Deliverables.pdf

PDF 169 KB Posted

Attached to
40 Foot Low Floor CNG or BEB Transit Buses- FTA Funded
Solicitation number
230011
Issued by
Pima County, Tucson City, Arizona

About this file

This document is Attachment J: Contract Deliverables for a bus manufacturing contract, detailing the comprehensive list of documentation and materials required to be submitted by the bus manufacturer to the Agency throughout the production process. The attachment outlines 45 specific deliverables with associated agency actions, due dates, formats, and required quantities, covering everything from bus testing reports and quality assurance certificates to training materials, technical drawings, manuals, and production-related documentation. Key deliverables include the Altoona Test Report (due prior to pilot bus delivery), serialized unit lists for each bus, manufacturing quality assurance program documentation, pre-delivery bus documentation packages, emissions certificates, training curricula, maintenance and diagnostic manuals, parts lists, technical drawings, and various certification documents.

The contract requires the bus manufacturer to provide detailed documentation at multiple stages of production, with most deliverables requiring review or approval by the Agency. Submission formats include hardcopy, electronic media, certificates, and scale drawings, with quantities ranging from 1 to 20 copies depending on the specific item. Critical submission timelines include pre-award site visits, with many documents required 30-90 days before or after specific production milestones, such as the first pre-production meeting, pilot bus completion, or final bus delivery. The build schedule must include specific production milestone dates, tracking each vehicle's progress from initial production line entry to final shipment, ensuring comprehensive oversight of the manufacturing process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT J

CONTRACT DELIVERABLES

Contract deliverables associated with this Contract are set forth in the table below, along with other pertinent information. Contract deliverables shall be submitted in accordance with “Section 3: Technical Specifications.”

Due dates shown note the last acceptable date for receipt of Contract deliverables. The City will consider early receipt of Contract deliverables on a case-by-case basis. The reference section designates the appropriate specification section(s) where the requirement is referenced.

Build Schedule

The bus manufacturer’s contract administrator shall supply a fleet build production schedule based on the dates in the Notice to Proceed, and a description of the manufacturer’s schedule for plant operations.

The production schedule should contain specific milestone dates, such as the following:

• First vehicle on production line (date on which any work will begin).

• First vehicle off production line.

• First vehicle through manufacturer’s quality assurance inspections.

• First vehicle shipped to the Agency.

• Last vehicle on production line.

• Last vehicle off production line.

• Last vehicle shipped to the Agency.

Deliverable Agency Action

Due Date

Format Quantity Due

1. Bus Testing— Altoona Test Report

Review Prior to pilot bus delivery

Hardcopy 1

2. List of serialized units installed on each bus

Review With each delivered bus

Electronic media

1 per bus

3. Copy of Manufacturers’ formal Quality Assurance Program

Review Pre-award site visit Hardcopy 1

4. QA manufacturing certificate Review With each delivered bus

Hardcopy 1 per bus

5. QA purchasing certifications acknowledging receipt of applicable specification

Review 30 days following first Pre-Production Meeting

Hardcopy 1 per major Supplier

6. Pre-Delivery Bus Documentation Package

Review With each delivered bus

Hardcopy 1 per bus

7. Motor Vehicle Pollution Requirements Certificate

Review With each bus Hardcopy 1

8. Engine Emissions Certificate— NOx levels

Review Prior to completion of pilot bus

Hardcopy 1

9. Pre-Production Meeting minutes Approval 30 days after each meeting

Hardcopy 2 originals

10. Driver’s log and incident report Review With each bus delivery if drive-away service is used

Hardcopy 1 per bus

Due

11. Title documentation Review 10 days prior to bus delivery

Hardcopy 1 per bus

12. Performance bond Review 30 days following execution of Contract

Hardcopy 1

13. Insurance certificates Approval Before Work commences

Hardcopy 1

14. Engineering support Review During Pre- Production Meeting

Contracts 1

15. Training instructor information Approval 30 days prior to delivery of pilot bus

16. Training curriculum Approval 30 days prior to delivery of pilot bus

Electronic media

17. Teaching materials Review During classroom instruction

Hardcopy 1

18. Professionally prepared mechanics’ “Bus Orientation” training video

Review 30 days prior to first production bus

Electronic Media

2 each

19. Final preventative maintenance manuals

Review 90 days after Agency written approval

Hardcopy

Per specification

20. Final diagnostic procedures manuals

Review 90 days after Agency

Per specification

21. Final parts manuals Approval 90 days after Agency

Per specification

22. Component repair manuals (Agency approval/review period of 90 days from date of receipt)

Approval 90 days after Agency written approval of OEM component repair list

Hardcopy

Electronic media

23. Draft preventative maintenance manuals (Agency approval/review period of 90 days from date of receipt)

Approval With pilot bus Hardcopy 1

24. Draft diagnostic procedures manuals (Agency approval/review period of 90 days from date of receipt)

Approval With pilot bus Hardcopy 1

Due

25. Draft parts manuals (Agency approval/review period of 90 days from date of receipt)

Approval With pilot bus Hardcopy 1

26. List o f OEM component repair manuals

Approval With pilot bus Hardcopy 1

27. Draft operators’ manuals (Agency approval/review period of 90 days from date of receipt)

Approval With pilot bus or maximum of 30 days prior to start of production

Hardcopy 1

28. Final operators’ manuals Review 30 days following Agency approval of draft manual

Hardcopy Per specification

29. Recommended spare parts list, including bill of materials

Review 60 days prior to shipment of first bus

Hardcopy 1

30. Part number index Approval 60 days prior to shipment of first bus

Hardcopy

Spreadsheet

31. Current price list Review 90 days after Agency written approval of draft parts manual

Hardcopy 20

32. In-process drawings Review 30 days prior to production

Scale drawings

33. Electrical and air schematics Review 30 days prior to production

Hardcopy 1

34. As-built drawings Review Within 60 days after final bus delivery

Electronic media

35. Material samples Review By conclusion of Pre- Production Meetings

36. Undercoating system program Approval First Pre-Production Meeting

Hardcopy 1

37. Flooring certificate Review First Pre-Production Meeting

Certificate/ copy of purchase order

38. Interior features – fire-resistance certificates

Review Prior to pilot bus completion

Certificates 1

39. Crashworthiness Review Pre-award audit Certificate 1

40. Technical review of electronic functionality

Approval Prior to production Hardcopy 1

41. Interior security camera layout Approval Prior to pilot bus completion

Copies of interior views

1 each

42. Technical review of power plant Prior to production 1 each

43. Power plant certifications Review Prior to pilot bus completion

Hardcopy 1 each

Due

44. Striping layout Approval Prior to production Hardcopy 1

45. Resolution of issues “subject to Agency approval”

Approval Prior to production Hardcopy 1