Attachment_J_14_-_SITE_UTILIZATION_PLAN.pdf

PDF 530 KB Posted

Attached to
Phase 2A C Street Addition Furniture
Solicitation number
DCSC-18-RP-0023
Issued by

About this file

Attachment J.14

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

“Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.”

HCMCB C STREET ADDITION

Solicitation No. CPFMD-15-0603

SITE UTILIZATION PLAN

HCMCB C Street Addition

SL-1 | PHASE 2A

July 5, 2016 thru Phase 2A Completion

To 6th Street

Ramp will be Used to Access Major

Equipment & Materials to Parking

Level Mechanical Room & Loading

Dock

Line of Existing Perimeter

Addition Space (Per Proposed MOT)

During Non-Rush Hour Periods. Fence to be Relocated as Needed

Owner Use of RampConstruction Personnel Access

FORRESTER

FIELD TRAILER

To 3rd Street

Proposed Location of Material Hoist

Access for Drill Rig During Pile

Operation

Area Between Extension & Fence

Line to be Used for Equipment & Material Staging.

Set-up will Vary

Based on Operations

Construction Access to Garage and Loading Dock

SOUTH EDGE OF C STREET

Areas will Become Available for Material Staging after C Level

Decking is Put in Place

CRANE

Forrester & Owner Office Areas

Proposed trash shoot location

Proposed Dumpster Location kborton Rectangle kborton Rectangle kborton Rectangle kborton Rectangle kborton Text Box Construction Personel Restrooms kborton Arrow kborton Line kborton Line