DeLaveaga_Golf_Course_-_Roofing_Repair_Project.pdf

PDF 262 KB Posted

Attached to
DeLaveaga Golf Course - Roofing Repair Project
Solicitation number
IFB No. PW-0239
Issued by
Santa Cruz County, San Francisco City, California

About this file

This is an Invitation for Bids (IFB No. PW-0239) issued by the City of Santa Cruz, California for the DeLaveaga Golf Course Roofing Repair Project. The project involves demolition of portions of existing roof and structural beams, reroof installation, alterations to rainwater collection scuppers, replacement of fascia, and repairs to existing structural beams and joists on approximately 4,500 square feet of existing roof at the DeLaveaga Clubhouse located at 401 Upper Park Road. Coordination between tenants, contractor, and project staff is required as tenant spaces must remain operational during construction. A mandatory pre-bid meeting is scheduled for August 13, 2025 at 10:00am at the project site, with questions due August 19, 2025, responses to questions by August 21, 2025, and bid submittals due August 26, 2025 at 2:00pm. The contract term is one year with potential renewals, and the City anticipates an overall construction schedule of 10 working days.

The project requires compliance with prevailing wage requirements and DIR registration for all contractors and subcontractors. Bidders must provide a 10% bid security, 100% performance bond, and payment bond (50% of contract price if under $1 million). Insurance requirements include Professional Liability, Commercial General Liability, Auto Liability, and Workers' Compensation coverage. The successful bidder must maintain a current City of Santa Cruz business tax certificate if located within city limits or performing services there for more than 6 days annually. Liquidated damages of $3,600 per day apply for failure to deliver or perform within specified time limits. All bids must be submitted electronically through the City's e-procurement portal, with hard-copy submissions also required by the stated deadline.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Invitation For Bids

No. IFB No. PW-0239

FOR

DELAVEAGA GOLF COURSE - ROOFING REPAIR PROJECT

Contact: BJ Dericco, Engineering Associate

Email: rdericco@santacruzca.gov

RESPONSE DEADLINE: August 26, 2025, 2:00 pm

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://procurement.opengov.com/portal/santacruzca

City of Santa Cruz

DeLaveaga Golf Course - Roofing Repair Project

I. INTRODUCTION

II. INSTRUCTIONS FOR BIDDERS

III. TERMS AND CONDITIONS

IV. BID SUBMITTALS

Attachments:

A - PC2, B25-0038, Plans, 4-16-25, BD

B - DeLaveaga Clubhouse Roof Repair - Technical Specifications

C - Invitation for Bids - DELAVEAGA GOLF COURSE - ROOFING REPAIR PROJECT

#IFB No. PW-0239 Title: DeLaveaga Golf Course - Roofing Repair Project

1. INTRODUCTION

1.1. Summary

The DeLaveaga Golf Course Roofing Repair project (c402604) will include demolition of portions of existing roof and structural beams, reroof installation, alterations to the rainwater collection scuppers, replacement of fascia and repairs to existing structural beams and joists. The existing roof is approximately 4,500 SF. Coordination between the tenants, contractor, and project staff will be necessary as the tenant spaces will be required to remain in operation during the construction activities.

1.2. Background

The DeLaveaga Clubhouse is located at 401 Upper Park Rd., Santa Cruz, CA. Within the two-story, 9,164 square foot (SF) building, operates a retail golf shop and restaurant. To date, the structure has been damaged by water intrusion from storm events, affecting operation of the tenant spaces inside.

1.3. Contact Information

Project Contact:

BJ Dericco

Engineering Associate

Email: rdericco@santacruzca.gov

Phone: (831) 420-5519

Procurement Contact:

BJ Dericco

Engineering Associate

Email: rdericco@santacruzca.gov

Phone: (831) 420-5519

Department:

Public Works

Department Head:

Nathan Nguyen

Public Works Director

1.4. Timeline

The City will make every effort to adhere to the following tentative schedule. All dates set forth in this

IFB are subject to change at the City’s sole discretion. Any change will be set forth in an addendum. All references in this IFB to “time” are Pacific Standard Time.

Release Project Date August 4, 2025 mailto:rdericco@santacruzca.gov tel:(831)420-5519 mailto:rdericco@santacruzca.gov tel:(831)420-5519

Pre-Bid Meeting (Mandatory) August 13, 2025, 10:00am

401 Upper Park Rd., Santa Cruz, CA, 95065

IFB Questions and Clarification Due Date August 19, 2025, 5:00pm

Response to bidder(s) IFB Questions and

Clarification & Issue Addenda

August 21, 2025, 5:00pm

Bid Submittal Due Date & Public Bid

Opening

August 26, 2025, 2:00pm

809 Center St., Room 201, Santa Cruz, CA, 95060

2. INSTRUCTIONS FOR BIDDERS

2.1. Questions and Requests for Clarification and Addenda

Questions or concerns regarding any aspect of this IFB shall be sent via City’s e-Procurement Portal’s

Question & Answer feature and received by the date identified in Timeline in INTRODUCTION Section.

Any questions or objections not submitted within the time and manner stated above or to anyone other than the above-stated contact will be deemed waived. The City is not bound by the oral representation of any City employee or official. Answers to questions received will be sent out via an addendum.

The City may determine it is necessary to revise any part of this IFB. Revisions will be made by written addenda and it is the Bidder's sole responsibility to comply with any addenda to this IFB and acknoeledge addenda via City's e-Procurement Portal. Addenda will be posted on the City’s e-

Procurement Portal, https://procurement.opengov.com/portal/santacruzca/projects/188661, under

Bidding Information.

2.2. Bid Submittal

Sealed bids are due no later than the Date and time specified in Timeline in INTRODUCTION Section. All bids will be submitted via City's e-Procurement Portal before the due date.

Prior to any bid being accepted, the bidder must demonstrate compliance with all bid specifications for such product. The burden of proof of compliance with this specification is the responsibility of the bidder. No exceptions to or deviations from this specification shall be considered unless each exception or deviation is specifically stated as an exception and accompanied by a detailed description of the exception and/or deviation. If no exception or deviation is shown, the bidder shall be required to furnish the equipment exactly as specified herein.

Failure to comply with all requirements, instructions, and conditions of the invitation for bids and this specification may result in rejection of bid.

2.3. Non-Response to IFB

If the Bidder does not wish to submit a bid, write “no bid at this time” and the Bidder name on the Bid

Sheet and return by the bid due date. Failure to respond to this Invitation for Bids may result in removal of the Bidder from the bid list for the solicited item.

2.4. Responsive Bids

Bids are considered responsive when they:

A. Comply with all requirements, instructions, and conditions of this solicitation.

B. Comply with the bid specifications and do not have unacceptable exceptions.

C. Include pricing for all items listed.

D. Include all required submittals.

E. Acknowledge all bid addenda.

F. Have signatures on the Bid Sheet.

https://procurement.opengov.com/portal/santacruzca/projects/188661/document?section=1750432 https://procurement.opengov.com/portal/santacruzca/projects/188661 https://procurement.opengov.com/portal/santacruzca/projects/188661/document?section=1750432 https://procurement.opengov.com/portal/santacruzca/projects/188661

G. Are received by the bid due date and time.

Non-responsive bids may not be considered and may be rejected.

2.5. Reservation of Rights

The City may exercise at its sole discretion the following rights. By responding to this IFB, Bidders acknowledge and consent to the following rights.

The City reserves the right to:

• Postpone, cancel, or issue a subsequent IFB.

• Reject any or all bids.

• Reject any bid that is conditional in any way or that contains erasures, items not called for, items not in conformity with applicable law, changes, additions, alternate bids, or any responsive or submitted by a Bidder that is not responsible.

• Issue addenda to amend, modify, add or delete requirements of this IFB.

• Remedy technical errors in the IFB process.

• Disqualify Bidders who are deemed non-responsive to the requirements of this IFB.

• Waive informality or immaterial irregularities or minor defects in a bid offer, accept and/or reject all or part of a bid offer.

• Use judgment whether to respond to questions after the IFB question submittal due date.

• Not award a Purchase Order/Contract.

• Award a Purchase Order/Contract to a single Bidder for the entire procurement or to multiple

Bidders by line item, in groups, or phases according to Section PRELIMINARY SCOPE OF WORK.

• If only one bid is received in response to this bid invitation, require the sole Bidder to submit cost or pricing data to assist in determining if the price is reasonable.

2.6. Bid Sheet Pricing

The Price Schedule can be found in Section BID FORM.

The Bidder shall use Bid Form for the submittal of their Bid Pricing. The Bid price submitted on the Bid

Form shall include the costs for services, systems, or goods listed in Bid Documents. Bid prices shall remain firm and not subject to escalation throughout the term of the contract including extensions.

Bidder's pricing shall be submitted as a firm-fixed fee (flat rate) for performance of all specifications on the Pricing Schedule of the Bid Form. The Price Schedule shall be completed in full and shall be incorporated herein. Any deviations from the Price Schedule may be considered nonresponsive.

All information provided in the IFB documents is based on past experience and expected future need.

Actual orders may vary during the contract term. The City reserves the right to obtain competitive https://procurement.opengov.com/portal/santacruzca/projects/188661/document?section=1750438 https://procurement.opengov.com/portal/santacruzca/projects/188661/document?section=1750434 quotes for contract items. If the Bidder is not consistently the low bidder for these items, the City may terminate this agreement.

2.7. References

The bidder shall submit with bid a list of a minimum of three (3) client references that have procured

DeLaveaga Golf Course - Roofing Repair Project service from the bidder, for a minimum of 1 year in the last five (5) years which demonstrate relevant experience with the Project. The bidder shall provide company or agency name, contact name, and phone number for each reference. It is the responsibility of the bidder to ensure the client reference contact person is available and willing to provide a reference within the timeframe stated in this section.

2.8. Collusive or Sham Bids

No person, supplier, or corporation shall make or file or be interested in more than one bid for the same work, except so far as alternate bid may be called for. Nor shall any person, supplier, or corporation submit a collusive or sham bid, per se, directly or indirectly, to induce any other supplier to submit such a bid, or to refrain from responding, or seek in any way to fix the price, or any portion of the proposed price, in order to secure an advantage against the owner or any person interested in a proposed contract. However, a person, supplier, or corporation submitting a sub-bid to a bidder or quoting prices on materials for a bidder, is not hereby disqualified from submitting sub-bids or quoting prices to other bidders.

The Bidder shall acknowledge that it has not directly or indirectly been collusive with any other bidder in the preparation and submission of the bid by submitting the Non-Collusion Declaration. If at any time it shall be found that the bidder to whom a contract has been awarded has, in presenting the bid, colluded with any other party or parties, said bidder shall be liable to the City for all loss or damage which the City has or may suffer as the result of the collusive activity, including, but not limited to, the cost of advertising and awarding a new contract.

2.9. Public Record

Bids received will become the property of the City. All bids and any subsequent contracts will be subject to public disclosure per the “California Public Records Act,” California Government Code, sections

7920.000 - 7931.000, once the City has awarded the contract resulting from this solicitation.

If a Bidder’s proprietary information is contained in documents or information submitted to City, and

Bidder claims that such information falls within one or more CPRA exemptions, Bidder must clearly mark such information “Confidential and Proprietary,” and identify the specific lines containing the information. In the event of a public request for such information, City will make best efforts to provide notice to Bidder prior to such disclosure. If a Bidder contends that any documents are exempt from the

CPRA and wishes to prevent disclosure, it is required to obtain a protective order, injunctive relief, or other appropriate remedy from a court of law in Santa Cruz County before the City is required to respond to the CPRA request. If Bidder fails to obtain such remedy within the time the City is required to respond to the CPRA request, City may disclose the requested information without any liability to

Bidder. Bidder further agrees that it shall defend, indemnify and hold City harmless against any claim, action or litigation (including but not limited to all judgments, costs, and attorney’s fees) that may result from denial by City of a CPRA request for information arising from any representation, or any action (or inaction), by the Bidder.

2.10. Award Protests

The City desires to foster cooperative relationships with Proposers and to reach a fair agreement in a timely manner.

The City encourages Proposers to resolve issues regarding the IFB requirements or the procurement process through written correspondence and discussions at least 5 business days prior to the proposal due date. This will allow the City time to research the validity of any stated issues and either issue an addendum to the IFB, cancel the IFB, or determine the protest to be unfounded and proceed with the solicitation. In the event, the protest of specifications is denied, and the protester wishes to continue in the protest process, the protesting Proposers must still submit a proposal in accordance with the proposal submittal procedures provided in this solicitation. Questions or concerns prior to the intent to award notice will be directed to:

BJ Dericco, Engineering Associate, rdericco@santacruzca.gov

Any Proposer who unsuccessfully bids on a City contract or any trade association representing workers who would have potentially been employed by such contract may formally protest a contract award.

Protest letters regarding a formal contract award will be directed to:

City of Santa Cruz

City Clerk Administrator

809 Center Street, Room 9

Santa Cruz, California 95060

Protests will be filed with the City Clerk’s office no later than 5 business days after the written Notice of

Intent to Award is sent by the City. Protest letters will include:

• The name, address, and telephone number of the protester;

• The Project title, IFB Number, and IFB due date;

• Name of City employee and Department designated as the contact in the original IFB;

• A detailed statement of the legal and/or factual grounds for the protest; and

• The form of relief requested.

The City Council will hear the protest prior to award of the contract. The protesting party may protest the City’s or successful Proposer’s failure to comply with the requirements of the Purchasing Ordinance or the solicitation documents. The protest must clearly set forth the basis for the protest; grounds not set forth in the written protest will not be considered by the City Council at the protest hearing. The City

Council will sustain a protest if the protesting party demonstrates by clear and convincing evidence that, as specified above, the City would act improperly in awarding the contract. The decision of the City

Council is final.

2.11. Contract Implementation

Upon award notification and prior to final contract approval, the successful proposer will be required to submit:

• Proof of insurance as specified in this solicitation document.

• Proof of insurance and prevailing wage compliance documentation as specified in this solicitation document.

• Living wage ordinance compliance documentation;

• Documentation of all credentials necessary to legally perform the services specified;

• A completed W9 form and, if applicable, non-resident withholding exemption form, if not already on file with the City; and

• Proof of a current City of Santa Cruz business tax certificate if the Contractor is located in, or performs services within, the city limits for more than 6 days annually.

The finalized contract will be in the form included as Appendix A Sample Agreement herein, and include the IFB documents, the Bidder’s Bid Form.

2.12. Environmental Conservation and Sustainable Living

The City of Santa Cruz has long been an advocate for environmental conservation and sustainable living.

This includes, but is not limited to, the Green Business Program, the Living Wage Ordinance, the Clean

Ocean Business Program, the Green Building Program and Climate Action Plan 2030 goals which define greenhouse gas reduction objectives to reduce community-wide greenhouse gas emissions 40 percent by 2030 and 100 percent by 2035 (compared to 1990 levels). In your Bid Form, please provide information about your company regarding any existing environmental conservation goals or guidelines, environmental or greenhouse gas emissions disclosures, Green Business certifications, existing alternative fuel service vehicles, superior employee benefit policies, or other applicable policies.

2.13. Financial Responsibility

The City accepts no financial responsibility for any costs incurred by a bidder in responding to this IFB and bidders acknowledge and agree that their Bids will become the property of the City and may be used by the City in any way deemed appropriate.

3. TERMS AND CONDITIONS

3.1. Insurance Requirements

Proposer will provide Certificate of Insurance(s) for Professional Liability, Commercial General Liability, Auto Liability, and Workers’ Compensation as stated in the City’s standard Terms and Conditions. The

City reserves the right to adjust the insurance terms provided based on the type and scope of project proposed by the Proposer.

3.2. Prevailing Wages and Labor Compliance

Prevailing wages must be paid to all employees working under this contract. This contract is subject to compliance monitoring and enforcement by the California Department of Industrial Relations

(DIR). Contractors and subcontractors must register with the DIR in order to submit a bid and be awarded a contract (http://www.dir.ca.gov/dlse/dlsePublicWorks.html). No bid will be accepted, nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. If awarded a Contract, the

Contractor and its subcontractors, of any tier, shall maintain active registration with the Department of

Industrial Relations for the duration of the Project.

3.3. Living Wage

Proposers agree to comply with the requirements of the Living Wage Ordinance as provided in Santa

Cruz Municipal Code Chapter 5.10.

3.4. Agreement (Appendix A)

The successful Proposer will be required to enter into an Agreement in the form of the Agreement attached hereto as Appendix A. The City reserves the right to adjust the terms, including insurance terms provided, based on the type and scope of the project proposed by the Proposer. If a Proposer is unable to accept City’s proposed Agreement terms substantially in the form presented, the Proposer shall include a revised copy of the Agreement with its Proposal. The revised copy must clearly mark any section to which it objects, set forth the Proposer’s proposed alternative terms, and explain the basis for each proposed change. The City reserves all rights to reject any revisions to the Agreement.

If a satisfactory contract cannot be negotiated in a reasonable time, the City in its sole discretion may terminate negotiations.

3.5. Contract Period

The term of the contract will commence upon notification of award and continue for a period of 1 year(s) plus any renewals agreed to by the parties and made in writing.

3.6. Equal Employment Opportunity and Non-Discrimination

City’s policies promote a working environment free from abusive conduct, discrimination, harassment, and retaliation; and require equal opportunity in employment for all regardless of race, religious creed

(including religious dress and grooming practices), color, national origin (including language use restrictions), ancestry, religion, disability (mental and physical), medical condition, sex, gender (including gender identity and gender expression), physical characteristics, marital status, age, sexual orientation, genetic information (including family health history and genetic test results), organizational affiliation, http://www.dir.ca.gov/dlse/dlsePublicWorks.html and military or and veteran status, or any other consideration made unlawful by local, State or Federal law. City requires Consultant to be in compliance with all applicable Federal and State and local equal employment opportunity acts, laws, and regulations and Consultant is responsible for ensuring that effective policies and procedures concerning the prevention of abusive conduct, discrimination, harassment, and retaliation exist in Consultant’s business organization. The City’s current Equal

Employment Opportunity and Non-Discrimination policies to which this Section applies may be viewed at http://www.codepublishing.com/CA/SantaCruz/?SantaCruz09/SantaCruz0983.html and http://www.cityofsantacruz.com/home/showdocument?id=59192. Copies are available upon request from the City’s Purchasing Division.

3.7. Indemnification

To the fullest extent permitted by law, Proposer agrees to indemnify, defend, and hold harmless the

City, its officials, officers, employees, agents, and volunteers (collectively, “Indemnitees”) from and against any and all liability, claim, action, loss, injury, damage, judgment, or expense, including attorneys’ fees and costs (“Losses”) caused by or resulting from the negligence, recklessness, or willful misconduct of Proposer, Proposer’s officers, employees, agents, or subcontractors in any way related to this RFP, including but not limited to Proposer’s Proposal. Proposer’s duty to indemnify and hold harmless Indemnitees shall not apply to the extent such Losses are caused by the sole or active negligence or willful misconduct of Indemnitees, as determined by an adjudicatory body or court of competent jurisdiction, if applicable. The obligation to defend shall arise regardless of any claim or assertion that Indemnitees caused or contributed to the Losses.

In the event this Agreement involves the performance of design professional services by Proposer, Proposer’s officers, employees, agents, or subcontractors, Proposer’s costs to defend Indemnitees shall not exceed the Proposer’s proportionate percentage of fault per Civil Code §2782.8. This section shall survive the termination or expiration of the Agreement.

3.8. Liquidated Damages

The parties agree that in litigation or arbitration resulting from either party’s breach, the amount of loss would be extremely difficult or impracticable to prove. Accordingly, the parties wish to make a commercially reasonable estimate of the damages they would incur in the event of a breach by the other party and to establish that estimate as liquidated damages. In the event of a breach by the seller, the buyer shall recover as liquidated damages and as the buyer’s exclusive remedy for the seller’s breach, the amount of $3,600.00 per day for failure to deliver or perform within the specified time limit.

3.9. Performance Bond/Payment Bond

Bonding requirements for federally funded contracts are subject to the following federal directives:

Bidder’s security of ten percent of the bid price for all public works contracts at the time of Bid submittal

(Public Contract Code Section 20483(a)).

A. Performance bond equal to 100-percent of the contract price for all public works contracts.

B. Payment bond for all public works contracts of at least:

C. 50-percent of the contract price if the contract price does not exceed $1 million.

http://www.codepublishing.com/CA/SantaCruz/?SantaCruz09/SantaCruz0983.html http://www.cityofsantacruz.com/home/showdocument?id=59192.

http://www.cityofsantacruz.com/home/showdocument?id=59192.

1. 40 percent of the contract price if the contract price exceeds $1 million but is not more than

$5 million; or

2. $2.5 million if the contract price exceeds $5 million.

Within ten (10) business days, not including legal holidays, of contract award, the successful Proposer must submit a performance bond and payment bond, executed by the Contractor and the Surety. All bonds must be issued by California admitted Sureties.

Should any surety or sureties be deemed unsatisfactory by the City, a notice will be given to the

Contractor. The Contractor shall promptly substitute a new surety or sureties satisfactory to the City. No further payment shall be deemed due or will be made under the contract until the new sureties are accepted by the City.

At its sole discretion, the City may allow the Contractor to provide bonds from multiple sureties to meet the bond requirements.

4. BID SUBMITTALS

4.1. Bid Form*

By confirming, the proposer is affirming to the following:

The undersigned, upon acceptance, agrees to furnish the following in accordance with the specifications and terms and conditions per City of Santa Cruz “Invitation for Bids for DeLaveaga Golf Course - Roofing

Repair Project” at the prices indicated herein.

The bidder, under penalty of perjury, declares not to be a party with any other business to an agreement to propose a fixed or uniform price in connection with this bid.

The bidder declares under penalty of perjury that she/he is authorized to sign this document and bind the business or organization to the terms of this bid.

The bidder recognizes the right of the City of Santa Cruz to reject any or all bids received and to waive any informality or minor defects in bids received.

The bidder declares under penalty of perjury that the information contained in this Bid and all accompanying documents are true and correct.

☐ Please confirm

*Response required

4.2. Hard-Copy Bid Required*

Bidder understands hard-copy bids are required to be submitted by the date and time as stated in the project timeline.

☐ Yes

☐ No

*Response required

4.3. Non-Collusion Declaration*

By confirming, the proposer, the party making the foregoing proposal declares that the proposal is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the proposal is genuine and not collusive or sham; that the Consultant has not directly or indirectly induced or solicited any other Consultant or Sub-Consultant to put in a false or sham proposal; and has not directly or indirectly colluded, conspired, connived, or agreed with any

Consultant, Sub-Consultant or anyone else to put in a sham proposal, or that anyone shall refrain from proposing; that the Consultant has not in any manner directly or indirectly, sought by agreement, communication, or conference with anyone to fix the proposal price of the Consultant or any other

Consultant or Sub-Consultant, or to fix any overhead, profit, or cost element of the proposal price, or of that of any other Consultant or Sub-Consultant, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the proposal are true; and, further, that the Consultant has not, directly or indirectly, submitted his or her proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, proposal depository, or to any member or agent thereof to effectuate a collusive or sham proposal.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct.

☐ Please confirm

*Response required

4.4. Compliance

Failure to comply with the City’s Terms and Conditions and Insurance Requirements may disqualify your bid.

4.4.1. By confirming, the bidder's company accept the City's Standard Terms and

Conditions.* ☐ Please confirm

*Response required

4.4.2. By confirming, the bidder's company accept the City's Insurance

Requirements.* ☐ Please confirm

*Response required

4.5. Technical Proposal

Proposers shall submit their proposal in hard copy to the Public Works Office, located at 809 Center St., Room 201, Santa Cruz, Ca, 95060. The following items must be submitted as part of the proposal for the

Project:

A. TOTAL PRICE FOR COMPLETION OF THE PROJECT: The price is to include the cost of all design, construction and operational services. The price shall include the furnishing of design and professional services, all materials, equipment, systems, tools, utilities, acquisition of all insurance, bonds, permits, approvals, authorizations, certificates, including applicable taxes and the performance of all labor and professional services including design costs and management necessary for the proper coordination and completion of the Project.

B. PROJECT MANAGER: Identify the individual who will function as the project manager during the preparation and development of the Contract Documents through final construction and startup.

C. PROJECT SCHEDULE: Provide a Critical Path Method resource loaded (i.e. labor and equipment) schedule showing your proposed Project delivery schedule. Identify all critical activities for the

Project. Identify key milestones at which Owner reviews and Owner approvals will be required.

Describe your proposed action plan to maintain compliance with your construction schedule.

Address your ability to respond quickly to potential delays. The Proposer shall identify how much allowance has been made for bad weather in the schedule, the days of the week and the hours of construction operations during each phase of the work, and the anticipated dates that the existing processing operation will need to be shut down. The City anticipates an overall schedule of 10 working days to complete the Project. The Vendor may submit an alternative schedule. A shorter alternative schedule is favorable to the City.

4.5.1. Federal Tax ID*

*Response required

4.5.2. References*

List a minimum of three references that have purchased similar items from your business. Provide company or agency name, contact name, phone number, and email address for each reference.

*Response required

4.6. City of Santa Cruz Business Tax Certificate

Contractor will maintain a current City of Santa Cruz business tax certificate if:

A. Contractor is located in the City of Santa Cruz; or

B. Contractor performs physical work in the City of Santa Cruz for 6 or more days annually; or

C. Contractor uses company vehicles to deliver within the City of Santa Cruz for 6 or more days annually.

For additional information and licensing requirements, call the Revenue division at 831/420-5070.

4.6.1. Contractor's Sale and/or service contract (Optional)

A copy of any sales and/or service contract that the Contractor will require during the execution of any contract resulting from this solicitation. Any terms that contradict the City’s terms and conditions or contain provisions that are determined not to be in the best interest of the City will disqualify the

Contractor.

4.6.2. Does your company have a City of Santa Cruz Business Tax Certificate?* ☐ Yes

☐ No

*Response required

When equals "Yes"

4.6.3. City of Santa Cruz Business Tax Certificate Number*

*Response required

When equals "Yes"

4.6.4. Expiration Date*

*Response required

4.6.5. Acknowledgment of Addenda and Questions and Answers*

In order to submit a bid, the vendor acknowledges that they have read all addenda, and questions and answers posted for this solicitation.

☐ Please confirm

*Response required

4.7. California Levine Act Statement

California Government Code Section 84308, commonly referred to as the "Levine Act," prohibits any member of the City Council of the City of Santa Cruz from participating in any action related to a contract if they receive any political contributions totaling more than $250 within twelve (12) months before or after the date a final decision concerning the contract has been made, from the person or company awarded the contract. The Levine Act also requires disclosure of such contribution by a party to be awarded a specific contract.

Answering YES to either of the two questions above does not preclude the City of Santa Cruz from awarding a contract to your firm or taking any subsequent action related to the contract. It does, however, preclude the identified City Council Member(s) from participating in any actions related to this contract.

4.7.1. Have you or your company, or any agent on behalf of you or your company, made any political contributions of more than $250 to an Officer of the City of

Santa Cruz in the twelve (12) months preceding, the date of the submission of your proposals or the anticipated date of any council action related to this contract? * ☐ Yes

☐ No

*Response required

When equals "Yes"

4.7.2. If yes, please identify the Council Member(s): *

*Response required

4.7.3. Do you or your company, or any agency on behalf of you or your company, anticipate or plan to make any political contribution of more than $250 to any

Member of the City Council in the twelve (12) months following any City

Council action related to this contract? * ☐ Yes

☐ No

*Response required

When equals "Yes"

4.7.4. If yes, please identify the Council Member(s): *

*Response required