN OR ADJACENT TO ALL CONSTRUCTION AREAS. NO
SMOKING ON STATION.
6. DEVELOP AND ENFORCE STORAGE, HOUSEKEEPING, AND DEBRIS REMOVAL PRACTICES THAT
REDUCE THE FLAMMABLE AND COMBUSTIBLE FIRE LOAD OF THE BUILDING TO THE LOWEST LEVEL
NECESSARY FOR DAILY OPERATIONS COMPLY WITH CHAPTER 33 FIRE SAFETY DURING
CONSTRUCTION.
7. INCREASE SURVEILLANCE OF BUILDINGS, AND EQUIPMENT WITH SPECIAL ATTENTION TO
EXCAVATIONS, CONSTRUCTION AREAS, CONSTRUCTION STORAGE, AND FIELD OFFICES.
8. CONDUCT ORGANIZATION-WIDE SAFETY EDUCATION PROGRAMS TO ENSURE AWARENESS OF ANY LIFE SAFETY CODE DEFICIENCIES, CONSTRUCTION HAZARDS AND INTERIM LIFE SAFETY MEASURES.
9. PROVIDE TEMPORARY DIRECTIONAL SIGNAGE APPROVED BY VETERANS AFFAIRS PROJECT
MANAGER.
GENERAL
THESE PLANS ARE THE PROPERTY OF IDS GROUP INC., AND ARE NOT TO BE USED FOR ANY OTHER
THAN THE LOCATION SHOWN HEREON.
1. NO CHANGES ARE TO BE MADE ON THESE PLANS WITHOUT THE KNOWLEDGE AND CONSENT OF
THE ARCHITECT OR ENGINEER WHOSE SIGNATURE APPEARS HEREON.
2. DO NOT SCALE DRAWINGS. ALL DIMENSIONS ARE TO FACE OF CONCRETE, FACE OF CONCRETE MASONRY UNITS, CENTERLINE OF COLUMNS AND BEAMS, OR FACE OF STUDS, UNLESS OTHERWISE NOTED. FINISH FLOOR ELEVATIONS ARE TO TOP OF CONCRETE SLAB OR TOP OF INTERIOR PAVING
UNLESS OTHERWISE NOTED.
3. ALL LEVELS REFERENCE POINTS ARE TAKEN FROM TOP OF SHEATHING OR TOP OF CONC.
SLAB/COMBO DECKING. DIMENSIONS ON ELEVATIONS, SECTIONS AND WALL SECTIONS ARE
REFERENCED TO THESE POINTS, UNLESS NOTED.
4. NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT PRIOR WRITTEN APPROVAL. REQUEST FOR
SUBSTITUTIONS SHALL BE IN ACCORDANCE WITH SECTION XXXX OF SPECIFICATIONS.
• THESE DRAWINGS DO NOT CONTAIN THE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY.
• ALL CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH THE STATE CONSTRUCTION
SAFETY ORDERS ENFORCED BY THE STATE DIVISION OF INDUSTRIAL SAFETY.
CODES
CONSTRUCTION SHALL COMPLY WITH APPLICABLE EDITION OF CALIFORNIA BUILDING CODE, ALL APPLICABLE LOCAL, STATE AND FEDERAL CODES, ORDINANCES, LAWS, REGULATIONS AND PROTECTIVE COVENANTS GOVERNING THE WORK. IN CASE OF CONFLICTS, THE MORE STRINGENT REQUIREMENT
SHALL GOVERN.
PERMIT
1. THE CONSTRUCTION OR DEMOLITION OF ANY BUILDING, STRUCTURE,USING SCAFFOLDING OR FALSE WORK MORE THAN 3 STORIES OR 36'-0" IN HEIGHT, REQUIRES A PERMIT FROM THE STATE OF CALIFORNIA DIVISION OF INDUSTRIAL SAFETY PRIOR TO THE ISSUANCE OF A BUILDING PERMIT.
( 1PC.B.9 )
2. A SEPARATE INTERIOR IMPROVEMENT PERMIT IS REQUIRED FOR ANY TENANT IMPROVEMENT IN
THIS BUILDING.
3. A PERMIT FROM THE DEPARTMENT OF PUBLIC WORKS IS REQUIRED FOR A PROTECTION FENCE OR
CANOPY ON OR OVER ANY STREET OR PUBLIC SPACE. PROTECTION OF PEDESTRIANS DURING
CONSTRUCTION SHALL BE PROVIDED PER C.B.C. SECTION 3303.
4. ALL ROOMS ARE REQUIRED TO BE MARKED WITH APPROVED SIGNAGE.
5. OBTAIN PERMIT FROM CITY ENGINEER PRIOR TO DOING ANY SIDEWALK AND CURB WORK.
6. SEPARATE PERMITS SHALL BE OBTAINED FOR SIGNS, FENCES, TRASH ENCLOSURES, RETAINING
WALLS, PLANTERS, AND POOLS.
7. THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THEIR DESIGN AND SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING OFFICIAL. ** REFER TO SHEET G-002 FOR LIST
OF DEFERRED SUBMITTALS.
METAL WORK
1. ALL METAL FRAMING MEMBERS SHALL BE ARRANGED AND SPACED AS TO PERMIT INSTALLATION OF PIPE CONDUITS AND DUCTWORK WITH A MINIMUM OF CUTTING. SHAFT WALLS SHALL BE PROVIDED
WITH NECESSARY FRAMES, BRACING, AND SEALANT AROUND THE OPENING.
2. CONTACT BETWEEN DISSIMILAR METAL SHALL BE PROTECTED.
WOOD WORK INCLUDING METAL STUDS
1. OFFSET STUDS WHERE REQUIRED SO THAT FINISH WALL SURFACE WILL BE FLUSH. IF STRUCTURAL PANELS ARE REQUIRED ON A WALL PLANE, THE ENTIRE WALL PLANE SHALL BE FURRED OR FINISHED
FLUSH.
2. INSTALL METAL CORNER BEADS AT ALL EXPOSED WALLBOARD EDGES. INSTALL CASING BEADS WHEREVER WALLBOARD, PLASTER, ETC. ABUTS A DISSIMILAR FINISH MATERIAL AND PROVIDE SEALANT
AS REQUIRED.
3. GYPSUM BOARD SHALL EXTEND TO UNDERSIDE OF STRUCTURE ABOVE AT ALL EXTERIOR
PERIMETER WALLS
DOORS
1. DOORS IN RATED WALLS SHALL CONSIST OF SELF-CLOSING, SELF-LATCHING ASSEMBLIES WITH SMOKE AND DRAFT SEALS AT HEAD AND JAMBS. DOOR ASSEMBLY RATINGS SHALL BE AS INDICATED
ON DOOR SCHEDULE. HOLD OPEN DEVICES ON RATED ASSEMBLIES SHALL BE MAGNETICALLY
OPERATED AND ACTIVATED BY SMOKE DETECTORS.
2. DOOR SIZES SHOWN ON DOOR SCHEDULE ARE OPENING SIZES. ALLOWANCE FOR THRESHOLDS, ECT., SHALL BE TAKEN OFF THE DOOR. DOORS AND FRAMES SHALL BE REINFORCED WHERE
REQUIRED FOR CLOSERS, STOPS, AND HARDWARE.
3. AIR LEAKAGE AT EXTERIOR DOORS SHALL BE LIMITED BY THE FOLLOWING:
a. ALL DOORS SHALL BE PROVIDED WITH A SEAL, ASTRAGAL, OR BAFFLE AT THE HEAD AND SILL.
b. DOORS MOUNTED ON EITHER THE INSIDE OR OUTSIDE OF AN EXTERIOR WALL SHALL HAVE A
MINIMUM 1/2" LAP AT EACH JAMB.
c. DOORS REQUIRING VERTICAL TRACK OR GUIDES SHALL USE A CONTINUOUS MOUNTING ANGLE, SEALED IN ACCORDANCE WITH "G" LISTED HERE.
d. DOORS MOUNTED BETWEEN THE JAMBS SHALL HAVE A CONTINUOUS SEAL OR BAFFLE AT EACH
JAMB.
e. MEETING RAILS OR SECTION DOORS AND MEETING STILES OR RAILS OR BI-PARTING DOORS
SHALL BE PROVIDED WITH A SEAL, ASTRAGAL, OR BAFFLE.
f. SWINGING DOORS SHALL BE WEATHER STRIPPED AT THE HEAD, SILL AND JAMBS.
g. OPEN EXTERIOR JOINTS AROUND WINDOW AND DOOR FRAMES, BETWEEN WALL AND
FOUNDATIONS, BETWEEN WALL AND ROOF, BETWEEN WALL PANELS, AT PENETRATIONS OF
UTILITY SERVICES THROUGH WALLS, FLOORS AND ROOFS AND ALL OTHER OPENINGS IN THE
EXTERIOR ENVELOPE SHALL BE SEALED, CAULKED, CASKETED, OR WEATHER STRIPPED TO
CREATE AN AIRTIGHT ASSEMBLY.
CONTRACTOR OBLIGATIONS FOR MITIGATION MONITORING AND REPORTING PROGRAM
1. THE CONTRACTOR SHALL INSTALL A VISUAL BARRIER (E.G., GREEN MESH FABRIC) ALONG THE PERIMETER OF CONSTRUCTION SITES FOR VERTICAL CONSTRUCTION PROJECTS. THIS REQUIREMENT SHALL BE SUBMITTED TO ARCHITECT AS A CONTRACTOR SUBMITTAL AND VERIFIED BY THE COMMUNITY
DEVELOPMENT DEPARTMENT PRIOR TO SITE WORK.
2. DUST CONTROL. THE CONTRACTOR SHALL BE REQUIRED TO COMPLY WITH SCAQMD RULES 402 AND 403, WHICH SHALL ASSIST IN REDUCING SHORT-TERM AIR POLLUTANT EMISSIONS. SCAQMD RULE 402 REQUIRES THAT AIR POLLUTANT EMISSIONS NOT BE A NUISANCE OFF SITE. SCAQMD RULE 403 (TABLES 1, 2, AND 3 OF RULE 403) REQUIRES THAT FUGITIVE DUST BE CONTROLLED WITH THE BEST AVAILABLE CONTROL MEASURES SO THAT THE PRESENCE OF SUCH DUST DOES NOT REMAIN VISIBLE IN THE ATMOSPHERE BEYOND THE PROPERTY LINE OF THE EMISSION SOURCE. THIS REQUIREMENT SHALL RESUBMITTED TO
ARCHITECT AS A CONTRACTOR SUBMITTAL AND VERIFIED BY THE COMMUNITY DEVELOPMENT
DEPARTMENT PRIOR TO SITE WORK.
3. ARCHITECTURAL COATINGS SHALL BE SELECTED SO THAT THE VOC CONTENT OF THE COATINGS IS COMPLIANT WITH SCAQMD RULE 1113. THIS REQUIREMENT SHALL RESUBMITTED TO ARCHITECT AS A CONTRACTOR SUBMITTAL AND VERIFIED BY THE COMMUNITY DEVELOPMENT DEPARTMENT PRIOR TO
COATING WORK.
4. CONTRACTOR TO REDUCE PROJECT CONSTRUCTION AIR QUALITY IMPACTS DURING CONSTRUCTION.
THE FOLLOWING SHALL BE IMPLEMENTED BY CONTRACTOR DURING CONSTRUCTION:
a. WATER ACTIVE SITES AT LEAST TWICE DAILY;• APPLY WATER THREE TIMES DAILY, OR NON-TOXIC SOIL
STABILIZERS ACCORDING TO MANUFACTURERS' SPECIFICATIONS, TO ALL UNPAVED PARKING OR
STAGING AREAS OR UNPAVED ROAD SURFACES;
b. ALL TRUCKS HAULING DIRT, SAND, SOIL, OR OTHER LOOSE MATERIALS ARE TO BE COVERED;• PAVE ROAD AND ROAD SHOULDERS;• INSTALL WHEEL WASHERS WHERE VEHICLES ENTER AND EXIT THE CONSTRUCTION SITE ONTO PAVED ROADS OR WASH OFF TRUCKS AND ANY EQUIPMENT LEAVING THE
SITE EACH TRIP;
c. APPLY NON-TOXIC SOIL STABILIZERS ACCORDING TO MANUFACTURERS' SPECIFICATIONS TO ALL INACTIVE CONSTRUCTION AREAS (PREVIOUSLY GRADED AREAS INACTIVE FOR TEN DAYS OR MORE);•
SUSPEND ALL EXCAVATING AND GRADING OPERATIONS WHEN WIND SPEEDS(AS INSTANTANEOUS
GUSTS) EXCEED 25 MILES PER HOUR;
d. SWEEP STREETS AT THE END OF THE DAY IF VISIBLE SOIL IS CARRIED ONTO ADJACENT PUBLIC PAVED
ROADS;
e. APPOINT A CONSTRUCTION RELATIONS OFFICER TO ACT AS A COMMUNITY LIAISON CONCERNING ON- SITE CONSTRUCTION ACTIVITY, INCLUDING RESOLUTION OF ISSUES RELATED TO PM10 GENERATION;
AND• REQUIRE ALL VEHICLES AND EQUIPMENT TO BE PROPERLY TUNED AND MAINTAINED ACCORDING
TO MANUFACTURERS' SPECIFICATIONS.
5. NOISE GENERATING: PROJECT CONSTRUCTION ACTIVITIES SHALL TAKE PLACE BETWEEN THE HOURS OF 7:00 AM AND 8:00 PM ON ANY DAY, AND ARE NOT PERMITTED ON SUNDAYS OR A CITY-RECOGNIZED HOLIDAY. THIS REQUIREMENT IS IDENTIFIED IN SECTION 15.90.050 OF THE CITY OF SANTA ANA NOISE
ORDINANCE.
6. CONTRACTOR TO INSTALL WINDOW ASSEMBLIES THAT ARE TESTED AND CERTIFIED TO PREVENT THE INTRUSION OF EXTERIOR NOISE SO THAT THE INTERIOR NOISE LEVEL WITH WINDOWS CLOSED, ATTRIBUTABLE TO EXTERIOR SOURCES, SHALL NOT EXCEED 45 DBA CNEL IN ANY HABITABLE ROOM. THIS
REQUIREMENT SHALL BE SUBMITTED TO ARCHITECT AS A CONTRACTOR SUBMITTAL.
7. CONTRACTOR TO SUBMIT EVIDENCE TO THE ARCHITECT AND OWNER THAT THE FOLLOWING NOISE REDUCTION MEASURES AS STATED ON THE CONSTRUCTION PLANS AND SPECIFICATIONS ARE BEING
IMPLEMENTED:
a. CONSTRUCTION TRAFFIC SHALL BE LIMITED TO HAUL ROUTES ESTABLISHED BY THE CITY OF SANTA
ANA.
b. STATIONARY EQUIPMENT (SUCH AS GENERATORS AND AIR COMPRESSORS) SHALL BE LOCATED AS FAR
FROM RESIDENCES, INCLUDING HOTEL ROOMS, AS FEASIBLE.
c. EQUIPMENT MAINTENANCE AND STAGING AREAS SHALL BE LOCATED AS FAR AWAY FROM RESIDENCES
AS FEASIBLE.
d. CONSTRUCTION EQUIPMENT SHALL BE FITTED WITH MANUFACTURER'S STANDARD, OR BETTER, NOISE-
SHIELDING AND MUFFLING DEVICES TO REDUCE NOISE LEVELS TO THE MAXIMUM EXTENT FEASIBLE.
e. THE PROJECT OWNER/DEVELOPER SHALL DESIGNATE A CONSTRUCTION COMPLAINT MANAGER FOR
THE PROJECT. A TELEPHONE CONTACT NUMBER SHALL BE CLEARLY POSTED AT ALL ACTIVE ACCESS
POINTS.
CUTTING AND PATCHING
1. THE CONTRACTOR SHALL IN THE WORK OF ALL TRADES, PERFORM ALL CUTTING, PATCHING, REPAIRING, RESTORING AND THE LIKE NECESSARY TO COMPLETE THE WORK AND TO RESTORE ANY DAMAGED OR AFFECTED SURFACES RESULTING FROM THE WORK OF THIS CONTRACT TO THEIR ORIGINAL
CONDITION TO THE SATISFACTION OF THE OWNERS AND THE ARCHITECT.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, FITTING, PATCHING, AND FIRE SAFING METHODS REQUIRED TO COMPLETE THE WORK INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
a. UNCOVERED PORTIONS OF THE WORK USED TO PROVIDE FOR INSTALLATION OF UNSCHEDULED WORK.
b. REMOVE AND REPLACE DEFECTIVE WORK.
c. REMOVE AND REPLACE WORK NOT CONFORMING TO REQUIREMENTS OF CONTRACT DOCUMENTS.
d. PROVIDE ROUTINE PENETRATIONS OF NON-STRUCTURAL SURFACES FOR INSTALLATION OF PIPING AND
ELECTRICAL CONDUIT.
e. REMOVE EXISTING WORK INDICATED IN THE DOCUMENTS AND AS MAY BE REQUIRED TO PERMIT THE
PROPER INSTALLATION OF NEW WORK THAT FORMS PART OF HIS CONTRACT. ALL CUTTING,REPAIRING
AND/OR PATCHING NECESSARY IN CONNECTION WITH SUCH REMOVALS SHALL BE DONE WITHOUT
EXTRA CHARGE, WHETHER OR NOT EVERY ITEM MAY BE SPECIFICALLY DESCRIBED.
3. PROCEDURES FOR NON-STRUCTURAL CUTTING AND PATCHING:
a. PROVIDE ADEQUATE TEMPORARY SUPPORT AS NECESSARY TO ASSURE THE STRUCTURAL VALUE
INTEGRITY OF THE AFFECTED PORTION OF THE WORK.
b. PROVIDE DEVICES AND METHODS TO PROTECT OTHER PORTIONS OF THE PROJECT FROM DAMAGE.
c. PROVIDE PROTECTION FROM THE ELEMENTS FOR THAT PORTION OF THE PROJECT WHICH MAY BE
EXPOSED BY CUTTING AND PATCHING WORK.
d. EXECUTE CUTTING BY METHODS WHICH WILL PREVENT DAMAGE TO OTHER WORK, AND WILL PROVIDE
PROPER SURFACES TO RECEIVE INSTALLATION OR REPAIRS.
e. EXECUTE FITTING AND ADJUSTMENT OF PRODUCTS TO PROVIDE A FINISHED INSTALLATION TO COMPLY
WITH SPECIFIED PRODUCTS, FUNCTIONS, TOLERANCES AND FINISHES, AND MANUFACTURER'S
CRITERIA.
f. RESTORE WORK WHICH HAS BEEN CUT OR REMOVED. INSTALL NEW PRODUCTS TO PROVIDE
COMPLETE WORK IN ACCORDANCE WITH REQUIREMENTS OF CONTRACT DOCUMENTS.
g. REFINISH ENTIRE SURFACE AS NECESSARY TO PROVIDE AN EVEN FINISH TO MATCH ADJACENT
FINISHES.
DEMOLITION
1. CONTRACTOR SHALL PROVIDE A "DISCOVERY PROCESS" TO IDENTIFY POTENTIAL COMPLICATIONS
WITHIN THE SCOPE OF WORK, PRIOR TO ANY DEMOLITION.
2. INTEGRITY OF EXISTING CONCRETE FLOOR (ABOVE AND BELOW) SHALL REMAIN INTACT.
3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS ESPECIALLY PIPES, DUCTS, AND CONDUIT.
4. ALL DEMOLITION WORK SHALL BE IN ACCORDANCE WITH CHAPTER 33 OF THE CALIFORNIA BUILDING
CODE, 2019 EDITION.
5. ALL DEMOLITION WORK SHALL BE IN ACCORDANCE WITH THE CALIFORNIA FIRE CODE, 2022 EDITION, SECTION 103.3.3 (INCLUDING ARTICLE 87).
6. THE CONTRACTOR SHALL FIELD SURVEY / AND VERIFY EXISTING CONDITIONS PRIOR TO STARTING ANY
WORK.
7. DURING THE DEMOLITION, THE CONTRACTOR SHALL ALWAYS BE AWARE OF THE INTENDED FINAL
RENOVATION CONDITIONS OF THE STRUCTURE AND THE REASON THE DEMOLITION WORK IS BEING
DONE.
8. THE CONTRACTOR MUST ALLOW FOR ADDITIONAL DEMOLITION THAT MAY NOT BE SHOWN, BUT IS
REQUIRED TO ACHIEVE THE FINISHED RESULT, AS SHOWN ON THE DRAWING.
9. DO NOT DISTURB OR DAMAGE IN ANY WAY EXISTING STRUCTURAL ELEMENTS. THE BUILDING HAS TO
COMPLY WITH ALL SAFETY REGULATIONS AT ALL TIMES.
10. THE CONTRACTOR SHALL RESTORE TO ITS ORIGINAL CONDITION ANY EXISTING WORK DAMAGED
DURING DEMOLITION BUT INDICATED TO REMAIN.
11. ALL REMOVED MATERIALS AND EQUIPMENT WHICH IN THE OPINION OF THE OWNER/ARCHITECT ARE SALVAGEABLE, SHALL REMAIN THE PROPERTY OF THE OWNER. DELIVER SUCH SALVAGED MATERIALS AND EQUIPMENT ON PREMISES AS DIRECTED, NEATLY PILE OR STORE THEM AND PROTECT FROM DAMAGE. DO NOT REUSE MATERIALS AND EQUIPMENT UNLESS SPECIFICALLY INDICATED ON PLANS OR
SPECIFIED. REMOVE FROM PREMISES AND DISPOSE OF ALL MATERIALS CONSIDERED BY THE
OWNER/ARCHITECT TO BE SCRAP. RECYCLE MATERIALS PER CURRENT JURISDICTIONAL CODE
12. ALL RUBBISH AND DEBRIS RESULTING FROM DEMOLITION AND/OR NEW WORK SHALL BE RECYCLED
AND/OR DISPOSED OF OFF-SITE AND SHALL NOT BE ALLOWED TO ACCUMULATE.
BEST MANAGEMENT PRACTICES (MINIMUM REQUIREMENTS FOR CONSTRUCTION PROJECTS)
1. ERODED SEDIMENTS AND OTHER POLLUTANTS MUST BE RETAINED ON SITE AND MAY NOT BE
TRANSPORTED FROM THE SITE VIA SHEET FLOW, SWALES, AREA DRAINS, NATURAL DRAINAGE COURSE
OR WIND.
2. STOCKPILES OF EARTH AND OTHER CONSTRUCTION-RELATED MATERIALS MUST BE PROTECTED
FROM BEING TRANSPORTED FROM THE SITE BY WIND OR WATER
3. FUELS, OILS, SOLVENTS AND OTHER TOXIC MATERIALS MUST BE STORED IN ACCORDANCE WITH THEIR LISTING AND ARE NOT TO CONTAMINATE THE SOIL NOR THE SURFACE WATERS. ALL APPROVED
STORAGE CONTAINERS ARE TO BE PROTECTED FROM THE WEATHER. SPILLS MUCH BE
CLEANED UP IMMEDIATELY AND DISPOSED OF IN A PROPER MANNER. SPILLS MAY NOT BE WASHED
INTO THE DRAINAGE SYSTEM.
4. EXCESS OR WASTER CONCRETE MAY NOT BE WASHED INTO THE PUBLIC WAY OR ANY OTHER
DRAINAGE SYSTEM. PROVISIONS SHALL BE MADE TO RETAIN CONCRETE WASTES ON-SITE UNTIL THEY
CAN BE DISPOSED OF AS SOLID WASTE.
5. TRASH AND CONSTRUCTION-RELATED SOIL WASTES MUST BE DEPOSITED INTO A COVERED
RECEPTACLE TO PREVENT CONTAMINATION OF RAINWATER AND DISPERSAL BY WIND.
6. SEDIMENTS AND OTHER MATERIALS MAY NOT BE TRACKED FROM THE SITE BY VEHICLE TRAFFIC. THE CONSTRUCTION ENTRANCE ROADWAYS MUST BE STABILIZED TO INHIBIT SEDIMENTS FROM BEING
DEPOSITED INTO THE PUBLIC WAYS. ACCIDENTAL DEPOSITIONS MUST BE SWEPT
UP IMMEDIATELY AND MAY NOT BE WASHED DOWN BY RAIN OR BY ANY OTHER MEANS.
7. DEWATERING OPERATIONS: REMOVE SEDIMENTS FROM GROUND WATER.
8. PAVING OPERATIONS: REDUCE DISCHARGE OF POLLUTANTS FROM PAVING OPERATIONS.
9. STRUCTURE CONSTRUCTION AND PAINTING: PREVENT AND REDUCE DISCHARGE FROM
CONSTRUCTION SITES AND PAINTING PROJECTS.
10. MATERIAL DELIVERY AND STORAGE: PREVENT AND REDUCE DISCHARGE OF POLLUTANTS TO STORM
WATER FROM MATERIAL USE.
11. MATERIAL USE: PREVENT AND REDUCE DISCHARGE OF POLLUTANTS TO STORM WATER FROM
MATERIAL USE.
12. SPILL PREVENTION AND CONTROL: PREVENT AND REDUCE DISCHARGER OF POLLUTANTS TO STORM
WATER SYSTEMS WITH GOOD HOUSEKEEPING.
13. SOLID WASTE MANAGEMENT: PREVENT REDUCE DISCHARGE OF POLLUTANTS TO STORM WATER
SYSTEMS FROM SOLID WASTE OR CONSTRUCTION.
14. HAZARDOUS WASTE MANAGEMENT: PREVENT AND REDUCE DISCHARGE OF POLLUTANTS TO STORM
WATER FROM TOXIC MATERIALS.
15. CONTAMINATED SOIL MANAGEMENT: PREVENT AND REDUCE DISCHARGE OF POLLUTANTS TO
STORM WATER FROM CONTAMINATED SOIL.
16. CONCRETE WASTE MANAGEMENT: PREVENT AND REDUCE DISCHARGE OF POLLUTANTS TO STORM
WATER FROM CONCRETE WASTE.
17. SANITARY/SEPTIC WASTE MANAGEMENT: PREVENT AND REDUCE DISCHARGE OF POLLUTANTS TO
STORM WATER FROM SANITARY AND SEPTIC SYSTEMS.
18. VEHICLE AND EQUIPMENT CLEANING: PREVENT AND REDUCE DISCHARGE OF POLLUTANTS TO
STORM WATER FROM CLEANING OF VEHICLES AND EQUIPMENT.
19. VEHICLE AND EQUIPMENT FUELING: PREVENT AND REDUCE DISCHARGE OF POLLUTANTS TO STORM
WATER FROM FUELING OF VEHICLES AND EQUIPMENT.
20. VEHICLE AND EQUIPMENT MAINTENANCE: PREVENT AND REDUCE DISCHARGE OF POLLUTANTS TO
STORM WATER FROM MAINTENANCE OF VEHICLES AND EQUIPMENT.
21. EMPLOYEE/SUBCONTRACTOR TRAINING: SWPPP STORM WATER POLLUTION PREVENTION PLAN.
22. SCHEDULING: SEQUENCING THE CONSTRUCTION PROJECT TO REDUCE THE AMOUNT OF SOIL
EXPOSED TO EROSION.
23. PRESERVATION OF EXISTING VEGETATION: MINIMIZE DAMAGE AND EROSION BY PRESERVING THE
EXISTING VEGETATION.
24. SEEDING AND PLANTING: MINIMIZE EROSION WITH SEEDING AND PLANTING.
25. MULCHING: FOR STABILIZING CLEARED AND FRESHLY SEEDED AREAS.
26. GEOTEXTILES AND MATS: FOR STABILIZATION OF SOILS.
27. DUST CONTROLS: REDUCE DUST AND SOIL EROSION.
28. TEMPORARY STREAM CROSSING: RECOMMENDATIONS FOR INSTALLING A TEMPORARY CULVER, FORD OR BRIDGE.
29. CONSTRUCTION ROAD STABILIZATION: RECOMMENDATIONS FOR DUST EROSION CONTROL.
30. STABILIZED CONSTRUCTION ENTRANCE: RECOMMENDATIONS FOR DUST, SEDIMENT AND EROSION
CONTROL FOR PUBLIC STREETS.
31. EARTH DIKE: TEMPORARY BERM OR RIDGE OF COMPACTED SOIL.
32. TEMPORARY DRAINS AND SWALES: TO DIVERT OFF-SITE RUNOFF AROUND A CONSTRUCTION SITE.
33. SLOPE DRAIN: TEMPORARY PIPE TO DIVERT RUNOFF FROM THE TOP OF A SLOPE TO THE BOTTOM
WITHOUT CAUSING EROSION.
34. OUTLET PROTECTION: INSTALL RIP-RAP TO REDUCE SEDIMENT IN THE SOIL.
35. CHECK DAMS: REDUCES VELOCITY OF CONCENTRATED STORM WATER FLOWS AND REDUCES
EROSION.
36. SLOPE ROUGHENING/TERRACING: CREATES MICROCLIMATES FOR ESTABLISHING VEGETATION.
37. SILT FENCE: FOR SEDIMENTATION CONTROL.
38. STRAW BALE BARRIERS: FOR SEDIMENTATION CONTROL.
39. SAND BAG BARRIER: FOR SEDIMENTATION CONTROL.
40. BRUSH OR ROCK FILTER: FOR SEDIMENTATION CONTROL AND VELOCITY REDUCTION.
41. STORM DRAIN INLET PROTECTION: DEVICES WHICH DETAIN SEDIMENT LADEN RUNOFF.
42. SEDIMENT TRAP: SMALL EXCAVATED OR BERMED ARE FOR SEDIMENTATION.
43. SEDIMENT BASIN: POND CREATED TO ALLOW EXCESSIVE SEDIMENT TO SETTLE.
IDS
1 PETERS CANYON ROAD, SUITE 130
IRVINE, CA. 92606
TEL: 949-387-8500, FAX: 949-387-0800
IDS GROUP
IDS PROJECT NO.
DRAWN BY
CHECKED BY
APPROVED BY
PROJECT IDENTIFICATION
THIS DRAWING WAS CREATED IN REVIT V. 2023
UNLESS OTHERWISE NOTED.
THE ORIGINAL SIZE OF THIS SHEET IS 30" X 42"
THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY AND
COPYRIGHT OF IDS GROUP AND SHALL NOT BE USED ON ANY
OTHER PROJECT OR LOCATIONS EXCEPT AS DESCRIBED ON THE
DRAWINGS, WITHOUT THE WRITTEN AGREEMENT WITH IDS GROUP.
SHEET NO. OF
ISSUE
STAMP
STAMP
ENGINEER/ARCHITECT
CLIENT
SHEET TITLE
SHEET NUMBER
APPROVAL STAMP
P L
A N
C H
E C
K S
U B
M
IT
T
G R
O U
P
F
IL
E L
O C
A T
IO
N
P
L O
T D
A T
E
U S
E R
400 S VICENTIA AVE, CORONA, CA 92882
DEMOLITION
PERMIT FOR
CORONA SOUTH
MALL
BUILDING "B"
725 S MAIN ST,
CORONA, CA 92882
PLAN CHECK SUBMITTAL 12/08/25
YY
MM
AB/JM
T E
HE D A R C
I
T
I A
R
A L I FO F C
O
N
CC
E N
L
S T
E
A T
I
S E
J
OJ
N H
O
S
R E
BLISHP
No. C 15573
REN. 7-31-27
DATEDESCRIPTIONREV.
2 BACK CHECK SUBMITTAL 01/19/26
C U se rs
\P a tr ic k .m o b in i\D o cu m e n ts \2
X
.0
A rc h
B L D
G B p a tr ic k.
m o b in i.r vt
/1 /2
:1 :1
P
M
G.003
GENERAL NOTES
24X084.01
P A
T R
IC
K
M O
B
IN
I
GENERAL NOTES
2/11/2026
B25-04335
Jasmine Garcia
_________________________Date:________ Javier Luna, P.E
City Engineer
Approved for Construction by:
UPUP
UP
UP
(E) DRINKING FOUNTAIN TO BE REMOVED
2. (E) PLASTER ALONG MASONRY WALL TO BE REMOVED
3. (E) WALL TO REMAIN, CONTRACTOR TO PROVIDE TEMPORARY BRACING FOR WALL/CONDUITS
4. (E) STOREFRONT WINDOW TO REMAIN
5. (E) CASEWORK/COUNTERTOP TO BE REMOVED
6. (E) RESTROOM WALL/FLOOR TILE AND RESTROOM ACCESSORIES TO BE REMOVED
7. (E) GAS LINE TO REMAIN, PROTECT IN PLACE
8. (E) FLOOR FINISH TO BE REMOVED
9. (E) CONCRETE RAMP AND RAILING TO REMAIN
10. REMOVER INTERIOR FINISH/GYP. B.D. AROUND WINDOW
FOR VISUAL INSPECTION OF THE HEAD/JAMB FRAMING, PROTECT IN PLACE WATERPROOFING
11. (E) CONCRETE STAIR AND RAILING TO REMAIN
12. (E) ACCESS LADDER TO BE REMOVED
13. NOT USED
14. (E) CONDUITS AND SHAFT WALL TO BE REMOVED
15. (E) COUNTERTOP/COUNTER TO BE REMOVED
16. (E) CASEWORK TO BE REMOVED
17. (E) WOOD UTILITY POLE TO REMAIN, PROTECT IN PLACE
18. (E) FLOOR FINISH AND WALL BASE TO BE REMOVED, PREP FOR NEW FINISH
19. (E) FURRING WALL ALONG (E) CMU WALL TO BE REMOVED, PROTECT IN PLACE STRUCTURAL CMU
WALL AND PREP FOR NEW FINISH
20. (E) COOLER/REFRIGERATOR UNIT TO BE REMOVED IN ITS ENTIRETY
21. (E) COOLER/REFRIGERATOR GLASS DOOR/WINDOW TO BE REMOVED
22. (E) ROLL UP DOOR TO REMAIN
23. (E) TRENCH DRAIN TO REMAIN
24. (E) RAILING TO BE REMOVED
25. (E) FIRE RISER TO REMAIN
26. (E) BOLLARD TO REMAIN
27. (E) ROOF ACCESS LADDER TO BE REMOVED
28. (E) HARDWOOD BASEBOARD TO BE REMOVED
29. (E) WOOD FRAMING RAISED FLOOR TO BE REMOVED
30. (E) STAIR AND HANDRAILS TO BE REMOVED
31. (E) WATER HEADER AND ASSOCIATED PLUMBING PIPING AND APPURTENANT TO BE REMOVED.
CAP EXISTING WATER AT MAIN WATER SUPPLY OF EXISTING BUILDING
32. (E) SITE WALL TO REMAIN
33. (E) RESTROOM FLOOR FINISH TO BE REMOVED
34. (E) FLOOR TILE TO BE REMOVED
35. (E) FLOOR DRAIN TO REMAIN
36. (E) FENCE AND GATE TO REMAIN
37. (E) PLUMBING FIXTURE TO BE REMOVED
38. (E) LOADING DOCK RAMP TO REMAIN
39. (E) COLUMN TO BE REMOVED
40. (E) COLUMN TO REMAIN, PROTECT IN PLACE
41. (E) CONCRETE CURB TO REMAIN
42. (E) SLIDING DOOR TO REMAIN
43. NOT USED
44. (E) MAIN WATER LINE TO REMAIN, CAP WATER LINE AND PROVIDE A HOSE BIB
REMOVE ALL PLUMBING PIPES BEYOND THIS POINT
45. DISCONNECT AND REMOVE ALL ELECTRICAL DEVICES, RECEPTACLES, JUNCTION
BOXES, AND DISCONNECT SWITCHES COMPLETE, REFER TO G-003 FOR ELECTRICAL DEMOLITION
GENERAL NOTES
46. DISCONNECT AND REMOVE EXISTING PANELS COMPLETE INCLUDING ALL BRANCH
CIRCUITRY, REFER TO G-003 FOR ELECTRICAL DEMOLITION GENERAL NOTES
47. THE MAIN SERVICE EQUIPMENT 'MSA' AND PANEL 'B' SHALL REMAIN IN PLACE,
PROTECTED, AND OPERATIONAL TO SUPPLY TEMPORARY POWER REQUIRED FOR
THE RENOVATION WORK, REFER TO G-003 FOR ELECTRICAL DEMOLITION GENERAL NOTES
48. REMOVE ALL BRANCH CIRCUITRY FROM PANEL 'B'. FROM PANEL 'B', PROVIDE (4) 20AMP GFCI TWIST LOCK, (2) 120V 20AMP GFCI DUPLEX RECEPTACLES, AND (3) 50AMP TWIST LOCK DEVICES FOR 50AMP TEMPORARY SPIDER BOXES ON THE WALL ADJACENT TO PANEL 'B', REFER TO G-003 FOR
ELECTRICAL DEMOLITION GENERAL NOTES
49. REMOVE EXISTING PLUMBING FIXTURES. CUT AND CAP EXISTING WASTE BELOW FLOOR, CAP EXISTING VENT PIPE ABOVE CEILING, REMOVE EXISTING WATER AND CAP AT MAIN WATER SUPPLY OF EXISTING BUILDING. DISPOSE EXISTING FIXTURES AND PIPE MATERIALS IN AN APPROVED MANNER.
50. REMOVE ALL EXISTING CODENSATE PIPE IN THIS AREA
NOTE:
- ANY MODIFICATIONS TO EXISTING FIRE ALARM AND FIRE SPRINKLER ARE DEFERRED SUBMITTAL
- EXISTING BUILDING SHALL REMAIN WATERPROOF.
DURING ANY WORK OR MODIFICATION PERFORMED ON THE EXISTING BUILDING, THE INTEGRITY OF
ITS WEATHERPROOFING AND WATER-RESISTANCE MUST NOT BE COMPROMISED
- OWNER HAS FIRST RIGHT FOR ALL EQUIPMENT FOR SALVAGE OR RECYCLING.
- DEMO AND REMOVE ALL MECHANICAL EQUIPMENT, PIPES, DUCT WORK, SUPPORTS, AND
ACCESSORIES RELATED TO THE HVAC SYSTEM ON THE FIRST AND MEZZANINE FLOORS
- EXISTING ROOF DRAIN AND DOWNSPOUT TO REMAIN, PROTECT IN PLACE
(E) NON-FIRE RATED WALL TO BE REMOVED
1 PLAN KEYNOTES
BUILDING DIMENSION FACE OF FINISH, U.N.O.
5' - 0"
(E) DOOR AND DOOR FRAME TO BE REMOVED
(E) DOOR TO REMAIN,
PROTECT IN PLACE
(E) PLUMBING FIXTURE TO BE REMOVED
D.F.
(E) SLAB ON GRADE TO REMAIN, PROTECT IN PLACE.
PATCH AND REPAIR AS NEEDED TO MATCH EXISTING, PROVIDE FLUSH TRANSITION
(E) NON-FIRE RATED WALL TO REMAIN, PROTECT IN PLACE
(E) MASONRY WALL TO REMAIN, PROTECT IN PLACE
FF
BB
AA
CC
DD
EE
ROOM
(E) REF.(E) REF.
(E) ROOM
(E) REF.
+/- 179'-8" VIF.
+/- 35'-2 3/4" VIF. +/- 28'-2" VIF. +/- 45'-10" VIF. +/- 29'-3 3/4" VIF. +/- 25'-6 1/4" VIF. +/- 15'-7 1/4" VIF.
V
IF
V
IF
/4
V
IF
/2
V
IF
/4
V
IF
/2
V
IF
4 4 41 4 4
TYP.
TYP.
21 21
39 39 39
40 4040
40 4040
40 4040
40 40
/1
45 45
UGPS
METER
SECT
MAIN SW
DIST.
M A
IN
M
S A
P N
L "B
4 4141 41 41
10 10 10 10
1. WORK SHALL COMPLY WITH THE PROVISIONS OF CHAPTER 33 OF CBC & CFC, 2022 EDITION :FIRE
SAFETY DURING CONSTRUCTION AND DEMOLITION"
2. SEE SHEET G.003 FOR ADDITIONAL GENERAL NOTES
3. NO CUTTING OR CORING OF STRUCTURAL ELEMENTS IS PERMITTED UNLESS EACH LOCATION IS SPECIALLY DETAILED AND NOTED IN THESE DOCUMENTS. ALL CORING AND CUTTING OF ANY CONCRETE MUST BE APPROVED BY THE ENGINEER BY RFI. THE CONTRACTOR MUST PERFORM GPR TO VERIFY THAT
NO STRUCTURAL ELEMENTS WILL BE CUT OR DAMAGED PRIOR TO THE START OF WORK.
4. GENERAL CONTRACTOR TO FIELD VERIFY THE EXISTING CONDITION AND INFORM
THE ARCHITECT OF ANY DISCREPANCIES.
5. NO DEMOLITION SHALL BEGIN UNTIL PLANS INCLUDING DEMOLITION WORK HAVE BEEN APPROVED BY
AHJ
6. THE ARCHITECT OR ENGINEER WILL MAKE VISITS TO THE JOB SITE TO OBSERVE THE PROGRESS OF THE WORK AND TO OBSERVE WHETHER OR NOT IT IS, IN GENERAL, BEING PERFORMED IN ACCORDANCE WITH THESE PLANS. THIS DOES NOT IN ANY WAY MEAN THAT THE ARCHITECT OR ENGINEER IS A GUARANTOR OF THE CONTRACTOR'S WORK: RESPONSIBILITY FOR SAFETY IN, ON OR ABOUT THE JOB
SITE: IN CONTROL OF THE SAFETY OR ADEQUACY OF ANY EQUIPMENT, BUILDING COMPONENT,
SCAFFOLDING, FORMS, OR OTHER WORK AIDS: OR SUPERINTENDING THE WORK.
7. PROVIDE CONSTRUCTION BARRICADES AS REQUIRED TO PROTECT PUBLIC'S HEALTH AND SAFETY
DURING THE WORK.
8. THE CONTRACTOR SHALL PROTECT ADJACENT PROPERTY AND STRUCTURES. ANY DAMAGE SHALL BE
PROMPTLY RESTORED TO THE SATISFACTION OF THE OWNER/ARCHITECT.
9. CONTRACTORS BIDDING OR PERFORMING WORK SHALL VERIFY THE CONDITIONS OF THE SITE, INCLUDING ACCESS BEFORE SUBMITTING BID OR COMMENCING WORK AND SHALL NOTIFY THE
ARCHITECT OF ANY DISCREPANCIES FOR PROMPT DIRECTION.
10. FIRE SAFETY DURING DEMOLITION AND CONSTRUCTION SHALL COMPLY WITH CFC CHAPTER 14.
11. ITEMS INDICATED AS TO BE DEMOLISHED ARE TO BE THOROUGHLY AND COMPLETELY REMOVED AND DISPOSED. ALL UTILITIES TO BE CAPPED AS REQUIRED, ALL STRUCTURE TO BE COMPLETELY RESTORED
TO IT ORIGINAL CONDITION.
12. ALL ITEMS AND EQUIPMENT REMAINING IN THE PROJECT AND NOT DEMOLISHED ARE TO BE FULLY PROTECTED FROM DAMAGE DURING MODERNIZATION. THE GENERAL CONTRACTOR IS RESPONSIBLE
FOR ALL DAMAGES OCCURRING DURING THE
CONTRACT PROCESS.
13. ALL ITEMS, UTILITIES, STRUCTURES, ETC. TO BE DEMOLISHED OR MODIFIED AS REQUIRED FOR NEW CONSTRUCTION TO BE INCLUDED IN BID. GENERAL CONTRACTOR TO FULLY FAMILIARIZE THEMSELVES
WITH THE EXISTING SITE AND INCLUDE WORK AS REQUIRED FOR NEW CONSTRUCTION IN BID.
14. OWNER TO PROVIDE LEAD AND ASBESTOS INSPECTION REPORTS. ITEMS IDENTIFIED BY POSITIVE TESTING BUT INDICATED TO REMAIN ARE TO BE UNDISTURBED. FOR ANY SUCH ITEMS THAT ARE INDICATED FOR REFINISHING, PATCHING, RELOCATION, PAINTING, ETC: DO NOT SAND OR DISTURB
AFFECTED SURFACES / MATERIALS.
ASBESTOS/LEAD ABATEMENT: CONTRACTOR TO NOTE ASBESTOS & LEAD MATERIALS EXISTING
ONSITE. ABATEMENT IS REQUIRED WHERE THESE MATERIALS ARE IMPACTED BY WORK. CONTRACTOR TO ASSUME ALL COSTS REQUIRED TO ABATE ASBESTOS AND LEAD CONTAINING MATERIALS DISTURBED
TO COMPLETE THE WORK, WHETHER OR NOT IT IS SPECIFICALLY IDENTIFIED HEREIN.
IDS
1 PETERS CANYON ROAD, SUITE 130
IRVINE, CA. 92606
TEL: 949-387-8500, FAX: 949-387-0800
IDS GROUP
IDS PROJECT NO.
DRAWN BY
CHECKED BY
APPROVED BY
PROJECT IDENTIFICATION
THIS DRAWING WAS CREATED IN REVIT V. 2023
UNLESS OTHERWISE NOTED.
THE ORIGINAL SIZE OF THIS SHEET IS 30" X 42"
THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY AND
COPYRIGHT OF IDS GROUP AND SHALL NOT BE USED ON ANY
OTHER PROJECT OR LOCATIONS EXCEPT AS DESCRIBED ON THE
DRAWINGS, WITHOUT THE WRITTEN AGREEMENT WITH IDS GROUP.
SHEET NO. OF
ISSUE
STAMP
STAMP
ENGINEER/ARCHITECT
CLIENT
SHEET TITLE
SHEET NUMBER
APPROVAL STAMP
P L
A N
C H
E C
K S
U B
M
IT
T
G R
O U
P
F
IL
E L
O C
A T
IO
N
P
L O
T D
A T
E
U S
E R
400 S VICENTIA AVE, CORONA, CA 92882
DEMOLITION
PERMIT FOR
CORONA SOUTH
MALL
BUILDING "B"
725 S MAIN ST,
CORONA, CA 92882
PLAN CHECK SUBMITTAL 12/08/25
YY
MM
AB/JM
T E
HE D A R C
I
T
I A
R
A L I FO F C
O
N
CC
E N
L
S T
E
A T
I
S E
J
OJ
N H
O
S
R E
BLISHP
No. C 15573
REN. 7-31-27
DATEDESCRIPTIONREV.
2 BACK CHECK SUBMITTAL 01/19/26
C U se rs
\P a tr ic k .m o b in i\D o cu m e n ts \2
X
.0
A rc h
B L D
G B p a tr ic k.
m o b in i.r vt
/1 /2
:1 :1
P
M
A.111
FIRST FLOOR PLAN -
DEMO
24X084.01
A u th o r
T R
U E
N O
R T
H N
W
S
E
KEYNOTES - FLOOR PLAN DEMO
SYMBOLS - FLOOR PLAN DEMO
1/8" = 1'-0"FIRST FLOOR PLAN - DEMO - DEMO PERMIT 1
GENERAL NOTES - DEMO
2/11/2026
B25-04335
Jasmine Garcia
_________________________Date:________ Javier Luna, P.E
City Engineer
Approved for Construction by:
1 (E) EXPOSED MECHANICAL DUCT TO BE REMOVED
2. (E) FRAMED DUCTWORK ENCLOSURE TO BE REMOVED
3. (E) MECHANICAL PLENUM/GYP. B.D. AND INSULATION UNDERSIDE OF ROOF/FLOOR FRAMING
TO BE REMOVED
4. (E) EXPOSED MEZZANINE FLOOR FRAMING TO BE REMOVED PRE STRUCTURAL DRAWINGS
5. (E) DECK AND GUARDRAIL TO BE REMOVED
6. (E) EXTERIOR WALL MOUNTED LIGHT FIXTURE TO REMAIN, PROTECT IN PLACE
7. (E) COOLER/REFRIGERATOR UNIT TO BE REMOVED IN ITS ENTIRETY
8. (E) RESTROOM TO REMAIN, PROTECT IN PLACE
9. (E) SOFFIT ABOVE TO BE REMOVED, PROTECT IN PLACE STRUCTURAL GLULAM BEAM
10. (E) ROOF ACCESS LADDER TO BE REMOVED
11. DISCONNECT AND REMOVE EXISTING LIGHTING FIXTURES, CIRCUITRY, AND ASSOCIATED
LIGHTING CONTROLS COMPLETE, REFER TO G-003 FOR ELECTRICAL DEMOLITION GENERAL NOTES
12. DEMOLISH EXISTING FIRE SPRINKLER AND ASSOCIATED PIPING SERVING THE FIRST LEVEL UNDER
MEZZANINE. CUT AND CAP PIPING ALL THE WAY TO MAIN. PROTECT MAIN PIPING IN PLACE.
13. NOT USED
14. (E) FIRE SPRINKLER TO REMAIN, PROTECT IN PLACE
(E) WALL TO BE REMOVED PER PLAN
(E) WALL TO REMAIN, PROTECT IN PLACE
1 PLAN KEYNOTES
(E) SUPPLY/RETURN AIR REGISTER TO BE REMOVED
(E) LIGHT FIXTURE TO BE REMOVED
(E) SUSPENSION ACOUSTIC CEILING TILE AND T-BAR GRID TO BE REMOVED.
(E) MECHANICAL PLENUM/GYP. B.D. UNDERSIDE OF ROOF/FLOOR FRAMING
TO BE REMOVED
(E) GYPSUM BOARD CEILING TO BE REMOVED
NOTE:
REMOVE EXISTING MECHANICAL PLENUM CEILING/ GYPSUM BOARD UNDERSIDE OF
FLOOR/ROOF FRAMING
(E) PLASTER CEILING TO REMAIN,
PROTECT IN PLACE
UNDERSIDE OF ROOF FRAMING
(EXPOSED/OPEN CEILING)
U.R.F.
(E) ACOUSTIC GLUE-UP TILE AND CEILING JOIST/FRAMING TO BE REMOVED
(E) LIGHT FIXTURE TO REMAIN
(E) GYPSUM BOARD CEILING TO REMAIN,
PROTECT IN PLACE
FF
BB
AA
CC
DD
EE
U.R.F.
8 8
+/- 179'-8" VIF.
+/- 35'-2 3/4" VIF. +/- 28'-2" VIF. +/- 45'-10" VIF. +/- 29'-3 3/4" VIF. +/- 25'-6 1/4" VIF. +/- 15'-7 1/4" VIF.
V
IF
V
IF
/4
V
IF
/2
V
IF
/4
V
IF
/2
V
IF
12 12
1. WORK SHALL COMPLY WITH THE PROVISIONS OF CHAPTER 33 OF CBC & CFC, 2022 EDITION :FIRE
SAFETY DURING CONSTRUCTION AND DEMOLITION"
2. SEE SHEET G.003 FOR ADDITIONAL GENERAL NOTES
3. NO CUTTING OR CORING OF STRUCTURAL ELEMENTS IS PERMITTED UNLESS EACH LOCATION IS SPECIALLY DETAILED AND NOTED IN THESE DOCUMENTS. ALL CORING AND CUTTING OF ANY CONCRETE MUST BE APPROVED BY THE ENGINEER BY RFI. THE CONTRACTOR MUST PERFORM GPR TO VERIFY THAT
NO STRUCTURAL ELEMENTS WILL BE CUT OR DAMAGED PRIOR TO THE START OF WORK.
4. GENERAL CONTRACTOR TO FIELD VERIFY THE EXISTING CONDITION AND INFORM
THE ARCHITECT OF ANY DISCREPANCIES.
5. NO DEMOLITION SHALL BEGIN UNTIL PLANS INCLUDING DEMOLITION WORK HAVE BEEN APPROVED BY
AHJ
6. THE ARCHITECT OR ENGINEER WILL MAKE VISITS TO THE JOB SITE TO OBSERVE THE PROGRESS OF THE WORK AND TO OBSERVE WHETHER OR NOT IT IS, IN GENERAL, BEING PERFORMED IN ACCORDANCE WITH THESE PLANS. THIS DOES NOT IN ANY WAY MEAN THAT THE ARCHITECT OR ENGINEER IS A GUARANTOR OF THE CONTRACTOR'S WORK: RESPONSIBILITY FOR SAFETY IN, ON OR ABOUT THE JOB
SITE: IN CONTROL OF THE SAFETY OR ADEQUACY OF ANY EQUIPMENT, BUILDING COMPONENT,
SCAFFOLDING, FORMS, OR OTHER WORK AIDS: OR SUPERINTENDING THE WORK.
7. PROVIDE CONSTRUCTION BARRICADES AS REQUIRED TO PROTECT PUBLIC'S HEALTH AND SAFETY
DURING THE WORK.
8. THE CONTRACTOR SHALL PROTECT ADJACENT PROPERTY AND STRUCTURES. ANY DAMAGE SHALL BE
PROMPTLY RESTORED TO THE SATISFACTION OF THE OWNER/ARCHITECT.
9. CONTRACTORS BIDDING OR PERFORMING WORK SHALL VERIFY THE CONDITIONS OF THE SITE, INCLUDING ACCESS BEFORE SUBMITTING BID OR COMMENCING WORK AND SHALL NOTIFY THE
ARCHITECT OF ANY DISCREPANCIES FOR PROMPT DIRECTION.
10. FIRE SAFETY DURING DEMOLITION AND CONSTRUCTION SHALL COMPLY WITH CFC CHAPTER 14.
11. ITEMS INDICATED AS TO BE DEMOLISHED ARE TO BE THOROUGHLY AND COMPLETELY REMOVED AND DISPOSED. ALL UTILITIES TO BE CAPPED AS REQUIRED, ALL STRUCTURE TO BE COMPLETELY RESTORED
TO IT ORIGINAL CONDITION.
12. ALL ITEMS AND EQUIPMENT REMAINING IN THE PROJECT AND NOT DEMOLISHED ARE TO BE FULLY PROTECTED FROM DAMAGE DURING MODERNIZATION.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .