DCKA-2023-B-0042_Att4.pdf
PDF 138 MB Posted
- Solicitation number
- DCKA-2023-B-0042
- Issued by
- Washington City, District of Columbia
About this file
This document is the Project Attachment 4 for the District of Columbia Power Line Undergrounding (DC PLUG) Feeder 15001 contract opportunity issued by the District of Columbia. The scope of work includes civil construction for the PEPCO feeder 15001 project located in Ward 4, including removal and disposal of existing roadway infrastructure, installation of PEPCO-supplied materials such as conduits and manholes, concrete and asphalt restoration, and maintenance of traffic flow and utility services throughout construction. The project area is bound by Colorado Avenue, Blagden Avenue NW, 16th Street NW, 14th Street NW, and 13th Street NW from Allison Street NW to Madison Street NW.
The contract does not specify any pricing terms, set-asides, incumbent contractors, or funding details. The document focuses on detailing the technical scope of work and construction requirements for the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DCKA-2023-B-0042_Att2.pptx | PPTX presentation | |
| DCKA-2023-B-0042_Amd5.pdf | ||
| DCKA-2023-B-0042_Att3.pdf | ||
| DCKA-2023-B-0042_Amd3.pdf | ||
| DCKA-2023-B-0042_Att1.pdf | ||
| DCKA-2023-B-0042_Amd4.pdf | ||
| DCKA-2023-B-0042_Amd7.pdf | ||
| DCKA-2023-B-0042_Amd6.pdf | ||
| DCKA-2023-B-0042_Amd1.pdf | ||
| DCKA-2023-B-0042_Amd2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .