SD-STD-01.01revHv2-2024 SIGNED.pdf
PDF 4 MB Posted
- Attached to
- ENGINEERING AND SUPPORT SERVICES
- Solicitation number
- DEAV2025-002
About this file
This is a Department of State (DOS) certification standard document (SD-STD-01.01, Revision H, Version 2) for forced entry and ballistic resistance of building systems, released in October 2024. The standard establishes testing and certification requirements for systems like doors, windows, walls, and other building components used in DOS diplomatic facilities worldwide.
The document details specific testing procedures and acceptance criteria for both forced entry (FE) resistance (5, 15, or 60 minute ratings) and ballistic resistance (BR) ratings for rifle and armor-piercing threats. Key updates from previous versions include increased ballistic testing requirements with 8 shots per round, revised forced entry testing protocols using identical toolsets for all FE durations, and new mounting gap requirements. The standard outlines detailed documentation requirements, certification processes, and quality control measures. Testing must be conducted at DOS-approved facilities listed in Table 8. Other significant changes include allowing systems up to 80% larger than tested size, new minimum transparency size requirements, and updated procedures for technical reviews and certification renewals. The document supersedes all earlier versions of SD-STD-01.01 and SD-STD-01.02.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Engineering Services .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SD-STD-01.01, Revision H Originally published June 16, 2020
Version 2 released October 24, 2024
(Supersedes all earlier revisions of
SD-STD-01.01 & SD-STD-01.02)
CERTIFICATION STANDARD
FORCED ENTRY AND BALLISTIC RESISTANCE
OF BUILDING SYSTEMS
PHYSICAL SECURITY DIVISION
OFFICE OF PHYSICAL SECURITY PROGRAMS
BUREAU OF DIPLOMATIC SECURITY
U.S. DEPARTMENT OF STATE
WASHINGTON, D.C. 20520
This 2024 is the same as the one published in 2020 except Table 8 Version 2 has superseded Table 8 Version 1.
-i-
UNCLASSIFIED
BRIEF TABLE OF CONTENTS
Page Number Preface x
Definitions 2
1.0 Scope and Requirements 7
2.0 Test Preparation 22
3.0 Test Procedures 29
4.0 Data 38
5.0 Technical Review Procedures 41
Figures TAB 2
Tables TAB 3
Forms TAB 4
-ii-
COMPLETE TABLE OF CONTENTS
1.0 SCOPE AND REQUIREMENTS
1.1 GENERAL
1.1.1 Users
1.1.1.a Intent
1.1.1.b Use
1.1.1.c DOS-Designed Systems
1.1.2 Exceptions
1.1.3 Implementation
1.1.3.a Implementation Date
1.1.3.b List of FE/BR-Certified Systems
1.1.3.c Procurement Relative to the Implementation Date
1.2 CERTIFICATION
1.2.1 Tested to Current Version of SD-STD.01.01
1.2.2 Tested to Earlier Versions of SD-STD.01.01
1.2.3 Certification Submission
1.2.4 Modifications
1.2.5 Previously Certified Systems
1.2.5.a New Certification of Previously Certified Systems
1.2.6 Certification Limits
1.2.6.a Orientation
1.2.6.b Certification for Sizes Other Than Test Sample Size
1.2.6.b.1 Sizes Which Exceed Eighty Percent in Any Dimension
1.2.6.b.2 Glazing Openings Smaller than Twelve Inches
1.2.6.b.3 Aberrational Shapes
1.2.6.b.4 Aberrational Aspect Ratios
1.3 SYSTEM TESTING CONCEPTS
1.3.1 Ballistic Resistance (BR)
1.3.1.a Ballistic Resistance Levels
1.3.1.b Shotgun
1.3.2 Forced Entry (FE) Resistance
1.3.2.a Forced Entry Resistance Levels
-iii-
1.3.3 Concurrent Testing
1.3.4 Multiple Samples
1.3.4.a Damage from a Previous Test
1.3.4.b Required to Provided Multiple Samples
1.3.4.b.1 Testing Less than the Minimum Required Number of Shots
1.3.4.c Electing to Provide Multiple Samples
1.3.4.c.1 Electing to Provide Multiple Samples for Ballistic Resistance
1.3.4.c.2 Electing to Provide Multiple Samples for Forced Entry
1.3.5 Doors
1.3.5.a Door System Undercuts
1.3.5.a.1 Doors with Thresholds
1.3.5.a.2 Doors without Thresholds
1.3.5.b Forced Entry Lock (FEL) Placement
1.3.6 Mulled Systems
1.3.6.a Mulling for Testing
1.3.6.b Schematic
1.3.7 Test Complete Systems
1.3.8 Mounting Gap
1.4 REVOCATION OF CERTIFICATION
1.4.1 Revocation Reasons
1.4.1.a Anomaly
1.4.1.b Material or Design Modification
1.4.1.c Component Substitution
1.4.1.d QA/QC Failure
1.4.1.e Subsequent Test Failure
1.4.1.f Failure to Comply with OBO Specifications
1.4.1.g Failure to Provide Requested Documentation or Lack of Documentation
1.4.1.h Production Ceased
1.4.2 Procurement of Decertified Systems
1.4.3 Revocation Procedures
1.4.3.a Notify Manufacturer
1.4.3.b Meet with Manufacturer and Review Manufacturer’s Proposal
-iv-
1.4.3.c Issue a Letter of Suspension
1.4.3.d Grace Period
1.4.3.e Issue a Letter of Revocation
1.4.4 Quality Assurance/Quality Control (QA/QC)
1.4.4.a QA/QC Procurement
1.4.4.b Differences
1.4.4.c Test Failure
1.5 REVISIONS
1.6 POINT OF CONTACT (POC) FOR THIS STANDARD
1.7 TEST SAMPLE
1.7.1 System Sample
1.8 CERTIFICATION DOCUMENTATION
1.8.1 Request for Certification
1.8.2 Minimum Requirements for Engineering Drawings and Specifications
1.8.2.a Minimum Formatting and Appearance Requirements
1.8.2.b Minimum Bill of Material (BOM) Requirements
1.8.2.c Minimum Labelling Requirements
1.8.2.d Minimum Dimensioning Requirements
1.8.2.e Minimum View Requirements
1.8.2.f Minimum Notes Requirements
1.8.3 Installation Instructions
1.8.4 OBO Specification Guarantee
1.8.5 Test-to-Failure Agreement
1.9 SCHEDULING
1.9.1 Testing Arrangements
1.9.2 Scheduling Procedure
1.9.2.a Documents and Scheduling
1.9.2.b Test Plan and Scheduling
1.9.2.c Test Sample and Scheduling
1.9.2.d Witnessing and Scheduling
1.10 REPORTING
1.11 TESTING AND CERTIFICATION OF DOS-DESIGNED FE/BR SYSTEMS
-v-
1.11.1 Sample Size
1.11.2 Effect on DOS Model Number
1.11.3 Mounting Clearance for DOS-Designed FE/BR Systems
1.11.4 Non-Standard DOS-Designed Systems
1.12 MODEL NUMBERING CONVENTION
1.12.1 DOS Model Number Assignment Procedure
1.12.2 Modification Numbering
1.12.3 Unique Model Numbers Requirement
2.0 TEST PREPARATION
2.1 TEST DIRECTOR
2.1.1 Test Director Assignment
2.1.2 Test Director Shall Ensure Compliance
2.2 TEST SAMPLE DOCUMENTATION AND TEST PLAN
2.2.1 Test Director Shall Examine Test Sample Documentation, and Formulate and Submit a Test Plan
2.2.1.a Examination
2.2.1.b Formal Test Plan
2.2.1.c Scheduling Testing
2.2.2 Test Sample Documentation Examination by Test Team
2.3 TEST SAMPLE MOUNTING
2.3.1 Ballistic Resistance Test Sample Mounting
2.3.2 Forced Entry Test Sample Mounting
2.3.2.a Forced Entry Test Fixture
2.3.2.b Forced Entry Test Sample Installation
2.3.2.c Forced Entry Mounting Clearance
2.3.2.d Forced Entry Test Samples Which Require Footers
2.3.3 Test Sample Labelling
2.4 BALLISTIC TEST SET-UP
2.4.1 Rifle
2.4.1.a Test Sample Placement
2.4.1.b Velocity Measurement Location
2.4.1.c Witness Panel Placement
-vi-
2.4.1.d Witness Panel Contouring
2.4.2 Shotgun
2.4.2.a Barrel Placement
2.4.2.b Deal Trays and the Witness Panel
2.4.2.c Witness Panel for Oblique or Convoluted Passages
2.4.3 Option to Waive Velocity Measurements
2.5 FORCED ENTRY TEST TEAM
2.5.1 Test Team Minimum Requirements
2.5.2 Number of Test Team Members
2.6 AMMUNITION, TOOLS, AND SUPPORT INSTRUMENTATION
2.6.1 Ballistic Testing
2.6.1.a Ballistic Testing Equipment
2.6.1.b Ammunition Requirements
2.6.1.b.1 Ammunition Configuration and Performance Standards
2.6.2 Forced Entry Tools
2.6.3 General Support Instrumentation
2.7 DS/PSP/PSD REPRESENTATION
2.7.1 DS/PSP/PSD Shall Witness Testing
2.7.2 Controversies or Questions
3.0 TEST PROCEDURES
3.1 GENERAL TEST PROCEDURES
3.1.1 Geometric Commonality and Physical Construction
3.1.2 Test Variations
3.1.3 Data Recording
3.1.4 Concurrent FE/BR Testing
3.1.5 Door Operability
3.1.5.a Measuring the Pull/Push Force
3.1.5.b Recording the Pull/Push Force
3.1.5.c Option for Door Closer Removal
3.2 BALLISTIC TESTING
3.2.1 Firing Procedure
3.2.2 Additional Firings
-vii-
3.2.2.a Limits on Transparencies
3.2.2.b Limits on Opaque Portions
3.2.2.c Limits on Ammunition
3.2.2.d No Limits on Oblique Angle Shots
3.2.3 Inspection of Witness Panel
3.2.3.a Classified as “Complete Penetration”
3.2.3.b Classified as “No Penetration” or “Partial Penetration”
3.2.4 Fair Hits
3.2.5 Measuring Shot Velocity
3.3 FORCED ENTRY TESTING
3.3.1 General
3.3.1.a Interruptions
3.3.1.b Forced Entry Testing Safety
3.3.1.c Rests
3.3.1.d Inspections
3.3.1.e Test Resources
3.3.2 Concentrated Assault Test
3.3.2.a Test Sequence
3.3.2.b Test Intent
3.3.2.c Exploit Dissimilar Portions
3.3.2.d Timing
3.3.2.e Progress Information
3.3.2.f Stepping Behind the Test Sample
3.3.3 Mulled Systems
3.3.4 Double Door Systems
3.3.5 Mounting Gap Forced Entry Testing
3.3.6 Test Sample Repairs or Replacements
3.3.6.a During or Between Testing
3.3.6.b After Testing
3.4 PASS/FAIL CRITERIA
3.4.1 Ballistic Rejection Criteria
3.4.2 Forced Entry Rejection Criteria
-viii-
3.4.2.a Pass/Fail Shapes
3.4.2.b Inherent Shape Advantage for Forced Entry
3.4.3 Certification Criteria
3.5 TEST TO FAILURE
3.6 DISPOSITION OF TEST ASSEMBLY
3.7 SAFETY
3.7.1 Safety Considerations
3.7.2 Responsibility for Safety
4.0 TEST DATA AND REPORTING
4.1 GENERAL REPORTING
4.2 MINIMUM REPORTING REQUIREMENTS
4.2.1 All-Inclusive
4.2.2 Report Title
4.2.3 Configuration Documentation
4.2.3.a Complete Configuration Documentation Required
4.2.3.b Verification of Identical System
4.2.4 Waivers
4.2.5 Test House Test Report
4.2.6 Ballistic Test Data
4.2.7 Forced Entry Test Data
4.2.8 Photographic Record of Testing
4.2.9 Narrative Summary
4.2.10 Video Recording of Testing
4.3 CERTIFICATION ISSUANCE
5.0 TECHNICAL REVIEW
5.1 CERTIFICATION BY TECHNICAL REVIEW (T/R)
5.1.1 Change to Certified System
5.1.2 Integration of Subassemblies of Certified Systems
5.1.3 Upgrade to Previously Tested System
5.1.4 Request for New Certification Under Current Version of this Standard
5.2 REQUESTS FOR CERTIFICATION BY TECHNICAL REVIEW
5.3 TECHNICAL REVIEW PROCEDURE
-ix-
5.3.1 Compare Drawings and Specifications
5.3.2 Physical Inspection
5.3.3 New Testing and/or Retesting
5.3.4 Final Decision
5.3.4.a Approval
5.3.4.b Rejection
-x-
PREFACE
MAJOR REVISIONS TO REVISION H
There have been a number of changes incorporated into this revision of the U.S.
Department of State forced entry and ballistic resistant testing specification. This section provides a general overview.
Administrative and Procedural
The latest revision to the test specification codifies many of the administrative and procedural processes the Bureau of Diplomatic Security (DS) has been following in recent years.
Complete and detailed drawings are required of systems considered for subsequent testing and certification.
The requirement that DS-approved systems must also comply with all applicable requirements and specifications promulgated by the US Department of States, Overseas Buildings Operations (OBO) Bureau is reinforced.
Prescriptive requirements for window and door size and mounting gap are removed.
The allowable size increase of a certified system is increased from 10 to 80% for most types of systems.
A minimum allowable size reduction for certified transparent systems is instituted
– reductions to transparencies resulting in less than 12 inches in length or width shall require further testing of the system.
An important procedural aspect of this revision is the introduction of a procedure to retest systems at DS discretion in order to certify a system under this standard that was previously certified under Revision G or G (Amended).
Ballistic Testing
There are a number of changes to ballistic testing requirements incorporated into Revision H. The most significant change is associated with the increasing the number of test shots required for certification. Additionally, the procedure has changed and all shots of the same round are fired consecutively.
Forced Entry Testing
The most significant change to forced entry testing involves five-minute testing.
Revision H institutes a new protocol which employs an identical toolset and six-man Test Team for 5, 15 and 60-minute forced entry testing. The toolkit has also been revised.
-xi-
SPECIFIC CHANGES TO REVISION H
Changes for this version, presented in the approximate order in which they appear in this written standard:
1. Changed the standard’s title, replacing “structural” with “building.”
2. Changed the illustration on the front page.
3. Changed the level of signatory from DAS to C/PSP Deputy Assistant Director.
4. Changed the definition of “Bullet, Ball” and “Bullet Jacket.”
5. Changed the definition of “certification letter” in order to reflect that a system must meet all of the requirements of this standard in order to be certified.
6. Removed the term / definition “certification of testing” (which was granted by a testing facility) in order to avoid potential confusion with certification issuance (which is granted by DOS).
7. Made the definition of “convoluted passage” broader.
8. Added a definition for “hand passageway.”
9. Added a definition for “DOS Codes” and Table 7: DOS Codes.
10. Capitalized “DOS Model Number” throughout this Standard to reflect that it is a proper noun.
11. Removed the definition of “DS/PSD/SEP” as the branch no longer exists.
12. Replaced “FBO” with “OBO.”
13. Added a definition for “FMJ.”
14. Added a definition for “full-size systems” under the definition for “systems.”
15. Added a definition for “manufacturer model number,” clearly distinguished it from the DOS Model Number, and stated that both numbers should be unique.
16. Added a definition for “mounting gap.”
17. Added a definition for “Technical Review.” Capitalized “Technical Review” throughout this standard to reflect that it is a proper noun and a formal process.
18. Made it clear that “Test Personnel,” “Test Team,” and “Attack Team” are synonymous. Capitalized “Test Team” to indicate that it is a proper noun in this standard.
19. Removed the definition for “View Window” since the term does not appear elsewhere in this standard.
20. Stated test facilities must be approved by DS/PSP/PSD in order to perform SD-STD-01.01 testing and placed the definition for “independent test facilities” adjacent to the definition for “test facilities.”
21. Stated the DOS is not obligated to issue ratings for products/systems it doesn’t have a reasonable expectation of using.
22. Where appropriate, replaced “equipment” with “systems.”
23. Created the new effective date / implementation date.
-xii-
24. Section 1.1: General – Added verbiage that it is the test facility’s responsibility to address safety and health practices and determine the applicability of regulatory limitations.
25. Section 1.1.1: Users – Clarifies that DOS as the certifying authority is not obligated to certify any system over which there is cause for concern.
26. Removes the ability to “grandfather” systems certified to a previous version of SD-STD-01.01; removes the term “recertification.”
27. Removed ambiguity about modifications / changes to design – any modification(s) must go through the formal Technical Review process.
28. Added a procedure for systems previously certified under Revision G or G (Amended) of this standard to become certified under this version, Revision H. See Section: 1.2.5: Previously Certified Systems.
29. Certification Limits (new Section 1.2.6):
a. Moved it under Section 1.2: Certification, instead of under Section 1.3:
System Testing Concepts.
b. Removed language that transparencies, louvers and grilles will not be limited to a certain size because it is not germane to this standard.
c. Section 1.2.6(b): Certification for Sizes Other Than Test Sample Size –
Changed the maximum certified size for FE/BR systems, instituted a new minimum size reduction for transparencies, and clarified that aberrational shapes (e.g. a trapezoid) and aspect ratios require additional testing.
30. Section 1.3.1(a): Ballistic Resistance Levels and Table 1: Ballistic Resistance Test Ammunition and Table 6: Minimum Ballistic Requirements – Removed the submachine gun rating.
31. Section 1.3.1(b): Shotgun – Deleted “hand” from “passageways,” and added that the Test Director can determine if shotgun testing is required.
32. Made it clear that multiple samples (regardless of the system’s fielded size) may be needed for ballistic testing, and PSD’s written permission is required for doing less than the number of shots in Table 6: Minimum Ballistic Test Requirements.
33. Added the Multiple Samples section. The manufacturer is allowed to submit multiple samples for testing. The manufacturer is allowed to submit up to one sample per round, or at the discretion of PSD, for ballistic testing. “Per round” does not mean “per shot” – switching out samples after every shot is not allowed. The manufacturer is allowed to submit up to one sample per vulnerable area for FE testing.
34. Removed the limitation on door sizes that had been Rev. G (Amended) Section 1.3.4(b).
35. Where appropriate, specified that PSD approval must be required in writing.
36. Section 1.3.5(b): Forced Entry Lock (FEL) Placement – Stated FEL placement requirements may be waived for multi-point locking actuator.
-xiii-
37. Removed the old Section 1.3.6 statement that separate samples may be submitted for testing of dissimilar portions because that is covered under the new Section 1.3.4(c).
38. Changed the name of old Section 1.3.7, new Section 1.3.8, from “1/4 Gap Certification” to “Mounting Gap” (includes a definition for “mounting gap” in the Definitions section) – No longer requires 1/4″ as long as the FE/BR resistance of the gap is at least as strong as the system itself and the gap is the largest allowed by the manufacturer’s installation instructions. Requires that the FE/BR performance of the mounting gap / mounting clearance to be tested.
39. Section 1.4.1: Revocation Reasons
a. Specified that even one anomaly is sufficient cause for revocation of certification.
b. Specified that even one material or design change is sufficient cause for certification revocation, and specified that the change did not have to be “significant.”
c. Specified that if a part of a system fails subsequent testing, that is sufficient cause to revoke the certification of a system.
d. Specified that if a subsequent test failure causes concern about the body of knowledge upon which a certification is based, not just the test results upon which the certification was based, that is sufficient cause to revoke the certification of a system.
e. Listed failure to comply with current OBO specifications as a reason for certification revocation; placed the burden of compliance on the manufacturer; and listed the appropriate remedy which is for the manufacturer to make the system compliant and submit the request via Technical Review.
f. Listed cease of production (e.g. manufacturer goes out of business) as a reason for certification revocation.
g. Listed failure to provide documentation as a reason for certification revocation.
40. Section 1.4.3(e): Issue a Letter of Revocation – Now, once a system’s certification is revoked, that DOS Model Number cannot be used again, even if new testing and certification efforts are successful.
41. For procuring decertified systems, removed the “as a result of” clause, since it had no bearing on the rest of the section.
42. Under Revocation Procedures, changed “technical review” of the manufacturer’s proposal to “engineering review.” A “Technical Review” and/or retesting is still required if the manufacturer’s proposal under Section 1.4.3(b): Meet with Manufacturer and Review Manufacturer’s Proposal is inadequate.
-xiv-
43. Under QA/QC testing, replaced “materially different” with “different” because anomalies and imperfections are also covered under this clause.
44. Re-named Section 1.6 as “Point of Contact (POC) for this Standard” instead of “Availability” and directed users to Section 1.6: POC elsewhere in this Standard instead of providing the contact information in multiple spots;
also, updated the mailing address.
45. Reworded Section 1.7.1: System Sample.
46. Removed Section 1.7.2: Independent Evaluation.
47. Documentation section (Section 1.8) – Made it clear that all certification submissions (whether via testing or Technical Review) shall include the certification documentation specified in Section 1.8: Certification Documentation, and clearly required: title blocks, sheet numbers, to-scale drawings, revision blocks (if appropriate), Bill of Materials, notes (e.g. welding codes, tolerances, etc.), and clear labelling (e.g. attack side, protected side…) and the format shall be at DS/PSP/PSD’s discretion; specified that the metric units should be written first, with imperial units in parentheses.
48. Required that engineering drawings are submitted as one complete package.
49. Required a Certification Request Form for all requests for certification
(whether via testing or Technical Review); previously, a letter was required.
50. Required the following in Section 1.8.3: Installation Instructions: care, maintenance, and repair instructions.
51. Witnessing – Changed the requirement from 10 to 15 days of advanced notice to be provided to DS/PSP/PSD in advance of the testing date.
52. Section 1.9.2: Scheduling Procedure – Changed the requirement from 10 to 30 days for the certification documentation to be submitted to the Test Director and DS/PSP/PSD prior to any scheduled testing.
53. Formatting – Separated out Section 1.9.2 material into sub-sections for ease of reading – not a substantive change.
54. Section 1.9.2(c): Explicitly required that the test sample comply with Section 1.7.1: System Sample before testing begins. Required DS/PSP/PSD to approve the testing schedule beforehand.
55. Section 1.11: Testing and Certification of DOS-Designed FE/BR Systems
– Changed “DOS or A&E designed FE/BR equipment” to “DOS-designed FE/BR systems.”
56. Section 1.12: Model Numbering Convention – Tidied up the language with regard to assignment procedure, and removed the ability to assign interim model numbers. Created Section 1.12.3: Unique Model Numbers Requirement because unique model numbers are necessary for each system for identification and recordkeeping purposes. Made it clear that both DOS Model Numbers and manufacturer model numbers must be unique.
57. Deleted the old Section 1.12.3: Prior Revision Certifications (which concerned DOS Model Numbers) as it was no longer relevant under the new
-xv-
Sections 1.2.2: Tested to Earlier Versions of SD-STD-01.01 and 1.2.5(a):
New Certification of Previously Certified Systems. Regarding DOS Model Numbers, for systems that were previously tested and are receiving new certification under this standard, see Section 1.2.5(a) as well as 1.12.1 DOS Model Number Assignment Procedure.
58. Section 2.1: Test Director – Separated out the assigning of the Test Director from what the Test Director will ensure.
59. Section 2.2 – Appended “and Test Plan” to the name of this section.
60. Reorganized the information in Section 2.2: Test Sample Documentation
(and Test Plan) into Section 2.2.1: Test Director Shall Examine Test Sample Documentation, and Formulate and Submit a Test Plan and Section 2.2.2: Test Sample Documentation Examination by Test Team, although the content remains substantively the same except that language was added that DS/PSP/PSD’s review will also “ensure that all potential vulnerabilities are investigated.”
61. Section 2.2: Test Sample Documentation and Test Plan – Changed the DS/PSP/PSD advanced scheduling notice requirement from 10 to 15 working days.
62. Section 2.3.2(b): Forced Entry Test Sample Installation – Relocated language to here from the old Section 2.5: Forced Entry Test Personnel regarding the manufacturer’s option to not allow active Test Team members to have participated in the installation.
63. Section 2.3.2(d): Forced Entry Test Samples Which Require Footers – Clarified that the bracing or capping is intended to represent the fielded condition and shall not enhance or detract from the FE performance – the intent of this section did not change.
64. Section 2.3.3: Test Sample Labelling – Required samples to be labelled with their attack and protected sides as well as their model numbers.
65. Section 2.4.1: Rifle
a. Section 2.4.1(a): Test Sample Placement – Made 20 feet the minimum placement.
b. Section 2.4.1(b): Velocity Measurement Location – Clarified what to do if measuring with other than screens.
c. Section 2.4.1(c): Witness Panel Placement – Provided a tolerance for the standoff of the witness panel.
66. Created Section 2.4.3: Option to Waive Velocity Measurements as a practical consideration, e.g. for oblique shots for which the measurements are difficult to take. Clarified that the option to waive any velocity measurements is at the sole discretion of DS/PSP/PSD representative.
67. Section 2.5: Forced Entry Test Team – Added requirements for the Test Team members to be “physically fit,” “in good health,” able to carry 60 lbs., and have a basic understanding of hand tool usage; lowered the minimum
-xvi-weight to 150 lbs. from 160 lbs.; removed the upper weight limit which had been 250 lbs.; and increased the maximum age to 45 years old from 34 years old.
68. Reorganized the content of Section 2.6, formerly Tools and Support Instrumentation, and now Ammunition, Tools, And Support Instrumentation, including absorbing “old” Section 2.7: Ammunition – However, substantively there is no change. Moved witness panel specifics to new Table 6 sub-table (not a substantive change).
69. Section 2.6.1(a): Ballistic Testing Equipment – Added new options besides screens for ballistic velocity measurement-taking.
70. New Section 2.7: DS/PSP/PSD Representation (old Section 2.8, same name) – directs the user to Section 1.9.2(d): Witnessing and Scheduling and Section 2.2.1(c): Scheduling Testing for the minimum required advanced notice and who provides this notice, to avoid double-listing the information in this standard under Section 2.7.
71. 2.7.3: Deleted section on “Non-Test Issues for DOS or A&E Designed System” because it is no directly applicable for inclusion into the testing standard.
72. Section 3.1.2: Test Variations – Added language that the DS/PSP/PSD representative may add to the test plan, although in practice this has always been true.
73. Section 3.1.5: Door Operability – This is outside the scope of this standard.
Use OBO guidance.
74. Section 3.2.1 Firing Procedure – Formatting changed but there was no substantive change other than the change to the gap already mentioned in Section 1.3.8: Mounting Gap.
75. Section 3.2.2(a) – Removed the limit of six shots on transparencies – there is no upper limit.
76. Section 3.2.3(a): Classified as “Complete Penetration”
a. Specified what purpose the light serves (non-substantive).
b. Specified 800 lumens or brighter instead of a 60-watt lightbulb.
c. Specified that penetration of the witness panel is a “Complete Penetration” and adjusted the Definition section’s definition of “Ballistic Penetration” accordingly.
77. Section 3.2.3(b): Classified as “No Penetration” or “Partial Penetration”
– Updated the title of this section and conformed to test house established test reporting conventions; updated the Definitions section accordingly.
78. Section 3.2.5: Measuring Shot Velocity (formerly part of Section 3.2.4:
Fair Hits):
a. Directed the user to Section 2.4.3: Option to Waive Velocity Measurements. Also, required that any instances of velocity measurements being waived shall be documented in the test report.
-xvii-
b. Referred the user to Section 2.6.1(a): Ballistic Testing Equipment instead of specifying that a chronograph must be used.
79. Section 3.3.1(a): Interruptions – Moved the verbiage on rests to its own section, new Section 3.3.1(c): Rests, though substantively there is no change. Also, since the old Section 3.3.2(e) mentioned periods of non-activity including “photography, safety inspection, conference with DS observers, etc.), these additional possible reasons for interruption were added/codified in the new Section 3.3.1(a): Interruptions.
80. New Section 3.3.1(c): Rests – As mentioned above, rest periods were moved out of Section 3.3.1(a) and into their own section. The language “rests may be given every 15 minutes” was replaced with “rests shall be given every 15 minutes” for 60-minute forced entry tests. Specified the duration (in minutes) that the rests shall be.
81. Old Section 3.3.1(c), new Section 3.3.1(d): Inspections – Added verbiage that the Test Team may look or reach through the test sample; removed the verbiage about stepping behind the sample since it is already covered in new Section 3.3.2(f): Stepping Behind the Test Sample.
82. Moved Test Team selection information from Section 3.3: Forced Entry Testing to Section 2.5: Forced Entry Test Team, and clarified there that its the Test Director who determines who is on the Test Team.
83. Section 3.3.1(e): Test Resources – Clarified when tools shall not be used, because given that inspections are allowed during a test, tools are allowed during that time. Additionally, specified what condition the tools should be in – “serviceable” is not good enough. Clarified that the Test Team may reach through a sample to retrieve a tool if it is safe to do so. Moved Table 2:
Forced Entry Resources note up to Section 3.3.1(e) that sharp edged tools shall not be re-sharpened during the test.
84. Sections 3.3.2(c) and 3.3.2(d) were combined into new Section 3.3.2(c):
Exploit Dissimilar Portions – The new section makes it clear that tests can be added to the test plan, not just subtracted, and includes a callback reference to Section 2.2.1(b): Formal Test Plan.
85. Section 3.3.2(f): Stepping Behind the Test Sample – This section serves the same purpose as the old Section 3.3.2(g).
86. Old Section 3.3.2(h) – A prohibition on the use of the wood ax during five-minute forced entry testing, was removed.
87. Old Section 3.3.2(i) – A prohibition on the use of the wood-splitting maul, was removed.
88. Section 3.4.1 Ballistic Rejection Criteria – Clarified language to conform with complete penetration, partial penetration and no penetration definitions.
89. Section 3.4.2(a): Pass/Fail Shapes – Clarified that it is the exterior (outer-most) dimensions provided for the pass/fail shapes.
-xviii-
90. Section 3.4.2(b): Inherent Shape Advantage for Forced Entry – Provided guidance for systems that are inherently not vulnerable to the pass/fail shape sizes in Section 3.4.2(a).
91. Removed old Section 3.4.3: Door Operability Rejection Criteria, because having a pull/push force exceeding 12 lbs. (5.5 kg.) is no longer a reason for a door to fail FE/BR testing.
92. Section 3.7: Safety – Provided a short list of possible considerations, keeping the language that the Test Director is responsible for safety; the Department of State is still not responsible for safety; stated that this standard does not address all safety concerns.
93. Section 4.1: General – Specified that the test lab supplies the test reports to DOS, not the manufacturer, thus clearing up chain of custody issues for the reports; changed the language concerning proprietary information and consent to documentation release.
94. Section 4.2.3(b): Verification of Identical System – This section requires verification by the test facility that the test sample was identical to the system shown in the manufacturer’s submitted drawings.
95. Section 4.2.5: Test House Test Report – Required that the test report include the as-tested size of the mounting gap.
96. Section 4.2.6: Ballistic Test Data – Took out requirement to weigh bullets.
97. Section 4.2.8: Photographic Record of Testing – Required images to be in color, in focus, high-res, and suitable for printing.
98. Section 4.2.10: Video Recording of Testing – Removed an archaic video format, VHS; stated that FE video footage should be recorded from both the attack side and the protected side, made it clear video was only for the FE portion of the testing, and included a requirement for a watermark.
99. Section 4.3: Certification Issuance:
a. Deleted language indicating that the testing laboratory will provide
DS/PSP/PSD with test reports for each system tested because it was duplicative of the language in Section 4.1: General Reporting.
b. Added the requirement for OBO guidance to be met in order for certification issuance to occur.
100. Section 5.1: Certification by Technical Review – Clarified that all T/Rs (not just those for upgraded systems) are done only at DS/PSP/PSD’s discretion.
Moved “DOS reserves the right to grant or reject a request for certification” from Section 5.3: Technical Review Procedure to Section 5.1. Added that any test reports for previously tested systems should be included with the request. Stated that new testing and/or retesting may be required (see also Section 5.3.3: New Testing and/or Retesting). Changed “previously certified system” to “each previously certified and/or tested system” because under the limits of Section 5.1 you may receive a T/R for an upgraded non-certified system.
-xix-
101. Section 5.1.1: Change to Certified Systems – Clarified that a T/R is needed even if the change is done merely to comply with OBO specifications.
102. Added Section 5.1.4: Request for Certification Under Current Version of this Standard
103. Section 5.2: Requests for Certification by Technical Review – Made it clear that these are only the minimum requirements. Required an explanation of each difference between prior systems and the candidate system. Spelled out which documents from Section 1.8: Certification Documentation are required for a T/R.
104. Section 5.2.3: Requests For Certification By Technical Review – Clarified what must be included in the request.
105. Section 5.3: Technical Review Procedure – Clarified that the candidate system will only be compared with its manufacturer’s other systems.
106. Table 1: Ballistic Resistance Test Ammunition – Required M80 to be steel jacketed; copper-jacketed M80 rounds are no longer acceptable for testing to this standard.
107. Table 2: Forced Entry Test Resources:
a. Added a number of replacements for each resource.
b. Removed the restriction that the wood-splitting maul shall not be used when testing transparent portions of samples.
c. Replaced the 12-lb. sledgehammer with the 10-lb. sledgehammer.
d. Added 14″-handle hatchet.
e. Added 17″-handle medium axe.
f. Removed 3.5-lb. 3″-head wood axe.
g. Added 5-lb. 36″-handle pick mattock.
h. Added 10″ compact grip 24 TPI mini hacksaw and replacement blades.
i. Added 12″ wood hand saw.
j. Replaced 48″ bolt cutters with 42″ bolt cutters.
k. Added 24″ pipewrench.
l. Removed portable propane torch.
m. Added 2x4x72″ lumber.
n. Added wood cribbing, both 6x6x16″ and 4x4x16″.
o. Added round 2x60″ schedule 40 steel pipe.
p. Added square 2x2x72″ steel tube.
q. Added socket sets, both SAE and metric.
r. Added hex key sets, both SAE and metric.
s. Added metal retractable utility knife and replacement blades.
t. Added one knife, similar to the LPS1175 Tool Category A knife.
u. Added Nylon 3-strand 0.5″ diameter 29′-length rope, similar to the LPS 1175
Tool Category A rope.
v. Added metal 8″ hand file.
w. Added 15- and 60-minute tools to 5-minute test.
-xx-
108. Table 6: Minimum Ballistic Requirements:
a. Removed the submachine gun.
b. Increased the number of shots per round for Opaque Areas: Center of Area from 1 to 8.
c. Increased the number of shots per round for the M855 for Opaque Areas:
Seams, Framing, Etc.
d. Increased the number of shots per round for Transparencies: Center of Area from 1 to 8.
e. Created a “Witness Panel” sub-table (not a substantive change).
f. Narrowed the range of acceptable ‘e’ (thinner) witness panel aluminum foil, and provided thickness ranges, hardness, and yield strength for both witness panels.
g. Referenced a new figure, Figure 3: 8-Shot Spacing, vice describing the spacing in the Notes text.
h. Created and referenced a new figure, Figure 4: 4-Shot Spacing.
109. Table 7: DOS Codes – Simplified the first digit to be either 1 or 2
(transparent or opaque).
110. Created Table 8: Test Labs Approved by DOS to Conduct FE Tests to this
Standard.
111. Removed the form, Certification of Testing, for the following reasons: 1)
“Certification” is only approved by DS/PSP and 2) the door pull test part of the form may not conform to current OBO guidance.
-1-
The U.S. Department of State program:
SD-STD-01.01 is part of the DOS program to ensure forced entry and ballistic resistant equipment which meet DOS standards are placed in DOS buildings overseas. This program accomplishes:
Establishing standards for forced entry and ballistic resistant levels of protection as a function of potential threat levels.
Establishing test criteria to ensure equipment meets the forced entry and ballistic resistant needs of the DOS.
Ensuring systems also meet the U.S. Department of State Bureau of Overseas Buildings Operations (OBO) Specifications for Forced Entry/Ballistic Resistant Doors, Windows, Modular Panels, Glazings and Louvers.
Requests for copies, questions, concerns, or comments concerning this Standard may be directed to the contact in Section 1.6: POC.
-2-
DEFINITIONS
A&E – Architectural and Engineering.
Assembly Drawing – A drawing which shows how a system is assembled. It includes the locations and arrangements of all bolts, glazing stops, glazing spacers, etc.
Ballistic Penetration
Complete Penetration – A perforation of the witness panel through which light passes (see Section 3.2.3(a): Classified as “Complete Penetration”).
No Penetration – No deformation of strike-face of test sample.
Partial Penetration – A penetration of the test sample that is not classified as
“Complete Penetration” or “No Penetration.”
BR – Ballistic Resistant.
Bullet, AP – An armor-piercing bullet which contains a core of hardened material to penetrate armor and other materials which may resist penetration by lead-cored bullets.
Bullet, Ball – Military designation of a small-arms projectile (bullet) consisting of a soft core (often lead) encased in a shell (jacket) of harder metal.
Bullet Jacket – The thin shell of material which encases the core of a bullet. The jacket material usually is copper or steel. A copper wash may be used to prevent rust.
Bullet Yaw – The angle between the centerline of a bullet and its flight path.
Candidate System – A manufacturer or DOS-designed system which is being considered by DS/PSP/PSD for forced entry and/or ballistic resistant certification.
Certification Letter – Document issued by DS/PSP/PSD for systems which meet the certification requirements as stated in this standard.
Contracting Officer (CO) – A person with the authority to enter into, modify, administer, and/or terminate contracts and make related determinations and finding.
Contracting Officer’s Representative (COR) – A person who is designated by the Contracting Officer to assist in administering the technical aspects of the contract.
Convoluted Passage – Any passageway through a system. Can be direct, indirect, or intricate.
Deal Tray – The subassembly of a transaction window which enables routine passage of materials of limited size between sides of the window. The window may be fixed, have a convoluted design, or include moveable elements to enhance security.
-3-
Disturbed Area – The area surrounding the point of ballistic impact which has been visibly cracked, holed, distorted, or otherwise changed by the ballistic impact.
Door, Double – Assembly of two doors with an opening typically twice as wide as either single door with a common latch and lock edge.
Door Threshold – The sill of a doorway.
DOS – U.S. Department of State. When “Department” is written in the context of this standard, it refers to the U.S. Department of State.
DOS Code – A four-digit code as detailed in Table 7: DOS Codes – this shorthand format helps end users quickly specify their rating needs – a system’s DOS Code is separate from and not to be confused with its DOS Model Number.
DS – Bureau of Diplomatic Security, U.S. Department of State.
DS/PSP/PSD – Physical Security Division, Office of Physical Security Programs, Bureau of Diplomatic Security.
Escape Hatch – A horizontally or vertically mounted non-door assembly. It may be roof-mounted and include a collapsible interior ladder.
FE – Forced Entry.
FE/BR – Forced Entry/Ballistic Resistant.
FMJ – Full Metal Jacket.
Hand Passageway – This includes but is not limited to the passageways inherent in deal trays, transaction drawers, louvers, and gun ports.
Hardline – Partitioning structure or system providing 5, 15, or 60-minute forced entry and/or ballistic resistant protection in order to preclude unauthorized access to a core or protected area.
Impact Obliquity – The angle between the bullet path and a line which is perpendicular to the impact surface at the point of impact.
Implementation Date – Date after which this standard supersedes all previous revisions.
Letter of Revocation – Notification to a manufacturer by DOS that a previously certified FE and/or BR system has been decertified.
Letter of Suspension – Notification to a manufacturer by DOS of its intent to decertify a previously certified FE and/or BR system.
-4-
Louvers – Angled and gapped slats which permit the passage of air through an otherwise impassable vertical barrier. While louvers usually are rigidly constructed, the slats may be moveable to seal off air passage.
Model Number – A unique identifier for a manufactured system.
DOS Model Number – The unique identifier for every FE/BR system certified by the U.S. State Department. This model number is assigned by the U.S. State Department. This model number will follow the conventions of Figure 1: DOS Model Numbering Convention.
Manufacturer Model Number – A unique identifier for a manufactured system which is assigned by the system’s manufacturer.
Mounting Gap – “Mounting gap” is synonymous with “installation mounting gap.” In order for a system, such as a door or window, to be installed into a building structure, a rough opening is needed. The gap between a system and the rough opening into which it is installed is called the mounting gap.
Mulled – The physical connecting together of two systems. The two systems may be anchored directly to each other or have a mullion between them.
Mullion – A component which separates two adjacent and separate systems. It can be vertical or horizontal, movable or fixed. For purposes of this standard, a mullion does not include steel or concrete structural members which are present in the building. Seismic joints are to be considered as mulled connections.
OBO – U.S. Department of State Overseas Building Operations, formerly the Office of Foreign Building Operations (FBO).
SD-STD-01.01 – State Department Standard 01.01, Certification Standard, Forced Entry and Ballistic Resistance of Building Systems, formerly Certification Standard, Forced Entry and Ballistic Resistance of Structural Systems, and before that, formerly Certification Standard, Forced Entry Resistance of Structural Systems).
SD-STD-01.02 – Former State Department Standard 01.02, Certification Standard, Ballistic Resistance of Structural Systems, superseded by SD-STD-01.01, Revision E.
Spall – Bullet or target material which has broken free due to ballistic impact and projected into the surrounding area.
System – The assembly of structural elements and devices which compromise the forced entry and/or ballistic barrier used by the U.S. Department of State. These assemblies can be designed and produced by manufacturers or designed by the Department of State for construction by contractors.
-5-
DOS-Designed Systems – These include concrete and steel hardlines, seismic joints, and specialty items, such as doors, windows, grilles, etc. for security upgrade projects.
Full-Size Systems – Systems that are representative of the fielded system’s actual size.
Manufacturer-Delivered Systems – These include both individual and mulled systems.
o Individual Systems – Individual doors, windows, louvers, hatches, grilles, or wall panels. The doors, windows, and panels may have two or more transparencies separated with a mullion.
o Mulled Systems – Individual systems anchored together to make a larger system.
Technical Review – A Technical Review, abbreviated in writing by “T/R,” is the review process described in Section 5.0: Technical Review by which a system may be granted certification at the discretion of DS/PSP/PSD if the system is sufficiently similar to one or more previously tested systems. See Section 5.1: Certification by Technical Review (T/R) for limitations. Note that new testing and/or retesting of a candidate system may be required under Section 5.3.3: New Testing and/or Retesting.
Test Director – Individual identified by the test facility responsible for the overall conduct, data collection, and safety of a forced entry or ballistic resistant test.
Test Facility / Test Lab – Laboratory or other area where forced entry and/or ballistic resistant testing is conducted. It may be either government-operated or independent. The facility must be approved by DS/PSP/PSD in order to perform SD-STD-01.01 certification testing; DS/PSP/PSD maintains a list of the facilities approved to perform this work.
Government Test Facility – Test facility operated by the U.S. Government. Can be used for DOS-designed systems or for QA/QC purposes at the discretion of
DOS.
Independent Test Facility – Test facility which is independently owned and operated. Not affiliated with any other corporation, interest group, or government agency.
Test Fixture – The structural assembly which holds the test sample. Field mounting hardware is used to mount the test sample into the test fixture.
Test Sample – The forced entry and/or ballistic resistant system(s) which is/are to be tested to this standard.
As-Tested Size – The size of the system’s full-scale test sample.
Test Team – When referring to forced entry testing, the Test Team is the team of personnel actively engaged in the Concentrated Assault Test but not including the Test Director, data
-6-recorders, or other supervisory personnel. Synonymous with “Test Personnel” and “Attack Team.”
Transparent Element – A glazing panel, including those designed to be backpainted, coated, or filmed, and including those which have been made only semi-transparent, or even opaque. Synonymous with “transparency” and “transparent armor.”
Window Frame – The opaque portion of a transparent assembly into which the transparent element is mounted.
Window Grille – Spaced, rigid bars which are mounted over exterior windows of the host structure to prevent access.
Witness Panel – A panel of thin material that is positioned behind a test sample during ballistic testing, the perforation of which determines penetration regardless of the penetrating material.
-7-
1.0 SCOPE AND REQUIREMENTS
1.1 GENERAL
This standard supersedes all prior versions of SD-STD-01.01 and SD-STD-01.02. It sets forth the requirements and testing procedures to certify forced entry (FE) and/or ballistic resistant (BR) systems which are intended for use by the U.S. Department of State (DOS) in its diplomatic facilities throughout the world. The certification of FE and BR systems is mandatory and indicates that the systems are rated to provide the level of FE and BR protection required by DOS standards for specific facilities in certain threat environments.
This standard does not purport to address all of the safety, environmental, and end-user concerns, if any, associated with its use. It is the responsibility of any testing facility that conducts testing to this standard to establish appropriate safety and health practices, and determine the applicability of regulatory limitations, before conducting any such testing (see also Section 3.7: Safety).
1.1.1 Users
1.1.1.a Intent This standard is intended primarily for manufacturers to test their products/systems and for DOS to certify systems that meet DOS needs.
1.1.1.b Use DOS is not under any obligation to issue FE/BR ratings and/or certifications for products/systems. For example, if products/systems are of a type that DOS does not have a reasonable expectation of using, then DOS is not obligated to certify them. If any reason comes to light before, during, or after testing which DS feels is cause for concern about a system, then DOS is not under any obligation to issue FE/BR ratings and/or certifications for that system, regardless of testing outcomes.
1.1.1.c DOS-Designed Systems This standard also can be used to test and certify DOS-designed walls, seismic joints, doors, grilles, etc. Section 1.11: Testing and Certification of DOS-Designed FE/BR Systems details considerations for testing DOS-designed FE/BR systems.
1.1.2 Exceptions
This standard does not apply to items of personal protection (helmets, visors, vests, etc.) or to materials intended for installation in automobiles or other mobile structures.
1.1.3 Implementation
1.1.3.a Implementation Date This standard will take effect as of the date it was signed by the DS/PSP Office Director (see signatory page). All FE/BR products procured pursuant to DOS physical security standards shall require certification to SD-STD-01.01.
-8-
1.1.3.b List of FE/BR-Certified Systems The Department of State Bureau of Diplomatic Security shall maintain both a list of FE/BR systems certified under Revision G or G (Amended) of SD-STD-01.01 hereafter referred to as the “G List,” and a list of FE/BR systems certified under this revision of SD-STD-01.01, Revision H, hereafter referred to as the “H List.” A system’s DOS Model Number will differentiate to which list an FE/BR system belongs under Section 1.12.1: DOS Model Number Assignment Procedure. Should the manufacturer of a system on the G List desire the system to be placed on the H List, the manufacturer should follow the guidance of Section 1.2.5: Previously Certified Systems (see also Section 1.2.2: Tested to Earlier Versions of DS-STD-01.01).
1.1.3.c Procurement Relative to the Implementation Date Products on the G List may be procured if the procurement action was initiated two years or less after the implementation date this version of SD-STD-01.01, Revision H.
1.2 CERTIFICATION
Certifications may be granted to systems which fall under Section 1.2.1: Tested to Current Version of SD-STD-01.01 or Section 1.2.2: Tested to Earlier Versions of SD-STD.01.01.
1.2.1 Tested to Current Version of SD-STD.01.01
Candidate systems which successfully complete the testing requirements specified in this version of SD-STD-01.01 may be granted certification.
1.2.2 Tested to Earlier Versions of SD-STD.01.01
Any system tested to a version of SD-STD-01.01 earlier than Revision G shall not be certified under Revision H without going through the entire certification process anew, as though the system had never been tested or certified before.
Candidate systems which were previously certified to Revision G or Revision G (Amended) of SD-STD-01.01 and meet the requirements of Section 1.2.5(a): New Certification of Previously Certified Systems may be granted certification under Revision H upon successful Technical Review (see Section 5.0: Technical Review).
1.2.3 Certification Submission
Certification submittals for candidate systems must comply with the documentation requirements as specified in Section 1.8: Certification Documentation, and Section 5.0:
Technical Review for Technical Reviews. Certification submittals for Technical Review which do not require new or retesting need not include a Test-To-Failure Agreement.
1.2.4 Modifications
Once a system is certified to this Standard, no design change or change in component material shall be made to that system. Items that are not relevant to the FE/BR certification are not subject to this design change requirement, for example: coatings or tints to glazings (except if they are applied films or interlayers that change the physical construction), -9-paints/anodizing, DOS-approved hardware schedules, and cladding or decorative trim pieces that were not part of the test sample.
For a new system that is substantially similar to a certified system, the new system…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .