This is an Invitation for Bids (IFB) issued by the Government of the District of Columbia (District), Office of Contracting and Procurement (OCP), on behalf of the District Department of Transportation (DDOT) for the Freeway I-295 Dynamic Message Signs (DMS) Replacement project. The District seeks a Contractor to remove and replace two (2) existing Dynamic Message Signs on Freeway I-295, one in the northbound direction and one in the southbound direction. The project requires the furnishing and installation of new NTCIP-compliant full-matrix color LED DMSs, integration into the DDOT Traffic Management Center ATMS software, and the modification of existing DMS cabinets. Proposals are due by 2:00 PM EST on Friday, May 10, 2024. The contract term is 6 months from the date of award.

The contract will be a fixed price contract based on fixed unit prices, with a not-to-exceed amount. A 22% Disadvantaged Business Enterprise (DBE) subcontracting goal is required. The contract is funded through the Federal-Aid Highway Program and subject to Buy America requirements, Davis-Bacon labor standards, and other federal requirements. The District will evaluate proposals and award the contract to the responsive and responsible bidder offering the lowest price.

View the file

Other files

File Type Posted
DCKA-2024-B-0046_Amd1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GOVERNMENT OF THE DISTRICT OF COLUMBIA

DISTRICT DEPARTMENT OF TRANSPORTATION

OFFICE OF CONTRACTING AND PROCUREMENT

FEDERAL-AID HIGHWAY PROGRAM (FAHP)

CONSTRUCTION

DCKA-2024-B-0046

FREEWAY I-295 DYNAMIC MESSAGE SIGNS (DMS) REPLACEMENT

FAP: 2022021

SOLICITATION, OFFER, AND AWARD

1. Caption

Freeway I-295 Dynamic Message Signs (DMS)

Replacement

Page of Pages

1 68

2. Contract Number

TBD

3. Solicitation Number

DCKA-2024-B-0046

4. Type of Solicitation Sealed Proposal (IFB) Sealed Proposals (RFP)

Sole Source Emergency

5. Date Issued

4/10/2024

6. Type of Market Open Set Aside Open Market with Set-Aside CBE Designated Category

7. Issued By: Denise Burton-Johnson 8. Address Offer to:

Office of Contracting and Procurement

441 4th Street, N.W., Suite 330 South

Washington, D.C. 20001

Submission should be made via DTAP system only.

NOTE: In sealed proposal solicitations “offer” or “offeror” means “proposal or “contractor”

SOLICITATION

9. Sealed offers in original and __1__ copies for furnishing the supplies or services in the Schedule will be received via electronic format via DTAP system until:

2:00 P.M. EST on Friday, May 10, 2024 (Hour) (Date)

CAUTION: Late submission, Modifications and Withdrawals: See 27 DCMR chapters 15 & 16 as applicable. All offers are subject to all terms & conditions contained in solicitation.

10. For Information Contact

A. Name B. Telephone C. E-mail Address

Han May Chan

Contract Specialist

(Area Code) (Number) (Ext) han.maychan@dc.gov

11. Table of Contents

(X) Section Description Page No.

(X) Section Description Page No.

PART I – THE SCHEDULE PART II – CONTRACT CLAUSES

X A Solicitation/Contract Form 0 X I Contract Clauses 35

X B Supplies or Services and Price/Cost 1-3 PART III – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

X C Specifications/Work Statement 3-8 X J List of Attachments 51-52

X D Packaging and Marking 9 PART IV – REPRESENTATIONS AND INSTRUCTIONS

X E Inspection and Acceptance 10-12

X K Representations, certification and other statements of offerors

X F Period of Performance/Deliverables 13

X G Contract Administration Data 14-19 X L Instructions, conditions & notices to offerors 54-67

X H Special Contract Requirements 20-34 X M Evaluation factors for award 68

12. In conjunction with the above, the undersigned agrees, if this offer is accepted within 120 calendar days from the receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified herein.

13. Discount for Prompt Payment 10 Calendar days % 20 Calendar days

30 Calendar days % Calendar days %

14. Acknowledgement of Amendments (The offeror acknowledges receipt of amendments to the

SOLICITATION):

Amendment Number

Date Amendment Number

Date

15A.

Name and Address of Offeror

16. Name and Title of Person Authorized to Sign Offer/Contract

15B. Telephone 15 C. Check if remittance address is different from above – Refer to section G

17. Signature 18. Award Date (Area Code) (Number) (Ext)

AWARD (TO BE COMPLETED BY GOVERNMENT)

19. Accepted as to Items Numbered 20. Amount 21. Accounting and Appropriation

2. Name of contracting Officer (Type or Print)

Benita Scott

23. Signature of Contracting Officer (district of Columbia) 24. Award Date

DDOT IFB DCKA-2024-B-0046 (April 2024)

Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 1 of 68

SECTION B: CONTRACT TYPE AND PRICE/COST

B.1 SUMMARY

The Government of the District of Columbia (District), Office of Contracting and Procurement

(OCP), on behalf of the District Department of Transportation (DDOT), is seeking a Contractor to remove and replace two (2) Dynamic Message Signs (DMS) on freeway I-295.

B.2 TYPE OF CONTRACT

In accordance with 27 DCMR Sections 2402, the contract (“the Contract”) awarded under this

Invitation for Bids (“IFB” or “Solicitation”) shall be a fixed price contract based on fixed unit prices, with a not-to-exceed amount (ceiling).

B.3 FEDERAL PARTICIPATION (FEDERAL-AID PROJECTS)

This paragraph supersedes Standard Specifications Section 107.02, “Federal-Aid Participation.”

Because the U.S. government is participating in the cost of the Work covered by the Contract, the

Work shall be under the supervision of the District but subject to the inspection and approval of the appropriate officials of the U.S. government and in accordance with the applicable federal statutes, rules, and regulations. Such inspection will in no case make the federal government a party to the Contract, nor will it subject the Contractor to compliance with the federal laws relative to labor on government contracts other than such labor requirements as required by law and as contained in the Contract Documents.

B.4 NOTICE OF DBE SUBCONTRACTING REQUIREMENTS

A Disadvantaged Business Enterprise (DBE) subcontracting plan (J.7 OCR DBE Utilization Form) is required to be submitted for this Contract.

If a DBE subcontracting plan is required for this Contract, and in accordance with the requirements of 49 CFR 26, Participation by Disadvantaged Business Enterprises in Department of

Transportation Financial Assistance Programs, the goal for DBE participation is expressed in percentage terms for the dollar value of the Contractor's aggregate workforce in each trade on all construction work on the Project.

DBE Goal: 22%

B.5 PRICE SCHEDULE

Note to bidders: Please refer to the attached J.16 Price Schedule. The price schedule of the selected awardee will be included in the executed contract.

B.6 SCOPE OF PAYMENT

In accordance with the Standard Specifications Section 109.02:

Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 2 of 68

A. The Contractor shall receive and accept compensation in accordance with the Price Schedule as full payment for furnishing all materials and for performing all of the Work in a complete and satisfactory manner including all labor, plant, as defined herein, and incidentals needed, and for all risk, loss, damage, or expense of whatever nature arising from the Work and its prosecution, subject to the terms of the Contract.

B. If work under one Contract Line-Item Number (“CLIN”) includes compensation for any work or material accessory to that CLIN, the amount of such work or material will not be measured, nor will payment be made under any other CLIN.

C. Where two or more CLINs areas overlap either by discrepancy in definition or by the intricate nature of the work, payment will be made at the lowest Contract unit price of overlapping

CLINs involved.

D. The phrases “Work includes” and “as part of the Work” are sometimes used to clarify that referenced requirements shall be included as part of the CLIN involved; no separate or additional payment will be made.

E. The phrase “at Contractor expense” means the Contractor shall meet requirements as its sole expense with neither liability nor expense to the District.

B.7.1 NONPROFIT FAIR COMPENSATION ACT OF 2020, D.C. Code § 2-222.01 et seq.

Nonprofit organizations, as defined in the Act, shall include in their rates the indirect costs incurred in provision of goods or performance of services under this contract pursuant to the nonprofit organization's unexpired Negotiated Indirect Cost Rate Agreement (NICRA). If a nonprofit organization does not have an unexpired NICRA, the nonprofit organization may elect to instead include in its rates its indirect costs:

(1) As calculated using a de minimis rate of 10% of all direct costs under this contract;

(2) By negotiating a new percentage indirect cost rate with the awarding agency;

(3) As calculated with the same percentage indirect cost rate as the nonprofit organization negotiated with any District agency within the past 2 years; however, a nonprofit organization may request to renegotiate indirect costs rates in accordance with B.7.2; or

(4) As calculated with a percentage rate and base amount, determined by a certified public accountant, as defined in the Act, using the nonprofit organization's audited financial statements from the immediately preceding fiscal year, pursuant to the OMB Uniform

Guidance, and certified in writing by the certified public accountant.

B.7.2 If this contract is funded by a federal agency, indirect costs shall be consistent with the requirements for pass-through entities in 2 C.F.R. § 200.331, or any successor regulations.

Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 3 of 68

B.7.3 The Contractor shall pay its subcontractors which are nonprofit organizations the same indirect cost rates as the nonprofit organization subcontractors would have received as a prime contractor.

Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 4 of 68

SECTION C: DESCRIPTION/ SPECIFICATIONS/ STATEMENT OF WORK

C.1 SCOPE OF WORK:

The Government of the District of Columbia (District), Office of Contracting and Procurement

(OCP), on behalf of the District Department of Transportation (DDOT) seeks a Contractor to remove and replace two (2) Dynamic Message Signs (DMS) on freeway I-295.

C.2 BACKGROUND

DDOT installed two Dynamic Message Signs (DMS) on District Freeway I-295 one each at northbound and southbound directions back in year 2000. The two signs have reached their life expectancy period and are no longer functional. DDOT seeks a Contractor to replace the two signs, which are used primarily for emergencies and special events. The overhead structure and the foundation for the two signs are in good shape. Only the signs and all the electronic components included in the systems need to be removed and replaced.

C.3 APPLICABLE DOCUMENTS

The following documents are applicable to this procurement and are hereby incorporated by reference:

No. Title Link

1 DDOT Standard Specifications for

Highways and Structures, 2013, 2020 revision, and any updates. (“Standard

Specifications” or “Specifications”) https://ddotwiki.atlassian.net/wiki/spaces/COM

/pages/2069271070/Standards+and+Manuals#

StandardsandManuals-

StandardSpecificationsforHighwaysandStructu res

2 DDOT Standard Drawings, 2015, 2020 revision, and any updates.

https://ddotwiki.atlassian.net/wiki/spaces/COM

/pages/2069271070/Standards+and+Manuals#

StandardsandManuals-

DesignandEngineeringManual

3 The Manual on Uniform Traffic Control

Devices for Streets and Highways

(MUTCD), 2023, and any updates.

https://mutcd.fhwa.dot.gov/

4 DDOT Work Zone Temporary Traffic

Control Manual 2006, and any updates.

https://ddotwiki.atlassian.net/wiki/spaces/COM

/pages/2069271070/Standards+and+Manuals#

StandardsandManuals-

StandardSpecificationsforHighwaysandStructu res

C.4 DEFINITIONS

https://ddotwiki.atlassian.net/wiki/spaces/COM/pages/2069271070/Standards+and+Manuals#StandardsandManuals-StandardSpecificationsforHighwaysandStructures https://ddotwiki.atlassian.net/wiki/spaces/COM/pages/2069271070/Standards+and+Manuals#StandardsandManuals-StandardSpecificationsforHighwaysandStructures https://ddotwiki.atlassian.net/wiki/spaces/COM/pages/2069271070/Standards+and+Manuals#StandardsandManuals-StandardSpecificationsforHighwaysandStructures https://ddotwiki.atlassian.net/wiki/spaces/COM/pages/2069271070/Standards+and+Manuals#StandardsandManuals-StandardSpecificationsforHighwaysandStructures https://ddotwiki.atlassian.net/wiki/spaces/COM/pages/2069271070/Standards+and+Manuals#StandardsandManuals-StandardSpecificationsforHighwaysandStructures https://ddotwiki.atlassian.net/wiki/spaces/COM/pages/2069271070/Standards+and+Manuals#StandardsandManuals-DesignandEngineeringManual https://ddotwiki.atlassian.net/wiki/spaces/COM/pages/2069271070/Standards+and+Manuals#StandardsandManuals-DesignandEngineeringManual https://ddotwiki.atlassian.net/wiki/spaces/COM/pages/2069271070/Standards+and+Manuals#StandardsandManuals-DesignandEngineeringManual https://ddotwiki.atlassian.net/wiki/spaces/COM/pages/2069271070/Standards+and+Manuals#StandardsandManuals-DesignandEngineeringManual https://mutcd.fhwa.dot.gov/ https://ddotwiki.atlassian.net/wiki/spaces/COM/pages/2069271070/Standards+and+Manuals#StandardsandManuals-StandardSpecificationsforHighwaysandStructures https://ddotwiki.atlassian.net/wiki/spaces/COM/pages/2069271070/Standards+and+Manuals#StandardsandManuals-StandardSpecificationsforHighwaysandStructures https://ddotwiki.atlassian.net/wiki/spaces/COM/pages/2069271070/Standards+and+Manuals#StandardsandManuals-StandardSpecificationsforHighwaysandStructures https://ddotwiki.atlassian.net/wiki/spaces/COM/pages/2069271070/Standards+and+Manuals#StandardsandManuals-StandardSpecificationsforHighwaysandStructures https://ddotwiki.atlassian.net/wiki/spaces/COM/pages/2069271070/Standards+and+Manuals#StandardsandManuals-StandardSpecificationsforHighwaysandStructures

Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 5 of 68

The definitions at Section 101.03 of the Standard Specifications apply to this Contract except to the extent specifically stated herein.

For the convenience of the bidders, the following definitions from Section 101.03 are specified below. To the extent that the definitions below modify and supplement Section 101.03, such modified and supplemented definitions supersede the corresponding definitions at Section 101.03.

These terms when used in this solicitation have the following meanings:

1. Contract – The entire, integrated agreement between the District and the Contractor for the

Project. The Contract is made of the Contract Documents, and supersedes prior negotiations, representations, or agreements.

2. Contract Documents – The Contract documents consist of the Solicitation sections A-K (the

“Contract Form”), addenda issued prior to execution of the Contract, the price schedule, performance and payment bonds, specifications, contract drawings, and other documents listed in the Contract Form, and modifications issued after execution of the Contract.

3. Final Acceptance – The occurrence of all the events, inspection, and satisfaction of all the conditions with respect to the Work for completion of all aspects of the Contract as set forth in

Standard Specifications Section 108.09.

4. Plant – All physical resources, facilities, machinery, equipment, staging, forms, tools, work, and storage space other than provided by the Contract, together with subsidiary essentials and necessary maintenance for proper construction and acceptable completion of the Project.

5. Project – The title of the Contract, and also the entire Work to be completed under the Contract.

6. Work – The furnishing of all labor, materials, equipment, and incidentals necessary or convenient to the successful completion of the Project and the carrying out of the duties and obligations imposed by the contract.

C.5 REQUIREMENTS

The purpose of this scope of work is to provide all labor, materials, and equipment for Project in accordance with the Contract Documents (“the Work”), which includes:

Providing all labor, materials, tools, equipment, and incidentals necessary to complete the project in accordance with the drawings, standard specifications, Supplementary Specifications (also referred to as J.14 Supplementary Specifications (Special Provisions). The specifications describe the minimum requirements for the material, design, quality assurance, and construction that shall govern the work to be performed.

The scope of work provides for the removal and replacement of two (2) full-matrix color LED

Dynamic Message Signs (DMS) capable of displaying 3 lines of 21 18”-characters, and its associated communications cables including fiber optics, feeder conductors, conduits, risers, Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 6 of 68 stainless steel banding material, termination equipment, connectors, and jumper cables. Unless otherwise stated, these requirements shall apply to all hardware and software components.

In this project, the term District Engineer is defined as the District of Columbia Department of

Transportation (DDOT) Engineer or his duly authorized representative.

Table 1: DMS Locations

DMS ID DDOT SIGN

STRUCTURE LABEL

DMS

LABEL

LOCATION

8001 295-048 295-N-8001 I-295 Northbound 1 mile north of Capital

Beltway

8002 295-047 295-S-8002 I-295 Southbound 0.25 mile north of

Laboratory Road

The work includes, but is not limited to, the following items:

a. Mobilization and demobilization, provision, and maintenance of work and storage space.

b. Provide employee training for this project.

c. Establishment and maintenance of temporary traffic control, including signs, temporary lighting, barricades, and other transition devices; reconfiguring the devices in conjunction with changes in work areas; and their removal and disposal upon project completion, including restoration of areas disturbed by temporary traffic detours to their original condition. The Contractor shall submit Traffic Control Plans (TCP), which includes

Maintenance of Traffic (MOT), to the CA for review and approval prior to commencement of work. All MOT shall be coordinated with work performed for other projects that may be underway in the vicinity.

d. Removal and disposal of two (2) existing Dynamic Message Signs (DMS), conduits, wiring, and other items associated with the DMSs on the supporting structures. The existing cabinets will remain in place.

e. Furnishing, installing, and testing two (2) new National Transportation Communication for

ITS protocol (NTCIP)-compliant Full-Matrix Color LED DMSs on existing structures at two (2) locations on Freeway I-295 as identified in Table 1. The existing conduit system between the existing cabinets and the new cabinets could be used on both sites. The new conduit system for power and communications from the new cabinets to the new signs shall be furnished and installed. The Contractor shall be responsible for determining the conduit and electrical conductor sizes in accordance with the National Electrical Code (NEC).

f. Furnishing and installing all related field hardware and software for Central Software

Upgrade and integrating into DDOT Traffic Management Center (TMC) Advanced

Transportation Management Systems (ATMS) software to provide a fully functioning

DMS system. The Contractor shall provide NTCIP compliance certification and warranty

Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 7 of 68 support for each DMS. The Contractor shall submit material compliance certifications and work procedures to the CA for review and approval at least seven (7) calendar days prior to each DMS delivery and installation.

g. Furnishing, installing, and testing two (2) CCTV Cameras to view and monitor each of the

DMS field cabinets.

h. Modification of the existing DMS cabinets to provide power and communications to the new pole mounted cabinets. This work includes removing all existing equipment deemed non-essential and cleaning up the existing cabinets (e.g., insect’s infestation, dirt, debris, and obsolete documents and drawings).

i. A technician work platform of 3ft X 3ft shall be provided beneath the new pole mounted cabinet for the Southbound DMS. The platform can be precast concrete or pour-in-place that meet DDOT standard requirements. The platform shall be level and extend 3-inches above and 4 inches below finished grade.

j. The Contractor shall perform all acceptance testing, installation, and training in the presence of a District Engineer or designated representative.

k. Provide detailed procedures for the removal of existing DMSs and the erection and installation of new DMSs, which include Traffic Control Plans (TCP) or Maintenance of

Traffic (MOT). The Contractor shall submit the procedures for review and approval at least seven (7) calendar days prior to commencement of work.

l. The Contractor shall be fully responsible for protection against damage for the duration of the contract of all the structures, streetlights, and the utility structures within the contract limits and adjacent thereto. The cost of this protective work is the Contractor’s responsibility and shall be reflected and distributed among the contract line items in section

B.5 and J.16 Price Schedule. No additional payment will be made.

m. The Contractor shall complete all work for this project within six (6) months from the date of contract award.

C.6 DELIVERABLES

C.6.1 In addition to any deliverables required elsewhere in the Contract Documents, as defined herein, the Contractor shall submit the following deliverables in accordance with the

Contract.

Item Description Schedule Contract

Reference

1. Subcontractor Payment Form Monthly G.3

2. Subcontractor Approval Request Form As Needed I.5.B

3. Schedule Update* Monthly G.1.B

4. EEO Monthly Employment Utilization Form Monthly G.6.A

Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 8 of 68

5. Office of Civil Rights DBE Utilization Form Monthly G.6.B

6. Certified Payrolls and Statement of Compliance Weekly H.2.C

C.6.2 For contracts subject to the 51% District Residents New Hires Requirements and/or First

Source Employment Agreement requirements, the Contractor shall submit to the CA, as a deliverable, the compliance report, or a waiver of compliance with its final request for payment.

C.7 CONTRACTOR’S RESPONSIBILITY FOR WORK

This clause supersedes Standard Specifications Section 107.15, “Contractor’s Responsibility for

Work.”

A. Until Final Acceptance of the Project by the District, the Contractor shall be responsible for the Project and shall take every precaution against injury, or damage to any part thereof, whether arising from the execution or from the non-execution of the Project. The Contractor shall rebuild, repair, restore, and bear the expense of such injury or damage before Final

Acceptance except to the extent that such injury or damage is due to unforeseeable cause beyond the control, and without the fault or negligence, of the Contractor or subcontractor.

B. In case of suspension of all or any portion of the Work from any cause whatever, the Contractor shall be responsible for the Project and shall 1) take such precautions as may be necessary to prevent damage to the Project, 2) provide for normal drainage and 3) erect any necessary temporary structures, signs, or other facilities. In addition, during such period of suspension, the Contractor shall properly and continuously maintain, in an acceptable growing condition, all living material in newly established plantings, seeding, and sodding furnished under the

Contract, and shall take necessary precautions to protect new tree growth and other important vegetative growth against injury.

C.8 BRAND NAME OR EQUAL

A. If items called for by the Solicitation have been identified by a brand name description, such identification is intended to be descriptive, but not restrictive, and is to indicate the quality and characteristics of products that will be satisfactory. The District will consider alternate products to be equal if the Contract Administrator determines them to be equal in all material respects to the brand name products referenced in the Solicitation.

B. The Contractor must provide all descriptive material (such as cuts, illustrations, drawings, or other information) necessary for the District to (i) determine whether the product offered meets the requirements of the Contract. In making the determination as to equality of a product the

District will consider information furnished by the Contractor. The District may, but is not obligated to, also consider information reasonably available to the District.

C.9 SUPPLEMENTARY SPECIFICATIONS

Supplementary Specifications ( “Special Provisions”) are attached at Section J.14.

Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 9 of 68

SECTION D: PACKAGING AND MARKING

Not Applicable.

Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 10 of 68

SECTION E: INSPECTION AND ACCEPTANCE

E.1 INSPECTION

This clause supersedes Standard Specifications Section 103.01, Article 12, “Inspection and

Acceptance.”

A. The Contractor shall allow the District, and any entity defined in subparagraph D below, to test and inspect materials and workmanship. at reasonable times and at the Site of the Work, unless the Engineer notifies the Contractor that inspection or testing of a material to be incorporated in the Work will be made at the place of production, manufacture, or shipment (“off-site”) of such material.

1. To the extent specified in the Engineer’s notification to the Contractor of off-site inspection or testing, such inspection or test shall be conclusive as to whether the material involved conforms to Contract requirements.

2. Such off-site inspection or test shall not relieve the Contractor of responsibility for damage

to. or loss of, the material prior to incorporation into the Work, nor in any way affect the rights of the District under the terms of this Article, except as herein above provided.

B. The District will endeavor to perform such inspections and testing in such manner as to not unnecessarily delay the Work. Special, full size, and performance tests shall be performed as described in the Contract.

C. The Contractor shall furnish promptly, without additional cost to the District, all facilities, labor, equipment, and material, including access and traffic control devices, needed for performing safe and convenient inspection and testing in accordance with subparagraph A and

D of this clause. If off-site material and workmanship are not ready for inspection at the time specified by the District, the Contractor shall be responsible for any additional cost of tests and inspection.

D. When a unit of government other than the District, a utility company, or a railroad has an interest in or is affected by the Contract, its respective representatives shall have the right to inspect such portion of the Work. Such inspection shall not make any government unit, utility company, or railroad a party to the Contract nor interfere with the rights of the District or the

Contractor.

E. The Contractor shall, at its own expense, replace any material and correct any workmanship determined by the District not to conform to the Contract requirements, as directed by the

District. If, however, the District determines that acceptance of such work is in the public interest, the District may accept such material or workmanship and make an appropriate downward adjustment in the Contract price. The Contractor shall promptly segregate and remove rejected material from the premises at Contractor’s expense. Costs associated with inspection services will not be permitted in claims nor as a basis of claims except as specifically provided herein.

Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 11 of 68

F. Failure of the District to inspect or reject workmanship or material shall not in any way imply acceptance, nor prevent the District from later rejecting the work. Inspection and acceptance by the District in no way relieves the Contractor of its responsibility to meet the requirements of the Contract Documents.

G. If the Contractor does not promptly replace rejected material or correct rejected workmanship, the District:

1. May, by Contract or otherwise, replace such material and correct such workmanship and charge the cost thereof to the Contractor, or

2. May terminate the Contractor’s Right to Proceed in accordance with Standard

Specifications Section 103.01 Article 5, “Termination-Delays.”

H. Should the Engineer determine that it is necessary to make an examination of any part or all of the Work by removing or tearing out same, the Contractor shall, upon request, promptly furnish all necessary facilities, labor, and material to do same. If such work is found to be defective or nonconforming, in any material respect, due to the fault of the Contractor or its Subcontractors, the Contractor shall be responsible for the expenses of such removal and tearing out of the work, examination, and of satisfactory reconstruction of the work. If, however, such work is found to meet the requirements of the Contract, the District will make an equitable adjustment in the Contract Price to compensate the Contractor for the additional services involved in such removal or tearing out of such work, examination, and reconstruction. If completion of the

Work has been delayed thereby, the District will, in addition, make an equitable extension of time.

E.2 ACCEPTANCE

This clause supersedes Standard Specifications Section 105.13, “Inspection – Acceptance.”

A. PARTIAL ACCEPTANCE - When the Contractor completes a suitable unit or portion of the

Project, the Engineer may make, or the Contractor may request, final inspection of that unit. If the Engineer determines that such unit or portion is complete and meets Contract requirements, he or she may accept in writing that unit or portion as complete, which written acceptance shall include a description of specific work accepted, and the Contractor may be relieved of further responsibility for the accepted unit or portion subject to the requirements of the Contract. Such partial acceptance shall not void or alter any Contract provision.

A. FINAL INSPECTION AND ACCEPTANCE

1. Within thirty (30) consecutive Calendar Days after receipt of written notice from the

Contractor that Contract work is complete, and the Project area cleaned up, the Engineer will make a final inspection of the Project. The Contractor shall promptly correct all deficiencies identified by the Engineer. Once the Contractor has satisfactorily completed

Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 12 of 68 all of the requirements at Section 108.09, “Substantial Completion and Acceptance,” the

Engineer will certify in writing Final Acceptance of the Project.

2. Unless otherwise provided in the Contract, Final Acceptance by the District will be made as promptly as practicable after inspection of the Work and shall be final and conclusive except with regard to latent defects, fraud, or such gross mistakes as may amount to fraud, or with regard to the District’s rights under any warranty or guaranty.

3. The Project will not be accepted until the Contractor has met all Contract requirements.

The Contractor remains responsible for the correction of any deficient or non-compliant aspects of the Work until Final Acceptance, even if discovered after Final Acceptance.

C. The warranty of workmanship for the Work shall commence at Substantial Completion and continue for a minimum period of three (3) years. If the Department declares partial Substantial

Completion on any portion of the Work in advance of Substantial Completion for the entire

Project, the warranty period for such portion shall commence on the date of partial Substantial

Completion and continue for a minimum period of three (3) years.

D. The Department, at any time during the warranty period, may conduct an inspection of the

Work in order to determine conformance to the Contract. If the Department reasonably determines that defective work of any nature is present and is the responsibility of the

Contractor, the Contractor shall immediately make corrective action to bring the defective

Work into compliance with the Contract, or to the satisfaction of the Department, and at no expense of the Department.

Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 13 of 68

SECTION F: PERIOD OF PERFORMANCE

F.1 PERIOD OF PERFORMANCE

For the purposes of the Contract, “Period of Performance” means “Contract Time” as defined in

Standard Specifications Section 108.08, “Determination of Contract Time and Partial

Suspension.”

In accordance with Standard Specifications Section 108.09, “Substantial Completion and Final

Acceptance,” the following periods of performance apply to this Contract:

A. Substantial Completion Date. Unless the Contract specifies a different time, Substantial

Completion is 30 Calendar Days before Final Acceptance.

B. Final Acceptance Date. The Final Acceptance Date is 6 months (or 183 calendar days) from the date of contract award.

F.2 FAILURE TO COMPLETE ON TIME

DDOT Standard Specifications for Highways and Structures 2013 Section 108.09(C), “Liquidated Damages,” applies to the Contract.

F.3 RESERVED

Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 14 of 68

SECTION G: CONTRACT ADMINISTRATION

G.1 INVOICE PAYMENT

This clause supplements and modifies Standard Specifications Section 103.01, Article 9, “Payments to Contractor,” and Section 109.05, “Progress Payments,” as follows:

A. Monthly Invoices (also be referred to as “applications for payment”). On a monthly basis, the

Contractor shall submit a proper invoice, in accordance with paragraph G.2(B) below, for completed work. The Contractor shall submit evidence of timely payments to all subcontractors, in accordance with paragraph G.3, below.

The District will make progress payments to the Contractor for work satisfactorily performed, less any retainage, discounts, allowances, or adjustments provided for in this Contract, on or before the 30th day after approval of an invoice for payment. Progress payments do not constitute final acceptance of the work for which payments are made.

B. The Contractor shall submit to the CA, as a condition for each progress payment, evidence of timely payments to subcontractors for work under the previous invoice, in accordance with

Paragraph G.3 and a performance schedule update. Notwithstanding paragraph G.1.A above, the District will not make payment on an invoice until such documentation is received.

C. Retainage.

The District may retain up to 5% of each progress payment. If, however, the Contractor has been notified in writing of its failure to meet Contract requirements, the District may withhold retainage up to 10% of each subsequent progress payment.

G.2 INVOICE SUBMITTAL

A. The Contractor shall create and submit applications for payment in an electronic format through the DC Vendor Portal, https://vendorportal.dc.gov.

B. Unless otherwise specified in the Contract, the Contractor shall submit proper invoices on a monthly basis.

C. To constitute a proper invoice, the Contractor shall enter all required information into the Portal after selecting the applicable purchase order number, which is listed on the Contractor’s profile.

D. At the time of each invoice, the Contractor shall submit to the CA all deliverables required under the Contract.

G.3 PAYMENTS TO SUBCONTRACTORS

This clause supplements and modifies Standard Specifications Section 109.06, “Payment to https://vendorportal.dc.gov/

Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 15 of 68

Subcontractors and Suppliers Certificate,” as follows:

A. All payments by the Contractor to subcontractors are subject to the Quick Payment Act, D.C.

Official Code § 2-220-01 et seq. Specifically:

1. The Contractor must take one of the following actions within seven (7) days of receipt of any amount paid to the Contractor by the District for work performed by any subcontractor under this contract:

a. Pay the subcontractor for the proportionate share of the total payment received from the District that is attributable to the subcontractor for work performed under the

Contract; or

b. Notify the CA and CO and the subcontractor, in writing, of the Contractor’s intention to withhold all or part of the subcontractor’s payment and state the reason for the nonpayment.

2. The Contractor shall include the following clauses into its subcontracts:

a. If the Contractor fails to make payments to the subcontractor by the payment date required by the subcontract, the Contractor shall pay such subcontractor interest penalties on amounts due the subcontractor beginning on the day after the payment is due and ending on the date on which the payment is made. Interest shall be calculated at the rate of at last 1% per month.

b. Any amount of interest penalty that remains unpaid by the Contractor after 30 days shall be added to the principal amount of the debt to the subcontractor an, thereafter, interest penalties shall accrue on the added amount.

3. A dispute between the Contractor and subcontract relating to the amounts of, or a subcontractor’s entitlement to, a payment, or late payment interest penalty, does not constitute a dispute to which the District is a party. The District may not be interpleaded into any judicial or administrative proceeding involving such dispute.

B. Each month during the Period of Performance, the Contractor shall complete the OCR

Subcontractor Payment Form, attached at J.8, and submit it to the CA and the Office of Civil

Rights (OCR).

G.4 ASSIGNMENT OF CONTRACT PAYMENTS

A. In accordance with 27 DCMR 3250, the Contractor may assign to a bank, trust company, or other financing institution funds due, or to become due, as a result of the performance of this contract.

B. Any assignment shall cover all unpaid amounts payable under the Contract and shall not be made to more than one party.

Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 16 of 68

C. Notwithstanding an assignment of contract payments, the Contractor, not the assignee, is required to prepare invoices. Where such an assignment has been made, the original copy of the invoice must refer to the assignment and must show that payment of the invoice is to be made directly to the assignee as follows: “Pursuant to the instrument of assignment dated

________, make payment of this invoice to (name and address of assignee).”

G.5 FINAL PAYMENT

This clause supersedes Standard Specifications Section 109.08, “Acceptance and Final Payment.”

A. Acceptance, as provided in Section E.2, herein, means “Final Acceptance,” as defined in

Standard Specification Section 108.08(B). When the Project has been accepted in accordance with Section E.2, herein,” the Contractor shall prepare, and submit to the CA, the final estimate for the Work performed for approval by the District. If the District approves the final estimate without exception to the quantities, the Contractor may file an invoice for final payment. The amount of the final payment will be the entire sum found to be due after deducting all previous payments and all amounts to be retained or deducted under the provisions of the Contract. All prior partial estimates and progress payments shall be subject to correction in the final estimate and payment.

B. In addition to its invoice for final payment, the Contractor must submit to the Contracting

Officer:

1. A release of all claims against the District arising from or relating to this Contract;

2. Proof of payment of all subcontractors in the form of release of all claims; and

3. All required product warranties, as-built drawings, operating manuals, material certifications, and other items as specified in the Contract.

The District shall not make final payment to the Contractor unless and until all required documentation is received.

A. All release forms must bear an original signature of an individual authorized to sign on behalf of the Contractor and must be affixed with the Contractor’s corporate seal or the seal of a

Notary Public.

B. Notwithstanding the provisions of B.1 above, the Contractor may reserve from the release specific claims only if such claims have been submitted in accordance with the Disputes clause of the Contract. In such event, the District will make final payment pending resolution of the claim. Upon final adjudication of the claim, any additional payment determined to be due the

Contractor will be placed on a supplemental estimate and processed for payment.

G.6 REPORTING REQUIREMENTS

Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 17 of 68

A. Equal Opportunity Reporting Requirements

1. During the Period of Performance, the Contractor shall complete the DDOT Monthly Equal

Employment Opportunity Utilization Report, attached at J.6, and submit it to the CO by the 5th day of each month. The report shall include the total work-hours for each employee classification in each trade in the covered area for the reporting period.

2. The Contractor shall include the requirements of this paragraph G.6(A) in all subcontracts and shall collect reports from each subcontractor and submit them with its report each month.

B. DBE Utilization

Each month during the Period of Performance, the Contractor shall complete the Office of

Civil Rights (OCR) DBE Utilization Form, attached at J.7, and submit it to the CA and to OCR.

G.7 CONTRACTING OFFICER (CO)

Contracts will be entered into and signed on behalf of the District only by contracting officers.

The contact information for the Contracting Officer is:

Benita Scott

Deputy Chief Contracting Officer

Office of Contracting and Procurement

District Department of Transportation

250 M Street SE 7th Floor, Washington, DC 20003 benita.scott@dc.gov

G.8 AUTHORIZED CHANGES BY THE CONTRACTING OFFICER

A. The CO is the only person authorized to approve changes in any of the requirements of the

Contract.

B. The Contractor shall not comply with any order, directive or request that changes or modifies the requirements of the Contract, unless issued in writing and signed by the CO.

C. In the event the Contractor effects any change at the instruction or request of any person other than the CO, the change will be considered to have been made without authority and no adjustment will be made in the Contract price or Contract schedule to cover any cost increase incurred as a result thereof.

D. The Contractor will be fully responsible for any changes not authorized in advance, in writing, by the CO; may be denied compensation or other relief for any additional work performed that is not so authorized; and may also be required, at no additional cost to the District, to take all corrective action necessitated by reason of the unauthorized changes.

mailto:benita.scott@dc.gov

Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 18 of 68

G.9 CONTRACT ADMINSTRATOR (CA)

A. The address and telephone number of the Contract Administrator (CA) will be provided at contract award.

B. For the purposes of the Contract, “Contract Administrator” or “CA” are synonymous with

“Engineer.” The CA is responsible for general administration of the Contract and advising the

CO as to the Contractor’s compliance or noncompliance with the Contract. The CA has the responsibility of ensuring the work conforms to the requirements of the Contract and such other responsibilities and authorities as may be specified in the Contract. The CA will act as the CO’s representative on technical matters, providing technical clarifications, as necessary, with respect to the Specifications or Statement of Work, and monitoring the progress and quality of the Contractor’s performance. Other responsibilities include:

1. Keeping the CO fully informed of any technical or contractual difficulties encountered during the performance period and advising the CO of any potential problem areas under the Contract;

2. Coordinating site entry for Contractor personnel, if applicable;

3. Reviewing and approving invoices for completed work if the Contractor’s costs are consistent with the negotiated amounts and progress is satisfactory and commensurate with the rate of expenditure;

4. Reviewing and approving invoices for deliverables to ensure receipt of goods and services.

This includes the timely processing of invoices and vouchers in accordance with the

District’s payment provisions;

5. Inspecting and accepting/rejecting all deliverables under the Contract; and

6. Maintaining a file that includes all Contract correspondence, modifications, records of inspections (site, data, equipment, etc.) and invoice or vouchers.

C. The CA shall NOT have the authority to:

1. Award, agree to, or sign any contract, delivery order or task order. Only the CO shall make contractual agreements, commitments, or modifications;

2. Grant deviations from or waive any of the terms and conditions of the Contract;

3. Increase the dollar limit of the contract or authorize work beyond the dollar limit of the

Contract,

4. Authorize the expenditure of funds by the Contractor;

5. Change the period of performance;

Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 19 of 68

6. Substitute key personnel without CO approval; or

7. Authorize the use of District property, except as specified under the Contract.

G.10 FIRST SOURCE AGREEMENT REQUEST FOR FINAL PAYMENT

G.10.1 For contracts subject to the 51% District Residents New Hires Requirements and/or First

Source Employment Agreement requirements, final request for payment must be accompanied by the compliance report or a waiver of compliance.

G.10.2 The District may impose monetary fines for willful breach of the employment agreement or failure to submit the compliance report.

Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 20 of 68

SECTION H: SPECIAL CONTRACT REQUIREMENTS

H.1 SPECIAL CONTRACT PROVISIONS

This Federal-Aid Highway Program (“FAHP”) contract is subject to Federal Highway

Administration (“FHWA”) 1273, Special Contract Provisions Federal-Aid Construction Contracts

(2012) (attached at J.2).

H.2 DEPARTMENT OF LABOR WAGE DETERMINATIONS

This clause supplements and modifies Paragraph H.10, “Labor Requirements,” below.

A. In accordance with applicable provisions of 29 CFR Part 1, General Wage Decision No.

DC20240001 01/12/2024 is bound herein and contain(s) the specific applicable wage rate(s) for: Heavy and Highway Construction Projects in Washington, DC. All wage categories in the Wage Determination apply to this contract including Heavy and Highway Construction, Sewer, and Water Lines, Paving and Incidental.

B. Further, as set forth in 29 CFR Part 1, Section 1.6I(3)(iv), if the intent to award letter is not issued within ninety (90) days of bid opening, all intervening modifications, notice of which are published on the US Department of Labor website, are made a part of this Contract.

The Contractor may request payment for this added labor cost.

C. Within 7 days after the regular payment date of the Contractor’s payroll period, the Contractor shall submit all certified payrolls and the accompanying Statement of Compliance electronically using LCPTracker, the DDOT electronic labor compliance software. DDOT will provide information regarding registration for LCPTracker at the pre-construction conference.

More information regarding these requirements is in the Davis Bacon Compliance

Requirements, in Attachment J.9.

H.3 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE

EQUAL EMPLOYMENT OPPORTUNITY (EXECUTIVE ORDER 11246)

This clause supersedes Standard Specifications Section 102.04, “Affirmative Action Program.”

Bidders are on notice that they are required to provide an Affirmative Action Plan.

Additional requirements are included in “FHWA Required Affirmative Action, Equal

Employment Opportunity and Subcontracting Requirements and Assurances,” which is incorporated into the Contract in Attachment J.3.

The goals and timetables for minority and female participation, expressed in percentage terms for the Contractor’s aggregate workforce in each trade on all construction work in the covered area, are as follows:

Time-tables Goals for minority participation in each trade Goals for female participation in each trade 28 % 6.9 %

Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 21 of 68

These goals are applicable to all the Contractor’s construction work (whether or not it is federal or federally assisted) performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the

Contractor also is subject to the goals for both its federally involved and non-federally involved construction.

The Contractor’s compliance with the Executive Order and the regulations in 41 CFR 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a), and its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the Contract, and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from contractor to contractor or from project to project for the sole purpose of meeting the Contractor’s goals shall be a violation of the Contract, the Executive Order, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

The Contractor shall provide written notification to the Director of the Office of Federal Contract

Compliance Programs, with a copy to the District, within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the Contract resulting from the Solicitation. The notification shall list the name, address, and telephone number of the subcontractor; employer identification number of the subcontractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the subcontract is to be performed.

As used in this Notice, and in the Contract resulting from this solicitation, the “covered area” is the site of the Project.

H.4 RESERVED

H.5 51% DISTRICT RESIDENTS NEW HIRES REQUIREMENTS AND/OR FIRST

SOURCE EMPLOYMENT AGREEMENT

A. The Contractor shall comply with the First Source Employment Agreement Act of 1984, as amended, D.C. Official Code § 2-219.01 et seq. (First Source Act).

B. The Contractor shall enter into and maintain during the term of the contract, a First Source

Employment Agreement (Employment Agreement) with the District of Columbia Department of Employment Services (DOES), in which the Contractor shall agree that:

1. The first source for finding employees to fill all jobs created in order to perform the contract shall be the First Source Register; and

2. The first source for finding employees to fill any vacancy occurring in all jobs covered by

Freeway I-295 Dynamic Message Signs (DMS) Replacement Page 22 of 68 the Employment Agreement shall be the First Source Register.

C. The Contractor shall not begin performance of the contract until its Employment Agreement has been accepted by DOES.