Delivery Schedule.rtf
RTF text file 53 KB Posted
- Attached to
- FCI Leavenworth QTR 3 Subsistence
- Solicitation number
- 15B40826Q00000007
About this file
This is a Delivery Schedule document for food service products to be delivered to FCI Leavenworth for Quarter 3. All products must be delivered within 30 days after receipt of order, with deliveries restricted to 7:00 am to 2:00 pm CST on non-federal holidays. Contractors must pre-arrange delivery schedules with the receiving warehouse at (913) 682-8700 ext: 1318 prior to award. All deliveries must be palletized, and strict temperature requirements apply: non-frozen perishable foods between 34°F and 41°F, canned goods above 34°F and not frozen, and frozen foods at 0°F or below. Any product showing prior thawing will be refused, and certified religious diet items must be marked with the Kosher Symbol on individual packages.
The facility will conduct detailed inspections with a conditional receipt period of up to three days to allow for examination and testing, and items failing to meet specifications will be refused. Non-accepted products must be picked up by the vendor at their expense within two weeks of noncompliance notification, or the facility will dispose of them. Delivery schedule failures without excusable delay and specification non-conformance will negatively impact contractor past performance evaluations, potentially affecting future award considerations. All items must comply with specifications outlined in the solicitation and award documentation, as well as applicable CID standards from the USDA.
Text of this file
FCI Leavenworth DELIVERY SCHEDULE – Requirement: QTR 3
FCI Leavenworth Food Service Department requires delivery of all products within 30 days after receipt of order (ARO).
Deliveries must be made between the hours of 7:00 am and 2:00 pm CST. Federal holiday deliveries will not be accepted. Delivery schedules must be pre-arranged with the receiving warehouse. Warehouse Phone: (913) 682-8700 ext: 1318
Upon Award, the Food Service Warehouse must be contacted prior to delivery for approval or adjustments in delivery schedule. Delivery schedules will be strictly enforced. Failure to deliver within the established time frame will be considered as nonconformance to the terms of the contract.
| All items will be closely inspected. |
| All deliveries must be palletized. |
| All non-frozen, perishable foods must be delivered between 34 degrees F and 41 degrees F. |
| All canned goods must be delivered above 34 degrees F and not frozen. |
| All frozen foods must be delivered at 0 degrees F or below. Any product that indicates prior thawing will be refused. |
| All certified religious diet items must be marked with the Kosher Symbol on individual packages, or the item will be refused. |
| Receipt of delivery may be conditional for a period of three (3) days in order to allow for adequate examination and testing. |
| Some items may require thawing and cooking to determine specifications compliance. |
| Items that fail to meet specifications will be refused. |
| If the product is not accepted, in accordance with FAR 52.212-4 (b), “The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price.” |
| Items which are conditionally received, and found to be unacceptable, must be picked up at the vendors' expense within two (2) weeks of noncompliance notification. |
| If the product is not picked up within two (2) weeks, it will be disposed of by warehouse staff. |
Items must meet specifications as indicated on the solicitation and award.
All items will be closely inspected prior to acceptance.
See FAR 52.212-4 (b) Inspection and Acceptance.
https://www.acquisition.gov/far/52.212-4?searchTerms=52.212-4
Contractor failure to meet delivery schedules without an excusable delay and/or failure to conform to contract specifications will negatively affect the contractor's history of past performance. Past performance information may be used by the Government to make future award decisions and/or may result in a finding that the quoter is not responsible for the award of future requirements.
Other files
| File | Type | Posted |
|---|---|---|
| Combined Synopsis -Subsistence.docx | DOCX document | |
| Combined Synopsis -Subsistence.docx | DOCX document | |
| Vendor Quote Cover Sheet.docx | DOCX document | |
| 3rd QTR FY 26 Specs Subsistence.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .