DCR Fleet Charging Station Site Breakheart Reservation P26-3632-X1A RFP Attachment.pdf
PDF 4 MB Posted
- Solicitation number
- BD-26-1020-DCRCU-DC250-126933
- Issued by
- Massachusetts
About this file
This is an RFP attachment for the Massachusetts Department of Conservation and Recreation for the installation of an electric vehicle charging station at Breakheart Reservation in Saugus, Massachusetts. The project involves the procurement of a vendor to purchase, install, and commission one Level 2 EV charging station with associated electrical infrastructure at the DCR fleet garage located at 177 Forest Street. The specified equipment includes one ChargePoint CPF50 single-port networked wall-mounted charging station (or approved alternative) rated for 32 amperes, one labeled disconnect switch, one evCHARGEsolutions Mini Wall Guard (or approved alternative), and all associated conduit, copper wiring, circuit breakers, junction boxes, and related components necessary for a complete operational system. The charging station shall be mounted on the building exterior above the ridge line at the designated location, with the disconnect switch mounted on the exterior wall at minimum 20 feet away in line of sight of the equipment. All wiring must be run in conduit using copper materials throughout the interior of the building, and the system shall be powered from the main electrical panel located inside the building.
The contractor is responsible for all inspection, permitting, equipment commissioning, and ensuring compliance with the latest National Electrical Code and applicable local codes. No specific response dates, due dates, site visit requirements, bidder's meetings, award dates, contract terms, pricing structures, set asides, or funding sources are detailed in this attachment. The document is designated as a Green Docket project for the new garage facility at Breakheart Reservation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP DCR Fleet Charging Station Site Breakheart Reservation P26-3632-X1A.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE
Breakheart Reservation, Garage, 177 Forest Street, Saugus, MA 01906
EQUIPMENT
• (1) Level 2 EV Charging Station – ChargePoint CPF50, Single Port, Networked, Wall Mounted, Power selected for 32A, (or approved alternative)
• (1) Disconnect Switch, Labeled as per requirements of the Electrical Code
• (1) Wall Mount Guard – evCHARGEsolutions – Part no. Mini Wall Guard (or approved alternative)
• Conduit, Wiring, Circuit Breakers, Junction Boxes, and all other associated equipment/parts needed for a complete operational system
GENERAL
• EV Charging Station to be mounted on building exterior – above building ridge at the designated location
• Disconnect Switch to be mounted on building exterior at the designated location, in line of sight of the EV Charging Station, and at a minimum distance of 20ft from the EV Charging Station
• All wiring to be run in conduit
• All wiring to be Copper
• Contractor is responsible for inspection, permitting, and equipment commissioning
• All work performed to be in accordance with the latest recognized National Electrical Code and applicable local codes
EXISTING
PROPOSED
SCOPE OF PROJECT
- INSTALL ONE EVSE [ELECTRICAL VEHICLE SUPPLY EQUIPMENT].
- EVSE TO BE POWERED BY MAIN PANEL LOCATED INSIDE OF BUILDING.
- EVSE TO HAVE DISCONNECT SWITCH MOUNTED ON EXTERIOR WALL.
- ALL CONDUIT TO BE RUN IN THE INTERIOR OF BUILDING.
- EVSE TO BE SINGLE PORT.
- EVSE TO BE WALL MOUNTED.
- EVSE TO HAVE WALL MOUNT GUARD FOR PROTECTION.
BREAKHEART RESERVATION
NEW GARAGE
177 FOREST STREET
SAUGUS, MA 01906
Mini Wall Guard
Dimensions in Inches
| SITE SPECIFIC DETAILS BREAKHEART RESERVATION |