The document is a Contract Data Requirements List (CDRL) for HVAC Service Tower/Chemical Treatment Reporting (Data Item A006) associated with a federal contract for HVAC maintenance services. The CDRL specifies bi-annual reporting requirements for HVAC maintenance and chemical treatment, including detailed tasks such as maintenance/repair of cooling towers, winterization, testing of equipment, chemical treatment, and comprehensive reporting of water analysis and system performance. The contractor must provide reports detailing maintenance activities, testing results, chemical treatment specifics, and any issues encountered during service, with submissions required to the Contracting Officer Representative (COR) at USAG-Natick-DPW.

The document outlines specific contractor responsibilities including hiring qualified subcontractors, conducting chemical treatments, performing water analysis testing, managing freeze protection protocols, and maintaining repair and maintenance records. The contractor will be liable for repairs resulting from negligence or accidents and must have appropriate spare parts and maintenance capabilities. This CDRL is part of a larger solicitation (W911QY-25-R-0007) for a Service-Disabled Veteran-Owned Small Business set-aside contract for HVAC maintenance services at a government facility, with a potential five-year contract period from May 2025 to April 2030.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A006
title: HVAC Service Tower/Chemical Treatment
sub:
auth:
ref: Performance Work Statement (PWS)
req_ofc: USAG-Natick-DPW
dd250:
appcode:
dist:
freq: Bi-Annual
asof:
firstsub:
subsub:
addressee1: USAG-Natick-DPW
draft1:
reg1:
repro1:
addressee2: COR
draft2:
reg2: 1
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 1
total_repro: 0
remarks: HVAC Service Tower/Chemical Treatment Report

CDRL A006

Annex H, para. 2.1.w,para. 2.1.x, para. 2.15, and para. 5.5.c.5 2.1.w. Open and Closed Cooling Towers – including Chemical Treatment – involving maintenance/repair/replacement of all necessary elements such as metering pumps, conductivity sensors, control valves, water make-up valves, basin electrical heaters, basin level probe/sensors, bleed valves;

towers winterization, and cooling season start-up; checking condition of tower’s fan motors, fans, belts (three times a year - spring, mid-cooling season, and fall – also included replacement when required); checking/testing for failure -electrical tower basin heaters (once a year, in fall); checking condition of level sensors (twice-a-year); checking/testing 3-way bypass control valves operation (twice-a-year); make-up water refill assembly; water bleed assembly (twice-a-year);

cleaning towers – twice a year (spring and fall); checking glycol solution/chemical treatment - for closed circuit Cooling Towers’ Heat Exchanger; “Spraying” System for Closed Circuit CT’s (twice a year);

Towers spring setting it up and refill, and in fall – winterize; conducting twice a-year sample-testing for Legionnaire bacillary traces, and if the results are positive, shall undertake respective treatment with increasing of current chemicals or conducting an appropriate hydrogen peroxide treatment; also included regular fan motor bearing greasing. CAVEAT: HVAC Contractor shall hire a qualified subcontractor specializing in such work, that subcontractor shall have an appropriate related experience, chemical specialized lab, licensed chemists.

The Contractor or Specialty Sub-Contractor shall submit, after every treatment (biweekly) a Report summarizing what was done and if there any issues, including the results of performed Testing Water Analysis (pH, Inhibitor, Conductivity, Chlorides, Glycol) in accordance with DD Form 1423-1, CDRL A006 (Refer Annex A, Section 6). This information shall be provided to the COR in writing by way of submitting a report - delivered in person - the same day the work took place.

2.1.x Chemical Treatment for indoor Closed Loop Systems such as - Hot Water, Chilled Water, Dual Purpose two-pipe Heating/Cooling systems – checking the operation of chemical feeders and evaluating its condition (cleanliness) of treated heating/cooling water. The Contractor or Specialty Sub- Contractor shall submit, after every treatment (biweekly) a Report summarizing what was done and if there any issues, including the results of performed

group:
total_price:
prep_name:
prep_sign: Carlos A Benevides, COR
prep_date: 03/05/2025
app_by:
app_sign:
app_date:
Page:
app: Adobe Professional 7.0
line_item:
exhibit:
xtdp: Off
xtm: Off
othercat:
system: HVAC Contract Reporting
ctr_no:
contr:
remarksb: Testing Water Analysis (pH, Inhibitor, Conductivity, Chlorides, Glycol) in accordance

with DD Form 1423-1, CDRL A006 (Refer Annex A, Section 6). This information shall be provided to the COR in writing by way of submitting a report delivered in person - the same day the work took place.

2.15 Freeze Protection. The Contractor shall shut down, secure, and drain all equipment subject to freeze damage when freezing weather conditions are forecast, anticipated, or imminent. The Contractor is responsible for and liable to provide such services whether or not specifically informed or notified by the COR/ACOR, of such conditions. All equipment secured and drained for these reasons shall be returned to normal service when danger of freeze conditions has passed. The Contractor shall be liable for correction of any and all damages incurred as a result of failure to adequately protect equipment under these conditions. The Contractor shall notify the DPW work control center no later than (NLT) four (4) hours after securing a system from possible freeze damage.

5.5 The Contractor shall be liable for repairs made necessary by negligence, accident or misuse by the Contractor’s or their sub-contractor’s personnel. The Contractor shall have and maintain, on hand locally, a supply of suitable spare parts sufficient for the normal maintenance and repair of all items listed.