DD-06-0001-87155-456 DRUM.pdf

PDF 86 KB Posted

Attached to
Hammerhead Crane - Industry Survey
Solicitation number
W9127N-26-X-1AWE
Issued by

About this file

This document is a detailed engineering drawing for a Drum Shell Detail of the Dalles Lock & Dam Intake Gantry Crane Main Hoist, part of a US Army Corps of Engineers project in Portland, Oregon (Contract # W9727N-06-C-0007). The drawing provides precise technical specifications for a cylindrical drum shell with multiple components, including rolled plates, shafts, and diaphragms made from materials like A36 steel and 4140 annealed steel.

Key technical details include a 26'-11 3/8" overall length drum with specific dimensional tolerances, groove patterns, drilling specifications, and welding requirements. The bill of materials lists seven primary items, with quantities and specific material specifications. The drawing includes multiple detailed views (end view, sectioned view), precise measurement annotations, and seven revision iterations, indicating a carefully engineered and iteratively developed component for the gantry crane rehabilitation project. Welding specifications note all welding must be per AWS D1.1 standards and inspected by CWI (Certified Welding Inspector).

View the file

Other files

File Type Posted
Industry Practice Comparison Survey.pdf PDF
Draft 6 ver1 PWS HH Crane Drum Repair.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

i------------------------------------------------------------26'-11 3/8 ° DVERALL---------------------------------------------------------1

----- 19 11/16' ---t-~---------------------------------------------------23'-8' ____________________________________________________ _,___19 11/16' -~

I---- 18 112· -----t------------- 6'-4' --------------i------------- 5'-6' ___________ .,__ __________ 5'-6" ___________ .,__ ____________ 6'-4' --------------i---- 18 1/2" -----t

¢56.425

CAFTER

MACHINING)

¢52.175

REF.

r BEARING

L()

C\J

RIGHT HAND GROOVES LEFT HAND GROOVES RIGHT HAND GROOVES LEFT HAND GROOVES

i------

20 9164" --->--- 46.25 GROOVES @l 1.143' PITCH = 52.86" 46.25 GROOVES @l 1.143' PITCH = 52.86' 46.25 GROOVES @l 1.143' PITCH = 52.86' 46.25 GROOVES @l 1.143' PITCH = 52.86' --i--- 20 9164 ' -~

3•

3•

__ _J _ _l __

10 9/64' -0-----i-----+- 10 9/64'

¢21/32' DRILL THRU

TAP 3/4-lOUNC C12) PLCS

FDR ITEM 5. USE CABLE

CLAMP FDR TEMPLATE,

SEE NOTE 4.

__ _L ___ __l __

NOTE:

3•

3•

I~

NOTE:

MAXIMUM MA TE RIAL

REMOVAL TD CLEAN

D.D. OF DRUM IS 1/4'

__ l__L __

12 5/8' 6 3 I 4 " -o------i

---w

¢56.425 I

__ <AFTER MA:HINING) J ----+'

¢52.175

(1)56.6 75

(AS ROLLED)

(1)56.375 +0.000

GEAR SEAT

I--- 19 3/4' ----Hrl

STRESS RELIEVE DRUM

AFTER '-/ELDING 8.

PRIOR TD MACHINING

NOTE: LEAVE 1/4' MACHINE

ALLD'w'ANCE ON EA. END OF

THE DRUM SHELL

w u

_J o._

_J o._ w u _J o._

1 114'

1/8"

1 10' g 0.125

1 1/ 4' i-·~--------R_D_L_L_IN_G_/F AB TDL.

' - 5'-11" ------------------------- 5'-11' ------------------------- 5'-11' ------------------------- 5'-11' ------------

CHAMFER 1/8' X 45'

1 SIDE ONLY FDR LEAD IN

¢ 0.003' ¢ 0.002·

UTER

DIA HRAGMS

C ) QTY

¢ 0.000' ¢ .999'

NNER

DIA HRAGMS

C ) QTY

FDR ASSEMBLY

-i-

DRILL THRU 8. TAP 3/4-lOUNC

(3) PLCS FDR EYE BDL T. AFTER

ASSEMBLY REAM TD ¢1'. DD NOT

PICK DRUM '-/ITH EYE BOLTS AT

THESE LDCA TIDNS.

E N D V E W 1: 12

DETAIL CD

1: 12

_j_

J I

DRUM l.D.

MINUS 0.003 TD 0.005

"'10.000 '"10.000

2'

R3/3

2·

8 1/2'

(1)[0 1/4

NOTE:

SECTIONED

1: 12 A

32 15/16'

18 15/16'

R3/32"

3 112· - /R3/8'

POLISH

/~ -'{ l/16'x45°

CHAMFER

I

I 3 93s·+O ooo·

- - ' -0.001 • fil

'""" '-Rl/16"

118' -

MACHINE BEARING END OF SHAFT AFTER 1 19/32

1 29/32'

FINAL '-/ELDING 8. STRESS

(1)13/16' DRILL THRU

¢1 3/16' C'BDRE

x 3/4' DP C3) PLCS

FDR ITEM 5

DETAIL

1: 4 r 5/8'

3;4· 1 I ~-++-~ 25

3/4' Rl 7 /32' c

1 118' - -, '-,--BREAK ALL

I- CORNERS

-+--- -1-- + ___,r--

1 118'

1/2' J 7 / 8' --+---1 1 112·

,_____,_ 7/8' 1 1/2'

I----- 4 3/ 4' ----i

I I I I I I

'=t-~ _ _-t_ 4J _ _l:1= ± =1:!_ _L.i::-Y ..::-C I I I I I I

R28.213'

L _

- _J 25

RI 7 /32"

j 1 1/2' ~ 3/16'

RELIEVING. POLISH -

FDR SEAL ~

KEYSEAT 1 1/2' '-!

G. (x , 314' D x 8 1/2' L

I

1/8 ·~ 8 1/2'

NOTES

1. ALL 'w'ELDING TD BE PER A'w'S Dl.l.

2. ALL 'w'ELDS TD BE INSPECTED BY C'w'I.

3. ALL MATERIAL TD BE A36 U.N.D.

4. LOCATE CABLE CLAMPS TD SUIT IN SHOP.

5. REMOVE ALL SHARP EDGES AND BURRS.

~y

(1)5,875 +0.000

(1)4 1/2 ¢10.0 10.0 l

CJP '-/ELD

UT/RT

NOTE: TYPE OF CJP '-/ELD PER

DRUM MANUFACTURER'S APPROVED

STANDARD '-/ELD PROCEDURES

2 1/4' i-CBEFDRE

I MACHINING)

ROLL D.D. TD

056.6 75" +0.125· -o.oo·

CJP '-/ELD

UT/RT

NOTE: TYPE OF CJP '-/ELD PER

DRUM MANUFACTURER'S APPROVED

STANDARD 'w'ELD PROCEDURES

IP s BLJIL Tl DETAIL ED 1: 4 1

DRUM SHELL GIRTH 'w'ELD

<PRIOR TD MACHINING)

DETAIL ED

1: 4 1

DRUM SHELL LONGITUDINAL 'w'ELD

<PRIOR TD MACHINING)

1.143 -I c.c. r-

1 TYP I ,

R0.530' R0.550'

55.578' R.D.

I 56.378

D.D.

I 56.578'

P.D.

I

DD-06-0001-87155-456

THE DALLES LOCK & DAM INTAKE GANTRY CRANE REHAB/LITA TION

CONTRACT # W9727N-06-C-0007

6 REVISED DETAIL 1 L WO

5 REVISED DETAIL 1 L WO

4 REVISED AS-BUil T L WO

3 REVISED SHELL WELD DETAILS & CORRECTED DIAPHRAGM WELD LEADER LWO

2 CORRECTED DIAPHRAGM SPACING LWO

7 REVISED PER ENGINEER'S REVIEW LWO

Number Descri lion y

REVISIONS

US ARMY CORPS OF ENGINEERS

PORTLAND DISTRICT

THE DALLES LOCK & DAM INTAKE GANTRY CRANE REHAB/LITA TION

BILL OF MATERIALS

ITEM PART QTY. DESCRIPTION

1 Al 4 Pl, ROLLED, 2 1 4" x 56.675" O.D. x 5'-11• LG. A36

2 81 4 PL, 1 1 2" x 52.175" O.D. AJ6 3 C1 2 SHA.FT, 10 1 4"0 x 32 15 16" LG. 4140 ANNEALED

4 01 4 PL, 1 1 2" x J 1 2" x 4 J 4" LC. A36 5 12 SHCS, J 4-10UNC x 2 J 4" LG.

6 4 WIRE ROPE, 1"~. 6xJ7, IWRC REF.

DALLES INTAKE GANTRY CRANE MAIN HOIST

NOMINAL TOLERANCE

UNLESS SPECIFIED

FRACTIONAL = + 1 /16

.xx = ± .030 .xxx = ± .010

DIX

Spokane, Wa.sllington 1-800-346-6867

Scale: Datt!l: Job No.

01 12 06 Drawn By. Checked By: Sl'!Mt:

MJW PAP 1

DRUM SHELL DETAIL

Rev.

Drl1wing No.

DMHD-1

NOT OFFICIAL

CONTRACT

DRAWINGS, ALL

ELEMENTS

SUBJECT TO

CHANGE.

g2encjtc Cloud+ g2encjtc Cloud+ To be replaced.

File details come from the government source that posted it. Updated .